CN205603085U - Two girder large -span upset bridge crane of four rails - Google Patents

Two girder large -span upset bridge crane of four rails Download PDF

Info

Publication number
CN205603085U
CN205603085U CN201620447021.2U CN201620447021U CN205603085U CN 205603085 U CN205603085 U CN 205603085U CN 201620447021 U CN201620447021 U CN 201620447021U CN 205603085 U CN205603085 U CN 205603085U
Authority
CN
China
Prior art keywords
girder
rails
motor
bridge crane
slide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620447021.2U
Other languages
Chinese (zh)
Inventor
岳学辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Province Feima Crane Co., Ltd.
Original Assignee
Bao Qi East China Henan Hoisting Crane Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bao Qi East China Henan Hoisting Crane Co Ltd filed Critical Bao Qi East China Henan Hoisting Crane Co Ltd
Priority to CN201620447021.2U priority Critical patent/CN205603085U/en
Application granted granted Critical
Publication of CN205603085U publication Critical patent/CN205603085U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model discloses a two girder large -span upset bridge crane of four rails, including first girder and second girder, first girder is located one side of second girder, the upper surface of first girder and second girder all is provided with first slide rail and second slide rail, first slide rail is located one side of second slide rail, and just the upper surface of two first slide rails all is provided with main dolly slider, and the upper surface of two second slide rails all is provided with auxiliary crab slider. This two girder large -span upset bridge crane of four rails, two girder large -span upset bridge crane of four rails be for four main beam bridge crane on four rails, and two girder large -span upset bridge crane of four rails adopts this structural style can reduce substantially very much total width of hoist, and light in weight, wheel -pressure little, satisfied that former old factory building basis load is low, production range requirement under the hoist limit for width condition, be applicable to that old factory building is expanded production and product update lifts by crane article and uses.

Description

A kind of four rails double girder large span upset bridge crane
Technical field
This utility model relates to bridge crane technical field, a kind of four rails double girder large span upset bridge crane.
Background technology
Bridge crane be crossbearer in workshop, warehouse and overhead, stock ground carry out the crane gear of material handling.Owing to its two ends are seated on tall and big concrete column or metal rack, shape is like bridge.The crane span structure of bridge crane along be laid on both sides overhead on track longitudinally running, crane span structure space below handling material can be made full use of, do not hindered by ground installation.It is a kind of hoisting machinery that range is the widest, quantity is most.
At present, the bridge crane on market uses four girder constructions, and cost is high, and crane overall width is big, and heavier and big to factory building foundation loading demands of conducting oneself with dignity, former old Factory Building uses the crane of this product, can not meet the needs of load and range.
Utility model content
The purpose of this utility model is to provide a kind of four rails double girder large span upset bridge crane, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, this utility model provides following technical scheme: the double girder large span of a kind of four rails overturns bridge crane, including the first girder and the second girder, described first girder is positioned at the side of the second girder, the upper surface of described first girder and the second girder is provided with the first slide rail and the second slide rail, described first slide rail is positioned at the side of the second slide rail, and the upper surface of two the first slide rails is provided with main carriage carriage, and the upper surface of two the second slide rails is provided with secondary dolly carriage, one end of described first girder and the second girder is all fixing with the side of operation device to be connected.
Described main carriage carriage includes the first assembly pulley, the side of described first assembly pulley is provided with the first motor, and first the rotating shaft of motor be in transmission connection by the first gear train and the first assembly pulley, the side of described first motor is provided with the first brake, described first motor be arranged above the first tie-beam, the upper surface of described first tie-beam is provided with the second motor, it is provided with the first decelerator in the rotating shaft of described second motor, the side of described first decelerator is provided with the first rotation wheel, described first surface rotating wheel connects by the top of the first steel wire rope and the first hook is fixing.
Described secondary dolly carriage includes the second assembly pulley, described second assembly pulley be arranged above three-motor, and the rotating shaft of three-motor is in transmission connection by the second gear train and the second assembly pulley, the side of described three-motor is provided with second brake, the side of described three-motor is provided with the first connecting plate, the upper surface of described first connecting plate is provided with the 4th motor, it is provided with the second decelerator in the rotating shaft of described 4th motor, the side of described second decelerator is provided with the second rotation wheel, described second surface rotating wheel connects by the top of the second steel wire rope and the second hook is fixing.
Preferably, the two ends of described first tie-beam are provided with two first hooks, and two first hooks lay respectively at the first girder and the outside of the second girder.
Preferably, described second hook is between the first girder and the second girder.
Preferably, described first assembly pulley is slidably connected at the upper surface of the first slide rail.
Preferably, described second assembly pulley is slidably connected at the upper surface of the second slide rail.
Compared with prior art, the beneficial effects of the utility model are: this four rail double girder large span upset bridge crane, four rails double girder large span upset bridge crane is relative to four rail four girder bridge cranes, four rails double girder large span upset bridge crane uses this version that the overall width of crane can be greatly reduced very much, and it is lightweight, wheel load is little, meet former old factory building foundation load low, production range requirement in the case of crane limit for width, it is applicable to old Factory Building expand production and model change lifting article use, reduce working shop of enterprise cost of investment, solve old product and cannot meet basis, workshop wheel load and the requirement of crane overall dimensions, new market range has been opened up in use field for crane products.
This structure bridge crane uses double girder four rail structure to arrange, two tracks arranged by i.e. every girder, the double outer outstanding double-hung version of main carriage carriage employing can be along girder outer side track transverse shifting, secondary dolly carriage is along girder inner track transverse shifting, secondary dolly carriage can pass through main carriage carriage lower space go position, meets diverse location and turns requirement.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model top view;
Fig. 2 is the structural representation of this utility model front view;
Fig. 3 is the structural representation of this utility model left view.
In figure: 1 first girder, 2 second girders, 3 first slide rails, 4 second slide rails, 5 operation devices, 6 main carriage carriages, 61 first assembly pulleys, 62 first motor, 63 first hooks, 64 first tie-beams, 65 second motor, 66 first decelerators, 67 first rotate wheel, 68 first steel wire ropes, 7 secondary dolly carriages, 71 second assembly pulleys, 72 three-motors, 73 first connecting plates, 74 the 4th motor, 75 second decelerators, 76 second rotate wheel, 77 second hooks, 78 second steel wire ropes.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
nullRefer to Fig. 1-3,This utility model provides a kind of technical scheme: the double girder large span of a kind of four rails overturns bridge crane,Including the first girder 1 and the second girder 2,By arranging the first girder 1 and the second girder 2,Make arranging of the first slide rail 3 and the second slide rail 4 convenient,First girder 1 is positioned at the side of the second girder 2,The upper surface of the first girder 1 and the second girder 2 is provided with the first slide rail 3 and the second slide rail 4,By arranging the first slide rail 3 and the second slide rail 4,The operation making main carriage carriage 6 and secondary dolly carriage 7 is convenient,And two the second slide rails 4 are positioned at the inner side of two the first slide rails 3,Make secondary dolly carriage 7 can pass the first tie-beam 64,First slide rail 3 is positioned at the side of the second slide rail 4,And the upper surface of two the first slide rails 3 is provided with main carriage carriage 6,And the upper surface of two the second slide rails 4 is provided with secondary dolly carriage 7,One end of first girder 1 and the second girder 2 is all fixing with the side of operation device 5 to be connected,By arranging operation device 5,Operation device 5 is made to control main carriage carriage 6 convenient with the operation of secondary dolly carriage 7.
nullMain carriage carriage 6 includes the first assembly pulley 61,First assembly pulley 61 is slidably connected at the upper surface of the first slide rail 3,By arranging the first assembly pulley 61,The transverse shifting making the first hook 63 is convenient,The side of the first assembly pulley 61 is provided with the first motor 62,And first the rotating shaft of motor 62 be in transmission connection by the first gear train and the first assembly pulley 61,By arranging the first motor 62,The first motor 62 is made to drive the first assembly pulley 61 to rotate,The side of the first motor 62 is provided with the first brake,By arranging brake,When making the first assembly pulley 61 slide,Can be the most out of service,First motor 62 be arranged above the first tie-beam 64,By arranging the first tie-beam 64,Two the first assembly pulleys 61 are made to be slidably connected at respectively on the first slide rail 3 of the first girder 1 and the setting of the second girder 2,The two ends of the first tie-beam 64 are provided with two first hooks 63,And two first hooks 63 lay respectively at the first girder 1 and outside of the second girder 2,The upper surface of the first tie-beam 64 is provided with the second motor 65,The first decelerator 66 it is provided with in the rotating shaft of the second motor 65,By arranging the first decelerator 66,The rising or falling speed of the first hook 63 can be reduced,The side of the first decelerator 66 is provided with the first rotation wheel 67,First surface rotating wheel 67 is connected by the first steel wire rope 68 is fixing with the top of the first hook 63.
nullSecondary dolly carriage 7 includes the second assembly pulley 71,By arranging the second assembly pulley 71,The transverse shifting making the first connecting plate 73 is convenient,Second assembly pulley 71 is slidably connected at the upper surface of the second slide rail 4,Second assembly pulley 71 be arranged above three-motor 72,And the rotating shaft of three-motor 72 is in transmission connection by the second gear train and the second assembly pulley 71,By arranging three-motor 72,Three-motor 72 is made to drive the second assembly pulley 71 to rotate,The transverse shifting making the first connecting plate 73 and the second hook 77 is convenient,The side of three-motor 72 is provided with second brake,The side of three-motor 72 is provided with the first connecting plate 73,The upper surface of the first connecting plate 73 is provided with the 4th motor 74,The second decelerator 75 it is provided with in the rotating shaft of the 4th motor 74,By arranging the 4th motor 74,The rotating shaft making the 4th motor 74 drives the second rotation wheel 76 rotation,The lifting making the second hook 77 is convenient,The side of the second decelerator 75 is provided with the second rotation wheel 76,Second surface rotating wheel 76 is connected by the second steel wire rope 78 is fixing with the top of the second hook 77,Second hook 77 is between the first girder 1 and the second girder 2.
Embodiment the most of the present utility model, for the ordinary skill in the art, being appreciated that in the case of without departing from principle of the present utility model and spirit and these embodiments can carry out multiple change, revise, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. rail double girder large span upset bridge crane, including the first girder (1) and the second girder (2), it is characterized in that: described first girder (1) is positioned at the side of the second girder (2), the upper surface of described first girder (1) and the second girder (2) is provided with the first slide rail (3) and the second slide rail (4), described first slide rail (3) is positioned at the side of the second slide rail (4), and the upper surface of two the first slide rails (3) is provided with main carriage carriage (6), and the upper surface of two the second slide rails (4) is provided with secondary dolly carriage (7), one end of described first girder (1) and the second girder (2) is all fixing with the side of operation device (5) to be connected;nullDescribed main carriage carriage (6) includes the first assembly pulley (61),The side of described first assembly pulley (61) is provided with the first motor (62),And first the rotating shaft of motor (62) be in transmission connection by the first gear train and the first assembly pulley (61),The side of described first motor (62) is provided with the first brake,Described first motor (62) be arranged above the first tie-beam (64),The upper surface of described first tie-beam (64) is provided with the second motor (65),It is provided with the first decelerator (66) in the rotating shaft of described second motor (65),The side of described first decelerator (66) is provided with the first rotation wheel (67),Described first surface rotating wheel (67) is connected by the first steel wire rope (68) is fixing with the top of the first hook (63);nullDescribed secondary dolly carriage (7) includes the second assembly pulley (71),Described second assembly pulley (71) be arranged above three-motor (72),And the rotating shaft of three-motor (72) is in transmission connection by the second gear train and the second assembly pulley (71),The side of described three-motor (72) is provided with second brake,The side of described three-motor (72) is provided with the first connecting plate (73),The upper surface of described first connecting plate (73) is provided with the 4th motor (74),It is provided with the second decelerator (75) in the rotating shaft of described 4th motor (74),The side of described second decelerator (75) is provided with the second rotation wheel (76),Described second surface rotating wheel (76) is connected by the second steel wire rope (78) is fixing with the top of the second hook (77).
A kind of four rails the most according to claim 1 double girder large span upset bridge crane, it is characterized in that: the two ends of described first tie-beam (64) are provided with two first hooks (63), and two first hooks (63) lay respectively at the first girder (1) and the outside of the second girder (2).
A kind of four rails the most according to claim 1 double girder large span upset bridge crane, it is characterised in that: described second hook (77) is positioned between the first girder (1) and the second girder (2).
A kind of four rails the most according to claim 1 double girder large span upset bridge crane, it is characterised in that: described first assembly pulley (61) is slidably connected at the upper surface of the first slide rail (3).
A kind of four rails the most according to claim 1 double girder large span upset bridge crane, it is characterised in that: described second assembly pulley (71) is slidably connected at the upper surface of the second slide rail (4).
CN201620447021.2U 2016-05-17 2016-05-17 Two girder large -span upset bridge crane of four rails Expired - Fee Related CN205603085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620447021.2U CN205603085U (en) 2016-05-17 2016-05-17 Two girder large -span upset bridge crane of four rails

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620447021.2U CN205603085U (en) 2016-05-17 2016-05-17 Two girder large -span upset bridge crane of four rails

Publications (1)

Publication Number Publication Date
CN205603085U true CN205603085U (en) 2016-09-28

Family

ID=56967560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620447021.2U Expired - Fee Related CN205603085U (en) 2016-05-17 2016-05-17 Two girder large -span upset bridge crane of four rails

Country Status (1)

Country Link
CN (1) CN205603085U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108033361A (en) * 2017-12-23 2018-05-15 玉林市玉州区万通华信科技服务部 A kind of overhead crane with electric hoists

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108033361A (en) * 2017-12-23 2018-05-15 玉林市玉州区万通华信科技服务部 A kind of overhead crane with electric hoists

Similar Documents

Publication Publication Date Title
CN206427933U (en) A kind of bridge crane
CN107399676B (en) A kind of double girder overhead crane
CN206827931U (en) A kind of bridge crane
CN205653058U (en) Harbour wind -force monitoring auto -lock protection type hoist
CN107500109A (en) A kind of overhead crane with electric hoists
CN206367985U (en) One kind lifting purlin car
CN201180066Y (en) Tyre type large-capacity tonnage carrying implement
CN203229310U (en) Loading and transporting lifting appliance for steel truss floor bearing plate
CN205603085U (en) Two girder large -span upset bridge crane of four rails
CN107720542B (en) Hoisting track composite beam
CN207418151U (en) A kind of multifunctional building crane
CN202429920U (en) Multi-trolley and double-girder gantry crane
CN205616467U (en) Novel monospar gantry crane
CN207142680U (en) A kind of double girder overhead crane
CN204416951U (en) A kind of low clearance twin beam overhead bridge crane
CN103204428A (en) Loading-transporting lifting appliance for steel bar truss floor support plate
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN205328465U (en) Jack -up overhead traveling crane longitudinal movement device
CN206858000U (en) A kind of reliable and stable high-performance electric block gantry crane
CN205114887U (en) Hand propelled removes portal frame
CN208603601U (en) Hang rotary bridge crane
CN104591002B (en) A kind of low clearance double girder overhead crane
CN204150955U (en) The electric block can walked on arc I-beam section
CN202643217U (en) Low headroom type steel wire rope electric block
CN207142685U (en) A kind of semimounted single-beam crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170327

Address after: 453400 Industrial Zone, Changyuan County, Henan, Xinxiang

Patentee after: Henan Province Feima Crane Co., Ltd.

Address before: 453400 Xinxiang, Changyuan, Henan lifting industrial park, the giant Avenue

Patentee before: Bao Qi East China, Henan hoisting crane Co., Ltd

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20170517

CF01 Termination of patent right due to non-payment of annual fee