CN205699209U - One is easy to line project installation climbers - Google Patents
One is easy to line project installation climbers Download PDFInfo
- Publication number
- CN205699209U CN205699209U CN201620710784.1U CN201620710784U CN205699209U CN 205699209 U CN205699209 U CN 205699209U CN 201620710784 U CN201620710784 U CN 201620710784U CN 205699209 U CN205699209 U CN 205699209U
- Authority
- CN
- China
- Prior art keywords
- climbers
- climbers body
- easy
- project installation
- line project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rehabilitation Tools (AREA)
Abstract
The utility model discloses one and be easy to line project installation foot button, including climbers body, the bottom of described climbers body is provided with support, one end of described support connects pedal, the both sides, bottom of described climbers body are provided with carrier, accumulator and motor are installed on described carrier, described motor is connected by wire controller, described climbers body Nei Bi lower end is symmetrically arranged with driving wheel, described climbers body Nei Bi upper end is symmetrically installed with driven pulley, the middle part of described climbers body is provided with regulation loop bar, described climbers body Nei Bi top is provided with electric expansion bar, described accumulator, electric expansion bar and motor are all electrically connected at controller.This device electric operating, save trouble and labor, reduce and manually climb muscle power, greatly improve the work efficiency of line project installation personnel.
Description
Technical field
This utility model belongs to power engineering and installs equipment technical field, is specifically related to one and is easy to line project installation use
Climbers.
Background technology
Climbers make the aid in power industry, especially during circuit project installation sets up, need at electricity
Carrying out electric mounting and work high above the ground on line bar, the climbers being used mostly at present are substantially to be climbed by manpower, i.e. by foot dish with buckle
Band forms, and utilizes formation angle between weight and the electric pole of human body self, keeps total balance of the body, but during climbing
The most tired, when climbing upper end, physical power loss makes more greatly circuit installation difficulty strengthen.
Utility model content
The purpose of this utility model is to provide one to be easy to line project installation climbers, to solve above-mentioned background technology
The problem of middle proposition.
For achieving the above object, this utility model provides following technical scheme: one is easy to line project installation climbers,
Including climbers body, the bottom of described climbers body is provided with support, and one end of described support connects pedal, the end of described climbers body
End both sides are provided with carrier, and described carrier is provided with accumulator and motor, and described motor is connected by wire control
Device processed, described climbers body Nei Bi lower end is symmetrically arranged with driving wheel, and described climbers body Nei Bi upper end is symmetrically installed with driven pulley, institute
The middle part stating climbers body is provided with regulation loop bar, and described climbers body Nei Bi top is provided with electric expansion bar, described accumulator, electricity
Dynamic expansion link and motor are all electrically connected at controller.
Preferably, described support is hinged by two groups of poles, and hinged place is provided with adjusting nut.
Preferably, described driving wheel, driven pulley and electric expansion bar be mounted on skid resistant course, and described driving wheel, from
Driving wheel is provided with the arc groove corresponding with electric pole cambered surface with electric expansion bar.
Preferably, described regulation loop bar is provided with threaded on stopper slot, and described stopper slot there is nut.
Technique effect of the present utility model and advantage: this is easy to line project installation climbers, by climbers body before climbing
Two parts, fasten on utility poles, by regulation loop bar regulation climbers body to normal operating range, according to the custom of different people
The angle of regulation support, is controlling driven by motor driving wheel by controller, and driving wheel and driven pulley form angle in-between,
Ensure the stability of device, after arriving specified point, control electric expansion bar by controller and stretch out, with electric pole cambered surface even
Connect, increase stability, prevent climbers from gliding.This device electric operating, save trouble and labor, reduce and manually climb muscle power, carry greatly
The high work efficiency of line project installation personnel.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1 electric expansion bar, 2 driving wheels, 3 accumulator, 4 supports, 5 climbers bodies, 6 driven pulleys, 7 regulation loop bars, 8 electricity
Machine, 9 carriers, 10 pedals, 11 controllers.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise
The every other embodiment obtained, broadly falls into the scope of this utility model protection.
This utility model provides one as shown in Figure 1 and is easy to line project installation climbers, including climbers body 5, institute
The bottom stating climbers body 5 is provided with support 4, and one end of described support 4 connects pedal 10, the both sides, bottom of described climbers body 5
Being provided with carrier 9, described carrier 9 is provided with accumulator 3 and motor 8, described motor 8 is connected by wire control
Device 11, described climbers body 5 inwall lower end is symmetrically arranged with driving wheel 2, and described climbers body 5 inwall upper end is symmetrically installed with driven pulley
6, the middle part of described climbers body 5 is provided with regulation loop bar 7, and described climbers body 5 inwall top is provided with electric expansion bar 1, described
Accumulator 3, electric expansion bar 1 and motor 8 are all electrically connected at controller 11
Further, described support 4 is hinged by two groups of poles, and hinged place is provided with adjusting nut, comfortable according to individual
Degree regulation adjusting nut and the angle of pedal 10.
Further, described driving wheel 2, driven pulley 6 and electric expansion bar 1 are mounted on skid resistant course, and described driving
Wheel 2, driven pulley 6 are provided with the arc groove corresponding with electric pole cambered surface with electric expansion bar 1, arrange with electric pole cambered surface contact surface
There is skid resistant course, greatly improve the stability of device.
Further, described regulation loop bar 7 is provided with threaded on stopper slot, and described stopper slot has nut, logical
Cross stopper slot and the size of nut regulation climbers internal diameter.
This is easy to line project installation climbers, by two parts of climbers body 5 before climbing, fastens on utility poles, logical
Overregulate loop bar 7 and regulate climbers body 5 to normal operating range, according to the angle of the custom regulation support 4 of different people, by control
Device 11 processed controls motor 8 and drives driving wheel 2, driving wheel 2 and driven pulley 6 to form angle in-between, it is ensured that the stability of device,
After arriving specified point, control electric expansion bar 1 by controller 11 and stretch out, be connected with electric pole cambered surface, increase stability, anti-
Only climbers glide.This device electric operating, save trouble and labor, reduce and manually climb muscle power, greatly improve line project and install
The work efficiency of personnel.
Last it is noted that the foregoing is only preferred embodiment of the present utility model, it is not limited to this
Utility model, although being described in detail this utility model with reference to previous embodiment, for those skilled in the art
For, the technical scheme described in foregoing embodiments still can be modified by it, or to wherein portion of techniques feature
Carry out equivalent, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. made, all
Within protection domain of the present utility model should be included in.
Claims (4)
1. it is easy to line project installation climbers, including climbers body (5), it is characterised in that: the bottom of described climbers body (5)
Being provided with support (4), one end of described support (4) connects has pedal (10), the both sides, bottom of described climbers body (5) to be provided with
Carrier (9), described carrier (9) is provided with accumulator (3) and motor (8), and described motor (8) is connected by wire control
Device processed (11), described climbers body (5) inwall lower end is symmetrically arranged with driving wheel (2), and described climbers body (5) inwall upper end symmetry is pacified
Equipped with driven pulley (6), the middle part of described climbers body (5) is provided with regulation loop bar (7), and described climbers body (5) inwall top is installed
Electric expansion bar (1), described accumulator (3), electric expansion bar (1) and motor (8) is had all to be electrically connected at controller (11).
One the most according to claim 1 is easy to line project installation climbers, it is characterised in that: described support (4) by
Two groups of poles are hinged, and hinged place is provided with adjusting nut.
One the most according to claim 1 is easy to line project installation climbers, it is characterised in that: described driving wheel (2),
Skid resistant course, and described driving wheel (2), driven pulley (6) and electric expansion it is mounted on driven pulley (6) and electric expansion bar (1)
Bar (1) is provided with the arc groove corresponding with electric pole cambered surface.
One the most according to claim 1 is easy to line project installation climbers, it is characterised in that: described regulation loop bar
(7) being provided with on threaded on stopper slot, and described stopper slot has nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620710784.1U CN205699209U (en) | 2016-06-21 | 2016-06-21 | One is easy to line project installation climbers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620710784.1U CN205699209U (en) | 2016-06-21 | 2016-06-21 | One is easy to line project installation climbers |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205699209U true CN205699209U (en) | 2016-11-23 |
Family
ID=57327469
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620710784.1U Expired - Fee Related CN205699209U (en) | 2016-06-21 | 2016-06-21 | One is easy to line project installation climbers |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205699209U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111589070A (en) * | 2019-12-19 | 2020-08-28 | 年亚欣 | Electric pole climbing device and method thereof |
CN111701201A (en) * | 2020-07-07 | 2020-09-25 | 丁西彦 | Line tower climbing device for power maintenance and using method thereof |
-
2016
- 2016-06-21 CN CN201620710784.1U patent/CN205699209U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111589070A (en) * | 2019-12-19 | 2020-08-28 | 年亚欣 | Electric pole climbing device and method thereof |
CN111701201A (en) * | 2020-07-07 | 2020-09-25 | 丁西彦 | Line tower climbing device for power maintenance and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205699209U (en) | One is easy to line project installation climbers | |
CN204983905U (en) | Convenient to use's interim guardrail of electric power construction | |
CN204798732U (en) | Lower waist ware of adjustable height and camber | |
CN203271578U (en) | Safety ladder for climbing up pole | |
CN203469393U (en) | Climber | |
CN206853013U (en) | Upper and lower extremities comprehensive rehabilitation training device | |
CN204745519U (en) | From electricity generation body -building device | |
CN205100534U (en) | Safe high altitude construction hanging flower basket | |
CN202121256U (en) | High voltage horizontal double-splitting line checking pulley | |
CN203469392U (en) | Grappler assembly for telegraph pole climbing | |
CN201643640U (en) | Drift skate | |
CN203916003U (en) | Skidding training aids | |
CN205455292U (en) | Over -and -under type police dog training diving tower | |
CN203722136U (en) | Insulation rope net apparatus for railway crossing tension stringing construction | |
CN205355632U (en) | Safe and reliable's high altitude safety hanger | |
CN202050189U (en) | High-altitude line working clearance physical power adjusting device | |
CN205858169U (en) | A kind of ladder of Anti-inclining | |
CN204407787U (en) | A kind of power line construction center line take-up coaster | |
CN203978263U (en) | A kind of cat ladder safety guard | |
CN204952122U (en) | Electronic climbers | |
CN104068953A (en) | Dressing device for handless people | |
CN208340107U (en) | A kind of sliding slide of crawler type environment-friendly type children | |
CN203139450U (en) | Elastic safety belt convenient to adjust | |
CN205287465U (en) | Novel improve electric power pole pole -climbing shoes of structure | |
CN217854423U (en) | Electric maintenance combination climbers based on coal conveying system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20170621 |