CN205689242U - One is bowed hole drainage arrangement - Google Patents
One is bowed hole drainage arrangement Download PDFInfo
- Publication number
- CN205689242U CN205689242U CN201620607882.2U CN201620607882U CN205689242U CN 205689242 U CN205689242 U CN 205689242U CN 201620607882 U CN201620607882 U CN 201620607882U CN 205689242 U CN205689242 U CN 205689242U
- Authority
- CN
- China
- Prior art keywords
- drain pipe
- pipe
- hole
- air pipe
- sealing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
One is bowed hole drainage arrangement, it includes air pipe, sealing of hole bar, upper drain pipe, lower drain pipe, it is characterized in that described air pipe one end is uncovered, other end iron plate welded seal, there is osculum at iron plate center, welded nut outside osculum, nut is furnished with bolt, welding described upper drain pipe inside osculum, air pipe opening end connects flexible pipe and is socketed with described sealing of hole bar, flexible pipe external iron wire colligation;Air pipe is further connected with arm of calming the anger, and arm of calming the anger is connected to snap joint and valve;Described upper drain pipe, lower drain pipe are placed in air pipe and sealing of hole bar, and lower drain pipe bottom has sieve aperture, upper drain pipe, lower drain pipe to have adapter to be connected.This utility model is applicable to mine deslagging technical field of drainage.
Description
Technical field
This utility model relates to mine deslagging technical field of drainage, is specifically related to one and bows hole drainage arrangement.
Background technology
Coal mine underground construction relates to gas drainage under suction, and hole of bowing in construction drill is more, and hole internal water accumulation affects gas drainage under suction effect,
Affect extraction pipeline gas density, the pore volume water of bowing of boring need to be discharged, to improve mine gas drainage effect, it is ensured that boring is just
Often use.
Shanxi Luan Group Yuwu Coal Co., Ltd. proposes utility model patent: ZL201320027859.2 "
To the hole deslagging drainage arrangement of bowing of boring under Zhong ", the pore volume water of bowing of boring can be discharged, have certain effect, but also have not in application
Foot.
The hole drainage arrangement of bowing of prior art, in actual use, defective existence, and need to be improved.This practicality
The defect of hair person of good sense's thoughts prior art can be improved, and spy concentrates on studies and coordinates repetition test, finally proposes one design
Rationally and be effectively improved the utility model of prior art defect.
Summary of the invention
This utility model technology is, for mine gas drainage problem, effectively to discharge the pore volume water of bowing of boring, it is ensured that ore deposit
The normal table that mountain produces.
The technical solution of the utility model is:
One is bowed hole drainage arrangement, and it is described that it includes that air pipe, sealing of hole bar, upper drain pipe, lower drain pipe is characterized in that
Air pipe one end is uncovered, other end iron plate welded seal, and there is osculum at iron plate center, welded nut outside osculum, spiral shell
Mother is furnished with bolt, welds described upper drain pipe inside osculum, and air pipe opening end connects flexible pipe and is socketed with described sealing of hole bar;
Air pipe is further connected with arm of calming the anger, and arm of calming the anger is equipped with snap joint and valve;Described upper drain pipe, lower drain pipe are placed in
In air pipe and sealing of hole bar, lower drain pipe lower end has sieve aperture, upper drain pipe, lower drain pipe to have adapter to be connected.
This utility model carries out draining for hole of bowing extraction borehole, quickly the connecing on arm of calming the anger of air pipe during use
Head accesses pressure wind by high-pressure rubber pipe, and pressure wind enters sealing of hole bar through air pipe, and boring internal water accumulation pressurized wind pressure acts through down
Drain pipe, upper drain pipe are discharged, and after boring hydrops is drained, close pressure air valve, screwing bolts.
This utility model once can discharge multiple boring hydrops, saves boring water discharge time.During draining, by brill
It is continuing to supply pressure wind in hole, and can grasp whether drilling and sealing leaks gas in time, check sealing quality, cut bulge test simultaneously
Step.Whether hydrops can be had in simplicity, fast decision boring.The equipment that this utility model uses can reclaim, recycling.
Substantially increase gas drainage under suction concentration after using this utility model, shorten the gas drainage under suction time, decrease gas control impact
The engineering time of mining operation.
This utility model is applicable to mine deslagging technical field of drainage.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is this utility model embodiment schematic diagram;
In figure: 1, air pipe;2, sealing of hole bar;3, upper drain pipe;4, lower drain pipe;5, iron plate;6, nut;7, bolt;8、
Connect flexible pipe;9, calm the anger arm;10, snap joint;11, valve;12, adapter.
Detailed description of the invention
Embodiment 1:
The hole draining of bowing of the extraction borehole of certain coal industry company have employed this utility model, the hole draining dress as it is shown in figure 1, one is bowed
Putting, it includes that air pipe 1, sealing of hole bar 2, upper drain pipe 3, lower drain pipe 4 is characterized in that described air pipe 1 one end is uncovered,
Other end iron plate 5 welded seal, there is osculum at iron plate 5 center, welded nut 6 outside osculum, and nut 6 is furnished with bolt 7, row
Welding described upper drain pipe 3 inside water hole, air pipe 1 opening end connects flexible pipe 8 and is socketed with described sealing of hole bar 2;Air pipe 1 is also
It is equipped with arm 9 of calming the anger, arm 9 of calming the anger is connected to snap joint 10 and valve 11;Described upper drain pipe 3, lower drain pipe 4 are placed in
In air pipe 1 and sealing of hole bar 2, lower drain pipe 4 bottom has sieve aperture, upper drain pipe 3, lower drain pipe 4 to have adapter 12 to be connected.
Embodiment is as in figure 2 it is shown, air pipe 1 is processed by Ф 50mm coating steel pipe, and it on, welding Ф 19mm calms the anger arm 9,
Calm the anger and be connected to 10mm snap joint 10 and valve 11 on arm 9, connect 10mm snap joint 10 with Ф 10mm high-pressure rubber pipe, with pressure wind
Device is connected, and is used for accessing pressure wind, can provide blast to multiple drainage arrangements as shown in Figure 2.Air pipe 1 open at one end, another
End is with iron plate 5 welded seal, and the osculum setting Ф 16mm is stayed at iron plate 5 center, and welds the nut 6 of Ф 16mm, and row is used in inner side
Water pipe 3(4 divide coating steel pipe) weld with iron plate 5 center preformed hole, nut 6 is connected with the bolt 7 of Ф 16mm, it is ensured that
Air tight.Air pipe 1 is connected flexible pipe 8 with sealing of hole bar 2 with Ф 50mm and is connected, and connects flexible pipe 8 external iron wire colligation, and often holds colligation
Number of channels is no less than 4 circles, it is ensured that air tight and de-by pressure wind pressure punching during draining.Lower drain pipe 4 uses 4 points of 3800mm length
Pvc pipe, lower drain pipe 4 one inserts away from about 1m at the bottom of drilling hole, and the 4 points of pvc pipes of joint at the bottom of hole need to process sieve aperture, and one with upper
Drain pipe 3(coating steel pipe) connect, between be connected with Ф 20mmPE adapter 12, and carry out colligation with thin wire.Boring hydrops
After drained, close this drainage arrangement, open valve 11 and can carry out gas drainage under suction.
Can suppress with this utility model drainage arrangement and test envelope, be tightened by Ф 16mm bolt 7 after drained water, valve 11 continues
Close, then supply pressure wind in boring, when pressing the malleation table on wind manifold head show to reach 0.2~0.3mpa, close and press
Becalm only voltage supply, if pressure can keep pressure not decline, illustrate that drilling and sealing effect is preferable, if pressure declines, brill be described
Hole sealing of hole gas leakage, need to re-start sealing of hole.
From in December, 2014, my company starts trial edition utility model drainage arrangement hole of bowing extraction borehole and arranges
Water, and irregularly joined a regular shift or class by management personnel and implement this work, by before draining with draining after boring actual measurement gas density analysis,
Using this drainage arrangement to substantially increase gas drainage under suction concentration, its increase rate is 3~50%.Particularly under five exploiting field return air
The go down the hill hole using effect of bowing of construction of mountain, adhesive tape is more obvious, five exploiting field gas total arm gas density from 5% to bringing up to
15% to 18%.Five three, exploiting fields every cyclic advance of going down the hill improves about 60m from about 20m, saves drilling construction expense 800,000.
Claims (1)
1. bowing a hole drainage arrangement, it includes air pipe (1), sealing of hole bar (2), upper drain pipe (3), lower drain pipe (4), its
It is characterised by that described air pipe (1) one end is uncovered, other end iron plate (5) welded seal, there is osculum at iron plate (5) center,
Welded nut (6) outside osculum, nut (6) is furnished with bolt (7), welds described upper drain pipe (3), air pipe inside osculum
(1) opening end connects flexible pipe (8) and the socket of described sealing of hole bar (2);Air pipe (1) is further connected with arm of calming the anger (9), arm of calming the anger
(9) snap joint (10) and valve (11) it are connected on;Described upper drain pipe (3), lower drain pipe (4) be placed in air pipe (1) and
In sealing of hole bar (2), lower drain pipe (4) bottom has sieve aperture, upper drain pipe (3), lower drain pipe (4) to have adapter (12) to be connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620607882.2U CN205689242U (en) | 2016-06-21 | 2016-06-21 | One is bowed hole drainage arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620607882.2U CN205689242U (en) | 2016-06-21 | 2016-06-21 | One is bowed hole drainage arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205689242U true CN205689242U (en) | 2016-11-16 |
Family
ID=57415401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620607882.2U Expired - Fee Related CN205689242U (en) | 2016-06-21 | 2016-06-21 | One is bowed hole drainage arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205689242U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107882586A (en) * | 2017-12-12 | 2018-04-06 | 贵州盘江精煤股份有限公司 | Water-bound and its construction method are blown in a kind of coal mine gas extraction |
CN108149697A (en) * | 2017-12-29 | 2018-06-12 | 长江勘测规划设计研究有限责任公司 | It is a kind of to be suitable for protective device and installation method in the facedown depth osculum hole of deformation |
CN110080819A (en) * | 2019-05-27 | 2019-08-02 | 河南理工大学 | One kind is bowed Kong Zijin draining deslagging integrated apparatus and method |
-
2016
- 2016-06-21 CN CN201620607882.2U patent/CN205689242U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107882586A (en) * | 2017-12-12 | 2018-04-06 | 贵州盘江精煤股份有限公司 | Water-bound and its construction method are blown in a kind of coal mine gas extraction |
CN108149697A (en) * | 2017-12-29 | 2018-06-12 | 长江勘测规划设计研究有限责任公司 | It is a kind of to be suitable for protective device and installation method in the facedown depth osculum hole of deformation |
CN108149697B (en) * | 2017-12-29 | 2023-02-14 | 长江勘测规划设计研究有限责任公司 | Installation method of protective device in depression-type deep drain hole adaptable to deformation |
CN110080819A (en) * | 2019-05-27 | 2019-08-02 | 河南理工大学 | One kind is bowed Kong Zijin draining deslagging integrated apparatus and method |
CN110080819B (en) * | 2019-05-27 | 2023-08-11 | 河南理工大学 | Device and method for integrating automatic water feeding, water discharging and slag discharging of depression hole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205689242U (en) | One is bowed hole drainage arrangement | |
CN103541663B (en) | Special three hole pipe and the usings method thereof of stopper | |
CN105697053A (en) | Pumping and pressing hybrid gas extraction downward drilling and water draining device | |
CN105715228B (en) | A kind of single tube gasbag-type gas drilling hole sealing device | |
CN206753527U (en) | A kind of comprehensive coal dust collection device of coal mine drilling | |
CN105114057A (en) | System and method for intelligently detecting sealing quality of gas drainage borehole | |
CN205571481U (en) | Trompil device is pressed in semiconductor mill pipeline area | |
CN205605879U (en) | Hydraulic type embolism drainage pressure relief mechanism for drilling water pressure test | |
CN205977166U (en) | Packer is in pit controlled to gas | |
CN205638532U (en) | But colliery is reuse's integrative hole sealing device of gas drainage water injection in pit | |
CN208703407U (en) | A kind of pipe pressurized closure tooling | |
CN208456577U (en) | A kind of gas drainage collection pumping monitoring device | |
CN204827294U (en) | Punch a hole with blowout preventer's drill way fixed structure in colliery | |
CN204082135U (en) | Extraction borehole sealing quality detector | |
CN104100293B (en) | Gas extraction drilling leak detection and leakage stoppage integrated device and method | |
CN203531832U (en) | Hole sealing device for underground hydraulic fracturing of coal mine | |
CN207018706U (en) | Four-way for roof vent pipe crosses attachment means | |
CN211951825U (en) | Pipeline connecting device presses in area | |
CN208239028U (en) | Pre- tightness test device | |
CN206144506U (en) | Device is slowly spouted in drill way of gas drainage drilling | |
CN107060683B (en) | Device and method for rapidly wrapping rubber with hole packer under pressure | |
CN203962029U (en) | Gas extraction drilling leak detection and leaking stoppage integrated device | |
CN106567679A (en) | oil drill pipe | |
CN104747102A (en) | Coal seam deslagging construction method and wind and water converter | |
CN216043860U (en) | Gas extraction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161116 Termination date: 20170621 |
|
CF01 | Termination of patent right due to non-payment of annual fee |