CN205618108U - Operations of major repair oil field well workover system - Google Patents

Operations of major repair oil field well workover system Download PDF

Info

Publication number
CN205618108U
CN205618108U CN201620452960.6U CN201620452960U CN205618108U CN 205618108 U CN205618108 U CN 205618108U CN 201620452960 U CN201620452960 U CN 201620452960U CN 205618108 U CN205618108 U CN 205618108U
Authority
CN
China
Prior art keywords
bank
china
quadruple board
platform
people
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620452960.6U
Other languages
Chinese (zh)
Inventor
阎修倜
陈微熙
王吉福
王吉林
燕波
冯沛
谷风康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Hercules Intelligent Equipment Technology Co Ltd
Original Assignee
Beijing Hercules Intelligent Equipment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Hercules Intelligent Equipment Technology Co Ltd filed Critical Beijing Hercules Intelligent Equipment Technology Co Ltd
Priority to CN201620452960.6U priority Critical patent/CN205618108U/en
Application granted granted Critical
Publication of CN205618108U publication Critical patent/CN205618108U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses an operations of major repair oil field well workover system has solved the problem that well workover operations of major repair system operator labor intensity in oil field is big among the prior art, work safety nature is low. This system includes drilling platform, and drilling platform is last to install platform manipulator, automatic hydraulic tong, set upright or straight hand, automatic elevator, platform manipulator along the reciprocal linear motion of Y axle orientation, derrick, derrick are fixed in drilling platform and go up and follow Z axle direction and extend, quadruple board platform people's bank of china footboard, quadruple board platform people's bank of china footboard extends and is articulated each other with the derrick along X axle direction, and quadruple board platform people's bank of china footboard can upwards rotate to coinciding with the derrick with its department of articulating, and the edge of quadruple board platform people's bank of china footboard is equipped with the guardrail, switch board, switch board are fixed in on the guardrail, quadruple board platform manipulator, quadruple board platform manipulator hang in quadruple board platform people's bank of china footboard below and can follow the reciprocal linear motion of length direction of quadruple board platform people's bank of china footboard, the hand is set upright or straight to the elevator, and the top that the hand was installed on the derrick and was lain in quadruple board platform people's bank of china footboard is set upright or straight to the elevator.

Description

Heavy repair task oil well system
Technical field
This utility model relates to oil well equipment technical field, refers in particular to a kind of automaticity, work The heavy repair task oil well system that reliability is high.
Background technology
At present, the workover rig that oil field at home workover treatment uses is all manual operation, it is simply that by operative employee's Manual operation completes oil, the repair work of gas and water well.During whole, workover rig is actually one Self hoist engine of individual use pull-out or put down the effect of tubing string, other are careful, scrappy, repeatability in a large number Work (trip out the shackle of tubing string in well, put, clean, enter the migration of well casing post, upper button etc.) be by Operative employee is manual to be done directly or operates what hydraulic tongs completed, and the speed of well workover is also by operative's speed Determine with the operating of workover rig, it is contemplated that the restriction of human body oneself factor (muscle power, response speed, to high temperature, Cold endurance etc.), well workover speed and uninterrupted working time all can not get being greatly improved;Otherwise it is intended to speed Do not reach, owing to the ignorance of human body condition can cause industrial accident that some are unnecessary on the contrary, occur producing Interruption, device damage, injury to personnel etc..It addition, owing to overflowing a large amount of profit in well in practical operation Pollute to afterwards the body of wellhead equipment and operative employee, make the most difficult exception of each generic operation on well head, It is unfavorable to cause to safety in production.
Along with the development in epoch, on the one hand the requirement of labor condition is improved constantly by the whole society, on the other hand with The continuous minimizing of the domestic between twenty and fifty quantity of labour force, this just require workover treatment to few peopleization or unmanned, Low labor intensity, high security develop, only in this way the benefit of guarantee company and the income of labourer. Therefore, the workover rig that automaticity is higher is also the most constantly being released, but the order of its fancy price is mostly Number old brand oil play is hung back.
Utility model content
The utility model proposes a kind of heavy repair task oil well system, solve oil well in prior art The problem that heavy repair task system operator labor intensity is big, job security is low.
For solving above-mentioned technical problem, the technical solution of the utility model is: heavy repair task oil well system, Including:
Drilling platforms, described drilling platforms is provided with platform mechanical arm, automatic liquid pressing tongs, aligning, from Dynamic elevator, described platform mechanical arm is along Y direction linear reciprocating motion;
Derrick, described derrick is fixed on described drilling platforms and extends along Z-direction;
Quadruple board platform People's Bank of China pedal, described quadruple board platform People's Bank of China pedal extends and mutual with described derrick along X-direction Hinged, described quadruple board platform People's Bank of China pedal can be rotated up to described derrick overlapping with its hinged place, described The edge of quadruple board platform People's Bank of China pedal is provided with guardrail;
Switch board, described switch board is fixed on described guardrail;
Two-deck table mechanical arm, described two-deck table mechanical arm hangs on below described quadruple board platform People's Bank of China pedal and can edge The length direction linear reciprocating motion of described quadruple board platform People's Bank of China pedal;
Elevator aligning, described elevator aligning is installed on described derrick and is positioned at described quadruple board platform People's Bank of China and steps on The top of plate.
Preferably, described drilling platforms being additionally provided with air operated slips, described air operated slips is positioned at described automatic hanging The underface of card, described automatic hydraulic clamper is in the side of described air operated slips, and described aligning is positioned at described The top of automatic liquid pressing tongs.
Preferably, described quadruple board platform People's Bank of China pedal is additionally provided with reinforcing plate.
Preferably, described elevator aligning is higher than described quadruple board platform People's Bank of China pedal 1000mm~1200mm.
This utility model provides the benefit that after have employed technique scheme: oil field of the present utility model is repaiied It is higher that traditional manual workover rig is just upgraded to automaticity by appropriate reconstruction by well heavy repair task system Oil well heavy repair task system, make use of existing equipment to reduce equipment cost, has reached automatization and repaiied The purpose of well.Workover rig referred herein refers to all workover rigs that oil field is used, and no matter it is used to Complete to remove single light maintenance operation, or the heavy repair task that use oil pipe, drill rod stand column are carried out, or examination Oil operation, it can be through being transformed into the oil well system of automatization.Under the operation of driller, well workover Machine utilize the operation of some tool units self possessed and additionally increase complete the single and shackle of column, Upper button, put, the automatically opening up and close up and swing etc. work of elevator, reach drilling platforms and two layers Platform is unmanned, thus alleviates the labor intensity of well puller, improves safety, comfortableness, extends and disposably connects The continuous working time, shorten the workover treatment time, improve production efficiency.
Accompanying drawing explanation
With embodiment, this utility model is described further below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of drilling platforms;
Fig. 2 is the structural representation at quadruple board platform People's Bank of China pedal;
Fig. 3 is the structural representation at the quadruple board platform People's Bank of China pedal after folding;
In figure: 1-drilling platforms;2-platform mechanical arm;3-automatic liquid pressing tongs;4-aligning;5-automatic hanging Card;6-derrick;7-air operated slips;8-switch board;9-fence;10-swing pipe district;11-quadruple board platform People's Bank of China steps on Plate;12-guardrail;13-switch board;14-two-deck table mechanical arm;15-elevator aligning;16-reinforcing plate.
Detailed description of the invention
Embodiment:
As depicted in figs. 1 and 2, respectively this utility model heavy repair task oil well system drilling platforms and The structural representation of quadruple board platform, is provided with platform mechanical arm 2, automatic liquid pressing tongs 3 on drilling platforms 1, holds up Forehand 4 and automatic elevator 5, be also equipped with switch board 8, fence 9 and swing pipe district 10, wherein, Platform Machinery Hands 2 can carry out linear reciprocating motion along Y direction.
Also being installed with derrick 6 on drilling platforms 1, this derrick 6 extends along Z-direction, i.e. derrick 6 Being vertically arranged, automatic elevator 5 is suspended on coaster, and pulley suspension is below the overhead traveling crane on derrick 6 top.
Being hinged with quadruple board platform People's Bank of China pedal 11 on derrick 6, this quadruple board platform People's Bank of China pedal 11 plate is along X-direction Extend, and quadruple board platform People's Bank of China pedal 11 can be rotated up to described derrick 6 overlapping (i.e. with its hinged place State shown in Fig. 3), the edge at quadruple board platform People's Bank of China pedal 11 is additionally provided with guardrail 12, solid on guardrail 12 Surely there is switch board 13, the fingerboard of quadruple board platform is fixed and anti-tipping apparatus with the U-shaped column that fastened, it Effect be to prevent column astasia from toppling over.
A two-deck table mechanical arm 14 is had at quadruple board platform People's Bank of China pedal 11 underhung, and this two-deck table mechanical arm 14 can be along the length direction linear reciprocating motion of described quadruple board platform People's Bank of China pedal 11.Platform mechanical arm 2 and two layers Platform mechanical hand 14 with the use of, it will complete migration make-up when piling or lower brill are put in the trip-out of column.
Being also equipped with elevator aligning 15 on derrick 6, this elevator aligning 15 is positioned at quadruple board platform People's Bank of China pedal The top of 11, generally, elevator aligning 15 need to exceed the height of quadruple board platform People's Bank of China pedal 11 and be 1000mm~1200mm, catches, when its effect is lower boring, the automatic elevator 5 freely rocked and embraces steady, making two When layer platform mechanical hand 14 fills column to automatic elevator 5, run trace is stable.
Being additionally provided with air operated slips 7 on drilling platforms 1, this air operated slips 7 is positioned at the underface of automatic elevator 5, Described automatic liquid pressing tongs 3 is positioned at the side of described air operated slips 7, and described aligning 4 is positioned at described automatic liquid The top of pressing tongs 3.
Quadruple board platform People's Bank of China pedal 11 is additionally provided with reinforcing plate 16.
This heavy repair task oil well system is that a performance is removed or accesses or trip out the unit of a column, For common light maintenance unit, which increase the tripping out of column, under enter, the link such as put, therefore Overhaul unit adds two-deck table mechanical arm 14, platform mechanical arm 2, quadruple board platform column compared to light maintenance unit Retaining mechanism and help automatic elevator 5 draw off on quadruple board platform and load the elevator aligning 15 of column.
Owing to quadruple board platform People's Bank of China pedal 11 is suspended structure, in order to prevent hanging two-deck table mechanical arm 14 Afterwards, it is excessive that the inner end of quadruple board platform People's Bank of China pedal 11 is bent downwardly amount of deflection, so quadruple board platform People's Bank of China pedal 11 Root need carry out necessity reinforcement.After two-deck table mechanical arm 14 hangs on below it, it is possible to complete Become to take out column continuous arrangement between the fingerboard specified of migrating from automatic elevator 5, also can take from fingerboard Go out column and migrate to load below coaster automatic elevator 5.In order to save installation two-deck table mechanical arm 14 repeatedly Tedious work, two-deck table mechanical arm 14 has been designed to foldable mechanism, and the complete receipts derrick 6 that works is moved Time, it can be pulled up (i.e. shown in Fig. 3) with quadruple board platform People's Bank of China pedal 11 entirety.
First innermost end of two-deck table mechanical arm 14 being walked to when receiving derrick 6 (near derrick 6), pull-up two layers Platform People's Bank of China pedal 11 (now two-deck table mechanical arm 14 will be in the state being perpendicular to derrick 6), derrick 6 Just can be by partially folded for two-deck table mechanical arm 14 on track after setting level on workover rig.
Aligning 4 has four purposes:
1) accurate make-up when column or single lower brill;
2) extrapolation suspension ring during single lower brill, make to move outside the automatic elevator below suspension ring to be put in single neck, complete Capture tubing string.
3) single extrapolate single lower end when pulling out of hole so that it is lie low on lifting machine, i.e. push away oil pipe.
4) single lower buttress by the single bottom of coaster pull-up in time when boring, allow it have control to swing to well head complete Become make-up.
Running into when removing single tubing string in heavy repair task, its processing method and common light maintenance operation make a trip Equally, fulfil assignment also with automatic elevator 5, aligning 4, automatic liquid pressing tongs 3, oil pipe lifting machine, There is manually and automatically pattern equally.Unique differentiation is first platform mechanical arm 2 main body to be transported before starting Middle space, to the left end (or right part) of own orbit, is spared by row, enters as oil pipe lifting machine Passage.
Operation column is the important form that heavy repair task is different from common light maintenance operation, when needing general overhaul flatly Oil well (or water injection well) trips out tubing string (single) in well when carrying out special operation, just available to column.This Time, basic work process is as follows:
One, column is played
Preparation: oil pipe lifting machine exits drilling platforms 1, platform mechanical arm 2 enters duty to start Await orders.Automatic elevator 5 installation direction: door is outwardly (back to derrick 6), and quadruple board platform all devices enters and uses State.
Manual: driller operates coaster and transfers, automatic elevator 5 (for open mode) is close to tubing string (tubing string gas Dynamic slips 7 is fixed on well head) box cupling time,
1) aligning 4 stretches out,
2) embrace automatic elevator 5 and after drag, driller transfers automatic elevator 5 simultaneously, and automatic elevator 5 is walked around and connect After hoop, automatic forward swing completes to embrace tubing string action,
3) automatic elevator 5 is closed, and aligning 4 is regained simultaneously;
4) air operated slips 7 is opened, and driller operates and carries on coaster, and column rises to second string collar and gives vent to anger Dynamic slips 7 with hydraulic tongs jaw contour time stop on carrying;
5) air operated slips 7 is closed, and hydraulic tongs is started working (shackle is return after terminating in situ automatically), simultaneously Platform mechanical arm 2, two-deck table mechanical arm 14 are sold and catch tubing string upper and lower side (to embrace pipe with hydraulic tongs simultaneously Post);
6) column enters placement area work such as () platform mechanical arm 2 reclaims, translates, extrapolations, driller Transfer coaster;
7) platform mechanical arm 2 is let go, and reclaims arm, returns to initial position and await orders.
8) automatic elevator 5 is opened, and after time delay 1s, two-deck table mechanical arm 14 pulls entrance placed point, column upper end (reclaim, rotate, walk, release, let go), returns to ready position after letting go.
9) driller transfers coaster and carries out tripping out next column.
Two, bore under column
Preparation: ibid, instrument (workover tool) enters well (by single for lifting machine, automatic elevator 5 state Mode or artificial is bored under root), switch board switches to lower drill jig formula.Column fence is installed (by column with one just Square frame surrounds, and frame angle has opening to be hung out for column), on carry coaster to quadruple board platform (driller's operation).
1) elevator aligning 15 embraces automatic elevator 5 assigned position (driller control automatic elevator 5 height), Two-deck table mechanical arm 14 is grabbed column upper end and is awaited orders (having programme-control) at fingerboard shelves " O " point simultaneously;
2) column is loaded automatic elevator 5 by two-deck table mechanical arm 14;
3) elevator aligning 15 is let go and reclaims, and after time delay 1s, automatic elevator 5 closes that (automatic elevator 5 exists Complete under free state to close), two-deck table mechanical arm 14 is let go and (is automatically performed the crawl of next root after letting go And put ready work in " 0 ");
4) automatic elevator 5 (driller's operation) is carried on;
5) platform mechanical arm 2 captures column (at fence gate) and rotates to well head, and aligning 4 is stretched simultaneously Above well head column box, opening and await orders, after column enters aligning 4, aligning 4 is closed, flat Platform mechanical hand 2 is let go and is returned to initial position and awaits orders;
6) transferring automatic elevator 5, column pin thread is to entering box (driller's operation);
7) aligning 4 is let go and reclaims, and after time delay 1s, hydraulic tongs is started working and (automatically moved back after above buckling bundle Return in situ);
8) air operated slips 7 is opened, and driller's put-on and delegated column enters well, and to correct position, (box cupling is at hydraulic tongs Working depth, driller controls) stop;
9) air operated slips 7 is closed;
10) automatic elevator 5 is opened, simultaneously aligning 4 drag after stretching out and grabbing automatic elevator 5 → above carry automatic hanging Card 5 (driller's operation) → automatic elevator 5 automatically disengages aligning 4 after walking around box cupling;
11) aligning 4 is regained and is awaited orders.
12) automatic elevator 5 to quadruple board platform palikinesia 1 is proposed on driller) carry out going into the well of next column.
Certainly, when being set to " automatically ", above action will be carried out by automated manner, but driller's operation The action of coaster remains what someone determined, the action that could perform by button in the past will above one dynamic The state made starts next action automatically, when has time delay to set the most in a program.
This utility model is not limited to above-mentioned detailed description of the invention, and all are conceived based on technology of the present utility model, The done improvement in structure, each falls among protection domain of the present utility model.

Claims (4)

1. heavy repair task oil well system, it is characterised in that including:
Drilling platforms, described drilling platforms is provided with platform mechanical arm, automatic liquid pressing tongs, aligning, from Dynamic elevator, described platform mechanical arm is along Y direction linear reciprocating motion;
Derrick, described derrick is fixed on described drilling platforms and extends along Z-direction;
Quadruple board platform People's Bank of China pedal, described quadruple board platform People's Bank of China pedal extends and mutual with described derrick along X-direction Hinged, described quadruple board platform People's Bank of China pedal can be rotated up to described derrick overlapping with its hinged place, described The edge of quadruple board platform People's Bank of China pedal is provided with guardrail;
Switch board, described switch board is fixed on described guardrail;
Two-deck table mechanical arm, described two-deck table mechanical arm hangs on below described quadruple board platform People's Bank of China pedal and can edge The length direction linear reciprocating motion of described quadruple board platform People's Bank of China pedal;
Elevator aligning, described elevator aligning is installed on described derrick and is positioned at described quadruple board platform People's Bank of China and steps on The top of plate.
2. heavy repair task oil well system as claimed in claim 1, it is characterised in that: described drilling well is put down Being additionally provided with air operated slips on platform, described air operated slips is positioned at the underface of described automatic elevator, described automatic liquid Pressing tongs is positioned at the side of described air operated slips, and described aligning is positioned at the top of described automatic liquid pressing tongs.
3. heavy repair task oil well system as claimed in claim 2, it is characterised in that: described quadruple board platform It is additionally provided with reinforcing plate on People's Bank of China's pedal.
4. the heavy repair task oil well system as described in any one of claims 1 to 3, it is characterised in that: Described elevator aligning is higher than described quadruple board platform People's Bank of China pedal 1000mm~1200mm.
CN201620452960.6U 2016-05-18 2016-05-18 Operations of major repair oil field well workover system Active CN205618108U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620452960.6U CN205618108U (en) 2016-05-18 2016-05-18 Operations of major repair oil field well workover system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620452960.6U CN205618108U (en) 2016-05-18 2016-05-18 Operations of major repair oil field well workover system

Publications (1)

Publication Number Publication Date
CN205618108U true CN205618108U (en) 2016-10-05

Family

ID=57023408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620452960.6U Active CN205618108U (en) 2016-05-18 2016-05-18 Operations of major repair oil field well workover system

Country Status (1)

Country Link
CN (1) CN205618108U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804674A (en) * 2016-05-18 2016-07-27 北京海格立斯智能装备技术有限公司 Oilfield well servicing system for overhaul operation
CN112593873A (en) * 2020-12-03 2021-04-02 东营市汉德自动化集成有限公司 Lifting type stand arranging method
CN112593874A (en) * 2020-12-03 2021-04-02 东营市汉德自动化集成有限公司 Lifting type discharging stand device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804674A (en) * 2016-05-18 2016-07-27 北京海格立斯智能装备技术有限公司 Oilfield well servicing system for overhaul operation
CN112593873A (en) * 2020-12-03 2021-04-02 东营市汉德自动化集成有限公司 Lifting type stand arranging method
CN112593874A (en) * 2020-12-03 2021-04-02 东营市汉德自动化集成有限公司 Lifting type discharging stand device
CN112593873B (en) * 2020-12-03 2023-02-28 东营市汉德自动化集成有限公司 Lifting type stand arranging method

Similar Documents

Publication Publication Date Title
CN104563912B (en) A kind of well drilling pipe column automation operating system
CN103388462B (en) Land rig comb equipment
CN205618108U (en) Operations of major repair oil field well workover system
CA1055474A (en) Device for handling and racking riser pipes and drill pipes
US3404741A (en) Automated system and drilling rig for continuously and automatically pulling and running a drill-pipe string
CN109322628B (en) Unmanned operation equipment for small workover wellhead
EP1660754B1 (en) Automated arm for positioning of drilling tools such as an iron roughneck
CN105804674A (en) Oilfield well servicing system for overhaul operation
CN106285518B (en) A kind of tubing string automatic processing device discharging four single upright column of small drilling tool
CN202012302U (en) Linkage manipulator
CN202673195U (en) Device for connecting drill pipes with three-joint unit
CN205778618U (en) A kind of quadruple board platform Intelligent drainage guard system
CN107227934A (en) A kind of oil-well rig tubing string automated programming system
CN203614056U (en) Automatic operation system of drilling tubular column
CN206769848U (en) Thribble automatic discharge device
US3158212A (en) Earth drilling rigs
CN201883964U (en) Automatic drill stem conveying device
CN205618107U (en) Light maintenance operation oil field well workover system
CN105840117A (en) Minor repair operation oil field well repair system
CN105937371A (en) Workover operation integrated equipment and string disassembling and assembling device thereof
CN105822237A (en) Small-tonnage hydraulic elevator for repairing well
CN202500508U (en) Automatic placing and taking device for drill rods
CN201614893U (en) Double-mechanical arm upright column device
CN211201811U (en) Oil pipe lifting and dropping device and system
CN206722806U (en) A kind of petroleum well workover Work robot guiding mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant