CN205637162U - Prefabricated assembled steel pipe restraint power consumption connected node - Google Patents

Prefabricated assembled steel pipe restraint power consumption connected node Download PDF

Info

Publication number
CN205637162U
CN205637162U CN201620410802.4U CN201620410802U CN205637162U CN 205637162 U CN205637162 U CN 205637162U CN 201620410802 U CN201620410802 U CN 201620410802U CN 205637162 U CN205637162 U CN 205637162U
Authority
CN
China
Prior art keywords
steel
buried
power consumption
node
lower flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620410802.4U
Other languages
Chinese (zh)
Inventor
庄金平
邱豪
张铮
蔡雪峰
杨尊煌
张三鹏
谈夏维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian University of Technology
Original Assignee
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian University of Technology filed Critical Fujian University of Technology
Priority to CN201620410802.4U priority Critical patent/CN205637162U/en
Application granted granted Critical
Publication of CN205637162U publication Critical patent/CN205637162U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a prefabricated assembled steel pipe restraint power consumption connected node, this steel pipe restraint power consumption connected node include core space pre -buried steel subassembly, four with the outer steel sheet of core space pre -buried steel subassembly assorted trompil and a plurality of blocks of beam -ends limit webs, four the outer steel sheet of trompil encloses to be established the outside of core space pre -buried steel subassembly forms outer steel pipe, it forms steel fibre self -compaction concrete core space to pour steel fibre self -compaction concrete outside in the steel pipe, beam -ends limit web sets up between the last lower flange of core space pre -buried steel subassembly, whenever it all is connected through a cast -in -place steel fibre self -compaction concrete linkage segment with the precast beam to go up the lower flange. The utility model discloses the advantage: the intensity and the ductility of node core space concrete can be improved, the aseismic design notion of " strong joint, weak component " is realized, the power consumption ability of performance beam -ends plastic hinge that can be better delays plastic hinge rigidity degeneration speed to improve the ability of shearing of beam -ends, realize that the beam -ends plastic hinge moves outward etc..

Description

The power consumption of prefabricated assembled steel tube confinement connects node
Technical field
This utility model relates to a kind of assembled steel reinforced concrete frame and connects node, refers in particular to a kind of prefabricated Assembled steel tube constraint power consumption connects node.
Background technology
In " 13 " period, China will be with Development of Green Building, intelligent building as direction, to build product Industry modernization is attached most importance to, and adjusts construction industry structure energetically, and the every policies and measures of integrated use are accelerated to push away Enter building industry modernization, promote building industry transition and upgrade.Precast reinforced concrete structure is conducive to carrying High efficiency, the saving energy, development Green environmental-protection building, and be conducive to improving and ensure to build work Cheng Zhiliang, tool has a broad prospect of the use.
Structural union and shock resistance are the keys in precast reinforced concrete structure extension process Technology, waters monoblock type node to reach after China's current assembled steel many employings of tendon concrete frame structure With cast-in-place purpose.But, existing assembled steel tendon concrete frame structure there are following defect: 1, prefabricated component beam-column joint cores reinforcing bar is intensive, and concreting difficulty is big, coagulation Soil density is difficult to ensure that, stirrup is also difficult to colligation and puts in place;2, prefabricated component connection node resists Shock stability is poor, and the ductility of joint cores is inadequate;3, the consumption of the beam-ends plastic hinge of assembling frame structure Energy ability is poor.In order to improve the prefabricated assembled concrete frame construction applicable model in earthquake territory further Enclose, reduce deformation and the damage of structure, therefore provide a kind of stress performance more excellent and the company of convenient construction The mode of connecing is urgent problem, is also the focus of current research.
Summary of the invention
The technical problems to be solved in the utility model, is to provide a kind of prefabricated assembled steel tube confinement to consume energy Connect node, improved intensity and the ductility of core space concrete by this connection node, it is achieved " save by force Point, weak component " aseismic design concept, and the shear resistance of beam-ends can be improved, it is achieved plastic hinge.
This utility model is achieved in that the power consumption of prefabricated assembled steel tube confinement connects node, described steel Pipe constraint power consumption connects node and includes a core space pre-buried steel assembly, four pieces and described core space pre-buried steel group The outer steel plate of the perforate that part matches and some blocks of beam-ends limit webs;Described core space pre-buried steel assembly includes One pre-buried overhanging top flange, a pre-buried overhanging lower flange, a upper bush stirrup, a lower sleeve stirrup, extremely Few two blocks of pre-buried overhanging webs and some built-in steel sleeves;
Described pre-buried overhanging top flange and pre-buried overhanging lower flange are all reserved with one in the position that mesophase is same Big hole;The inner side formation being located at described lower sleeve stirrup is vertically enclosed in the lower end of some described built-in steel sleeves One rectangular core district;Described pre-buried overhanging lower flange is set in the bottom of described built-in steel sleeve, and makes this Pre-buried overhanging lower flange is positioned at the upper end of described lower sleeve stirrup;
One end of every described pre-buried overhanging web is all embedded in inside described rectangular core district, the equal edge of the other end The outside in rectangular core district is extended in beam-ends direction;Described pre-buried overhanging top flange is set in described pre-buried steel The top of sleeve, and make described pre-buried overhanging top flange be connected to the upper end of described pre-buried overhanging web;Institute State the upper end that upper bush stirrup is set on described built-in steel sleeve and is positioned at described pre-buried overhanging top flange;
Four blocks of outer steel plates of described perforate enclose the outside formation one outer steel pipe being located at described rectangular core district, in institute Pour Steel Fiber Reinforced Self-compacting Concrete in stating outer steel pipe and form Steel Fiber Reinforced Self-compacting Concrete core space, this steel The middle part of fiber self-dense concrete core space is reserved with an injected hole;Described beam-ends limit web is arranged on institute State between the upper lower flange of pre-buried overhanging top flange and pre-buried overhanging lower flange;Every described upper lower flange is with pre- Beam processed is all connected by a cast-in-place Steel Fiber Reinforced Self-compacting Concrete linkage section.
Further, when described steel tube confinement power consumption connection node is corner node or mid-side node, described pre- Bury overhanging top flange on the limit corresponding to corner node or mid-side node to having a top flange anchor plate, institute State pre-buried overhanging lower flange on the limit corresponding to corner node or mid-side node, be upwards provided with a lower flange anchoring Plate, and described top flange anchor plate and lower flange anchor plate be all embedded in inside described rectangular core district.
Further, the height of described built-in steel sleeve is equal to the height of the outer steel plate of described perforate, and works as institute State lower flange when needing through reinforcing bar, described upper lower flange all offers for plugging built-in steel sleeve Sleeve jack.
Further, the inner side of the outer steel plate of every described perforate is provided with anchoring rib.
Further, one block of described beam-ends limit web or two pieces it are provided with between every described upper lower flange Described beam-ends limit web, and the length of described beam-ends limit web is more than the length of upper lower flange.
Further, described beam-ends limit web offers several circular holes.
Further, described upper lower flange and beam-ends limit web are provided with several shear connectors.
Further, described top flange offers several concreting steam vents.
Further, described pre-buried overhanging web includes a cantilever plate and an anchor plate;Described anchor plate It is embedded in inside described rectangular core district;Between described cantilever plate is inserted between adjacent described built-in steel sleeve In gap, and one end of this cantilever plate and described anchor plate are fixing is connected, the other end along beam-ends direction to extension Stretch out the outside in described rectangular core district.
The beneficial effects of the utility model are as follows:
1, connecting in node in the constraint power consumption of this utility model assembled steel tube, outer steel pipe is core space steel Fiber self-dense concrete provides sidewise restraint, improves intensity and the ductility of core space concrete, real Show the aseismic design concept of " strong node, weak component ";Meanwhile, node is connected in steel tube confinement power consumption Core space can not set stirrup, overcomes tradition beam column node core area stirrup intensive, the difficulty of constructional difficulties Topic;
2, it is connected the connecting portion cast-in-place steel fibre of employing of node from close at precast beam with steel tube confinement power consumption Real concrete, utilizes the ductility that Steel Fiber Reinforced Self-compacting Concrete is good to improve the power consumption energy of beam-ends plastic hinge Power, and its good mobility solves not in place the asking of concrete vibrating at beam-ends overhanging steel assembly Topic, can preferably play the energy dissipation capacity of beam-ends plastic hinge, delay plastic hinge Stiffness Deterioration speed;
3, steel tube confinement power consumption connects the pre-buried overhanging steel assembly of core space of node, can improve beam-ends Shear resistance, it is achieved plastic hinge, decreases plastic hinge and adversely affects joint cores;
4, in construction aspect, the waist muscle of precast beam can be by the pre-buried overhanging steel group of joint cores Part connects, and overcomes the problem that tradition beam column node core area reinforcing bar is intensive, it can be ensured that the construction of node Quality;
5, the installation of the pre-buried overhanging steel assembly of this utility model assembled steel tube constraint power consumption connection node Sequencing, overcoming weld seam, shear connector, first to do the outer steel pipe preformed hole that may cause excessive, makes steel pipe The problem that binding effect weakens.
Accompanying drawing explanation
This utility model is further described the most in conjunction with the embodiments.
Fig. 1 is the structural representation that the power consumption of this utility model beam-ends meridosternous steel tube confinement connects node.
Fig. 2 is the pre-buried steel group that this utility model makes beam-ends double web steel tube confinement power consumption connection node One of assembled state figure of part.
Fig. 3 a is the pre-buried steel group that this utility model makes beam-ends double web steel tube confinement power consumption connection node The two of the assembled state figure of part.
The structural representation of pre-buried steel assembly when Fig. 3 b is this utility model making corner node.
The structural representation of pre-buried steel assembly when Fig. 3 c is this utility model making mid-side node.
Fig. 4 is the outer steel pipe that this utility model makes beam-ends double web steel tube confinement power consumption connection node One of assembled state figure.
Fig. 5 is the outer steel pipe that this utility model makes beam-ends double web steel tube confinement power consumption connection node The two of assembled state figure.
Fig. 6 is the beam-ends both sides that this utility model makes beam-ends double web steel tube confinement power consumption connection node The configuration state figure of web.
Fig. 7 pours the double web steel tube confinement power consumption of the beam-ends after molding for this utility model and connects node Structural representation.
Fig. 8 is the connection diagram that in this utility model, steel tube confinement power consumption connects node and prefabricated lower prop.
Fig. 9 is the connection diagram that in this utility model, steel tube confinement power consumption connects node and precast beam.
Figure 10 is the connection signal that in this utility model, steel tube confinement power consumption connects node and prefabricated upper prop Figure.
Wherein, the power consumption of 100-steel tube confinement connects node, and 1-core space pre-buried steel assembly, 11-is pre-buried overhanging Top flange, 112-top flange anchor plate, the pre-buried overhanging lower flange of 12-, 122-lower flange anchor plate, 13- Upper bush stirrup, 14-lower sleeve stirrup, the pre-buried overhanging web of 15-, 151 cantilever plates, 152-anchor plate, 16-built-in steel sleeve, the outer steel plate of 2-perforate, 21-anchors rib, 3-beam-ends limit web, 31-circular hole, 32- Shear connector, 4-Steel Fiber Reinforced Self-compacting Concrete, 5-precast beam, 6-protruding bar, the prefabricated lower prop of 7-, 8- Lower prop reinforcing bar, 9-slip casting articulamentum, the prefabricated upper prop of 10-, 111, the upper lower flange of 121-, a-big hole, B-sleeve jack, c-rectangular core district, the outer steel pipe of d-, d1-injected hole, e-self-compaction steel fiber reinforced concrete Linkage section, f-concreting steam vent, g-overlaps beam slab.
Detailed description of the invention
Refer to shown in Fig. 1 to Figure 10, this utility model prefabricated assembled steel tube confinement power consumption connecting joint The preferred embodiment of point 100, the power consumption of described steel tube confinement connects node 100 and includes a core space pre-buried steel The outer steel plate 2 of the perforate that assembly 1, four pieces and described core space pre-buried steel assembly 1 match and some pieces Beam-ends limit web 3, wherein, the outer steel plate 2 of perforate is to carry out according to the shape of core space pre-buried steel assembly 1 Perforate;Described core space pre-buried steel assembly 1 includes that a pre-buried overhanging top flange 11, is pre-buried overhanging 14, at least two blocks of pre-buried overhanging webs 15 of lower flange 12, upper bush stirrup 13, lower sleeve stirrup And some built-in steel sleeves 16;Wherein, every piece of pre-buried overhanging top flange 11 all has outside 2-4 The top flange 111 stretched, every piece of pre-buried overhanging lower flange 12 all has 2-4 overhanging lower flange 121, And the power consumption of same steel tube confinement connects as in node 100, top flange 111 and lower flange 121 quantity are 's.
Described pre-buried overhanging top flange 11 and pre-buried overhanging lower flange 12 are the most reserved in the position that mesophase is same Have a big hole a, with facilitate follow-up pour Steel Fiber Reinforced Self-compacting Concrete 4 time can reserve injected hole d1; The inner side formation one being located at described lower sleeve stirrup 14 is vertically enclosed in the lower end of some described built-in steel sleeves 16 Rectangular core district c;Described pre-buried overhanging lower flange 12 is set in the bottom of described built-in steel sleeve 16, And make this pre-buried overhanging lower flange 12 be positioned at the upper end of described lower sleeve stirrup 14;
One end of every described pre-buried overhanging web 15 is all embedded in inside described rectangular core district c, another End all extends the outside of rectangular core district c along beam-ends direction;Described pre-buried overhanging top flange 11 is sheathed On the top of described built-in steel sleeve 16, and described pre-buried overhanging top flange 11 is made to be connected to described pre-buried The upper end of overhanging web 15;Described upper bush stirrup 13 is set on described built-in steel sleeve 16 and position Upper end in described pre-buried overhanging top flange 11.Wherein, described pre-buried overhanging web 15 includes that one is overhanging Plate 151 and an anchor plate 152;Described anchor plate 152 is embedded in inside described rectangular core district c; Described cantilever plate 151 is inserted in the gap between adjacent described built-in steel sleeve 16, and this cantilever plate 151 One end fixing with described anchor plate 152 be connected, the other end extends outward described rectangle along beam-ends direction The outside of core space c.
The height of described built-in steel sleeve 16 is equal to the height of the outer steel plate 2 of described perforate, and works as on described When lower flange 111,121 needs through reinforcing bar, described upper lower flange 111,121 all offers for Plug the sleeve jack b of built-in steel sleeve 16.In the specific implementation, if upper lower flange 111,121 Without pass through reinforcing bar, then have only in pre-buried overhanging top flange 11 and the four of pre-buried overhanging lower flange 12 Directly enclose (on four corners of i.e. corresponding upper bush stirrup 13 and lower sleeve stirrup 14) on individual angle and set Upper built-in steel sleeve 16, and upper lower flange 111,121 all need not arrange sleeve jack b;As On fruit, lower flange 111,121 needs through reinforcing bar, then except pre-buried overhanging top flange 11 and pre-buried in addition to Stretch (i.e. corresponding upper bush stirrup 13 and four of lower sleeve stirrup 14 on four angles of lower flange 12 On corner) enclose and set built-in steel sleeve 16, corresponding sleeve jack b also to plug pre-buried steel bushing Cylinder 16, and the two ends up and down of built-in steel sleeve 16 are respectively welded at upper bush stirrup 13 and lower sleeve On stirrup 14.
Four blocks of outer steel plates 2 of described perforate enclose the outside formation one outer steel pipe d being located at described rectangular core district c, When implementing, the contact jaw by outer for adjacent apertures steel plate 2 is needed to weld together, upper lower flange 111, The part that 121 steel plates 2 outer with pre-buried overhanging web 15 and perforate contact then need not welding, described Pour Steel Fiber Reinforced Self-compacting Concrete 4 in outer steel pipe d and form Steel Fiber Reinforced Self-compacting Concrete core space (not Diagram), so, outer steel pipe d can avoid contacting with core space pre-buried steel assembly 1 by perforate, and Only provide radial constraint to Steel Fiber Reinforced Self-compacting Concrete 4;This Steel Fiber Reinforced Self-compacting Concrete core space Middle part is reserved with an injected hole d1, in the specific implementation, and can be first in rectangular core district c pre-buried one Root pvc pipe (not shown), extracts PVC out after Steel Fiber Reinforced Self-compacting Concrete 4 final set poured again Manage;Described beam-ends limit web 3 is arranged on described pre-buried overhanging top flange 11 and pre-buried overhanging bottom wing Between the upper lower flange 111,121 of edge 12;Every described upper lower flange 111,121 is equal with precast beam 5 It is connected by a cast-in-place Steel Fiber Reinforced Self-compacting Concrete linkage section e.Outside every described perforate, steel plate 2 is interior Side is provided with anchoring rib 21, to strengthen anchorage effect.
It is provided with one block of described beam-ends limit web 3 or two between every described upper lower flange 111,121 Beam-ends limit web 3 described in block, according to the seismic Concept of strong shear capacity and weak bending capacity, the length of described beam-ends limit web 3 More than the length of upper lower flange 111,121, the length of beam-ends limit web 3 can need according to stress Determine.In the specific implementation, whether the beam-ends limit that waist muscle selects to arrange can be set according to precast beam 5 The quantity of web 3, is connected with the precast beam 5 not having waist muscle when steel tube confinement power consumption connects node 100 Time, then on the most described, between lower flange 111,121, it is provided with one block of beam-ends limit web 3 (such as Fig. 1 Shown in);When steel tube confinement power consumption connection node 100 is connected with the precast beam 5 being provided with waist muscle, then Two pieces of beam-ends limit webs 3 (as shown in Figure 7) it are provided with between lower flange 111,121 on the most described, To facilitate, the protruding bar 6 of precast beam 3 is welded on two beam-ends limit webs 3.
Several circular holes 31 are offered on described beam-ends limit web 3, when implementing, can be according to reality Stress demand carries out perforate, to increase the cohesive force between beam-ends limit web 3 and concrete.On described It is provided with several shear connectors 32 on lower flange 111,121 and beam-ends limit web 3, when implementing, Some shear connectors can be welded in upper lower flange 111,121 on beam-ends limit web 3 according to cohering requirement 32, to guarantee steel assembly and concrete cooperation.Several coagulations are offered on described top flange 111 Soil pours steam vent f, in this way it can be ensured that beam-ends is during casting concrete, and beam-ends limit web The air of 3 inner concretes can be discharged from this concreting steam vent f.
Please emphasis with reference to shown in Fig. 3 b and Fig. 3 c, be angle when the power consumption of described steel tube confinement connects node 100 When node or mid-side node, described pre-buried overhanging top flange 11 is on the limit corresponding to corner node or mid-side node To having a top flange anchor plate 112, described pre-buried overhanging lower flange 12 is at corner node or mid-side node Upwards it is provided with a lower flange anchor plate 122 on corresponding limit, i.e. connects node in steel tube confinement power consumption 100 when being corner node or mid-side node, needs the pre-buried overhanging abdomen on the limit corresponding to corner node or mid-side node Plate 15 replaces with top flange anchor plate 112 and lower flange anchor plate 122, and when mounted, described on Edge of a wing anchor plate 112 and lower flange anchor plate 122 are all embedded in inside described rectangular core district c.
The power consumption of this utility model prefabricated assembled steel tube confinement connects the construction method of node 100, described side Method comprises the steps:
Step 1, the core space pre-buried steel assembly 1 of making steel tube confinement power consumption connection node 100:
First, built-in steel sleeve 16 is stood on the inner side of lower sleeve stirrup 14, and by lower sleeve stirrup Inside 14, the position with 16 times end in contact of built-in steel sleeve welds together;Meanwhile, by pre-buried overhanging under The bottom of built-in steel sleeve 16 is inserted in (when implementing, if on pre-buried overhanging lower flange 12 in the edge of a wing 12 It is provided with sleeve jack b, then needs to be inserted in built-in steel sleeve 16 sleeve jack b;Without Sleeve jack b, then be directly inserted in built-in steel sleeve 16 i.e. by four angles of pre-buried overhanging lower flange 12 Can), and make pre-buried overhanging lower flange 12 be positioned at the upper end of lower sleeve stirrup 14;
Then, pre-buried overhanging web 15 is inserted in the space between adjacent built-in steel sleeve 16;Will be pre- Bury overhanging top flange 11 and be inserted in built-in steel sleeve 16, and make pre-buried overhanging top flange 11 be connected to pre-buried The upper end of overhanging web 15;Meanwhile, upper bush stirrup 13 it is set on built-in steel sleeve 16 and is positioned at The upper end of pre-buried overhanging top flange 11 forms a rectangular core district c (as illustrated in fig. 2 and 3 a);
Finally, the position that upper bush stirrup 13 contacts with built-in steel sleeve 16 is welded together;Will be pre- Bury overhanging web 15 and pre-buried overhanging lower flange 12 and pre-buried overhanging top flange 11 at rectangular core district c Interior contact site welds together, and the contact site outside rectangular core district c wouldn't weld;
If it is corner node or mid-side node that steel tube confinement power consumption connects node 100, then by corner node or margin knot Top flange anchor plate 112 and the lower flange anchor plate 122 on the limit corresponding to Dian weld with built-in steel sleeve 16 It is connected together (as shown in figures 3 b and 3 c);
Step 2, outer for four pieces of perforates steel plate 2 is enclosed the outside being located at rectangular core district c, and open adjacent Outside hole, the contact jaw of steel plate 2 is welded together to form an outer steel pipe d;Meanwhile, would extend out outer steel pipe d The position that contacts with upper lower flange 111,121 of pre-buried overhanging web 15 in outside weld together (as Shown in Fig. 4 and Fig. 5);This step 2 should be noted that: upper lower flange 111,121 and pre-buried outside Stretch web 15 part that steel plate 2 contacts outward with perforate and need not welding, to ensure during implementing, Not mutually power transmission between core space pre-buried steel assembly 1 and outer steel pipe d;
Step 3, first welding upper beam end edge web 3 between upper lower flange 111,121, and if in advance Do not set waist muscle on beam 5 processed, then between upper lower flange 111,121, weld one block of beam-ends limit web 3 i.e. Can (as shown in Figure 1), if being provided with waist muscle on precast beam 5, then in upper lower flange 111,121 Between weld two pieces of beam-ends limit webs 3 (as shown in Figure 6);
Then in rectangular core district c a pre-buried pvc pipe (not shown) to form injected hole d1, And pour Steel Fiber Reinforced Self-compacting Concrete 4 in rectangular core district c, treat Steel Fiber Reinforced Self-compacting Concrete 4 Extract pvc pipe after final set out, thus form steel tube confinement power consumption and connect node 100 (as shown in Figure 7); When implementing, after having poured Steel Fiber Reinforced Self-compacting Concrete 4, need just to rotate at set intervals one Secondary pvc pipe, to prevent pvc pipe because taking out together with glutinous with Steel Fiber Reinforced Self-compacting Concrete 4 Come.
Step 4, by the lower prop reinforcing bar 8 of prefabricated lower prop 7 from steel tube confinement power consumption connect node 100 pre- Bury steel bushing 16 to pass, and connect the bottom of node 100 and prefabricated lower prop 7 in steel tube confinement power consumption Between top, reserved certain height is as slip casting articulamentum 9 (as shown in Figure 8);With steel form (not Diagram) surrounding of slip casting articulamentum 9 is sealed, and by injected hole d1 toward internal slip casting, make lower prop The rectangular core district c that reinforcing bar 8 is connected node 100 with steel tube confinement power consumption forms entirety;Wherein, slip casting Articulamentum 9 can strengthen the power consumption of prefabricated lower prop 7 and steel tube confinement be connected node 100 adhesive property and Ensure the water resistance of junction.Between injected hole d1, slip casting articulamentum 9 and built-in steel sleeve 16 Communicating, slurry first passes through injected hole d1 and is injected into slip casting articulamentum 9, is filling slip casting articulamentum 9 After, slurry can fill again the space between built-in steel sleeve 16 and lower prop reinforcing bar 8, and final from rectangle The top of the built-in steel sleeve 16 of core space c is overflowed, to guarantee that lower prop reinforcing bar 8 consumes energy with steel tube confinement The rectangular core district c connecting node 100 can form an entirety;
If step 5 precast beam 5 is provided with waist muscle, then by the protruding bar 6 of precast beam 5 with steel pipe about Upper lower flange 111,121 and the beam-ends limit web 3 of bundle power consumption connection node 100 weld respectively; If precast beam 5 does not set waist muscle, the most do not perform this step 5;
Step 6, steel tube confinement power consumption connect node 100 pour from close with the connecting portion of precast beam 5 Real steel fiber reinforced concrete linkage section e (as it is shown in figure 9, this Fig. 9 be only given with one of them direction pre- The connection way of beam 5 processed, the way in remaining direction is identical), pour self-compaction steel fiber reinforced concrete even After the section of connecing e, pour overlapping beam slab g (owing to pouring of beam slab g of overlapping is often to make in prior art Use, the most no longer elaborate);After completing to overlap the pouring of beam slab g, will be pre- The reinforcing bar grout sleeve (not shown) of upper prop 10 processed is inserted in and connects node 100 through steel tube confinement power consumption Lower prop reinforcing bar 8 in, and toward slip casting (as shown in Figure 10) in prefabricated upper prop 10;In the specific implementation, Prefabricated upper prop 10 and floor need to leave certain space, are then in the milk from each reinforcing bar of prefabricated upper prop 10 Grouting port (not shown) slip casting inside of sleeve, until slurry is from the excessive slurry mouth of reinforcing bar grout sleeve (not Diagram) flow out.
In sum, this utility model has the advantages that
1, connecting in node in the constraint power consumption of this utility model assembled steel tube, outer steel pipe is core space steel Fiber self-dense concrete provides sidewise restraint, improves intensity and the ductility of core space concrete, real Show the aseismic design concept of " strong node, weak component ";Meanwhile, node is connected in steel tube confinement power consumption Core space can not set stirrup, overcomes tradition beam column node core area stirrup intensive, the difficulty of constructional difficulties Topic;
2, it is connected the connecting portion cast-in-place steel fibre of employing of node from close at precast beam with steel tube confinement power consumption Real concrete, utilizes the ductility that Steel Fiber Reinforced Self-compacting Concrete is good to improve the power consumption energy of beam-ends plastic hinge Power, and its good mobility solves not in place the asking of concrete vibrating at beam-ends overhanging steel assembly Topic, can preferably play the energy dissipation capacity of beam-ends plastic hinge, delay plastic hinge Stiffness Deterioration speed;
3, steel tube confinement power consumption connects the pre-buried overhanging steel assembly of core space of node, can improve beam-ends Shear resistance, it is achieved plastic hinge, decreases plastic hinge and adversely affects joint cores;
4, in construction aspect, the waist muscle of precast beam can be by the pre-buried overhanging steel group of joint cores Part connects, and overcomes the problem that tradition beam column node core area reinforcing bar is intensive, it can be ensured that the construction of node Quality;
5, the installation of the pre-buried overhanging steel assembly of this utility model assembled steel tube constraint power consumption connection node Sequencing, overcoming weld seam, shear connector, first to do the outer steel pipe preformed hole that may cause excessive, makes steel pipe The problem that binding effect weakens.
Although the foregoing describing detailed description of the invention of the present utility model, but it is familiar with the skill of the art Art personnel should be appreciated that our described specific embodiment is merely exemplary rather than for right The restriction of scope of the present utility model, those of ordinary skill in the art are according to spirit of the present utility model The modification of the equivalence made and change, all should contain of the present utility model claimed In the range of.

Claims (9)

1. a prefabricated assembled steel tube confinement power consumption connects node, it is characterised in that: described steel pipe is about Bundle power consumption connect node include a core space pre-buried steel assembly, four pieces with described core space pre-buried steel assembly phase The outer steel plate of the perforate of coupling and some blocks of beam-ends limit webs;Described core space pre-buried steel assembly includes that one is pre- Bury overhanging top flange, a pre-buried overhanging lower flange, a upper bush stirrup, a lower sleeve stirrup, at least two The pre-buried overhanging web of block and some built-in steel sleeves;
Described pre-buried overhanging top flange and pre-buried overhanging lower flange are all reserved with one in the position that mesophase is same Big hole;The inner side formation being located at described lower sleeve stirrup is vertically enclosed in the lower end of some described built-in steel sleeves One rectangular core district;Described pre-buried overhanging lower flange is set in the bottom of described built-in steel sleeve, and makes this Pre-buried overhanging lower flange is positioned at the upper end of described lower sleeve stirrup;
One end of every described pre-buried overhanging web is all embedded in inside described rectangular core district, the equal edge of the other end The outside in rectangular core district is extended in beam-ends direction;Described pre-buried overhanging top flange is set in described pre-buried steel The top of sleeve, and make described pre-buried overhanging top flange be connected to the upper end of described pre-buried overhanging web;Institute State the upper end that upper bush stirrup is set on described built-in steel sleeve and is positioned at described pre-buried overhanging top flange;
Four blocks of outer steel plates of described perforate enclose the outside formation one outer steel pipe being located at described rectangular core district, in institute Pour Steel Fiber Reinforced Self-compacting Concrete in stating outer steel pipe and form Steel Fiber Reinforced Self-compacting Concrete core space, this steel The middle part of fiber self-dense concrete core space is reserved with an injected hole;Described beam-ends limit web is arranged on institute State between the upper lower flange of pre-buried overhanging top flange and pre-buried overhanging lower flange;Every described upper lower flange is with pre- Beam processed is all connected by a cast-in-place Steel Fiber Reinforced Self-compacting Concrete linkage section.
Prefabricated assembled steel tube confinement the most according to claim 1 power consumption connects node, its feature Be: described steel tube confinement power consumption connect node be corner node or mid-side node time, described pre-buried overhanging on The edge of a wing on the limit corresponding to corner node or mid-side node to having a top flange anchor plate, described pre-buried outside Stretch lower flange on the limit corresponding to corner node or mid-side node, be upwards provided with a lower flange anchor plate, and described Top flange anchor plate and lower flange anchor plate are all embedded in inside described rectangular core district.
Prefabricated assembled steel tube confinement the most according to claim 1 and 2 power consumption connects node, its It is characterised by: the height of described built-in steel sleeve is equal to the height of the outer steel plate of described perforate, and works as on described When lower flange needs through reinforcing bar, described upper lower flange all offers the set for plugging built-in steel sleeve Cylinder jack.
Prefabricated assembled steel tube confinement the most according to claim 3 power consumption connects node, its feature It is: the inner side of the outer steel plate of every described perforate is provided with anchoring rib.
Prefabricated assembled steel tube confinement the most according to claim 3 power consumption connects node, its feature It is: between every described upper lower flange, be provided with one block of described beam-ends limit web or two pieces of described beam-ends Limit web, and the length of described beam-ends limit web is more than the length of upper lower flange.
Prefabricated assembled steel tube confinement the most according to claim 3 power consumption connects node, its feature It is: on the web of described beam-ends limit, offer several circular holes.
Prefabricated assembled steel tube confinement the most according to claim 3 power consumption connects node, its feature It is: on described upper lower flange and beam-ends limit web, be provided with several shear connectors.
Prefabricated assembled steel tube confinement the most according to claim 3 power consumption connects node, its feature It is: on described top flange, offer several concreting steam vents.
Prefabricated assembled steel tube confinement the most according to claim 3 power consumption connects node, its feature It is: described pre-buried overhanging web includes a cantilever plate and an anchor plate;Described anchor plate is embedded in institute State inside rectangular core district;Described cantilever plate is inserted in the gap between adjacent described built-in steel sleeve, and One end of this cantilever plate is fixing with described anchor plate to be connected, and the other end extends outward described along beam-ends direction The outside in rectangular core district.
CN201620410802.4U 2016-05-09 2016-05-09 Prefabricated assembled steel pipe restraint power consumption connected node Withdrawn - After Issue CN205637162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620410802.4U CN205637162U (en) 2016-05-09 2016-05-09 Prefabricated assembled steel pipe restraint power consumption connected node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620410802.4U CN205637162U (en) 2016-05-09 2016-05-09 Prefabricated assembled steel pipe restraint power consumption connected node

Publications (1)

Publication Number Publication Date
CN205637162U true CN205637162U (en) 2016-10-12

Family

ID=57050021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620410802.4U Withdrawn - After Issue CN205637162U (en) 2016-05-09 2016-05-09 Prefabricated assembled steel pipe restraint power consumption connected node

Country Status (1)

Country Link
CN (1) CN205637162U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780935A (en) * 2016-05-09 2016-07-20 福建工程学院 Prefabricated assembling type steel pipe restrained energy-dissipation connection node and construction method
CN107905369A (en) * 2017-12-25 2018-04-13 合肥工业大学 Assembling frame beam-column connection
CN110080396A (en) * 2019-05-21 2019-08-02 杜鸣川 A kind of modified assembled architecture cage six-way section and its assembly method
CN111021539A (en) * 2019-12-30 2020-04-17 北京京盛泰华金属结构有限公司 Assembling method for beam-column connecting joint of steel-structure cantilever beam
KR102154647B1 (en) * 2020-01-20 2020-09-11 주식회사 충전공영개발 Structure that strengthens cross section stiffness of column and girder by intergrating diaphragm and girder in steel frame structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780935A (en) * 2016-05-09 2016-07-20 福建工程学院 Prefabricated assembling type steel pipe restrained energy-dissipation connection node and construction method
CN105780935B (en) * 2016-05-09 2018-12-21 福建工程学院 Prefabricated assembled steel tube confinement energy consumption connecting node and construction method
CN107905369A (en) * 2017-12-25 2018-04-13 合肥工业大学 Assembling frame beam-column connection
CN107905369B (en) * 2017-12-25 2024-02-23 合肥工业大学 Assembled frame beam column connection node
CN110080396A (en) * 2019-05-21 2019-08-02 杜鸣川 A kind of modified assembled architecture cage six-way section and its assembly method
CN111021539A (en) * 2019-12-30 2020-04-17 北京京盛泰华金属结构有限公司 Assembling method for beam-column connecting joint of steel-structure cantilever beam
KR102154647B1 (en) * 2020-01-20 2020-09-11 주식회사 충전공영개발 Structure that strengthens cross section stiffness of column and girder by intergrating diaphragm and girder in steel frame structure

Similar Documents

Publication Publication Date Title
CN105780935B (en) Prefabricated assembled steel tube confinement energy consumption connecting node and construction method
CN205637162U (en) Prefabricated assembled steel pipe restraint power consumption connected node
CN105735466B (en) Prefabricated wall column one-part form steel bar connecting structure and method
CN107143040A (en) The connecting structure and its construction method of a kind of prefabricated regeneration monolith beam
CN106869315A (en) Concrete-filled steel tubular frame and its construction method with presstressed reinforcing steel
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN108442536A (en) A kind of prefabricated assembled shear wall groove slurry anchor horizontal connection construction
CN103790379A (en) Method for constructing connection joint between flat slab and post cap in reverse construction method
CN110056092A (en) Bolt plug-in type precast shear wall and superimposed sheet connecting structure and construction method up and down
CN108951952A (en) Concrete filled steel tube precast shear wall plate perps connecting node and assembly method
CN106437032A (en) Assembled concrete filled steel tubular column splicing structure and method
CN205976072U (en) Assembly type structure wall body and prefabricated concrete structure
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN212926718U (en) Prefabricated horizontal grouting sleeve connecting wall unit and wall
CN207436278U (en) A kind of assembly concrete-filled steel tube column-girder steel punching node
CN212478172U (en) Splicing type prefabricated building concrete member
CN110952659B (en) Prefabricated column node connecting structure and construction method
CN208105506U (en) A kind of prefabricated assembled shear wall groove slurry anchor horizontal connection construction
CN209227834U (en) A kind of assembly concrete-filled steel tube frame-shear-wall structure
CN209323688U (en) Prefabricated assembling type reinforced concrete column splices node structure
CN209243966U (en) A kind of connecting node of heat-insulation wall plate
CN206844342U (en) A kind of prefabricated primary and secondary beam connecting node
CN205975996U (en) Thick liquid anchor lap joint structure and wall body
CN205444565U (en) Wallboard connected node
CN208167507U (en) The pier bottom structure and single track bridge pier of single track bridge pier

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20161012

Effective date of abandoning: 20181221