CN205603037U - Assembly fixture is lifted by crane in major diameter tube bank - Google Patents

Assembly fixture is lifted by crane in major diameter tube bank Download PDF

Info

Publication number
CN205603037U
CN205603037U CN201620436565.9U CN201620436565U CN205603037U CN 205603037 U CN205603037 U CN 205603037U CN 201620436565 U CN201620436565 U CN 201620436565U CN 205603037 U CN205603037 U CN 205603037U
Authority
CN
China
Prior art keywords
tube bank
assembly
subassembly
fixed pulley
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620436565.9U
Other languages
Chinese (zh)
Inventor
周斌
陈宏伟
朱生萍
张涛
姚金杉
张建晓
高亚萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou LS Heavy Equipment Co Ltd
Original Assignee
Lanzhou LS Heavy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou LS Heavy Equipment Co Ltd filed Critical Lanzhou LS Heavy Equipment Co Ltd
Priority to CN201620436565.9U priority Critical patent/CN205603037U/en
Application granted granted Critical
Publication of CN205603037U publication Critical patent/CN205603037U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Automatic Assembly (AREA)

Abstract

Assembly fixture is lifted by crane in major diameter tube bank and application method relate to heat exchanger tube assembly field, and it is inconvenient to have overcome the prior art operation, hoists the difficulty that has a big risk. Its structure has: subassembly 3 is drawn in tube bank hanger plate subassembly 1, fixed pulley group spare 2, tube bank, tube bank hanger plate subassembly 1 comprises arc board 4 and lug 5, fixed pulley group spare 2 fix on the basic platform. During the use: drawn subassembly 3 to install the intermediate position at the tube bank front end tube bank, wire rope walks around fixed pulley group spare 2, and the tube bank is passed to its one end, is drawn subassembly 3 to link to each other with the tube bank, and the wire rope other end is connected with another crane, wire rope passes through fixed pulley group spare 2, and pulling tube bank horizontal direction at the uniform velocity gets into the casing. The major diameter tube bank is when equipment hoist and mount business turn over casing, and speed is evenly controllable, and operational risk is little, the commonality is strong, and applicable tube bank in various different diameters is assembled, improve the tube bank packaging efficiency by a wide margin, reduced tube bank assembly costs.

Description

Large diameter pipe does up and hangs assembly tooling
Technical field
Apparatus of the present invention relate to heat exchanger tube lifting and assembling field.
Background technology
Heat exchanger is to apply one of unit the most widely in the industries such as chemical industry, oil, pharmacy and the energy.China's dynamics of investment in the construction of the projects such as large-scale oil refining, large-scale Coal Chemical Industry, big ethylene strengthens in recent years, and scale is the most increasing.Adapting with the complexes maximized, heat exchanger is also keeping the large-scale development, and manufacture and the installation of this heat exchanger are had higher requirement.Large heat exchanger tube bank assemble in owing to device diameters is excessive, tube bank quality is overweight, there is the problems such as operating difficulties, danger are bigger.At present when assembling tube bank, generally needing to install tube bank slideway in heat exchanger shell, this certainly will add equipment investment cost.When assembling tube bank, relying on manpower to draw by jack, installation difficulty is big, restrain that hauling speed is uneven is easily caused tube bundle deformation;Installation effectiveness is low, is unsuitable for producing in enormous quantities.
Summary of the invention
We problem to be solved are: overcome large diameter pipe in prior art to do up and hang and operation inconvenience in assembling process, the difficulty that lifting risk is bigger.
The invention provides large diameter pipe to do up and hang assembly tooling, its structure has: tube bank boatswain chair assembly 1, fixed block assembly 2, tube bank tension assembly 3;Wherein said tube bank boatswain chair assembly 1 is made up of two symmetrical hangers 5 at arc plate 4 and arc plate two ends;Described fixed block assembly 2 is made up of the fixed pulley being fixed on basic platform;Described tube bank tension assembly 3 is made up of the steel pipe that intensity is good, can be with tube bank transverse plane laminating.
Large diameter pipe does up and hangs the using method of assembly tooling and be:
1. put and restrain on the arc plate 4 of tube bank boatswain chair assembly 1, crane is sling tube bank to certain altitude position by the steel wire rope that is fixed on tube bank boatswain chair assembly 1 symmetrical hanger 5 above, move in parallel again and tube bank about 1/3 length is sent in housing, make tube bank slideway implement on housing;
2. Fixed Tube-sheet Reboiler, changes the lifting position of tube bank boatswain chair assembly 1, and in advance gasket seal assembling is put in place;
3. tube bank tension assembly 3 is arranged on the centre position of tube bank front end;Fixed block assembly 2 walked around by steel wire rope, and its one end, through tube bank, is connected with tube bank tension assembly 3, and the steel wire rope other end is connected with another crane;
4. another crane the most at the uniform velocity tense wire rope, fixed block 2 tension tube bank tension assembly 3 walked around by steel wire rope;Vertical direction crane interoperation simultaneously, makes tube bank keep certain height by tube bank boatswain chair assembly 1;Tube bank at the uniform velocity enters housing by the tension level direction of steel wire rope, carries out tube bank and assembles.
The invention has the beneficial effects as follows: major diameter tube bank is when assembling lifting turnover housing, and speed uniform, controllable, operational risk is little;Highly versatile, the tube bank being applicable to various different-diameter assembles;Tube bank packaging efficiency is greatly improved, reduces tube bank assembly cost;Easy and simple to handle, safe and reliable, reduce the operation level requirement that tube bank is assembled workmen.Solve the difficult point during large heat exchanger tube bank lifting and assembling.
Accompanying drawing explanation
Fig. 1 large diameter pipe does up and hangs and assembly tooling structure and operation chart,
In figure: 1 tube bank boatswain chair assembly, 2 fixed block assemblies, 3 tube bank tension assemblies.
Fig. 2 restrains boatswain chair modular construction schematic diagram,
In figure: 4 arc plates, 5 hangers.
Detailed description of the invention
As it can be seen, present configuration includes restraining boatswain chair assembly 1, fixed block assembly 2, tube bank tension assembly 3;Wherein said tube bank boatswain chair assembly 1 is made up of two symmetrical hangers 5 at arc plate 4 and arc plate two ends;Described fixed block assembly 2 is made up of the fixed pulley being fixed on basic platform;Described tube bank tension assembly 3 is made up of the steel pipe that intensity is good, can be with tube bank transverse plane laminating.
Using method:
The arc plate 4 restraining boatswain chair assembly 1 during lifting pads below tube bank, and the gravity of tube bank is evenly distributed on arc plate 4, can be to having restrained cushioning and protection, it is ensured that tube bank lifting steadily, can prevent tube bundle deformation;
Crane is sling tube bank to certain altitude position by the steel wire rope that is fixed on tube bank boatswain chair assembly 1 symmetrical hanger 5 above, then moves in parallel tube bank about 1/3 length is sent in housing, makes tube bank slideway implement and plays a supporting role on housing;
Then Fixed Tube-sheet Reboiler, changes the lifting position of tube bank boatswain chair assembly 1, and in advance gasket seal assembling is put in place;
Tube bank tension assembly 3 is arranged on the centre position of tube bank front end;Fixed block assembly 2 walked around by steel wire rope, and its one end, through tube bank, is connected with tube bank tension assembly 3, and pulling force acts on the two ends of tension assembly 3 steel pipe, it is ensured that tube bank is by uniform horizontal direction pulling force;The steel wire rope other end is connected with another crane, and steel wire rope is converted into the pulling force of horizontal direction by the pulling force of 2 vertical direction of fixed block;
Vertical direction crane interoperation simultaneously during operation, makes tube bank keep certain height by tube bank boatswain chair assembly 1;The tension level direction that tube bank in housing utilizes slideway to pass through another crane rope at the uniform velocity enters housing;Carry out tube bank to assemble.
Note preventing steel wire rope from directly contacting with tube bank, rub, scratch is restrained.
It is steady that the present invention ensures that housing is drawn in tube bank, and speed is controlled.

Claims (1)

1. large diameter pipe does up and hangs assembly tooling, it is characterized in that: its structure has tube bank boatswain chair assembly (1), fixed block assembly (2), tube bank tension assembly (3);Wherein said tube bank boatswain chair assembly (1) is made up of two symmetrical hangers (5) at arc plate (4) and arc plate two ends;Described fixed block assembly (2) is made up of the fixed pulley being fixed on basic platform;Described tube bank tension assembly (3) is made up of the steel pipe that intensity is good, can be with tube bank transverse plane laminating.
CN201620436565.9U 2016-05-16 2016-05-16 Assembly fixture is lifted by crane in major diameter tube bank Active CN205603037U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620436565.9U CN205603037U (en) 2016-05-16 2016-05-16 Assembly fixture is lifted by crane in major diameter tube bank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620436565.9U CN205603037U (en) 2016-05-16 2016-05-16 Assembly fixture is lifted by crane in major diameter tube bank

Publications (1)

Publication Number Publication Date
CN205603037U true CN205603037U (en) 2016-09-28

Family

ID=56967256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620436565.9U Active CN205603037U (en) 2016-05-16 2016-05-16 Assembly fixture is lifted by crane in major diameter tube bank

Country Status (1)

Country Link
CN (1) CN205603037U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105775991A (en) * 2016-05-16 2016-07-20 兰州兰石重型装备股份有限公司 Large-diameter tube bundle hoisting assembly tooling and using method thereof
CN109794755A (en) * 2018-12-27 2019-05-24 上海电气电站设备有限公司 A kind of bundle fitting device and method
CN110961853A (en) * 2019-12-27 2020-04-07 哈电集团(秦皇岛)重型装备有限公司 Tube bundle assembly auxiliary turnover device and turnover method using same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105775991A (en) * 2016-05-16 2016-07-20 兰州兰石重型装备股份有限公司 Large-diameter tube bundle hoisting assembly tooling and using method thereof
CN109794755A (en) * 2018-12-27 2019-05-24 上海电气电站设备有限公司 A kind of bundle fitting device and method
CN110961853A (en) * 2019-12-27 2020-04-07 哈电集团(秦皇岛)重型装备有限公司 Tube bundle assembly auxiliary turnover device and turnover method using same

Similar Documents

Publication Publication Date Title
CN105775991A (en) Large-diameter tube bundle hoisting assembly tooling and using method thereof
CN205603037U (en) Assembly fixture is lifted by crane in major diameter tube bank
CN202785258U (en) Hoisting device for air overturn of large-sized steel column
CN212503731U (en) Boiler installation overhead hoist
CN205603125U (en) Special hoist device that horizontal water tube cooler heat exchange tube was changed
CN202417595U (en) Sensor lifting device
CN201596610U (en) Hanger on automatic aluminum hub spraying equipment
CN204111235U (en) A kind of voltage transformer and JP cabinet dismounting special purpose device
CN106542441A (en) A kind of Pickling-shop special purpose crane
CN102384693B (en) Installation method of baffle plate in large-size heat exchanger
CN104129730A (en) Transformer and JP cabinet disassembly and assembly lifting device
CN209507286U (en) A kind of cable placement bracket
CN207209896U (en) A kind of large-scale dismountable lower end axle inspection platform
CN202785254U (en) Lifting tool
CN202657821U (en) Impeller assembly-disassembly lifting device of no-split centrifugal compressor
CN204434124U (en) Tower machine is from the structure installing and certainly dismantle counterbalanced weight
CN104495645A (en) Structure capable of mounting and dismounting balancing weight automatically by tower crane
CN205616437U (en) Device of a hoist and mount graphite heat preservation section of thick bamboo
CN205241747U (en) " arm " formula stove roller hoist
CN203373106U (en) High-altitude hanging basket support convenient to dismount and mount
CN205170253U (en) Detachable removal hoist device
CN212609106U (en) Carry out hoist device in coordination that main hanging and supplementary hung to heat exchanger
CN212953779U (en) Steel construction section bar hoist device
CN218261552U (en) Lifting appliance for construction of natural gas long-distance pipeline
CN219259348U (en) Deep well pump hoisting overhauls device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant