CN205618173U - Slip casting pipe is backfilled to tunnel vault - Google Patents

Slip casting pipe is backfilled to tunnel vault Download PDF

Info

Publication number
CN205618173U
CN205618173U CN201620282246.7U CN201620282246U CN205618173U CN 205618173 U CN205618173 U CN 205618173U CN 201620282246 U CN201620282246 U CN 201620282246U CN 205618173 U CN205618173 U CN 205618173U
Authority
CN
China
Prior art keywords
slip casting
tunnel
tunnel vault
grouting pipe
vault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620282246.7U
Other languages
Chinese (zh)
Inventor
王成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SPLENDOR YAN-DRAINAGE MATERIALS Ltd
Original Assignee
JIANGSU SPLENDOR YAN-DRAINAGE MATERIALS Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SPLENDOR YAN-DRAINAGE MATERIALS Ltd filed Critical JIANGSU SPLENDOR YAN-DRAINAGE MATERIALS Ltd
Priority to CN201620282246.7U priority Critical patent/CN205618173U/en
Application granted granted Critical
Publication of CN205618173U publication Critical patent/CN205618173U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a slip casting pipe is backfilled to tunnel vault, the global design is the taper structure, thick liquid import A's cross -sectional area is 1.5~2.0 times of thick liquid export B cross -sectional area, can be when the slip casting operation the effectual osmotic pressure of establishhing fast to be favorable to entire system's pressure stability, improve slip casting efficiency, reduce the slip casting number of times at same slip casting point. Simultaneously, the characteristics according to the slip casting of tunnel secondary lining vault set up rectangular pipe 4 inside the body to manage global design in line shape or arc with slip casting, the different radian requirements of satisfying the tunnel vault that can be fine, phenomenon such as avoid appearing droing.

Description

A kind of tunnel vault backfill Grouting Pipe
Technical field
This utility model relates to grouting equipment technical field, is specifically related to a kind of tunnel vault backfill Grouting Pipe.
Background technology
Tunnel vault backfill slurry injection technique is the one of slurry injection technique, including:
1, per-fore pouring liquid with small pipe technology
It is characterized in: construction technology is simple, working space requires less, arrangement and method for construction to adjust at any time and the significant feature such as economic benefit, ductule is mainly used in the pre-pouring grout of stratum, the mechanical property of country rock can be changed, improve the mechanics parameter of country rock, be conventional a kind of grouting mode;
2, tunneling boring curtain grouting technology
It is characterized in: surrounding rock in excavation crushes, and when water yield is bigger, uses periphery pre-pouring grout, by wall rock grouting, form wall rock grouting consolidation, reduce its infiltration coefficient, improve self, and safety stable with preliminary bracing common guarantee construction period cavern.This technology is just applied at Geleshan Tunnel;
3, steel tube shed
Lead pipe-shed support is along excavation contour line, the boring that Drilling is parallel with tunnel axis, then inserts steel pipe, and slip casting in pipe, the country rock of consolidation steel pipe periphery, and forms the support system of frame in predetermined scope.Its Main Function is to improve the shearing strength of country rock around steel pipe, and makes steel pipe integrated with country rock, piperoof-support system transfer front soil body load, leading supporting country rock.The general employing when entrance construction.In the tunnel that buried depth is little, when there is building surface, it is possible to use this method.
Slurry injection technique at underground structure antiseepage, foundation ditch strengthening, prevent the aspects such as surface subsidence, built structures basement process, push pipe antifriction jacking from playing an important role.For tunnel engineering, slip casting has a packing action, reinforcement effect and subtract the effect of oozing.But the intensity of tradition Grouting Pipe and grouting pressure are less than normal, the shape of Grouting Pipe also tends to fit very well the radian of tunnel vault, the problem such as cause slip casting effect poor, easy to fall off, generally requires and a slip casting point is carried out repeatedly grouting operation can be only achieved promising result, inefficiency.
Utility model content
The technical problems to be solved in the utility model is to overcome the deficiencies in the prior art, this utility model provides tunnel vault backfill Grouting Pipe, feature according to tunnel secondary lining vault slip casting arranges rectangular tube at tubular body, and Grouting Pipe global design is in line shape or arc, the different radian requirements of tunnel vault can well be met, it is to avoid phenomenons such as coming off occurs;Meanwhile, Grouting Pipe is designed to the conical pipe that the cross-sectional area of slurry inlet is big compared with serum outlet cross-sectional area, slip casting efficiency can be greatly improved.
For reaching above-mentioned purpose, the technical solution adopted in the utility model is: a kind of tunnel vault backfill Grouting Pipe, vault for tunnel secondary lining backfills slip casting, including body, reinforce overcoat, slurry inlet, serum outlet and injected hole, described slurry inlet and serum outlet lay respectively at the two ends of body, described injected hole is evenly distributed on body, described sealing strip covers on injected hole, described reinforcing overcoat envelopes sealing strip, described body is taper tubular structure, described taper tubular inside configuration is provided with rectangular tube, the sidewall of described rectangular tube is provided with some through holes, the cross-sectional area of described slurry inlet is 1.5~2.0 times of serum outlet cross-sectional area.
Improving further as this utility model, described taper tubular structure is linear.
Improving further as this utility model, described taper tubular structure is arc.
Improving further as this utility model, the material of described rectangular tube is politef.
Improving further as this utility model, the material of described taper tubular structure is rustless steel or rubber.
Improving further as this utility model, described rectangular tube is and the conial tube of taper tubular structure matching.
Due to the utilization of technique scheme, this utility model compared with prior art has the advantage that
The tunnel vault backfill Grouting Pipe of this utility model scheme, feature according to tunnel secondary lining vault slip casting arranges rectangular tube at tubular body, and Grouting Pipe global design is in line shape or arc, the different radian requirements of tunnel vault can well be met, it is to avoid phenomenons such as coming off occurs;Meanwhile, Grouting Pipe is designed to the conical pipe that the cross-sectional area of slurry inlet is big compared with serum outlet cross-sectional area, slip casting efficiency can be greatly improved.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings technical solutions of the utility model are described further:
Accompanying drawing 1 is the oblique view of tunnel vault of the present utility model backfill Grouting Pipe;
Accompanying drawing 2 is the arcuation appearance schematic diagram of tunnel vault of the present utility model backfill Grouting Pipe.
In figure: 1, reinforce overcoat;2, sealing strip;3, slurry outlet;4, rectangular tube;5, through hole;6, taper tubular structure;A, slurry inlet;B, serum outlet.
Detailed description of the invention
Below in conjunction with the accompanying drawings and specific embodiment the utility model is described in further detail.
Tunnel vault described in the utility model backfill Grouting Pipe as shown in accompanying drawing 1 to Fig. 2, global design is cone structure, the cross-sectional area of slurry inlet A is 1.5~2.0 times of serum outlet B cross-sectional area, it is preferably 2.0 times, osmotic pressure can be set up fast and effectively when slip casting operation, and the pressure stability of beneficially whole system, improve slip casting efficiency, reduce the slip casting number of times at same slip casting point.Meanwhile, according to the feature of tunnel secondary lining vault slip casting, rectangular tube 4, and Grouting Pipe global design be in line shape or arc are set at tubular body, the different radian requirements of tunnel vault can well be met, it is to avoid phenomenons such as coming off occurs.
For achieving the above object, the taper tubular structure 6 of above-mentioned tunnel vault backfill Grouting Pipe is linear or arc.
Further, for improving the intensity of above-mentioned tunnel vault backfill Grouting Pipe, the material of rectangular tube 4 is politef.
Further, the material of taper tubular structure 6 is rustless steel or rubber.
Further, rectangular tube 4 is the conial tube mated with taper tubular structure 6.
Below it is only concrete exemplary applications of the present utility model, protection domain of the present utility model is not constituted any limitation.The technical scheme that all employing equivalents or equivalence are replaced and formed, within the scope of all falling within this utility model rights protection.

Claims (6)

1. a tunnel vault backfill Grouting Pipe, vault for tunnel secondary lining backfills slip casting, including body, reinforce overcoat, sealing strip, slurry inlet, serum outlet and injected hole, described slurry inlet and serum outlet lay respectively at the two ends of body, described injected hole is evenly distributed on body, described sealing strip covers on injected hole, described reinforcing overcoat envelopes sealing strip, it is characterized in that: described body is taper tubular structure, described taper tubular inside configuration is provided with rectangular tube, the sidewall of described rectangular tube is provided with some through holes, the cross-sectional area of described slurry inlet is 1.5~2.0 times of serum outlet cross-sectional area.
Tunnel vault the most according to claim 1 backfill Grouting Pipe, it is characterised in that: described taper tubular structure is linear.
Tunnel vault the most according to claim 1 backfill Grouting Pipe, it is characterised in that: described taper tubular structure is arc.
Tunnel vault the most according to claim 1 backfill Grouting Pipe, it is characterised in that: the material of described rectangular tube is politef.
Tunnel vault the most according to claim 1 backfill Grouting Pipe, it is characterised in that: the material of described taper tubular structure is rustless steel or rubber.
6. backfill Grouting Pipe according to the tunnel vault described in claim 1 or 4, it is characterised in that: described rectangular tube is and the conial tube of taper tubular structure matching.
CN201620282246.7U 2016-04-06 2016-04-06 Slip casting pipe is backfilled to tunnel vault Expired - Fee Related CN205618173U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620282246.7U CN205618173U (en) 2016-04-06 2016-04-06 Slip casting pipe is backfilled to tunnel vault

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620282246.7U CN205618173U (en) 2016-04-06 2016-04-06 Slip casting pipe is backfilled to tunnel vault

Publications (1)

Publication Number Publication Date
CN205618173U true CN205618173U (en) 2016-10-05

Family

ID=57029078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620282246.7U Expired - Fee Related CN205618173U (en) 2016-04-06 2016-04-06 Slip casting pipe is backfilled to tunnel vault

Country Status (1)

Country Link
CN (1) CN205618173U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985047A (en) * 2019-12-31 2020-04-10 盾构及掘进技术国家重点实验室 Device and method for protecting pre-buried line concentration and structure in shield segment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985047A (en) * 2019-12-31 2020-04-10 盾构及掘进技术国家重点实验室 Device and method for protecting pre-buried line concentration and structure in shield segment

Similar Documents

Publication Publication Date Title
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN203756182U (en) Support structure applied to shallow road tunnel in weak rock area
CN205013011U (en) Pyroclastic flow stratum tunnel advance support structure
CN105840207A (en) Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method
CN106320354B (en) The Seepage method on solution cavity development stratum under coating
CN103437339A (en) Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum
CN103277120A (en) Post-unfreezing water burst prevention method of non-full-depth freezing vertical shaft
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN203961994U (en) Under balancing earth-pressure shielding machine, wear the concealed tunneling structure of having runed shield tunnel
CN105179011B (en) A kind of tunnel closure facility and its method for blocking
CN204253056U (en) A kind of shield machine export & import reinforcing structure
CN205314107U (en) Sectional type slip casting pipe device that foundation stabilization used
CN104612696B (en) Construction method for large-section underground excavation subway station to pass through viaduct in fine sand layer by using column hole method
CN109026020B (en) Water-rich tunnel karst cave treatment and excavation method
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN103321233B (en) The preparation method of groundwater resources retracting device in landslide deep layer draining and sliding mass
CN204940315U (en) A kind of water-stopping system for the large-scale vertical shaft of region of FuShui
CN203161244U (en) Existing subway underground excavation running tunnel protection structure
CN104790982B (en) Casing material for ultra-deep hole grouting of underground excavated tunnel
CN205013007U (en) Pyroclastic flow stratum tunnel stability control construction structures
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN107060821A (en) A kind of many lithology method for protecting support of face

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161005

Termination date: 20190406