CN205604255U - Dark foundation pit retaining structure seam stagnant water planar arrangement structure - Google Patents

Dark foundation pit retaining structure seam stagnant water planar arrangement structure Download PDF

Info

Publication number
CN205604255U
CN205604255U CN201620273855.6U CN201620273855U CN205604255U CN 205604255 U CN205604255 U CN 205604255U CN 201620273855 U CN201620273855 U CN 201620273855U CN 205604255 U CN205604255 U CN 205604255U
Authority
CN
China
Prior art keywords
jet grouting
grouting pile
pressure rotary
rotary jet
iii
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620273855.6U
Other languages
Chinese (zh)
Inventor
王泽东
王朝华
詹涛
喻建云
黎建华
冯建勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority to CN201620273855.6U priority Critical patent/CN205604255U/en
Application granted granted Critical
Publication of CN205604255U publication Critical patent/CN205604255U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model provides a dark foundation pit retaining structure seam stagnant water planar arrangement structure, high pressure jet grouting pile I (4), high pressure jet grouting pile III (6) and high pressure jet grouting pile's II (5) line of centres and envelope I (1) and envelope are II (2) parallel, high pressure jet grouting pile I (4), is the distance on high pressure jet grouting pile II (5) and high pressure jet grouting pile's III (6) II (2) limits of centre -to -centre spacing envelope I (1) and envelope (R 150 )Mm, wherein R is high pressure jet grouting pile I (4) respectively, high pressure jet grouting pile II (5) and high pressure jet grouting pile's III (6) radius, and high pressure jet grouting pile I (4) and high pressure jet grouting pile's II (5) center is at a distance of being 2R, high pressure jet grouting pile's III (6) the center and the line perpendicular to envelope I (1) and the envelope II (2) of envelope seam (3). The seam stagnant water among the dark foundation pit retaining structure has effectively been realized.

Description

A kind of deep footing groove enclosing structure joint seal plane arrangement structure
Technical field
This utility model relates to a kind of arrangement, a kind of deep footing groove enclosing structure joint seal horizontal layout Structure.
Background technology
Along with the economic and development of society, the underground in the exploitation in city old city, city track traffic engineering, big and medium-sized cities is empty Between exploitation and skyscraper deep foundation pit construction get more and more, either subway station or skyscraper Extra-Deep Foundation Pit knot Structure, uses diaphram wall, bored concrete pile+waterproof between piles or SMW engineering method stake etc. mostly.And more urban engineering geology is from upper And it is respectively down miscellaneous fill layer, powder soil horizon, fine sand layer, coarse sands layer etc., owing to the engineering properties of these soil layers is more special;Special Not being in the higher area of level of ground water, the joint seal of deep footing groove enclosing structure processes and is particularly important.
At present, in engineering design, the joint seal of deep footing groove enclosing structure generally uses high-pressure rotary jet grouting pile sealing, its horizontal layout General stake is used equidistantly to intersect with stake and stake limit and the tangent structure in building enclosure limit.But, in sandy soil layer, this kind of cloth Put that structure has the disadvantage in that 1, the construction perpendicularity precision of jet grouting pile driving machine is 1%, and the deepest deviation of reinforcement depth be the biggest, Therefore between high-pressure rotary jet grouting pile and building enclosure, the most likely there is gap in high-pressure rotary jet grouting pile;2, spray water in sand seam geology The high-pressure rotary jet grouting pile pile body of mud is rigidity, and when deep pit digging, deep footing groove enclosing structure can deform, rigidity High-pressure rotary jet grouting pile is then it may happen that rupture failure, and serious affects its water stopping function;3, particularly at the sharp sand of phreatic high In Ceng, spraying neat slurry, pile quality is poor or very difficult pile.
Summary of the invention
The purpose of this utility model is the high-pressure rotary jet grouting pile used for joint seal in existing deep footing groove enclosing structure and goes along with sb. to guard him Likely occur between structure gap, rigidity high-pressure rotary jet grouting pile pile body it may happen that rupture failure has a strong impact on water stopping function etc. asks Topic, it is provided that a kind of deep footing groove enclosing structure joint seal plane arrangement structure.
For achieving the above object, technical solution of the present utility model is: a kind of deep footing groove enclosing structure joint seal planar cloth Put structure, including identical high-pressure rotary jet grouting pile I, high-pressure rotary jet grouting pile III and the high-pressure rotary jet grouting pile II being arranged in order of structure, described high pressure Rotary churning pile I, high-pressure rotary jet grouting pile III are parallel with building enclosure I and building enclosure II with the line of centres of high-pressure rotary jet grouting pile II, high pressure The centre-to-centre spacing building enclosure I of rotary churning pile I, high-pressure rotary jet grouting pile II and high-pressure rotary jet grouting pile III and the distance on building enclosure II limit are (R-150) mm, wherein R is respectively high-pressure rotary jet grouting pile I, high-pressure rotary jet grouting pile II and the radius of high-pressure rotary jet grouting pile III, and high pressure rotation The center of spray stake I and high-pressure rotary jet grouting pile II is at a distance of for 2R, and the center of high-pressure rotary jet grouting pile III is perpendicular to the line of building enclosure seam Building enclosure I and building enclosure II.
The radius R=400mm of described high-pressure rotary jet grouting pile I, high-pressure rotary jet grouting pile II and high-pressure rotary jet grouting pile III.
By the order of described high-pressure rotary jet grouting pile I, high-pressure rotary jet grouting pile II and high-pressure rotary jet grouting pile III to high-pressure rotary jet grouting pile I, high-pressure rotary-spray Stake II and high-pressure rotary jet grouting pile III are constructed successively.
Compared with prior art, the beneficial effects of the utility model are:
This utility model includes identical high-pressure rotary jet grouting pile I, high-pressure rotary jet grouting pile III and the high-pressure rotary jet grouting pile II being arranged in order of structure, High-pressure rotary jet grouting pile I, high-pressure rotary jet grouting pile III are parallel with building enclosure I and building enclosure II with the line of centres of high-pressure rotary jet grouting pile II, The centre-to-centre spacing building enclosure I of high-pressure rotary jet grouting pile I, high-pressure rotary jet grouting pile II and high-pressure rotary jet grouting pile III and the distance on building enclosure II limit are (R-150) mm, wherein R is respectively high-pressure rotary jet grouting pile I, high-pressure rotary jet grouting pile II and the radius of high-pressure rotary jet grouting pile III, and high pressure rotation The center of spray stake I and high-pressure rotary jet grouting pile II is at a distance of for 2R, and the center of high-pressure rotary jet grouting pile III is perpendicular to the line of building enclosure seam Building enclosure I and building enclosure II;This kind of arrangement effectively solves the high-pressure rotary jet grouting pile and high pressure caused because of stake chance error difference Gap between rotary churning pile and between high-pressure rotary jet grouting pile and building enclosure, thus define the cement stabilization body of lap connection, the most in fact The joint seal in deep footing groove enclosing structure, good seepage-proof property are showed.
Accompanying drawing explanation
Fig. 1 is this utility model mesohigh rotary churning pile horizontal layout schematic diagram.
In figure, building enclosure I 1, building enclosure II 2, building enclosure seam 3, high-pressure rotary jet grouting pile I 4, high-pressure rotary jet grouting pile II 5, High-pressure rotary jet grouting pile III 6.
Detailed description of the invention
Illustrate with detailed description of the invention, this utility model to be described in further detail below in conjunction with accompanying drawing.
See Fig. 1, a kind of deep footing groove enclosing structure joint seal plane arrangement structure, for diaphram wall joint seal, Lower diaphragm wall and SMW engineering method stake connecting part sealing, deposited reinforced concrete pile and deposited reinforced concrete pile waterproof between piles etc., Including identical high-pressure rotary jet grouting pile I 4, high-pressure rotary jet grouting pile III 6 and the high-pressure rotary jet grouting pile II 5 being arranged in order of structure.Described high-pressure rotary-spray Stake I 4, high-pressure rotary jet grouting pile II 5 and the line of centres of high-pressure rotary jet grouting pile III 6 and building enclosure I 1 and the parallel high pressure of building enclosure II 2 The centre-to-centre spacing building enclosure I 1 of rotary churning pile I 4, high-pressure rotary jet grouting pile II 5 and high-pressure rotary jet grouting pile III 6 and the distance on building enclosure II 2 limit For (R-150) mm, wherein R is respectively high-pressure rotary jet grouting pile I 4, high-pressure rotary jet grouting pile II 5 and the radius of high-pressure rotary jet grouting pile III 6.And The center of high-pressure rotary jet grouting pile I 4 and high-pressure rotary jet grouting pile II 5 is at a distance of for 2R, though high-pressure rotary jet grouting pile I 4 and high-pressure rotary jet grouting pile III 6 Body is tangent, and the point of contact of high-pressure rotary jet grouting pile I 4 and high-pressure rotary jet grouting pile II 5 is the center of high-pressure rotary jet grouting pile III 6.High-pressure rotary jet grouting pile The center of III 6 is perpendicular to building enclosure I 1 and building enclosure II 2 with the line of building enclosure seam 3.
Concrete, the radius R=400mm of described high-pressure rotary jet grouting pile I 4, high-pressure rotary jet grouting pile II 5 and high-pressure rotary jet grouting pile III 6 is the highest The stake footpath of pressure rotary-spraying stake I 4, high-pressure rotary jet grouting pile II 5 and high-pressure rotary jet grouting pile III 6 is 800mm.Therefore, high-pressure rotary jet grouting pile I 4, height The centre-to-centre spacing building enclosure I 1 of pressure rotary-spraying stake II 5 and high-pressure rotary jet grouting pile III 6 and the distance on building enclosure II 2 limit are (R-150) Mm=250mm;The center of high-pressure rotary jet grouting pile I 4 and high-pressure rotary jet grouting pile II 5 is apart for 2R=800mm.
Concrete, press the order of high-pressure rotary jet grouting pile I 4, high-pressure rotary jet grouting pile II 5 and high-pressure rotary jet grouting pile III 6 during construction to high-pressure rotary-spray Stake I 4, high-pressure rotary jet grouting pile II 5 and high-pressure rotary jet grouting pile III 6 are constructed successively.
According to actually used understand, this utility model by change high-pressure rotary jet grouting pile arrangement, improve sandy soil and in Pile quality in coarse sands layer, so make will not because of after reinforcing soil strength is higher, pile body perpendicularity deviation, pile quality Bad cause building enclosure seam percolating water, it is ensured that deep footing groove enclosing structure joint seal quality.
In engineering reality, this utility model obtains good economic benefit and society in deep footing groove enclosing structure joint seal is constructed Can benefit.Concrete engineering example: station, track traffic Line 1 Zhongshan Road West, Nanchang, design building enclosure is 800 thick reinforced concretes The soil long 356m of diaphram wall, building enclosure seam 3 high-pressure rotary jet grouting pile I 4 of Φ 800, high-pressure rotary jet grouting pile II 5 and high pressure rotation Spray stake III 6 sealing, designs a length of 64*20*3=3840m of total stake.In high-pressure rotary jet grouting pile I 4, high-pressure rotary jet grouting pile II 5 and high pressure rotation After spray stake III 6 has been constructed 28 days, by core boring sampling, core sample is complete;Local excavation checks, pile body is complete and pile body and wall Body is closely connected, and plasticity is preferable.Do not find ground-connecting-wall seam percolating water after excavation of foundation pit, achieve preferable economic and social benefit.
Above content is to combine concrete preferred implementation further detailed description of the utility model, it is impossible to assert this Being embodied as of utility model is confined to these explanations.For this utility model person of an ordinary skill in the technical field, Without departing from the concept of the premise utility, it is also possible to make some simple deduction or replace, said structure all should be considered as Belong to protection domain of the present utility model.

Claims (3)

1. a deep footing groove enclosing structure joint seal plane arrangement structure, it is characterised in that: include that structure is identical and be arranged in order High-pressure rotary jet grouting pile I (4), high-pressure rotary jet grouting pile III (6) and high-pressure rotary jet grouting pile II (5), described high-pressure rotary jet grouting pile I (4), The line of centres of high-pressure rotary jet grouting pile III (6) and high-pressure rotary jet grouting pile II (5) and building enclosure I (1) and building enclosure II (2) Parallel, high-pressure rotary jet grouting pile I (4), high-pressure rotary jet grouting pile II (5) and the centre-to-centre spacing building enclosure I of high-pressure rotary jet grouting pile III (6) (1) and the distance on building enclosure II (2) limit is (R-150) mm, wherein R is respectively high-pressure rotary jet grouting pile I (4), high Pressure rotary-spraying stake II (5) and the radius of high-pressure rotary jet grouting pile III (6), and high-pressure rotary jet grouting pile I (4) and high-pressure rotary jet grouting pile II (5) Center at a distance of for 2R, the center of high-pressure rotary jet grouting pile III (6) is perpendicular to building enclosure with the line of building enclosure seam (3) I (1) and building enclosure II (2).
A kind of deep footing groove enclosing structure joint seal plane arrangement structure the most according to claim 1, it is characterised in that: Described high-pressure rotary jet grouting pile I (4), high-pressure rotary jet grouting pile II (5) and the radius R=400mm of high-pressure rotary jet grouting pile III (6).
A kind of deep footing groove enclosing structure joint seal plane arrangement structure the most according to claim 1, it is characterised in that: By the order of described high-pressure rotary jet grouting pile I (4), high-pressure rotary jet grouting pile II (5) and high-pressure rotary jet grouting pile III (6) to high-pressure rotary jet grouting pile I (4), high-pressure rotary jet grouting pile II (5) and high-pressure rotary jet grouting pile III (6) are constructed successively.
CN201620273855.6U 2016-04-05 2016-04-05 Dark foundation pit retaining structure seam stagnant water planar arrangement structure Expired - Fee Related CN205604255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620273855.6U CN205604255U (en) 2016-04-05 2016-04-05 Dark foundation pit retaining structure seam stagnant water planar arrangement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620273855.6U CN205604255U (en) 2016-04-05 2016-04-05 Dark foundation pit retaining structure seam stagnant water planar arrangement structure

Publications (1)

Publication Number Publication Date
CN205604255U true CN205604255U (en) 2016-09-28

Family

ID=56965356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620273855.6U Expired - Fee Related CN205604255U (en) 2016-04-05 2016-04-05 Dark foundation pit retaining structure seam stagnant water planar arrangement structure

Country Status (1)

Country Link
CN (1) CN205604255U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542097A (en) * 2017-09-28 2018-01-05 中国建筑第八工程局有限公司 The drainage system and its construction method of the seam crossing infiltration of deep footing groove enclosing structure
CN107829440A (en) * 2017-12-06 2018-03-23 上海市机械施工集团有限公司 Reinforcement structure and its construction method at underground continuous wall seam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542097A (en) * 2017-09-28 2018-01-05 中国建筑第八工程局有限公司 The drainage system and its construction method of the seam crossing infiltration of deep footing groove enclosing structure
CN107829440A (en) * 2017-12-06 2018-03-23 上海市机械施工集团有限公司 Reinforcement structure and its construction method at underground continuous wall seam

Similar Documents

Publication Publication Date Title
CN102418344B (en) Injector, drill bit combination structure and combination drilling tool
CN103343544B (en) Construction method for large-scale open caisson
CN103696416B (en) A kind of method for processing foundation
CN203361143U (en) Combination structure of high-pressure jet grouting pile and prestressed pipe pile
CN103114609A (en) Connection device of new and old underground diaphragm walls and construction method
CN103015429A (en) Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN205876322U (en) Rich water sand cobble stratum shield constructs business turn over hole system of consolidating
CN105386458B (en) A kind of embedded plasticity cement mixing method groove inside of continuous underground wall construction method
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN109594575A (en) A kind of open caisson periphery grouting and reinforcing soil body construction method
CN112252332A (en) Grooving construction method for underground diaphragm wall of ultra-deep shaft
CN105862872B (en) A kind of deep footing groove enclosing structure joint seal construction method
CN205604255U (en) Dark foundation pit retaining structure seam stagnant water planar arrangement structure
CN109024609A (en) A kind of foundation pit supporting construction and its construction method based on old campshed
CN204456058U (en) A kind of constructing structure reducing building base subsidence speed
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN206592151U (en) A kind of stifled row's integrated structure of rich water karst tunnel
CN206204978U (en) For the miniature grouting steel pipe pile multi-column pier foundation structure of Selection of Urban Pedestrian Overpass
CN105839653B (en) A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system
CN109881696B (en) HPPG (high Performance Poly propylene glycol) bottom sealing construction method
CN107023021A (en) A kind of design and construction method of flexible compound Diaphragm Wall Support Structure
CN208815560U (en) A kind of structure of Underground Subway Station construction period full station sealing
CN110206062A (en) The dark construction method of underground river shallow embedding is worn under a kind of Urban Underground pipe gallery
CN106149631B (en) High mountain strid arch dam avalanche type Slope Treatment method
CN102677671B (en) Construction method of precast pile in thick-slag-stone-layer field

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170209

Address after: 430074 Hubei city of Wuhan province East Lake Development Zone Road No. 21

Patentee after: The Fourth Engineering Co., Ltd. of China Railway 11 Civil

Patentee after: China Railroad 11 Bureau Group Co., Ltd.

Address before: 430074 Hubei city of Wuhan province East Lake Development Zone Road No. 21

Patentee before: The Fourth Engineering Co., Ltd. of China Railway 11 Civil

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20190405