CN205638224U - Fitment is with ground quick drilling device - Google Patents
Fitment is with ground quick drilling device Download PDFInfo
- Publication number
- CN205638224U CN205638224U CN201620432336.XU CN201620432336U CN205638224U CN 205638224 U CN205638224 U CN 205638224U CN 201620432336 U CN201620432336 U CN 201620432336U CN 205638224 U CN205638224 U CN 205638224U
- Authority
- CN
- China
- Prior art keywords
- nut
- connecting rod
- slider
- mechanical box
- drilling device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model relates to a drilling equipment especially relates to a fitment is with ground quick drilling device. The to -be -solved technical problem of the utility model is to provide a fitment is with ground quick drilling device of convenient operation, labour saving and time saving, drilling is effectual, penetration rate is fast. In order to solve the technical problem, the utility model provides a such fitment is with ground quick drilling device, including the universal wheel, left side frame, servo motor, the step, a guiding sleeve, nut I, nut II, the lead screw, bolster bearing housing, the hose, automatically controlled valve, the guide rail, connecting rod I, connecting rod II, gear motor, the carousel, slider I, the adapter sleeve, the shower nozzle, the rotating electrical machines, the drill bit, right side frame, mechanical box, slider II, a slide rail, the pushing hands, roof and water tank, left side frame and right rest base portion install the universal wheel, left side frame right side upper portion is equipped with bolster bearing housing. The utility model discloses convenient operation, labour saving and time saving, drilling is effectual, penetration rate is fast effect have been reached.
Description
Technical field
This utility model relates to a kind of drilling equipment, particularly relates to a kind of finishing ground rapid drilling device.
Background technology
Boring refers to process, with drill bit, the operation portalled on solid material.Here the boring work in investigation and prospecting, and the aid and part emergency measure method needed of holing are taught.Fit up also known as decoration or decoration.Refer to carry out in certain area and scope, realized including Hydroelectric Project Construction, body of wall, floor, ceiling, view etc., a whole set of arrangement and method for construction formed according to certain design concept and rule attractive in appearance and design.Little to furniture put with door towards, big to room accessories and the customized treatment of light fixture, be all the embodiment of finishing.Fitting up different with decoration, decoration is the maneuver that the articles for daily use or living environment carry out art processing.Strengthen aesthetic effect, and improve its function, economic worth and social benefit, and with environmental protection as design concept.Perfect decoration should be combined closely with the function of object, adapts to processing technology, plays the performance of material, and has good artistic effect.In house decoration, in the installation process of hydropower installation or other furniture, it is often necessary to hole on the ground.
Current drilling equipment exist inconvenient operation, waste time and energy, drilling effect is bad, penetration rate is slow shortcoming, therefore need a kind of easy to operate, time saving and energy saving, drilling effect is good, penetration rate is fast finishing ground rapid drilling device of research and development badly.
Utility model content
(1) to solve the technical problem that
This utility model in order to overcome current drilling equipment exist inconvenient operation, waste time and energy, drilling effect is bad, penetration rate is slow shortcoming, the technical problems to be solved in the utility model is to provide a kind of easy to operate, time saving and energy saving, drilling effect is good, penetration rate is fast finishing ground rapid drilling device.
(2) technical scheme
nullIn order to solve above-mentioned technical problem,This utility model provides such a finishing ground rapid drilling device,Include universal wheel、Left frame、Servomotor、Step、Fairlead、Nut I、Nut II、Screw mandrel、Top chock、Flexible pipe、Electrically-controlled valve、Guide rail、Connecting rod I、Connecting rod II、Reducing motor、Rotating disk、Slider I、Adapter sleeve、Shower nozzle、Electric rotating machine、Drill bit、Right shelf、Mechanical box、Slide block II、Slide rail、Pushing hands、Top board and water tank,Bottom left frame and right shelf, universal wheel is installed,Left frame right upper portion is provided with top chock,Left frame lower right side is provided with step and servomotor,Servomotor is positioned at below step,Screw mandrel is installed between top chock and step,Screw mandrel is provided with nut I and nut II,Nut II is positioned at above nut I,It is provided with mechanical box on the right side of nut I and nut II,Mechanical box bottom left is provided with fairlead,Mechanical box bottom right is provided with adapter sleeve,Adapter sleeve is provided with shower nozzle,Guide rail and reducing motor it is provided with inside mechanical box,Reducing motor is positioned on the right of guide rail,Guide rail is provided with slider I,Slider I coordinates with guide rail,Connecting rod II it is provided with on the left of slider I,Connecting rod II is provided with electric rotating machine through fairlead,Electric rotating machine bottom is provided with drill bit,Rotating disk it is provided with on front side of reducing motor,Disk edge is hingedly connected with connecting rod I,Connecting rod I lower end is articulated and connected on the right side of slider I,Slide rail it is provided with on the left of right shelf,Slide rail is provided with slide block II,It is connected with on the right side of mechanical box on the left of slide block II,Left frame and right shelf top are provided with top board,Top board top is arranged with pushing hands,Top board crown center is provided with water tank,Water tank is between pushing hands,Water tank bottom is provided with flexible pipe,Electrically-controlled valve is installed on flexible pipe,Flexible pipe lower end is connected with shower nozzle.
Preferably, also including travel switch, top chock bottom is provided with travel switch.
Preferably, also include foot rest and spring, left frame and right shelf lower front side symmetry and be hingedly connected with foot rest, foot rest be hingedly connected with spring.
Preferably, mechanical box material is rustless steel.
Operation principle: when needs are holed, water tank is filled water by workman, then utilizes pushing hands that this device is shifted onto need the position of boring, and makes drill bit be directed at position to be holed.Control electric rotating machine to rotate, electric rotating machine drives bit, control electrically-controlled valve to open, water flows to shower nozzle by flexible pipe, and it is sprayed on bore position from shower nozzle, control servomotor to rotate forward, servomotor drives screw mandrel to rotate forward, under the effect of screw mandrel, nut I and nut II move downward, nut I and nut II driving mechanical case move downward, mechanical box drives its upper-part to move downward, drill bit moves downward at surface drilling, when drill bit pierces certain depth, control reducing motor to rotate, reducing motor drives rotating disk to rotate, rotating disk drives slider I to move up and down by connecting rod I, slider I drives its upper-part to move up and down, when slider I moves upward, drill bit moves upward and is taken out of by the garbage in hole, when slider I moves downward, drill bit moves downward and continues boring.Because drill bit boring during can timing by hole in garbage discharge, therefore so that penetration rate faster, drilling effect is more preferable.After boring completes, controlling servomotor reversion, now drill bit moves upward, and when drill bit moves upward to above the ground, controls servomotor and stops operating.When slider I is moved downwardly to origin-location, controls reducing motor and stop operating, then control electrically-controlled valve and close.
Because also including travel switch, top chock bottom is provided with travel switch.When nut II moves upward and touches travel switch, travel switch controls servomotor and stops operating, to protect equipment to be without prejudice.
Because also including foot rest and spring, left frame and right shelf lower front side symmetry are hingedly connected with foot rest, are hingedly connected with spring between foot rest.When drill bit alignment bore position, workman utilizes and foot rest is fixed this device, prevents this device during boring to be moved.When needing this device mobile after boring, foot rest can be rotated and pack up by workman, and under the action of the spring, foot rest is fixed in left frame or right shelf.
Because mechanical box material is rustless steel, the service life of this device can be extended.
(3) beneficial effect
The effect that this utility model has reached easy to operate, time saving and energy saving, drilling effect is good, penetration rate is fast.
Accompanying drawing explanation
Fig. 1 is the first main TV structure schematic diagram of the present utility model.
Fig. 2 is the second of the present utility model main TV structure schematic diagram.
Fig. 3 is the third main TV structure schematic diagram of the present utility model.
Being labeled as in accompanying drawing: 1-universal wheel, the left frame of 2-, 3-servomotor, 4-step, 5-fairlead, 6-nut I, 7-nut II, 8-screw mandrel, 9-top chock, 10-flexible pipe, 11-electrically-controlled valve, 12-guide rail, 13-connecting rod I, 14-connecting rod II, 15-reducing motor, 16-rotating disk, 17-slider I, 18-adapter sleeve, 19-shower nozzle, 20-electric rotating machine, 21-drill bit, 22-right shelf, 23-mechanical box, 24-slide block II, 25-slide rail, 26-pushing hands, 27-top board, 28-water tank, 29-travel switch, 30-foot rest, 31-spring.
Detailed description of the invention
With embodiment, this utility model is further described below in conjunction with the accompanying drawings.
Embodiment
1
nullA kind of finishing ground rapid drilling device,As Figure 1-3,Include universal wheel 1、Left frame 2、Servomotor 3、Step 4、Fairlead 5、Nut I 6、Nut II 7、Screw mandrel 8、Top chock 9、Flexible pipe 10、Electrically-controlled valve 11、Guide rail 12、Connecting rod I 13、Connecting rod II 14、Reducing motor 15、Rotating disk 16、Slider I 17、Adapter sleeve 18、Shower nozzle 19、Electric rotating machine 20、Drill bit 21、Right shelf 22、Mechanical box 23、Slide block II 24、Slide rail 25、Pushing hands 26、Top board 27 and water tank 28,Bottom left frame 2 and right shelf 22, universal wheel 1 is installed,Left frame 2 right upper portion is provided with top chock 9,Left frame 2 lower right side is provided with step 4 and servomotor 3,Servomotor 3 is positioned at below step 4,Screw mandrel 8 is installed between top chock 9 and step 4,Screw mandrel 8 is provided with nut I 6 and nut II 7,Nut II 7 is positioned at above nut I 6,It is provided with mechanical box 23 on the right side of nut I 6 and nut II 7,Mechanical box 23 bottom left is provided with fairlead 5,Mechanical box 23 bottom right is provided with adapter sleeve 18,Adapter sleeve 18 is provided with shower nozzle 19,Mechanical box 23 is internal is provided with guide rail 12 and reducing motor 15,Reducing motor 15 is positioned on the right of guide rail 12,Guide rail 12 is provided with slider I 17,Slider I 17 coordinates with guide rail 12,Connecting rod II 14 it is provided with on the left of slider I 17,Connecting rod II 14 is provided with electric rotating machine 20 through fairlead 5,Electric rotating machine 20 bottom is provided with drill bit 21,Rotating disk 16 it is provided with on front side of reducing motor 15,Rotating disk 16 edge is hingedly connected with connecting rod I 13,Connecting rod I 13 lower end is articulated and connected on the right side of slider I 17,Slide rail 25 it is provided with on the left of right shelf 22,Slide rail 25 is provided with slide block II 24,It is connected with on the right side of mechanical box 23 on the left of slide block II 24,Left frame 2 and right shelf 22 top are provided with top board 27,Top board 27 top is arranged with pushing hands 26,Top board 27 crown center is provided with water tank 28,Water tank 28 is between pushing hands 26,Flexible pipe 10 it is provided with bottom water tank 28,Electrically-controlled valve 11 is installed on flexible pipe 10,Flexible pipe 10 lower end is connected with shower nozzle 19.
Also including travel switch 29, top chock 9 bottom is provided with travel switch 29.
Also include foot rest 30 and spring 31, left frame 2 and right shelf 22 lower front side symmetry and be hingedly connected with foot rest 30, foot rest 30 be hingedly connected with spring 31.
Mechanical box 23 material is rustless steel.
Operation principle: when needs are holed, water tank 28 is filled water by workman, then utilizes pushing hands 26 that this device is shifted onto need the position of boring, and makes drill bit 21 be directed at position to be holed.nullControl electric rotating machine 20 to rotate,Electric rotating machine 20 drives drill bit 21 to rotate,Control electrically-controlled valve 11 to open,Water flows to shower nozzle 19 by flexible pipe 10,And it is sprayed on bore position from shower nozzle 19,Control servomotor 3 to rotate forward,Servomotor 3 drives screw mandrel 8 to rotate forward,Under the effect of screw mandrel 8,Nut I 6 and nut II 7 move downward,Nut I 6 and nut II 7 driving mechanical case 23 move downward,Mechanical box 23 drives its upper-part to move downward,Drill bit 21 moves downward at surface drilling,When drill bit 21 pierces certain depth,Control reducing motor 15 to rotate,Reducing motor 15 drives rotating disk 16 to rotate,Rotating disk 16 drives slider I 17 to move up and down by connecting rod I 13,Slider I 17 drives its upper-part to move up and down,When slider I 17 moves upward,Drill bit 21 moves upward and is taken out of by the garbage in hole,When slider I 17 moves downward,Drill bit 21 moves downward and continues boring.Because drill bit 21 boring during can timing by hole in garbage discharge, therefore so that penetration rate faster, drilling effect is more preferable.After boring completes, controlling servomotor 3 and invert, now drill bit 21 moves upward, and when drill bit 21 moves upward to above the ground, controls servomotor 3 and stops operating.When slider I 17 is moved downwardly to origin-location, controls reducing motor 15 and stop operating, then control electrically-controlled valve 11 and close.
Because also including travel switch 29, top chock 9 bottom is provided with travel switch 29.When nut II 7 moves upward and touches travel switch 29, travel switch 29 controls servomotor 3 and stops operating, to protect equipment to be without prejudice.
Because also including foot rest 30 and spring 31, left frame 2 and right shelf 22 lower front side symmetry are hingedly connected with foot rest 30, are hingedly connected with spring 31 between foot rest 30.When drill bit 21 is directed at bore position, workman utilizes and foot rest 30 is fixed this device, prevents this device during boring to be moved.When needing this device mobile after boring, foot rest 30 can be rotated and pack up by workman, and under the effect of spring 31, foot rest 30 is fixed in left frame 2 or right shelf 22.
Because mechanical box 23 material is rustless steel, the service life of this device can be extended.
Embodiment described above only have expressed preferred implementation of the present utility model, and it describes more concrete and detailed, but therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, for the person of ordinary skill of the art, without departing from the inventive concept of the premise, it is also possible to making some deformation, improve and substitute, these broadly fall into protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be as the criterion with claims.
Claims (4)
- null1. a finishing ground rapid drilling device,It is characterized in that,Include universal wheel (1)、Left frame (2)、Servomotor (3)、Step (4)、Fairlead (5)、Nut I (6)、Nut II (7)、Screw mandrel (8)、Top chock (9)、Flexible pipe (10)、Electrically-controlled valve (11)、Guide rail (12)、Connecting rod I (13)、Connecting rod II (14)、Reducing motor (15)、Rotating disk (16)、Slider I (17)、Adapter sleeve (18)、Shower nozzle (19)、Electric rotating machine (20)、Drill bit (21)、Right shelf (22)、Mechanical box (23)、Slide block II (24)、Slide rail (25)、Pushing hands (26)、Top board (27) and water tank (28),Left frame (2) and right shelf (22) bottom are provided with universal wheel (1),Left frame (2) right upper portion is provided with top chock (9),Left frame (2) lower right side is provided with step (4) and servomotor (3),Servomotor (3) is positioned at step (4) lower section,Screw mandrel (8) is installed between top chock (9) and step (4),Screw mandrel (8) is provided with nut I (6) and nut II (7),Nut II (7) is positioned at nut I (6) top,Nut I (6) and nut II (7) right side are provided with mechanical box (23),Mechanical box (23) bottom left is provided with fairlead (5),Mechanical box (23) bottom right is provided with adapter sleeve (18),Adapter sleeve (18) is provided with shower nozzle (19),Mechanical box (23) is internal is provided with guide rail (12) and reducing motor (15),Reducing motor (15) is positioned at guide rail (12) the right,Guide rail (12) is provided with slider I (17),Slider I (17) coordinates with guide rail (12),Slider I (17) left side is provided with connecting rod II (14),Connecting rod II (14) is provided with electric rotating machine (20) through fairlead (5),Electric rotating machine (20) bottom is provided with drill bit (21),Reducing motor (15) front side is provided with rotating disk (16),Rotating disk (16) edge is hingedly connected with connecting rod I (13),Connecting rod I (13) lower end is articulated and connected with slider I (17) right side,Right shelf (22) left side is provided with slide rail (25),Slide rail (25) is provided with slide block II (24),Slide block II (24) left side is connected with mechanical box (23) right side,Left frame (2) and right shelf (22) top are provided with top board (27),Top board (27) top is arranged with pushing hands (26),Top board (27) crown center is provided with water tank (28),Water tank (28) is positioned between pushing hands (26),Water tank (28) bottom is provided with flexible pipe (10),Electrically-controlled valve (11) is installed on flexible pipe (10),Flexible pipe (10) lower end is connected with shower nozzle (19).
- A kind of finishing ground the most according to claim 1 rapid drilling device, it is characterised in that also including travel switch (29), top chock (9) bottom is provided with travel switch (29).
- A kind of finishing ground the most according to claim 1 rapid drilling device, it is characterized in that, also include foot rest (30) and spring (31), left frame (2) and right shelf (22) lower front side symmetry and be hingedly connected with foot rest (30), foot rest (30) be hingedly connected with spring (31).
- A kind of finishing ground the most according to claim 1 rapid drilling device, it is characterised in that mechanical box (23) material is rustless steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620432336.XU CN205638224U (en) | 2016-05-14 | 2016-05-14 | Fitment is with ground quick drilling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620432336.XU CN205638224U (en) | 2016-05-14 | 2016-05-14 | Fitment is with ground quick drilling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205638224U true CN205638224U (en) | 2016-10-12 |
Family
ID=57058953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620432336.XU Expired - Fee Related CN205638224U (en) | 2016-05-14 | 2016-05-14 | Fitment is with ground quick drilling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205638224U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106671296A (en) * | 2016-11-22 | 2017-05-17 | 无锡市伟丰印刷机械厂 | Novel wall body material rapid punching device |
CN107116700A (en) * | 2017-05-18 | 2017-09-01 | 安徽颍瑞源焊管科技有限公司 | A kind of decorative panel for building perforating device |
CN107587841A (en) * | 2017-08-01 | 2018-01-16 | 裴迎新 | A kind of water pump installation servicing unit |
CN110714724A (en) * | 2019-09-16 | 2020-01-21 | 河南理工大学 | A mining equipment for coal mining |
-
2016
- 2016-05-14 CN CN201620432336.XU patent/CN205638224U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106671296A (en) * | 2016-11-22 | 2017-05-17 | 无锡市伟丰印刷机械厂 | Novel wall body material rapid punching device |
CN106671296B (en) * | 2016-11-22 | 2018-01-30 | 无锡市伟丰印刷机械厂 | A kind of quick perforating device of materials for wall |
CN107116700A (en) * | 2017-05-18 | 2017-09-01 | 安徽颍瑞源焊管科技有限公司 | A kind of decorative panel for building perforating device |
CN107587841A (en) * | 2017-08-01 | 2018-01-16 | 裴迎新 | A kind of water pump installation servicing unit |
CN110714724A (en) * | 2019-09-16 | 2020-01-21 | 河南理工大学 | A mining equipment for coal mining |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205638224U (en) | Fitment is with ground quick drilling device | |
CN205631023U (en) | Quick perforating device of wall body for fitment | |
CN204867510U (en) | Numerically -controlled drilling machine | |
CN205764000U (en) | A kind of efficient puncher of magnetic iron bar | |
CN204901563U (en) | Self -cleaning LED street lamp | |
CN206578054U (en) | Novel photovoltaic cell panel automatic flushing device | |
CN205654051U (en) | Quick painting device of wall for interior decoration | |
CN105962618A (en) | Wall decoration painting device | |
CN205700703U (en) | A kind of finishing cullet high-efficient treatment device | |
CN205558289U (en) | Building templates belt cleaning device | |
CN205835473U (en) | A kind of Rigid foam polyurethane cutter sweep | |
CN205758462U (en) | Wall cleaning plant used by a kind of finishing | |
CN203945509U (en) | A kind of stone material groover | |
CN204602697U (en) | For the living water washing implement of electrical equipment | |
CN212761191U (en) | Panel perforating device for building engineering | |
CN205685432U (en) | A kind of finishing plate cutter sweep that gives up | |
CN205853111U (en) | A kind of engineering body of wall cutter sweep | |
CN205818181U (en) | A kind of stone drilling machine can lowered the temperature to stone material | |
CN205894617U (en) | Fitment is with over -and -under type high efficiency device of wipeing wall | |
CN205712967U (en) | A kind of finishing floor tile quickly breaks device into pieces | |
CN205889057U (en) | Fitment is with sub - device of nail pulling | |
CN202804235U (en) | Numerical control equipment with counterweight | |
CN112763674A (en) | Water quality detection device | |
CN205370472U (en) | Novel play oil field tubular column equipment down | |
CN205743067U (en) | A kind of finishing is with efficiently digging floor apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20180514 |
|
CF01 | Termination of patent right due to non-payment of annual fee |