CN205637040U - Multi -functional time delay discharge port suitable for ooze biological facility that is detained of row rainwater - Google Patents
Multi -functional time delay discharge port suitable for ooze biological facility that is detained of row rainwater Download PDFInfo
- Publication number
- CN205637040U CN205637040U CN201620434175.8U CN201620434175U CN205637040U CN 205637040 U CN205637040 U CN 205637040U CN 201620434175 U CN201620434175 U CN 201620434175U CN 205637040 U CN205637040 U CN 205637040U
- Authority
- CN
- China
- Prior art keywords
- overflow
- ooze
- row
- delay
- facility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model provides a multi -functional time delay discharge port suitable for ooze biological facility that is detained of row rainwater, including concrete foundation, the overflow wall of a well, municipal delivery port and top overflow passageway, wherein, still including oozing row passageway, ooze row passageway including oozing the calandria, ooze the calandria setting on the lateral wall of the overflow wall of a well, the inboard mouthful of well body with surrounding through the overflow wall of a well that oozes the calandria communicates, ooze the outside mouth and rain water facilities intercommunication of calandria, it passes through the well body, municipal delivery port and municipal pipeline connection to ooze row passageway and top overflow passageway. Multi -functional time delay discharge port have following advantage: specially adapted grass planting ditch, rainwater garden etc. Need ooze the rain water facilities who arranges, have delay adjustment and adjust according to different precipitation and carry out the effect of hierarchical control, can collect and discharge the infiltration rainwater when effectively increasing rain water facilities's rainwater detention time, prevent that the plant is by long term immersion, protecting plant normal growth.
Description
Technical field
This utility model relates to multistage time delay exhaust apparatus, particularly to a kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility.
Background technology
Rainwater time delay discharge is one of common technique in storm water management, it is mainly used in regulating rainfall runoff and enters the water yield of city planting ductwork, play the effect of delay adjustment runoff, tradition rainwater time delay floss hole is mainly used in the control of stormwater facility operation water level, there is the function controlling water amount, but have that structure is single, the problem of function singleness, it is difficult to meet diameter stream grading control or the requirement of heavy rain peak flow control, therefore, prior art requires further improvement and perfect, to realize the further exploitation of Multifunctional rain delay regulating device.
Summary of the invention
(1) goal of the invention: for solving above-mentioned problems of the prior art, the purpose of this utility model is to provide a kind of multistage overflow well, can realize making different grading control respectively for different rainfall degree, reach different control targets, play the effect cutting down runoff peak value during heavy rain, can suitably take into account the regulation and control to Runoff during middle light rain and prevent in stormwater facility plant by long period of soaking.
(2) technical scheme: a kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility, including concrete foundation, the overflow borehole wall, municipal administration outlet and top overflow ducts, wherein, also includes oozing row's passage;
The described row's passage that oozes includes oozing comb, described in ooze comb and be arranged on the sidewall of the overflow borehole wall, described in ooze the interior side port of comb and connect with the well body surrounded by the overflow borehole wall, described in ooze the lateral port of comb and connect with stormwater facility;
Described top overflow ducts includes that top overflow grating and top overfall, described top overflow grating are arranged on the top of the overflow borehole wall;
Described row's passage and the top overflow ducts of oozing is connected with municipal pipeline by well body, municipal administration outlet.
Preferably, sidepiece overflow ducts is also included;
Described sidepiece overflow ducts includes sidepiece overflow grating and side overflow mouth, and described sidepiece overflow grating is fixing with the pre-embedded steel slab being arranged on overflow borehole wall sidewall to be connected, and described side overflow mouth is arranged on inside sidepiece overflow grating.
Preferably, the position of row's passage is oozed described in less than described sidepiece overflow ducts.
Preferably, described top overflow grating is obliquely installed.
Preferably, overflow grating relatively low side in described top is arranged at sidepiece overflow grating.
Preferably, the described overflow borehole wall is arranged by Prefabricated block splicing.
Preferably, described top overflow grating is rectangle or circle.
Preferably, a diameter of 20-100mm of comb is oozed described in.
Preferably, ooze row's passage described in and include two.
Preferably, said two ooze row passage be arranged in the both direction of straight line or said two ooze row passage be vertically arranged.
(3) beneficial effect: the Multifunctional time-delay floss hole that this utility model provides has the advantage that being particularly well-suited to grass planting ditch, Rain Garden etc. needs to ooze the stormwater facility of row; there is delay adjustment and carry out the effect of grading control according to different precipitation regulation; infiltration rainwater can be collected and discharges while the rainwater holdup time being effectively increased stormwater facility; prevent plant by long period of soaking, protect plant normal growth.
Accompanying drawing explanation
Fig. 1 is longitudinal planing surface schematic diagram of this utility model Multifunctional time-delay floss hole;
Fig. 2 is the horizontal planing surface schematic diagram of this utility model Multifunctional time-delay floss hole;
Fig. 3 is the floor map of this utility model Multifunctional time-delay floss hole.
1-oozes comb;2-sidepiece overflow grating;3-pre-embedded steel slab;4-municipal administration outlet;5-top overfall;6-top overflow grating;The 7-overflow borehole wall;8-side overflow mouth;81-one-level overfall;Bis-grades of overfalls of 82-;9-concrete foundation.
Detailed description of the invention
Below in conjunction with preferred embodiment, this utility model is described in further details; elaborate more details in the following description so that fully understanding this utility model; but; this utility model obviously can be implemented in multiple these other modes described that are different from; those skilled in the art can make similar popularization according to practical situations, deduce in the case of this utility model intension, the most should be with the content constraints of this specific embodiment protection domain of the present utility model.
Fig. 1-3 is the schematic diagram of embodiment of the present utility model, it should be noted that this accompanying drawing is only used as example, is not to draw according to the condition of equal proportion, and should not be construed as limiting in this, as to actual requirement protection domain of the present utility model.
In order to make up tradition time delay floss hole in water yield time delay, deficiency in terms of grading control and Water-quality control, this Multifunctional time-delay floss hole have employed extend the runoff time of staying relate to thought, on the basis of limited volume adjusted, by the design of floss hole, reach the target of Multistage Control, floss hole is connected with rain penetration facility by oozing comb 1, outer row after rain penetration, avoid rainwater long period of soaking plant, protection plant growing, also by extending the rainfall runoff time of staying in stagnant storage space, diameter stream carries out On-line precipitation purification, obtain more preferable effluent quality, it is particularly well-suited to grass planting ditch, Rain Gardens etc. need to ooze the stormwater facility of row.
A kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility, including concrete foundation 9, the overflow borehole wall 7, municipal administration outlet 4 and top overflow ducts, wherein, also includes oozing row's passage;The described row's passage that oozes includes oozing comb 1, described in ooze comb 1 and be arranged on the sidewall of the overflow borehole wall 7, described in ooze the interior side port of comb 1 and connect with the well body surrounded by the overflow borehole wall 7, described in ooze the lateral port of comb 1 and connect with stormwater facility;Described top overflow ducts includes that top overflow grating 6 and top overfall 5, described top overflow grating 6 are arranged on the top of the overflow borehole wall 7;Described row's passage and the top overflow ducts of oozing is connected with municipal pipeline by well body, municipal administration outlet 4.
When rainwater is less, by oozing row's passage, rainfall runoff is oozed row, extend the holdup time of rainfall runoff, when rainwater is bigger, carry out Quick drainage by top overflow ducts, prevent rainwater spill-over, tentatively realize two grades of grading control of rainwater.
Top overflow grating 6 can prevent the bulky grain pollutant such as weeds, leaves, rubbish from entering well body.
Also include sidepiece overflow ducts;Described sidepiece overflow ducts includes sidepiece overflow grating 2 and side overflow mouth 8, described sidepiece overflow grating 2 is fixing with the pre-embedded steel slab 3 being arranged on the overflow borehole wall 7 sidewall to be connected, described side overflow mouth 8 is arranged on inside sidepiece overflow grating 2, the described position of row's passage of oozing is less than described sidepiece overflow ducts, described side overflow mouth 8 includes one-level overfall 81 and two grades of overfalls 82, and described one-level overfall 81 is positioned at below two grades of overfalls 82.
Increase sidepiece overflow ducts can realize oozing row's passage, sidepiece overflow ducts and three grades of grading control of top overflow ducts, wherein, sidepiece overflow ducts also can realize the multi-level hierarchical of inside and control, rainfall runoff discharge to stormwater facility can realize being precisely controlled and multi-functional control, the discharge function of significant increase existing time delay floss hole.
Described top overflow grating 6 is obliquely installed.
The relatively low side of described top overflow grating 6 is arranged at sidepiece overflow grating 2.
The described overflow borehole wall 7 by Prefabricated block splicing arrange, Prefabricated block be pre-designed manufacture, low cost and the Fast Construction of discharge outlet can be realized, described Prefabricated block can be selected for PP or PE plastic material.
Described top overflow grating 6 is rectangle or circle.
The described a diameter of 20-100mm oozing comb 1, diameter and the model of oozing comb 1 select according to actual place and design requirement, but are not limited to 20-100mm.
Described ooze row passage include two, said two ooze row passage be arranged in the both direction of straight line or said two ooze row passage be vertically arranged.
The described quantity oozing row's passage is not limited to two, and a plurality of combining form oozing row's passage is also not necessarily limited to lineal layout or vertical distribution.
When rainwater is the least, rainfall runoff infiltrates at lower position through rain penetration facility, collects through oozing comb 1 and discharges, i.e. ensure that the rainwater holdup time, by rain penetration facility, rainfall runoff can be carried out On-line precipitation purification again, it is thus achieved that preferably effluent quality;
When rainwater is less, rainfall runoff enters well body by the one-level overfall 81 of sidepiece overflow ducts, enters municipal pipeline, owing to the path of one-level overfall 81 is less by municipal administration outlet 4, the speed that rainfall runoff is discharged effectively is slowed down, and adds the dead time of rainfall runoff;
When rainwater is bigger, rainfall runoff enters well body by one-level overfall 81 and two grades of overfalls 82 of sidepiece overflow ducts, enters municipal pipeline, now by municipal administration outlet 4, the discharge capacity of sidepiece overflow ducts is fully used, and the mass rate of emission of rainfall runoff significantly improves;
When rainwater be the precipitation such as heavy rain very big in the case of, rainfall runoff discharges by oozing row's passage, sidepiece overflow ducts and top overflow ducts simultaneously, and rainwater mass rate of emission promotes again, meets the requirement of Quick drainage;
In the case of precipitation is high, rainfall runoff is only capable of by oozing row's passage, sidepiece overflow ducts and top overflow ducts discharge simultaneously, and the total emission volumn of rainfall runoff is the upper limit of floss hole, can effectively control crest discharge.
Above content is the explanation to the preferred embodiment that this utility model is created, and those skilled in the art can be helped to be more fully understood by the technical scheme that this utility model is created.But, these embodiments are merely illustrative, it is impossible to assert that the detailed description of the invention that this utility model is created is only limitted to the explanation of these embodiments.For this utility model creates person of an ordinary skill in the technical field, on the premise of creating design without departing from this utility model, it is also possible to make some simple deductions and conversion, all should be considered as belonging to the protection domain that this utility model is created.
Claims (10)
1. it is applicable to ooze row's rainwater biology and is detained a Multifunctional time-delay floss hole for facility, including concrete foundation, the overflow borehole wall, municipal administration outlet and top overflow ducts, it is characterised in that: also include oozing row's passage;
The described row's passage that oozes includes oozing comb, described in ooze comb and be arranged on the sidewall of the overflow borehole wall, described in ooze the interior side port of comb and connect with the well body surrounded by the overflow borehole wall, described in ooze the lateral port of comb and connect with stormwater facility;
Described top overflow ducts includes that top overflow grating and top overfall, described top overflow grating are arranged on the top of the overflow borehole wall;
Described row's passage and the top overflow ducts of oozing is connected with municipal pipeline by well body, municipal administration outlet.
A kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility the most according to claim 1, it is characterised in that: also include sidepiece overflow ducts;
Described sidepiece overflow ducts includes sidepiece overflow grating and side overflow mouth, and described sidepiece overflow grating is fixing with the pre-embedded steel slab being arranged on overflow borehole wall sidewall to be connected, and described side overflow mouth is arranged on inside sidepiece overflow grating.
A kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility the most according to claim 2, it is characterised in that ooze the position of row's passage described in: less than described sidepiece overflow ducts.
A kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility the most according to claim 2, it is characterised in that: described top overflow grating is obliquely installed.
A kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility the most according to claim 4, it is characterised in that: the relatively low side of overflow grating, described top is arranged at sidepiece overflow grating.
A kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility the most according to claim 1, it is characterised in that: the described overflow borehole wall is arranged by Prefabricated block splicing.
A kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility the most according to claim 1, it is characterised in that: described top overflow grating is rectangle or circle.
A kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility the most according to claim 1, it is characterised in that ooze a diameter of 20-100mm of comb described in:.
A kind of Multifunctional time-delay floss hole being applicable to ooze row's rainwater biology delay facility the most according to claim 1, it is characterised in that ooze row's passage described in: and include two.
The most according to claim 9 a kind of it be applicable to ooze row's rainwater biology and be detained the Multifunctional time-delay floss hole of facility, it is characterised in that: said two is oozed row's passage and is arranged in the both direction of straight line or said two is oozed row's passage and is vertically arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620434175.8U CN205637040U (en) | 2016-05-16 | 2016-05-16 | Multi -functional time delay discharge port suitable for ooze biological facility that is detained of row rainwater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620434175.8U CN205637040U (en) | 2016-05-16 | 2016-05-16 | Multi -functional time delay discharge port suitable for ooze biological facility that is detained of row rainwater |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205637040U true CN205637040U (en) | 2016-10-12 |
Family
ID=57059303
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620434175.8U Active CN205637040U (en) | 2016-05-16 | 2016-05-16 | Multi -functional time delay discharge port suitable for ooze biological facility that is detained of row rainwater |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205637040U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105863022A (en) * | 2016-05-16 | 2016-08-17 | 北京雨人润科生态技术有限责任公司 | Multifunctional delayed drainage port suitable for rainwater infiltration drainage and bioretention facility |
CN108560679A (en) * | 2018-06-27 | 2018-09-21 | 江西师范大学 | A kind of drainage pipeline with biological corridor function |
-
2016
- 2016-05-16 CN CN201620434175.8U patent/CN205637040U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105863022A (en) * | 2016-05-16 | 2016-08-17 | 北京雨人润科生态技术有限责任公司 | Multifunctional delayed drainage port suitable for rainwater infiltration drainage and bioretention facility |
CN108560679A (en) * | 2018-06-27 | 2018-09-21 | 江西师范大学 | A kind of drainage pipeline with biological corridor function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735455B (en) | One kind enters river pollution complex ecological closure works system | |
CN104982249B (en) | A kind of Rain Garden for greenbelt among road | |
CN104129857A (en) | High-cold region reclaimed water deep-purification constructed wetland system | |
CN107816082A (en) | A kind of sponge roof rainwater collection reutilization system | |
CN104141346B (en) | Combined rainwater diafiltration tree pond | |
CN101767911A (en) | Method and device for strengthening treatment of slope interception | |
CN103572829A (en) | Electrically-controlled automatic adjustable overflow weir intercepting well | |
CN205637040U (en) | Multi -functional time delay discharge port suitable for ooze biological facility that is detained of row rainwater | |
CN205604406U (en) | A biological area of being detained that is used for heavy grade road rainfall runoff to control | |
CN105645691A (en) | Multifunctional and ecological tree pool | |
CN106836442A (en) | Road runoff discarding system and road runoff filtration system | |
US20230046121A1 (en) | Farmland irrigation and drainage system | |
CN106320494A (en) | Sponge engineering system based on existing urban road and drainage condition and construction method of sponge engineering system | |
CN105863022A (en) | Multifunctional delayed drainage port suitable for rainwater infiltration drainage and bioretention facility | |
CN205637050U (en) | Multi -functional municipal pipeline discharge port suitable for different precipitation conditions | |
CN107503426A (en) | A kind of wet land system and its construction method for integrating rainwater-collecting, regulating and storing, purifying | |
CN103437281A (en) | Bridge deck runoff collection treatment and emergency system | |
CN105019537A (en) | Roof impoundment and waterlogging prevention system | |
CN104234171A (en) | Non-point source pollution control-based arterial drainage water quality regulation and control system and arterial drainage water quality regulation and control method | |
CN204282494U (en) | Roof retaining prevention waterlogging system | |
CN105863029A (en) | Multifunctional municipal pipeline discharge port suitable for different rainfall conditions | |
CN207277483U (en) | A kind of wet land system for integrating rainwater-collecting, regulating and storing, purifying | |
CN215105886U (en) | Initial rainwater closure purification system suitable for municipal road sponge construction | |
WO2014198240A1 (en) | Multi-filtration drainage and irrigation water pipe, omni-directional planting pot and filtration drainage and irrigation pipe bundle | |
CN209891286U (en) | Rainwater collection, purification, regulation and storage ecological utilization system for sponge urban viaduct |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181010 Address after: 100097 No. 1 building, morning garden, Century City, Haidian District, Beijing 1612 Co-patentee after: Beijing Yuren Runke Ecology Technology Co., Ltd. Patentee after: Wang Wenliang Address before: 100080 2106-025 21, north 9 Ring Road, Haidian District, Beijing. Patentee before: Beijing Yuren Runke Ecology Technology Co., Ltd. |