CN205665358U - Withstand voltage test system is executed outward to large -scale transformer neutral point - Google Patents

Withstand voltage test system is executed outward to large -scale transformer neutral point Download PDF

Info

Publication number
CN205665358U
CN205665358U CN201620491846.4U CN201620491846U CN205665358U CN 205665358 U CN205665358 U CN 205665358U CN 201620491846 U CN201620491846 U CN 201620491846U CN 205665358 U CN205665358 U CN 205665358U
Authority
CN
China
Prior art keywords
unit
neutral point
capacitor
parallel
frequency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620491846.4U
Other languages
Chinese (zh)
Inventor
李予全
寇晓适
郑含博
王伟
赵磊
邵颖彪
马伦
李晓纲
郭磊
蒲兵舰
钱诗林
张博
白银浩
谢伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Henan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620491846.4U priority Critical patent/CN205665358U/en
Application granted granted Critical
Publication of CN205665358U publication Critical patent/CN205665358U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model discloses an execute the withstand voltage test system outside the large -scale transformer neutral point scene, include high tension switchgear, the experimental power of frequency conversion, excitation transformer, protection resistance, frequency compensation unit, survey article unit and ampere meter, high tension switchgear access AC electric current, high tension switchgear, the experimental power of frequency conversion are connected with excitation transformer electricity in proper order, the high voltage loop circuit connect protection resistance R and the ampere meter of excitation transformer, the frequency compensation unit is connected to the other end of protection resistance R and ampere meter, the frequency compensation unit and by the unit connection of the article of survey, the frequency compensation unit includes cascade compensation reactor and shunt compensation capacitor unit, included by examination article and alternating voltage measuring unit by the article of survey unit that it is parallelly connected with alternating voltage measuring unit to be tried article. The utility model discloses can execute withstand voltage test outside large -scale transformer neutral point scene is accomplished to the power frequency within range with test frequency control, effectively guarantee the reliable safe operation of transformer equipment.

Description

Pressure test system is executed outside a kind of high-power transformer neutral point
Technical field
This utility model relates to transformer neutral point pressure test technical field, is specifically related to a kind of high-power transformer neutral Pressure test system is executed outside point is on-the-spot.
Background technology
According to the requirement of " Erection works of electrical installations Standard for handover test of electric equipment " (GB50150-2006), main transformer pressure Device is during carrying out on-the-spot commissioning test, and winding rated voltage is 110kV and above transformator, and its neutral point should be handed over Stream pressure test, test withstanding voltage standard is the 80% of delivery test magnitude of voltage;Its China and foreign countries execute the frequency of ac voltage withstanding test voltage Rate is 45-65Hz, and under full voltage, tolerance time is 60s.
According to existing field testing procedure, owing to tested transformer neutral point insulation against ground can be equivalent to an equivalent electric Hold, by producing required test voltage value with series compensation reactor series resonance scene, use voltage measurement unit prison simultaneously Survey.But owing to tested transformer neutral point insulation against ground equivalent capacitance value is according to different there are differences of transformer type, for Ensure that series resonance frequency meets power frequency scope (45-65Hz), it is desirable to the different different series compensations of transformer neutral point coupling Reactor, thus cause and execute series compensation reactor parameter in pressurized system outside high-power transformer neutral point and vary, do not have The flexible suitability of standby on-the-spot test.And test transform capacity is big, experimental facilities is heavy, inconvenience carrying, gives on-the-spot test tape Carry out difficulty.
Notification number be the utility model patent of CN205157710 disclose a kind of extra-high voltage neutral reactor presence should Pressure test system, including frequency conversion experiment power supply, exciting transformer, compensation capacitor unit, tested article unit, frequency conversion test electricity Source, exciting transformer, compensation capacitor unit, tested article unit are sequentially connected with, during the tested article unit of this pilot system includes Property point reactor and ac voltage measurement unit, parallel capacitor is in parallel with neutral reactor, to tested article unit Neutral reactor carries out induced over voltage withstand test, and this system is to carry out pressure examination for 1000kV extra-high voltage transformer neutral point Testing, tested transformator scope is less, need to mate different series connection time in actual use to different tested device unit testing Compensation reactor, does not possess the flexible suitability of on-the-spot test, and the scene test of giving brings difficulty.
Utility model content
In view of this, the purpose of this utility model is for the deficiencies in the prior art, it is provided that a kind of high-power transformer is neutral Pressure test system is executed, it is possible to on-the-spot high-power transformer neutral point executes pressure test outside carrying out, it is adaptable to various outside point is on-the-spot High-power transformer, on-the-spot test is flexibly, easy to operate.
For solving above-mentioned technical problem, technical solution adopted in the utility model is as follows:
Pressure test system is executed, wherein, including high-tension switch cabinet, frequency conversion test outside a kind of high-power transformer neutral point scene Power supply, exciting transformer, protective resistance, frequency compensation unit, tested article unit and ammeter, described high-tension switch cabinet accesses A/ C electric current, described high-tension switch cabinet, frequency conversion experiment power supply are sequentially connected electrically with exciting transformer;The high pressure of described exciting transformer Loop connection protective resistance R and ammeter, the other end rate of connections compensating unit of described protective resistance R and ammeter, described Frequency compensation unit is connected with described tested article unit;Described frequency compensation unit includes series compensation reactor and shunt compensation Capacitor unit;Described tested article unit includes that test specimen and ac voltage measurement unit, described test specimen are surveyed with alternating voltage Amount unit is in parallel;Described ac voltage measurement unit is made up of high-voltage bleeder C10 and low pressure potentiometer C11, and described high pressure divides Depressor C10 and low pressure potentiometer C11 is in parallel with described test specimen after connecting.
Preferably, described parallel capacitor unit includes capacitor C1-C9, and described capacitor C1-C3 parallel connection is even Connecing, described capacitor C4-C6 is connected in parallel, and described capacitor C7-C9 is connected in parallel, described in be connected in parallel after capacitor C1- C3, C4-C6, C7-C9 are connected in series.
Preferably, described ac voltage measurement unit also includes kilovoltmeter, described kilovoltmeter and described low pressure Potentiometer C11 is in parallel.
Preferably, described ac voltage measurement unit includes kilovoltmeter.
Preferably, described series compensation reactor is high voltage reactor.
Preferably, described tested article unit also includes variable inductor C12, described variable inductor C12 and test specimen string Connection connects.
The beneficial effects of the utility model are:
Frequency compensation unit of the present utility model uses series compensation reactor and parallel capacitor unit composition, and Connection compensates capacitor unit and is made up of capacitor C1-C9, increases pressure voltage while ensureing to increase capacitance.In use Can directly change this capacitor when certain capacitor failure, it is not necessary to integral replacing, reduce maintenance cost, and by multiple Capacitor composition has been also convenient for the arrangement of the parallel capacitor unit of entirety, reduces the volume of equipment.
This utility model adds variable inductor C12 in tested article unit, at the trial, for different large-scale changes Depressor, can complete different transformer neutral point couplings, it is possible to flexibly to various large-scale by regulation variable inductor C12 Pressure test is executed, it is possible to complete the on-the-spot test to transformer neutral point insulation outside the neutral point scene of transformator.
This utility model equipment conveying is convenient, and floor space is little, adapts to the transport between different tests scene, breaches tradition Execute Withstand test device outside neutral point scene and not there is the bottleneck of on-the-spot broad applicability, make the neutral point of various high-power transformer Execute outward pressure added test voltage to control to be possibly realized in the range of power frequency, filled up execute outside domestic on-the-spot neutral point scene pressure The blank of assay device.
Accompanying drawing explanation
Fig. 1 is the circuit theory diagrams of this utility model embodiment 1.
Fig. 2 is the circuit theory diagrams of this utility model embodiment 2.
Detailed description of the invention
Below in conjunction with the accompanying drawings utility model technical scheme is further illustrated:
Embodiment 1:
This utility model includes that high-tension switch cabinet 1, frequency conversion experiment power supply 2, exciting transformer 3, protective resistance R, frequency are mended Repaying unit 4, tested article unit 5 and ammeter, high-tension switch cabinet 1 accesses A/C electric current, high-tension switch cabinet 1, frequency conversion experiment power supply 2 Being sequentially connected electrically with exciting transformer 3, the output voltage U1 of frequency conversion experiment power supply 2 is boosted as U2, excitation-transformation variable by exciting transformer 3 Series connection protective resistance R and ammeter in depressor 3 high tension loop.Tested article unit 5 is by test specimen 6 and ac voltage measurement unit 7 Composition, test specimen 6 is in parallel with ac voltage measurement unit 7.Frequency compensation unit 4 is by series compensation reactor 8 and shunt compensation Capacitor unit 9 forms;Parallel capacitor unit 9 connects 8 with series compensation reactor, parallel capacitor unit 9 Being made up of nine identical capacitor C1 ~ C9, wherein, capacitor C1 ~ C9 is divided into three groups, first group: capacitor C1, C2, C3 are also Connection, second group: capacitor C4, C5, C6 are in parallel, the 3rd group: capacitor C7, C8, C9 are in parallel, and then this three group capacitor is connected on Together, while ensureing to increase capacitance, pressure voltage is increased.Test specimen 6 equivalence neutral point electric capacity CX.
Exciting transformer 3 excites resonant tank, makes the series compensation in loop by frequency conversion experiment power supply 2 output frequency There is resonance in reactor 8 and parallel capacitor unit 9.Exciting transformer 3 is played the effect of protection by high-tension switch cabinet 1, Prevent the excessive damage equipment of electric current.Ac voltage measurement unit 7 also includes kilovoltmeter, uses kilovoltmeter to alternating current Pressure measures, high-voltage bleeder C10 and low pressure show that instrument forms, and low pressure display instrument is by low pressure potentiometer C11 and electricity Pressure table composition, it is ensured that the transformer neutral point voltage of pressure test is monitored.
The output voltage of frequency conversion experiment power supply 2 is raised to suitably by this utility model at the trial by exciting transformer 3 Magnitude of voltage, to excite whole test loop, the output frequency of regulation frequency conversion experiment power supply, make the frequency compensation unit 4 in loop Realizing resonant frequency is 50HZ, and now the output frequency of frequency conversion experiment power supply 2 is test frequency, test specimen 6 equivalent capacity institute Making alive is resonance potential.According to series resonance principal, this pilot system utilizes high voltage reactor and and capacitor resonant tank product Raw high voltage and big electric current, power supply only needs the meritorious part consumed in offer system, and required power supply capacity significantly reduces, experiment The volume and weight of equipment the most significantly reduces.And parallel capacitor unit is in parallel with test specimen in pilot system, it is whole The capacitance of individual device increases, and the scope of test frequency increases the most therewith, the expanded range of the most tested transformator.At resonance shape State, when the insulation weak-point of test specimen is breakdown, circuit takes off humorous immediately, and loop current declines immediately, it is possible to electric current in the loop Table shows.
Embodiment 2:
Difference from Example 1 is, tested article unit 5 includes test specimen 6, ac voltage measurement unit 7 and variable Inducer C12.At the trial, for different high-power transformers, can be completed difference by regulation variable inductor C12 Transformer neutral point mates, it is possible to execute pressure test to outside the neutral point scene of various high-power transformers flexibly, it is possible to complete existing The field test to transformer neutral point insulation.
Finally illustrate, above example only in order to the technical solution of the utility model to be described and unrestricted, this area Other amendment or equivalents that the technical solution of the utility model is made by those of ordinary skill, without departing from this practicality The spirit and scope of new technique scheme, all should contain in the middle of right of the present utility model.

Claims (6)

1. execute pressure test system outside a high-power transformer neutral point scene, it is characterised in that: include high-tension switch cabinet, frequency conversion Experiment power supply, exciting transformer, protective resistance, frequency compensation unit, tested article unit and ammeter, described high-tension switch cabinet connects Entering A/C electric current, described high-tension switch cabinet, frequency conversion experiment power supply are sequentially connected electrically with exciting transformer;Described exciting transformer High tension loop connection protective resistance R and ammeter, the other end rate of connections compensating unit of described protective resistance R and ammeter, Described frequency compensation unit is connected with described tested article unit;Described frequency compensation unit includes series compensation reactor and parallel connection Compensate capacitor unit;Described tested article unit includes test specimen and ac voltage measurement unit, described test specimen and alternating current Pressure measuring unit is in parallel;Described ac voltage measurement unit is made up of high-voltage bleeder C10 and low pressure potentiometer C11, described height Pressure potentiometer C10 and low pressure potentiometer C11 is in parallel with described test specimen after connecting.
2. execute pressure test system outside high-power transformer neutral point scene as claimed in claim 1, it is characterised in that: described also Connection compensates capacitor unit and includes that capacitor C1-C9, described capacitor C1-C3 are connected in parallel, and described capacitor C4-C6 is in parallel Connect, described capacitor C7-C9 is connected in parallel, described in be connected in parallel after capacitor C1-C3, C4-C6, C7-C9 be connected in series.
3. execute pressure test system outside high-power transformer neutral point scene as claimed in claim 1, it is characterised in that: described friendship Stream voltage measurement unit also includes kilovoltmeter, and described kilovoltmeter is in parallel with described low pressure potentiometer C11.
4. execute pressure test system outside high-power transformer neutral point scene as claimed in claim 1, it is characterised in that: described friendship Stream voltage measurement unit includes kilovoltmeter.
5. execute pressure test system outside high-power transformer neutral point scene as claimed in claim 1, it is characterised in that: described string Connection compensation reactor is high voltage reactor.
6. executing pressure test system outside the high-power transformer neutral point scene as described in any one of claim 1-5, its feature exists In: described tested article unit also includes that variable inductor C12, described variable inductor C12 are connected in series with test specimen.
CN201620491846.4U 2016-05-26 2016-05-26 Withstand voltage test system is executed outward to large -scale transformer neutral point Active CN205665358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620491846.4U CN205665358U (en) 2016-05-26 2016-05-26 Withstand voltage test system is executed outward to large -scale transformer neutral point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620491846.4U CN205665358U (en) 2016-05-26 2016-05-26 Withstand voltage test system is executed outward to large -scale transformer neutral point

Publications (1)

Publication Number Publication Date
CN205665358U true CN205665358U (en) 2016-10-26

Family

ID=57161517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620491846.4U Active CN205665358U (en) 2016-05-26 2016-05-26 Withstand voltage test system is executed outward to large -scale transformer neutral point

Country Status (1)

Country Link
CN (1) CN205665358U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771911A (en) * 2016-12-09 2017-05-31 广西电友科技发展有限公司 A kind of elementary errors compensation industrial frequency withstand voltage experimental rig in parallel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771911A (en) * 2016-12-09 2017-05-31 广西电友科技发展有限公司 A kind of elementary errors compensation industrial frequency withstand voltage experimental rig in parallel

Similar Documents

Publication Publication Date Title
Shareghi et al. Effects of current and voltage harmonics on distribution transformer losses
CN202119866U (en) Variable-frequency series resonance voltage withstanding test device
CN205608139U (en) Change of current becomes partial discharge test device
CN101294985B (en) Power supply device for controllable reactor induction voltage-resistant experiment and its partial discharging measurement method
CN103267933B (en) The method of shelf depreciation in measuring transformer induced voltage test device
CN204269765U (en) A kind of transformer for power frequency withstand test and test unit
CN101833043A (en) Method for measuring electric capacity and dielectric loss of capacitance type voltage transformer
CN105259489B (en) Extra-high voltage neutral reactor scene induced over voltage withstand test system and method
CN201203633Y (en) Power supply device for controllable inductor induction voltage-resistant experiment
CN203217005U (en) Converter transformer no-load test schematic wiring diagram
CN109521338A (en) Frequency conversion parallel resonance pressure resistant test method based on Cascade boosting
CN109212389A (en) A kind of large-capacity power equipment ac voltage withstanding test method
CN108459249A (en) The extra-high voltage GIL alternating-current voltage resistance test devices and method of controllable saturation reactance
CN110456236A (en) Railway traction transformer shelf depreciation handover property test method
CN204422710U (en) A kind of oil-immersed type testing transformer
CN202870240U (en) A partial discharge testing device of a converter transformer at a high altitude locality
CN102590564A (en) Wiring structure for partial discharge test of balance traction transformer
CN202210109U (en) Metering box capable of electrically replacing electric meter and current transformer
CN102288880A (en) Frequency-changing resonant withstand voltage testing device
CN107861012A (en) A kind of through-flow device of high-power transformer
CN205665358U (en) Withstand voltage test system is executed outward to large -scale transformer neutral point
CN109946571A (en) The method for carrying out voltage transformer induced over voltage withstand test using relay-protection tester
CN207067321U (en) High altitude localities 750kV shunt reactor Partial Discharge Testing on Site devices
CN106771813B (en) A kind of Tesla transformer secondary coil on-off measurement method
CN202256512U (en) Multifunctional phase check instrument

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant