CN205666623U - Ground county electric wire netting AVC control system - Google Patents

Ground county electric wire netting AVC control system Download PDF

Info

Publication number
CN205666623U
CN205666623U CN201620164622.2U CN201620164622U CN205666623U CN 205666623 U CN205666623 U CN 205666623U CN 201620164622 U CN201620164622 U CN 201620164622U CN 205666623 U CN205666623 U CN 205666623U
Authority
CN
China
Prior art keywords
avc
county
ground
control system
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620164622.2U
Other languages
Chinese (zh)
Inventor
夏友斌
苏志朋
宋铭敏
俞鹏
潘文虎
凤飞
沈新村
周启扬
王鹏
汪超
仇前生
汤大伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuhu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Wuhu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Wuhu Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620164622.2U priority Critical patent/CN205666623U/en
Application granted granted Critical
Publication of CN205666623U publication Critical patent/CN205666623U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses a ground county electric wire netting AVC control system, its characterized in that: control system transfer AVC application module and county to transfer AVC application module to constitute by ground, but the county transfer AVC, transfer the operation of AVC the whole network, but mutual independence operation again, the reliability and the flexibility that have improved the AVC system, and then realize carrying out the idle optimization of regional power grid from the angle of whole distract electric wire netting improve comprehensively, improve the grid voltage quality, optimize idle trend, reduce the net and decrease, improvement voltage qualification rate.

Description

A kind of ground county electrical network AVC control system
Technical field
The present invention relates to Grid idle work optimization, particularly to a kind of ground county electrical network AVC control system.
Background technology
In recent years, AVC has obtained popularity in electrical network, coverage rate about 30%~40%.The popularization and application of AVC and electricity The raising of the automatization level of network operation has close relationship.Dispatching automation SCADA/EMS system is at the above electrical network of districts and cities Universal, being gradually improved of " four is distant " function, AVC is obtained whole network data information, and by the deep processing to information, is being expired Foot power grid security, the reliable and condition of economical operation, it is achieved the whole network transformator parted hair and the automated closed-loop control of reactive-load compensation equipment System.
At present, AVC system is at province and district utility grid preferable joint debugging control strategy, in Jiangsu, Anhui and Guangdong, Achieve some successful experiences.But at present, county's electrical network is vertical coupled closely, county's network planning mould is relatively small feature, still There is not a set of effective AVC system.Therefore need one badly to be taken into account by county's net, carry out nothing from area power grid the whole network angle The AVC control system of merit Control of Voltage, it is achieved the voltage stabilization of area power grid and idle work optimization.
Utility model content
Technical problem to be solved in the utility model is to provide one county's electrical network AVC control system in a distributed manner, it is achieved From ground, the angle of county's overall situation electrical network carry out regional power grid idle work optimization, improve rate of qualified voltage.
For reaching above-mentioned purpose, the technical solution of the utility model is, one county's electrical network AVC control system in a distributed manner, It is characterized in that: described control system is adjusted AVC application module and county to adjust AVC application module to constitute by ground, county adjust AVC, adjust AVC can run by the whole network, separate can run again, improves reliability and the motility of AVC system, and then realize area power grid Voltage stabilization and idle work optimization.
Under described control system normal condition, that is under the whole network operational mode, ground utility grid AVC application module is the most right Ground is adjusted and is had He Ge county of transformer station under its command and adjust and have transformer station under its command and carry out idle work optimization, and county adjusts AVC application module to be in off-line state, only reports Alert module accepts the information of area AVC application and shows, is not involved in idle control;When the system failure or communication failure, County adjust AVC application module with ground adjust AVC application module can off-the-line run, county adjust AVC, adjust AVC respectively to have under its command transformer station prison Control and carry out Reactive power control.
The optimization object function of described control system is:
Min F=min{ λ1∑αiPi2Σβj(Vj-VjS)2}
Wherein, α i is that active loss calculates the factor, and the overall situation is 1 when running, and will include optimization range in by this circuit;Off-the-line is transported It is 0 during row, does not include optimization range in;Pi is circuit active loss;β i is that voltage calculates the factor;Vj is for measuring real-time voltage.λ1、 λ 2 is weight coefficient;
The value of VjS is:
In described optimization object function, equation is constrained to the power flow equation of system and calculates the number of putting of the factor:
Pi=Vi∑Vj(Gijcosθij+Bijsinθij)
Qi=Vi∑Vj(Gijcosθij-Bijsinθij)
Inequality constraints is:
Qij≥0
0≤γi≤γimax
τi≥τimin
Wherein α i and β i adjusts the value of AVC to be contrary in TiaoAVCHe county, ground.
One county's electrical network AVC control system in a distributed manner, owing to using above-mentioned structure, adjusts AVC with this invention ensures that System and county adjust AVC system both can to run by the whole network, off-the-line can run again, improve reliability and the motility of AVC system.Thus Realize the angle from whole distract electrical network and carry out regional power grid idle work optimization, improve comprehensively, improve grid voltage quality, optimize nothing Merit trend, reduces network loss, improves rate of qualified voltage.
Accompanying drawing explanation
With detailed description of the invention, this utility model is described in further detail below in conjunction with the accompanying drawings;
Fig. 1 is this utility model one ground county electrical network AVC Control system architecture schematic diagram;
Fig. 2 is the control flow chart of this utility model a kind of ground county electrical network AVC control system.
Detailed description of the invention
As it is shown in figure 1, this utility model is adjusted by ground utility grid AVC application module and the county being deployed on county's tune server AVC application module two parts form.Time properly functioning, ground tune AVC application tune the most over the ground has transformer station under its command and carries out idle work optimization, Hai Jiangge county tune has transformer station under its command and includes voltage & var control scope in, carries out regional power grid from the angle of whole distract electrical network idle Optimize, improve grid voltage quality comprehensively, reduce grid loss, improve stability and the safety of Operation of Electric Systems Property.Now, county adjusts AVC application to be in off-line state, and only alarm module accepts the information of area AVC application and shows, is not involved in In idle control.Under normal operation mode, Tiao Ge transformer station of county is processed by area power grid AVC application as Generic Substation, Row joint debugging is transferred in province, it is achieved the whole province's reactive power optimization simultaneously as an area power grid.
When running into the special circumstances such as system failure, communication failure, area power grid AVC and county adjust AVC automatic parallel off fortune OK, or manually off-the-line is run.Area power grid AVC is by linchpin transformer station of part or all of county off-the-line, automatic voltage adjusting module weight Newly it is optimized calculating, and adjusts administrative transformer station to carry out idle control the most over the ground.AVC application during county adjusts server simultaneously is opened With, and from becoming a set of independent AVC system, it is achieved to having supervisory control of substation under its command and carrying out Reactive power control.
Distributed area power grid AVC system has the feature of dynamic adjusting range.When the overall situation is run, from whole distract electrical network Angle carry out regional power grid idle work optimization, improve grid voltage quality comprehensively.When off-the-line is run, each control area is transported Row is separate, does not interfere with each other, improves the reliability of AVC system.
As shown in Figure 2, it is contemplated that ground adjusts AVC system and county to adjust AVC off-the-line to run, the optimization range of ground tune AVC system will Can change, in optimization object function, introduce calculating the factor herein.When the overall situation is run, the meter of parameters optimization in object function Calculating the factor is 1, participates in optimal control.When off-the-line is run, the parameters optimization corresponding off-the-line gone out calculates the factor and is set to 0, target Function does not consider to be optimized it.This object function adjusts AVC system and county to adjust AVC system, the meter of the two with being simultaneously suitable for Calculate the factor and take opposite number.Calculate the introducing of the factor, ground is adjusted AVC system and county adjust the Reactive Power Optimization Algorithm for Tower of AVC system to unify Come, simplify computational algorithm, improve the scope of application of object function, before and after off-the-line optimum results will not deviation relatively big, cause point The excessive action of joint, capacitor.
The scale simultaneously taking account of area power grid is relatively small, rate of qualified voltage examination is heavier, algorithm should not be excessively complicated, Choosing loss minimization herein and voltage levvl is optimum as optimization aim, concrete optimization object function object function is as follows:
Min F=min{ λ1∑αiPi2∑βj(Vj-VjS)2} (1)
Wherein, α i is that active loss calculates the factor, and the overall situation is 1 when running, and will include optimization range in by this circuit;Off-the-line is transported It is 0 during row, does not include optimization range in.Pi is circuit active loss.β i is that voltage calculates the factor.Vj is for measuring real-time voltage.λ1、 λ 2 is weight coefficient.The value of VjS is as follows:
Equality constraint is the power flow equation of system and the number of putting calculating the factor:
Pi=Vi∑Vj(Gijcosθij+Bijsinθij)
Qi=Vi∑Vj(Gijcosθij-Bijsinθij)
It should be noted that in above formula, α i and β i adjusts the value of AVC to be contrary in TiaoAVCHe county, ground, because the control of the two Scope processed is mutex relation.
Inequality constraints is:
Qij≥0
0≤γi≤γimax
τi≥τimin (4)
Above inequality constraints is expressed as node voltage amplitude constraint and the constraint of Line Flow.Three formulas are for saving public affairs Taking charge of must not the constraint of the idle loopback of outlet to prefecture-level company.Four formulas, five formulas are to consider number of equipment action during idle control and move Make the constraint of time interval.For Wuhu Region electric network composition, put aside the constraint of generator output.
Utilize the constraints that formula (3) and formula (4) provide, be iterated target function type (1) calculating, try to achieve F minimum Voltage & var control scheme under Zhi, it is achieved the whole network idle work optimization that county's net is taken into account and Control of Voltage.Actual motion is tied Fruit show for ground, county's electrical network this iterative computation time in the range of accepting because at present, the idle control of county's electrical network Measure is load tap changer control and capacitor switching, and capacitor is accessed by 10kV bus mostly, and amount of calculation is the simplest Single.
The control flow of county's electrical network AVC system is as shown in Figure 2 in a distributed manner.In second step, AVC system not only obtains entirely Network data information, also needing the operational mode obtaining current county tune AVC system is that the overall situation is run or off-the-line is run, thus to calculating The factor carries out putting number.This Reactive power control flow chart is adjusted with being simultaneously suitable for, county adjust AVC system, essential difference with acquisition Data message different.
As a example by the electrical network AVC system of somewhere, after county in a distributed manner based on EMS electrical network AVC system operation with closed ring.Pass through The on-the-spot application of some months, achieves good operational effect.After newly AVC system puts into operation, bus rate of qualified voltage was compared to last year The same period, company of city busbar voltage qualification rate increase rate is little, and even 10kV busbar voltage qualification rate still has reduction.Reason is Prefecture-level company itself has disposed AVC system, and rate of qualified voltage is in higher level.In AVC system, the access of county's net is to company of city Major network Control of Voltage bring certain raising, but to distribution DeGrain.But the busbar voltage qualification rate for county's net carries Rise substantially, the highest lifting nearly 5%, averagely improves 2.78%.
The new AVC system simultaneously including optimization range in greatly reduces the whole network line loss per unit, and line loss per unit is averagely by 3.86% It is down to 3.7%.It is otherwise noted that the whole network line loss per unit fluctuates shallower after new AVC system puts into operation, also reflection makes new advances AVC system reasonably distributes existing idle resource, and the economical operation for electrical network provides reliable technical support.
County in a distributed manner based on EMS electrical network AVC system is on the basis of ground county integral automation system, respectively on ground Adjust, county adjusts and disposes AVC, and object function introduces the calculating factor so that this object function is simultaneously suitable for TiaoAVCHe county, ground and adjusts AVC, simplifies computational algorithm, it is ensured that ground adjusts AVC system and county to adjust AVC system sectionalizing to run, and improves the reliable of AVC system Property.Thus realize the angle from whole distract electrical network and carry out regional power grid idle work optimization, improve comprehensively, improve line voltage matter Amount, Optimum Reactive Power Flow, reduces network loss, improves rate of qualified voltage.
AVC system has obtained good operational effect since putting into operation, optimize reactive power flow further, reduce network loss, slow Solve the pressure of area power grid power factor regulation, greatly reduce the workload of management and running personnel.
Above in conjunction with accompanying drawing, this utility model is exemplarily described, it is clear that this utility model implements and is not subject to The restriction of aforesaid way, as long as have employed the various improvement that technical solutions of the utility model are carried out, or the most improved direct application In other occasion, all within protection domain of the present utility model.

Claims (1)

1. a Zhong Di county electrical network AVC control system, it is characterised in that: described control system includes ground utility grid AVC application mould Block and the county being deployed on county's tune front server adjust AVC application module to simultaneously act on and have supervisory control of substation under its command and carry out idle Optimal control;
Under described control system normal condition, ground utility grid AVC application module is adjusted the most over the ground and is had He Ge county of transformer station tune under its command Having transformer station under its command and carry out idle work optimization, county adjusts AVC application module to be in off-line state, and only alarm module accepts area AVC application Information and show, be not involved in idle control;When the system failure or communication failure, county adjusts AVC application module to solve Row run, directly to having supervisory control of substation under its command and carrying out Reactive power control.
CN201620164622.2U 2016-03-03 2016-03-03 Ground county electric wire netting AVC control system Expired - Fee Related CN205666623U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620164622.2U CN205666623U (en) 2016-03-03 2016-03-03 Ground county electric wire netting AVC control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620164622.2U CN205666623U (en) 2016-03-03 2016-03-03 Ground county electric wire netting AVC control system

Publications (1)

Publication Number Publication Date
CN205666623U true CN205666623U (en) 2016-10-26

Family

ID=57162450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620164622.2U Expired - Fee Related CN205666623U (en) 2016-03-03 2016-03-03 Ground county electric wire netting AVC control system

Country Status (1)

Country Link
CN (1) CN205666623U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105633975A (en) * 2016-03-03 2016-06-01 国网安徽省电力公司芜湖供电公司 AVC control system for distributed county power grid

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105633975A (en) * 2016-03-03 2016-06-01 国网安徽省电力公司芜湖供电公司 AVC control system for distributed county power grid

Similar Documents

Publication Publication Date Title
US11462908B2 (en) Distributed grid node with intelligent battery backup
US10784684B2 (en) Total harmonic control
Brearley et al. A review on issues and approaches for microgrid protection
JP2017521034A (en) Power grid network gateway aggregation
CN106712103B (en) A kind of micro-capacitance sensor voltage stabilizing control system and control method
Dragičević et al. AC and DC microgrid control
Callegari et al. Voltage support and selective harmonic current compensation in advanced AC microgrids
Hamoud et al. Voltage sag and swell mitigation using D-STATCOM in renewable energy based distributed generation systems
CN205666623U (en) Ground county electric wire netting AVC control system
CN105633975B (en) A kind of county's power grid AVC control system in a distributed manner
Marini et al. Active power filter commitment for harmonic compensation in microgrids
Arshad et al. Multi-agent based distributed voltage regulation scheme with grid-tied inverters in active distribution networks
Suresh et al. Voltage sag compensation in multiline distribution system using closed loop controlled IDVR
Elgamal et al. An adaptive multiagent control system for autonomous economic operation and resilience assurance in a hybrid-energy islanded microgrid
CN103513122A (en) Power quality monitoring method and device
Saaklayen et al. Service restoration through coordinated operation of soft open points and distributed generation units in distribution networks
Zhou et al. Voltage Control Strategies for Active Distribution Networks with Multiple Distributed Energy Resources-A Survey
Usman et al. Power losses management in low voltage active distribution networks
Chauhan et al. Advancements in microgrid voltage control schemes
Shukl et al. EV charging concept based on common DC bus with multiple PV arrays
Shukl et al. Dual Mode Operation of PV-BES Based Microgrid with Seamless Transition Capability
Caldognetto et al. Experimental verification of an active microgrid with distributed power-based control
Benhamida et al. A Fuzzy Logic controller for reactive power and PQ bus voltage control
Meliopoulos Microgrid Deployment to Benefit DER Integration
BR112017000119B1 (en) METHOD FOR CONTROLING A POWER NETWORK, APPARATUS FOR CONTROLING A POWER NETWORK, ENERGY MEASUREMENT DEVICE, METHOD FOR CONTROLLING THE NETWORK, POWER NETWORK SYSTEM, METHOD FOR INTERFACING A POWER NETWORK, AND METHOD FOR MONITORING THE POWER IN A POWER NETWORK NODE

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161026

Termination date: 20200303

CF01 Termination of patent right due to non-payment of annual fee