CN205688464U - A kind of prefabricated high-strength explosion-proof ripple well - Google Patents

A kind of prefabricated high-strength explosion-proof ripple well Download PDF

Info

Publication number
CN205688464U
CN205688464U CN201620623727.XU CN201620623727U CN205688464U CN 205688464 U CN205688464 U CN 205688464U CN 201620623727 U CN201620623727 U CN 201620623727U CN 205688464 U CN205688464 U CN 205688464U
Authority
CN
China
Prior art keywords
well
well body
suspension ring
strength explosion
prefabricated high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620623727.XU
Other languages
Chinese (zh)
Inventor
宋仲华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620623727.XU priority Critical patent/CN205688464U/en
Application granted granted Critical
Publication of CN205688464U publication Critical patent/CN205688464U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

This utility model provides a kind of prefabricated high-strength explosion-proof ripple well, including well body and the movable manhole cover of xoncrete structure, is welding well lid base on well body in place of certain distance, and sidepiece inserts some stainless steel tubes, and pithead position is provided with suspension ring.This utility model high-strength explosion-proof ripple well can carry out batch production batch production outside the venue, by accurately compiling muscle, joining mould, maintenance, can significantly improve the production efficiency of inspection shaft, can accurately test the antiknock ability of inspection shaft simultaneously, be effectively increased construction quality.And when construction, use hanging device to hook suspension ring 4 and lift by crane and install, construction speed can be greatly speeded up.

Description

A kind of prefabricated high-strength explosion-proof ripple well
Technical field
The present invention relates to a kind of construction instrument, particularly to a kind of prefabricated high-strength explosion-proof ripple well.
Background technology
In traditional underground engineering construction field, it is often necessary to the pipeline buryings such as substantial amounts of communication, plumbing, cable are existed Underground, during the burying underground of distance, for ease of maintenance, the maintenance of pipeline, needs to arrange an inspection every a segment distance All kinds of pipelines are passed from inspection shaft by well, and once circuit breaks down, and circuit can be examined by maintainer by inspection shaft Look into, and repair or replace in inspection shaft.For there being the pipeline of antiknock requirement, can be by circuit from steel pipe between inspection shaft In through protecting, but inspection shaft position is a weak part all the time, it is necessary to use the side improving inspection shaft antidetonation strength Formula is protected.
In traditional inspection shaft makes, being usually after being completed by excavation of foundation pit, configuration template in foundation ditch, scene is carried out Pour.Owing to underground utilities are the most, needing template is cut hole time cast-in-place, relatively big to damaged template, meanwhile, scene may be deposited At weak soil, gravel, mud etc., working environment is poor, joins mould difficulty greatly, and lace reinforcing bar is many in addition, constructs relatively difficult.Particularly exist In the case of distance, inspection shaft are many, need to put into a large amount of manpower and materials, each inspection shaft excavated one by one, join mould, pour, Working performance is low, and quality is difficult to ensure card.
Utility model content
This utility model aims to provide and a kind of non-at-scene waters the prefabricated high-strength explosion-proof ripple well that well can make outside the venue.This reality Realized by below scheme with novel:
A kind of prefabricated high-strength explosion-proof ripple well, including just using the label concrete more than C60 and reinforcement fabrication The well body of the xoncrete structure of cube shape and movable manhole cover, the inner chamber of well body is cube-shaped cavity, on well body along one Welding well lid base in place of set a distance, this well lid base is to be processed by the I-steel that both sides are symmetrical, in I-steel and well body Reinforcement welding together;Sidepiece at well body inserts some stainless steel tubes, as steel pipe buried in advance part, its internal diameter size and quantity The most pre-buried pipeline determines, typically by placed side by side together for the built-in fitting of same type pipeline;Movable manhole cover uses Steel processing and fabricating, bottom may be stuck on well lid base.
Pithead position at the symmetrical dual-side of described well body is provided with suspension ring, and the degree of depth in suspension ring embedment well body is the least In the 1/3 of well height, and with the reinforcement welding in well body, well head upper surface is exposed not less than 10cm in the top of suspension ring, in order to In installing suspension hook or reeving lifting.
For ease of snapping in movable manhole cover, the distance of the upper plane separation well head of well lid base is less than well body overall height 15%。
Compared with the technology that existing manual site waters well, it is raw that this high-strength explosion-proof ripple well can carry out batch production batch outside the venue Produce, by accurately compiling muscle, joining mould, maintenance, the production efficiency of inspection shaft can be significantly improved, simultaneously can be to the antiknock ability of inspection shaft Accurately test, be effectively increased construction quality.And when construction, use hanging device to hook suspension ring 4 and lift by crane and pacify Dress, can greatly speed up construction speed.
Accompanying drawing explanation
Fig. 1 embodiment 2 prefabricated high-strength explosion-proof ripple well construction schematic diagram.
Detailed description of the invention
Embodiment is simply to illustrate that a kind of implementation of the present utility model, not as to this utility model protection domain Restricted explanation.
Embodiment 1
A kind of prefabricated high-strength explosion-proof ripple well, structure is as it is shown in figure 1, include using the label concrete more than C60 and steel The well body 1 of the cube-shaped xoncrete structure that muscle is made and movable manhole cover 2, the length of the outside of well body 1 is 2 Rice, wall thickness 0.4 meter, the inner chamber of well body 1 is cube-shaped cavity 101, is welding well lid base on well body in place of 30cm 1-2, this well lid base is to be processed by the I-steel that both sides are symmetrical, and I-steel is together with the reinforcement welding in well body;? The sidepiece of well body inserts some stainless steel tubes 3, as the pipeline that steel pipe buried in advance part, its internal diameter size and quantity are the most pre-buried Determine, typically by placed side by side together for the built-in fitting of same type pipeline;Movable manhole cover 2 is by some HM300 × 200 shaped steel 2-1 processing and fabricating, its height is 30cm, and width is 20cm, and a length of 160cm is stitched together the most side by side, and bottom can It is stuck on the pre-buried I-steel of well lid base 5, constitutes surfacing and the movable manhole cover that can mention at any time, it is simple to personnel enter inspection In looking into well, pipeline is carried out Maintenance and Repair.The well head 1-3 position of the symmetrical dual-side of well body is provided with suspension ring 4, and suspension ring 4 bury Entering the degree of depth in well body 1 is 70cm, and with the reinforcement welding in well body, the top of suspension ring 4 is exposed well head 1-1 upper surface and is 10cm, in order to install suspension hook or reeve lifting.

Claims (3)

1. a prefabricated high-strength explosion-proof ripple well, it is characterised in that: include using the label concrete more than C60 and reinforcement fabrication The well body of cube-shaped xoncrete structure and movable manhole cover, the inner chamber of well body is cube-shaped cavity, away from well Welding well lid base in place of certain distance on body, the sidepiece at well body inserts some stainless steel tubes;Movable manhole cover uses steel Processing and fabricating, bottom is stuck on well lid base.
2. prefabricated high-strength explosion-proof ripple well as claimed in claim 1, it is characterised in that: at the symmetrical dual-side of described well body Pithead position be provided with suspension ring, the degree of depth in suspension ring embedment well body not less than the 1/3 of well height, and with the reinforcing bar in well body Welding, well head upper surface is exposed not less than 10cm in the top of suspension ring.
3. prefabricated high-strength explosion-proof ripple well as claimed in claim 1, it is characterised in that: the upper plane separation well head of well lid base Distance is 15% less than well body overall height.
CN201620623727.XU 2016-06-22 2016-06-22 A kind of prefabricated high-strength explosion-proof ripple well Expired - Fee Related CN205688464U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620623727.XU CN205688464U (en) 2016-06-22 2016-06-22 A kind of prefabricated high-strength explosion-proof ripple well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620623727.XU CN205688464U (en) 2016-06-22 2016-06-22 A kind of prefabricated high-strength explosion-proof ripple well

Publications (1)

Publication Number Publication Date
CN205688464U true CN205688464U (en) 2016-11-16

Family

ID=57416654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620623727.XU Expired - Fee Related CN205688464U (en) 2016-06-22 2016-06-22 A kind of prefabricated high-strength explosion-proof ripple well

Country Status (1)

Country Link
CN (1) CN205688464U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487829A (en) * 2018-11-16 2019-03-19 合肥智瑞工程科技有限公司 A kind of prefabricated reinforced concrete cable shaft with sliding well lid, waterproof
CN111395399A (en) * 2020-03-30 2020-07-10 中铁第一勘察设计院集团有限公司 Comprehensive pipe ditch four-way well

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487829A (en) * 2018-11-16 2019-03-19 合肥智瑞工程科技有限公司 A kind of prefabricated reinforced concrete cable shaft with sliding well lid, waterproof
CN111395399A (en) * 2020-03-30 2020-07-10 中铁第一勘察设计院集团有限公司 Comprehensive pipe ditch four-way well

Similar Documents

Publication Publication Date Title
CN102691294B (en) Construction method of underground continuous wall
CN204370431U (en) A kind of occlusion long-short pile space enclosing structure
CN109555116A (en) A kind of high density karst intense development area fully-sleeved filled pile construction method
CN104775433B (en) A kind of method of pile pulling construction
CN102505704A (en) Large open caisson construction method in soft geological shaft
CN104264663A (en) Hard cutting construction technology for secant piles
CN102561404A (en) Steel reinforced concrete column type joint and construction method of underground diaphragm wall using same
CN205688464U (en) A kind of prefabricated high-strength explosion-proof ripple well
CN112502133A (en) Construction process of building underground continuous wall based on steel grating
CN107816116A (en) A kind of spigot-and-socket reinforcing bar Concrete Drainage Pipe installation method based on graded broken stone basis
CN201459756U (en) Hanging-type construction ceiling coil vertical shaft
CN204185845U (en) A kind of water-proof pile board wall supporting and protection structure
CN104480929A (en) Pile and wall integrated construction method for applying occlusive pile into permanent basement external wall
CN106049502B (en) A kind of underground utilities exploration drilling cutting method
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN104563111B (en) A kind of construction method of taper pile anchor rock
CN206956783U (en) A kind of assembling type device for detecting manhole
CN206438528U (en) Pre-cast sink well part and open caisson
CN101381991A (en) Geothermal heat pump buried pipe in pile and construction method
CN112252302A (en) Method for realizing split hoisting of underground continuous wall special-shaped steel reinforcement cage into groove based on BIM
CN102561454B (en) Water intake method utilizing pipe jacking vertically
CN105178356B (en) Setting-up construction method for vertical joint bars of columns in reverse building method
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN206625238U (en) A kind of assembled waveform steel liner plate supporting construction of Circular Pit
CN206581282U (en) Diaphram wall Ω type milling joints

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161116

Termination date: 20170622