CN205688494U - Height is guaranteed the quality No clean water tank - Google Patents

Height is guaranteed the quality No clean water tank Download PDF

Info

Publication number
CN205688494U
CN205688494U CN201620452133.7U CN201620452133U CN205688494U CN 205688494 U CN205688494 U CN 205688494U CN 201620452133 U CN201620452133 U CN 201620452133U CN 205688494 U CN205688494 U CN 205688494U
Authority
CN
China
Prior art keywords
water
water tank
quality
casing
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620452133.7U
Other languages
Chinese (zh)
Inventor
钟荷清
钟琍琳
钟逍虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620452133.7U priority Critical patent/CN205688494U/en
Application granted granted Critical
Publication of CN205688494U publication Critical patent/CN205688494U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Domestic Plumbing Installations (AREA)

Abstract

A kind of height is guaranteed the quality No clean water tank, including: casing (1), casing (1) is to be stacked into one or more cuboid by a plurality of square pipe, the connection of head and the tail concatenation forms from top to bottom, the guarantee the quality advantage of No clean water tank of this utility model height is: unique technological innovation overcomes conventional water tank and causes the rotten drawback in the majority of tap water, the overall process that water tank runs, it is simply that self-cleaning process incessantly, it is achieved that " Running water never becomes putrid ";This utility model may utilize construction wall space;Guarantee the quality the No clean water tank new secondary water-supply mode of composition with this utility model height, replace existing secondary water-supply mode, it will guarantee water quality safety, save cleaning charge with, reduce sewage discharge, reduce water supply cost, produce significant energy-saving and emission-reduction effect.

Description

Height is guaranteed the quality No clean water tank
Technical field
This utility model relates to energy-conserving and emission-cutting technology field, and the one concretely relating to energy-saving building technology field is used Height in secondary water-supply is guaranteed the quality No clean water tank.
Background technology
The urbanite of China more than 60% uses secondary water-supply, along with urbanization and the development of high-rise building, uses two The population of secondary water supply only can increase, and an equipment critically important in secondary water supply system is exactly water tank, mainly has high-order energy storage water Case, break pressure cistern and low level break tank (underground aqua storage tank), the water in conventional water tank is because of, chlorine residue consumption big with air exposed surface To the greatest extent, dead angle, stagnant water, impurity deposition, seasonal high temperature etc. are had to grow harmful microorganism;Change ball-cock assembly, the people of cleaning water tank Member's entrance water tank etc. and bring external contamination, the water capacity in water tank is perishable is a problem old, big, difficult, although take periodically Detection, cleaning, people the most easily have and pollute the water exceeded standard, therefore, 2015, and house town and country construction portion of China, country are sent out Exhibition reform committee, the Ministry of Public Security, national health State Family Planning Commission combine and have issued " about strengthening and improvement town dweller's secondary water-supply facility is built If with the notice that management guarantees water quality safety ".
High-order energy storage water supply tank, it has the kinetic energy of press water is converted to potential energy storage, regulation water use peak Good function, but for improving secondary water-supply water quality, people do not stint increasing investment, bear high energy consumption, take the side that some are new Formula: or cancel high-order energy storage water supply tank (maintain high-order fire water box), use low level break tank (underground tank), one The kinetic energy of secondary water supply eliminates the most most, then with variable frequency pump level pressure secondary water-supply, and with water electricity consumption the most again, power failure is then cut off the water (newly-built high level Building takes this mode more), energy consumption is huge, and underground tank still has pollution, still needs to routine cleaning;Or use intelligent remote water Case water quality real-time monitoring system, its ratio routine cleaning science, but costly, water tank is also intended to clean;Laminate (without negative pressure) frequency conversion Pump level pressure secondary water-supply mode advantage is a lot, but it can be used only in place that water supply flow, a pressure relatively fills, is not suitable for Building more than middle and high layer, and definitely energy consumption is the lowest, improves secondary water-supply water quality in a word and is directly proportional to energy consumption, expense.
Summary of the invention
The purpose of this utility model is that design is a kind of had both retained existing water supply tank energy storage, decompression, the function of peak regulation, again could Overcome the birth defect that its water quality is variable, it is ensured that the rotten height that do not exceeds standard of the water in water tank is guaranteed the quality No clean water tank, derives energy Consume the secondary water-supply mode minimum, water quality is optimum.
This utility model height No clean water tank of guaranteeing the quality includes: casing 1, water storage 2, air filter 3, water inlet pipe mouth 4, overflow Flow tube mouth 5, ball-cock assembly 6, effluent pipe mouth 7, level sensor 8.
Casing 1 is to be stacked into one or more cuboid by a plurality of square pipe, and head and the tail concatenation is even from top to bottom Logical forming, so, casing 1 is exactly a long pipeline, through air filter 3 with the trace dust of air inspiration casing 1 and Once supply water and bring the trace impurity of casing 1 into and will not stop in casing 1, deposit, the pollution of concentration over-standard will not be produced, it is achieved " Running water never becomes putrid ".
Need according to volume and installation environment, casing 1 by a plurality of square pipe can multiple row multilamellar intensive be stacked into one long Cube, forms integral product water tank with other adnexaes;Can also single-row multilamellar or the dispersion of multiple row multilamellar to be stacked into interconnection many Individual cuboid, such as utilizes the parapet of building, stair, escalator wall, the space of partition wall, Assembling single-row multilamellar or many Multiple cuboids of the interconnection of row multilamellar dispersion stacking are combined into casing 1.Square pipe can preferentially select non-cohesive, heap hydrops Dirt, weld the plastics square pipe of easy extrusion molding, it is also possible to drawing the thin-wall stainless steel Square Welded Pipe of molding, square The sectional area of tubing should be greater than using supply mains's sectional area.
Bottom square pipe tail end at casing 1 is provided with effluent pipe mouth 7, at the top layer of casing 1, is provided with and top layer side The water storage 2 of shape tubing head end connection, is connected to water inlet pipe mouth 4 in the side of water storage 2 through ring flange, another at water storage 2 Side is connected to the overflow mouth of pipe 5, on water storage 2, is connected to air filter 3.Water inlet on water storage 2 inner flange Being connected to ball-cock assembly 6 on pipe, this is easy to install with water tank isolation, overhaul ball-cock assembly, changes bridge piece downward during without ball-cock assembly, This can be avoided artificial accidental pollution water tank.
Several level sensors 8 it are provided with (as passive magnetic drains spring in the outside vertical direction of casing 1 and water storage 2 Pipe), they can show water tank real time water level;Command signal is provided for automatic open close electrodynamic valve or water pump feed-tank moisturizing;Fault Alarm, jerk during unrestrained water overflow;Can be mended for reasonable, scientific offering water tank with statistical analysis hydrodynamic(al) for building state by them Water program provides foundation, provides signal source for intelligence moisturizing.
As traditional measures: for preventing accidental pollution, water inlet pipe should be installed check-valves, should arrange in overflow pipe Weight valve;For discharging the sewage that just dress and pipe-networks engineering produce, set before outlet pipe water supply main valve and before water inlet pipe water inlet pipe mouth Putting blowoff valve, for so-called " No clean " is relatively conventional water tank, if water supply network is cleaning, that must clean, no together The over cleaning cycle is the longest.
This utility model height is guaranteed the quality the moisturizing control mode of No clean water tank: be used in low-rise building or the water of building bottom Case, with level sensor instruction electrodynamic valve moisturizing (ball-cock assembly use play fail-safe spilling water bilayer effect);It is used in skyscraper Water tank level sensor instructs water pump moisturizing.Instructing electrodynamic valve, water pump with level sensor, the water that can realize in water tank connects Moisturizing again (this is favourable to water quality) when being closely finished, optional only moisturizing when by water ebb (this is favourable to pipe network peak regulation), these are two years old It is not all right that the alone ball-cock assembly of point controls moisturizing.
The guarantee the quality advantage of No clean water tank of this utility model height is: unique technological innovation overcome conventional water tank cause from Carry out the drawback in the majority of aqueous metamorphism, the overall process that water tank runs, it is simply that self-cleaning process incessantly, it is achieved that " Running water never becomes putrid "; This utility model may utilize construction wall space;With this utility model height guarantee the quality No clean water tank composition " laminate (without negative pressure) change Frequently pump constant pressure supply water+high-level tank water " or " lower water box+general pump moisturizing+high-level tank water " new secondary water-supply side Formula, replaces " laminating (without negative pressure) variable frequency pump level pressure to supply water ", " underground tank+variable frequency pump level pressure supplies water ", " underground tank+power frequency Pump moisturizing+high-level tank water " etc. existing secondary water-supply mode, it will guarantee water quality safety, save cleaning charge with, reduce sewage Discharge, reduce water supply cost, produce significant energy-saving and emission-reduction effect, because: although being with water pump equally, for " water supply ", water Pump is often in for a long time, underload, inefficient state, for " moisturizing ", water pump be in the short time, at full capacity, high efficiency state, The change of one wordThe difference lies in a single word, energy consumption heaven and earth;Besides the existence of underground tank is inherently polluted+wasted, the lower water box used by new paragon is Being arranged on once supplies water can ensure that the height being supplied to, and lower water box relatively sink is also energy-accumulating water tank.
Accompanying drawing explanation
Fig. 1 is that the multilamellar multiple row height prepared with square pipe is guaranteed the quality No clean water tank essential structure schematic three dimensional views.
Fig. 2 is the adjacent square tube otch front schematic three dimensional views of connection weldering of casing 1.
Fig. 3 is the casing 1 of 4 cuboid compositions of the interconnection utilizing building parapet space to assemble single-row multiple-level stack Schematic three dimensional views.
Detailed description of the invention
Embodiment one: according to Fig. 1, Fig. 2, shown, casing 1 is the cuboid built up by 42 square pipe 6 row 7 layer stack, At the corresponding surface of the horizontal and vertical two adjacent square tube ends needing head and the tail to connect, each cut big with sectional area in square tube etc. Square breach (such as Fig. 2), then connects U-shaped butt seam welding, uses pane closed port the most again, marks the position of S in Fig. 1 Representing and vertically seal with pane, the positional representation of mark H has used pane across seal, such docking, sealing, with The present embodiment of 42 square tubes has at 41, the unsealed interconnection of positional representation of mark A, the positional representation of mark B Unsealed vertical passageway, the positional representation pipeline head end of mark F seals with square, at the outer rib circular arc of all adjacent square tubes Interval spot welding, makes casing 1 become rigidity overall.
In the bottom square tube tail end square sealed port of casing 1, square welds effluent pipe mouth 7, in top layer square tube Head end square sealed port, opens a window LK (such as Fig. 2) on top layer square tube head end, be docked and connected with water storage 2 (as Fig. 1), being connected with ring flange in water storage 2 side, water inlet pipe mouth 4 is welded on ring flange, at water storage 2 opposite side Being welded the overflow mouth of pipe 5, on water storage 2, be connected to air filter 3, ball-cock assembly 6 is arranged on water storage 2 inner flange On water inlet pipe on dish, in every layer of square tube of casing 1, one level sensor 8-1 8-7 is installed, water storage 2 is installed one An individual peak level sensor 8-ZG and spilling water sensor 8-YS.
Water tank running: can arbitrarily select one-level to start as water tank moisturizing in level sensor 8-1 8-7 Level, dry-reed tube switch connection electrodynamic valve or pump power feed-tank moisturizing, water level is gradually increasing, and the air in water tank is through air filter Clear device 3 breathes out, and when water level rises to peak level sensor 8-ZG, dry-reed tube switch cuts off electrodynamic valve or pump power stops Feed-tank moisturizing, during people's water, water level is gradually reduced, and water tank is through air filter 3 inspiration air, and water level decreasing is to selected During level sensor 8, dry-reed tube switch connects again electrodynamic valve or pump power feed-tank moisturizing, so goes round and begins again, automatically follows Ring.When fault makes water level exceed peak level sensor 8-ZG, when reaching spilling water sensor 8-YS, spilling water sensor 8-YS instructs Buzzer is reported to the police and cuts off electrodynamic valve or pump power.
Embodiment two: according to Fig. 3, is built up 4 cuboids by single-row 4 layer stack of square pipe and (substitutes 4 daughters side respectively Wall), annular interconnection, it is combined into casing 1, is that the tail end of upper strata tubing welds company with the opening of the head end of lower floor tubing at three arrows Logical place, the initial and end end square sealed port of every layer of tubing, bottom tubing tail end sealing square is connected to effluent pipe mouth 7, On top layer square tube head end, have the window LK connected with water storage.Other adnexaes composition is identical with embodiment one, this reality Execute the actual application of example, also need casing 1 is taked heat-insulation and heat-preservation measure.
This utility model needs according to volume and installation environment, it is also possible to have multiple embodiment.

Claims (2)

1. a high No clean water tank of guaranteeing the quality, including: casing (1), it is characterised in that: casing (1) is by a plurality of square pipe heap Building up one or more cuboid, the connection of head and the tail concatenation forms, at the bottom square pipe tail of casing (1) from top to bottom End is provided with effluent pipe mouth (7), at the top layer of casing (1), is provided with the water storage (2) connected with top layer square pipe head end, Being connected to water inlet pipe mouth (4) in the side of water storage (2) through ring flange, the opposite side at water storage (2) is connected to the overflow mouth of pipe (5), on water storage (2), it is connected to air filter (3), the water inlet pipe on water storage (2) inner flange is connected to Ball-cock assembly (6).
A kind of height the most according to claim 1 is guaranteed the quality No clean water tank, it is characterised in that: at casing (1) and water storage (2) Outside vertical direction be provided with several level sensors (8).
CN201620452133.7U 2016-05-18 2016-05-18 Height is guaranteed the quality No clean water tank Expired - Fee Related CN205688494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620452133.7U CN205688494U (en) 2016-05-18 2016-05-18 Height is guaranteed the quality No clean water tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620452133.7U CN205688494U (en) 2016-05-18 2016-05-18 Height is guaranteed the quality No clean water tank

Publications (1)

Publication Number Publication Date
CN205688494U true CN205688494U (en) 2016-11-16

Family

ID=57262694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620452133.7U Expired - Fee Related CN205688494U (en) 2016-05-18 2016-05-18 Height is guaranteed the quality No clean water tank

Country Status (1)

Country Link
CN (1) CN205688494U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839709A (en) * 2016-05-18 2016-08-10 钟荷清 High-quality no-clean water tank

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839709A (en) * 2016-05-18 2016-08-10 钟荷清 High-quality no-clean water tank

Similar Documents

Publication Publication Date Title
CN206396875U (en) The prefabricated pumping plant of integral type
CN204662649U (en) A kind of integral intelligent pumping plant
WO2021003978A1 (en) Steel valve chamber
CN106801448B (en) A kind of system to be generated electricity using multiple high-rise energy storage water pipes
CN205688494U (en) Height is guaranteed the quality No clean water tank
AU2021100043A4 (en) A new type of FRP integrated prefabricated pump station
CN104294908A (en) Intelligent type integrated airtight sewage lifting pump station
CN105839709A (en) High-quality no-clean water tank
CN102444955B (en) Photovoltaic construction solar system integrated with vertical water discharge, water collecting and air changing
CN103046615B (en) Pressure-stabilizing water-air isolated water storage tank and pump station
CN209468813U (en) A kind of integrated form integration pump house
CN100516673C (en) Disinfection by chlorine dioxide purification system used in central central air conditioning
CN211849782U (en) Novel indoor sewage discharge system
CN206205081U (en) Vacuum toilet seat
CN210964417U (en) Environment-friendly energy-saving intelligent dust suppression equipment
CN204974671U (en) Safe energy -conserving perchloric acid fume chamber
CN202470291U (en) Photovoltaic building solar vertical system integrated with water discharge and collection and ventilation
CN220666349U (en) Integrated prefabricated type frequency conversion water supply equipment for partition water tank
CN207295964U (en) A kind of horizontal prefabricated pumping plant of integration
CN208485711U (en) The miscellaneous water shunt filtering disinfection storage water tank of rainwater in a kind of automatic control floor
CN202745124U (en) Pressure storage water tank
CN207499055U (en) Integrated discharge pump works
CN207567930U (en) The prefabricated pumping plant of buried type integrated
CN207567855U (en) A kind of integrated buried type water supply pumping plant
CN101092821B (en) Pot without negative pressure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161116

Termination date: 20200518