CN205539517U - A special stand is fixed in leveling that is used for geophysics earth electromagnetism appearance magnetic probe - Google Patents

A special stand is fixed in leveling that is used for geophysics earth electromagnetism appearance magnetic probe Download PDF

Info

Publication number
CN205539517U
CN205539517U CN201620302013.9U CN201620302013U CN205539517U CN 205539517 U CN205539517 U CN 205539517U CN 201620302013 U CN201620302013 U CN 201620302013U CN 205539517 U CN205539517 U CN 205539517U
Authority
CN
China
Prior art keywords
fixed
fixing groove
supporting leg
magnetic probe
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620302013.9U
Other languages
Chinese (zh)
Inventor
刘志亮
董明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Langfang Zhongtie Geophysical Survey Co ltd
Original Assignee
Langfang Zhongtie Geophysical Survey Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Langfang Zhongtie Geophysical Survey Co ltd filed Critical Langfang Zhongtie Geophysical Survey Co ltd
Priority to CN201620302013.9U priority Critical patent/CN205539517U/en
Application granted granted Critical
Publication of CN205539517U publication Critical patent/CN205539517U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model provides a special stand is fixed in leveling that is used for geophysics earth electromagnetism appearance magnetic probe, dock Panel one side is equipped with the azimuth scale and marks the district, the azimuth scale marks the district both ends and is equipped with horizontal bubble respectively, dock Panel centre of a circle position is equipped with the fixed slot support, be equipped with rotatable fixed slot on the fixed slot support, be equipped with the fixed subassembly no. 2 of detaining on the rotatable fixed slot, the fixed fixed subassembly no. 1 of buckleing of two upper ends on subassembly installation of detaining is fixed by fixed screw no. 2, the dock Panel edge is equipped with the landing leg fixed slot, the installation landing leg is fixed by fixed screw no. 1 in the landing leg fixed slot, support fixed subassembly no. 1 is fixed the fixed slot support on dock Panel with the fixed subassembly no. 2 of support, it can improve the field of magnetic probe by a wide margin and lay efficiency, the physical prospecting technical staff has been removed from and the spade need be hand -carried, instrument and open -air troubles of digging the hole such as level bar, it is more accurate to make the open -air data collection of technical staff, it is convenient, especially, in the mountain area, it is more obvious during forest zone physical prospecting construction operation.

Description

Special stand is fixed in leveling for geophysics mt instrument magnetic probe
Technical field
This utility model relates to engineering geophysics prospecting auxiliary equipment field, particularly relates to a kind of for the earth Special stand is fixed in the leveling of physics mt instrument magnetic probe.
Background technology
Magnetotelluric sounding method (MT) is that early 1950s is by former Soviet Union A.N.Tikhonov and France The Natural electromagnetic field method that L.Cagnird proposes respectively.Its principle be utilize high-altitude vertical incidence sky So alternating electromagnetism ripple (10-3~103Hz) it is excitation field source, by observing mutually orthogonal electric field and magnetic field on earth's surface Carry out a kind of geophysical exploration method of Study of The Underground medium electrical structure.Exist according to the electromagnetic wave of different frequency Conductor has the principle of different skin depth, measures by the earth electromagnetic response sequence of high frequency tremendously low frequency on earth's surface Row, process through relevant data and analyze the electrical structure obtaining the earth from shallow to deep.
Wherein audio-frequency magnetotelluric magnetic method (AMT) and controlled-source audiomagnetotellurics method (CSAMT) are again the earth electricity Two branching methods of magnetic method, both approaches observing frequency (1-105Hz) electromagnetic method wants height significantly, visits Depth measurement degree is shallow, and outdoor operation method is arranged basically identical, and institute's utilization instrument is also consistent, therefore this quasi-instrument It is referred to as mt instrument.Owing to these two kinds of method detection superficial part (0-2.0km) information resolution are high, it is not subject to The advantages such as shield layer with high resistivity, have widely at aspects such as geological prospecting water detection, Rail Highway engineering investigations now Use.
Magnetotelluric development experience scalar impedance, two stages of tensor impedance, and mt instrument Development then experienced by dummy run phase, digitisation stage;Modern mt instrument is for adapting to magnetotelluric method The needs of technology development, current mt Instrument Development trend is integrated, lighting, multiple tracks and distant Survey remote-control.The main mt instrument being currently used for producing has: phoenix geophysics company of Canada produces V5-2000, V8 multi-functional electric device;The GDP-32 multi-functional electric device that Zonge company of the U.S. produces; The GMS-07 frequency domain synthesis electromagnetic method instrument that Metronix company of Germany produces;The U.S. Geometrics and EMI The equipment such as the EH-4 of company's joint research and development.
Engineering field mt instrument method of work arranges (cross-shaped device): the two pairs of electrodes of horizontal direction With two Magnetic Sensors (being called for short magnetic probe, be about 60-80cm) orthogonal laying respectively, its azimuth deviation is little In 2 °, horizontal magnetic probe top is away from central point 8m-10m.Such as two pairs of electrodes azimuth be respectively 30 ° and 120 °, then corresponding magnetic probe azimuth just should be arranged to 120 ° and 30 °, guarantee Ex/Ey Electrode and Hy/Hx magnetic probe are the most vertical.Wherein for the laying of magnetic probe, Ministry of Land and Resources, country Clear stipulaties in the magnetotelluric method industry standard that the units such as Railway Bureau are issued: antenna azimuth error should hang down with electrode Directly, and using compass to position, azimuth angle error is not more than 2 °, and magnetic probe answers horizontal positioned, for avoiding Bigger error, the horizon rule calibration that length should be used to be more than 40cm, for the noise avoiding vibrations to produce, answer Magnetic probe is imbedded below ground or is fixed on special non-metal frame.Existing magnetic probe distribution method is past Toward need with spade pit digging fix, horizon rule calibrated horizontal, compass location, need leveling repeatedly and adjustment Angle can be only achieved the requirement of associated specifications, and efficiency is low, method is original.
Summary of the invention
In order to solve problem above, this utility model provides one for geophysics mt instrument magnetic probe Leveling fix special stand, it is installed and regulation is simple, and effect is laid in the field that magnetic probe can be greatly improved Rate, makes technical staff's field data collection more accurate, convenient, especially in mountain area, forest zone physical prospecting construction Become apparent from during operation.
The technical solution of the utility model is: provide a kind of tune for geophysics mt instrument magnetic probe Flat fixing special stand, it is by fixed panel, scale marked area, azimuth, horizontal bubble, supporting leg, props up Lower limb fixes groove, rotatable fixing groove, fixing groove bearing, fixed screw one, clip assembly one, fixing spiral shell Silk two, clip assembly two, bearing fixation kit one and bearing fixation kit two form, fixed panel side Being provided with scale marked area, azimuth, scale marked area, azimuth is respectively arranged at two ends with horizontal bubble, fixed panel Home position is provided with fixing groove bearing, and fixing groove bearing is provided with rotatable fixing groove, on rotatable fixing groove Being provided with clip assembly two, clip assembly two upper end is installed clip assembly one and is fixed by fixed screw two, Fixed panel edge is provided with supporting leg and fixes groove, and supporting leg is installed supporting leg in fixing groove and fixed by fixed screw one, Fixing groove bearing is fixed on fixed panel by seat fixation kit one with bearing fixation kit two.
Preferably, supporting leg can move up and down regulation height in supporting leg fixes groove, reaches leveling fixed panel Purpose.
Preferably, fixed panel is circular.
Preferably, rotatable fixing groove can rotate to arbitrarily angled on fixing groove bearing.
Preferably, owing to magnetic probe installation position can not have external magnetic bodies to disturb, fixed panel, orientation Angle index marked area, horizontal bubble, supporting leg, supporting leg fix groove, rotatable fixing groove, fixing groove bearing, Fixed screw one, clip assembly one, fixed screw two and clip assembly two are nonmetallic materials and make.
Compared with prior art, the beneficial effects of the utility model are: the field cloth of magnetic probe can be greatly improved If efficiency, make technical staff's field data collection more accurate, convenient, especially in mountain area, forest zone physical prospecting Become apparent from during construction operation.The application of this support, not only eliminating geophysical prospecting technology personnel needs to carry with The instrument such as spade, horizon rule and the trouble of field pit digging, also make technical staff field arrange magnetic probe more just Prompt, efficiently, accurately.
Accompanying drawing explanation
Further this utility model is illustrated below according to figure:
Fig. 1 is structure chart of the present utility model;
Fig. 2 is the decomposition chart that this utility model supporting leg, supporting leg fix groove and fixed screw one;
Fig. 3 is the structure chart that the rotatable fixing groove of this utility model is connected with fixing groove bearing;
Fig. 4 is plane structure chart of the present utility model;
Fig. 5 is the structure chart of this utility model embodiment;
Shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5: 1, fixed panel, 2, scale marked area, azimuth, 3, Horizontal bubble, 4, supporting leg, 5, supporting leg fix groove, 6, rotatable fixing groove, 7, fixing groove bearing, 8, Fixed screw one, 9, clip assembly one, 10, fixed screw two, 11, clip assembly two, 12, Seat fixation kit one, 13, bearing fixation kit two.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described in further detail, it should be noted that accompanying drawing is only For explaining this utility model, it is that this utility model embodiment is schematically illustrated, and it is not intended that right Restriction of the present utility model.
In description of the present utility model, except as otherwise noted, term " on ", D score, "left", "right", " interior ", Orientation or the position relationship of the instruction such as " outward ", " front end ", " rear end ", " head ", " afterbody " are based on attached Orientation shown in figure or position relationship, be for only for ease of description this utility model and simplify describe rather than Instruction or hint indication device or element must have specific orientation, with specific azimuth configuration and operation, Therefore it is not intended that to restriction of the present utility model.
In description of the present utility model, it should be noted that unless otherwise clearly defined and limited, art Language " is connected ", " connection " should be interpreted broadly, and connects for example, it may be fixing, it is also possible to be detachable Connect, or be integrally connected;Can be to be mechanically connected, it is also possible to be electrical connection;Can be to be joined directly together, Can also be indirectly connected to by intermediary.For the ordinary skill in the art, can concrete feelings Condition understands above-mentioned term concrete meaning in this utility model.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, for geophysics mt instrument magnetic probe Special stand is fixed in leveling, and it is by fixed panel 1, scale marked area, azimuth 2, horizontal bubble 3, props up Lower limb 4, supporting leg fix groove 5, rotatable fixing groove 6, fixing groove bearing 7, fixed screw 1, clip group Part 1, fixed screw 2 10, clip assembly 2 11, bearing fixation kit 1 and bearing fixation kit 2 13 compositions, fixed panel 1 side is provided with scale marked area, azimuth 2,2 liang, scale marked area, azimuth End is respectively equipped with horizontal bubble 3, and fixed panel 1 home position is provided with fixing groove bearing 7, fixing groove bearing 7 Being provided with rotatable fixing groove 6, rotatable fixing groove 6 is provided with clip assembly 2 11, clip assembly 2 11 upper ends are installed clip assembly 1 and are fixed by fixed screw 2 10, and fixed panel 1 edge is provided with and props up Lower limb fixes groove 5, and supporting leg is installed supporting leg 4 in fixing groove 5 and fixed by fixed screw 1, bearing fixation kit one Fixing groove bearing 7 is fixed on fixed panel 1 by 12 with bearing fixation kit 2 13.
Preferably, supporting leg 4 can move up and down regulation height in supporting leg fixes groove 5, reaches leveling and fixes The purpose of panel 1.
Preferably, fixed panel 1 is circular.
Preferably, rotatable fixing groove 6 can rotate to arbitrarily angled on fixing groove bearing 7.
Preferably, owing to magnetic probe installation position can not have external magnetic bodies to disturb, fixed panel 1, orientation Angle index marked area 2, horizontal bubble 3, supporting leg 4, supporting leg fix groove 5, rotatable fixing groove 6, fixing groove Bearing 7, fixed screw 1, clip assembly 1, fixed screw 2 10 and clip assembly 2 11 are equal Make for nonmetallic materials.
Embodiment
As it is shown in figure 5, first lay azimuth requirement according to magnetic probe, rotate rotatable fixing groove 6 to referring to After orientation angle index, use the bearing fixation kit 1 bottom fixing groove bearing 7 and bearing fixation kit 2 13 fix, and then insert supporting leg 4 one toward underground, and supporting leg 4 top is through the supporting leg on fixed panel 1 Fixing groove 5, uses compass to adjust fixed panel 1 direction, makes 0 ° of direction of fixed panel 1 scale and compass 0 ° of direction is consistent, fixes from supporting leg and inserts another supporting leg 4 to underground groove 5, is adjusted by horizontal bubble 3 After fixed panel 1 is level, two fixed screws 1 are used to be fixed on fixed panel 1 by supporting leg 2, Insert the 3rd supporting leg 4 and fix, after support is connected into merit, magnetic probe being put into rotatable fixing groove In 6, use fixed screw 2 10 that clip assembly 1 is fixed on clip assembly 2 11 upper end, play Leveling, orientation and the effect of fixing magnetic probe.
This utility model is installed and regulation is simple, and efficiency is laid in the field that magnetic probe can be greatly improved, and makes skill Art personnel's field data collection is more accurate, convenient, especially in mountain area, forest zone physical prospecting construction operation time more For substantially.The application of this support, not only eliminating geophysical prospecting technology personnel needs to carry with spade, horizon rule Deng instrument and the trouble of field pit digging, magnetic probe is more convenient, efficient, accurate also to make technical staff field arrange Really.
The above is embodiment of the present utility model, is not limited to this utility model, for this area Technical staff for, this utility model can have various modifications and variations.All in spirit of the present utility model Right of the present utility model all should be contained in any modification, equivalent substitution and improvement etc. made within principle to want Within the scope of asking.

Claims (5)

1. special stand is fixed in the leveling for geophysics mt instrument magnetic probe, and it is by fixed panel (1), azimuth scale marked area (2), horizontal bubble (3), supporting leg (4), supporting leg fix groove (5), Rotatable fixing groove (6), fixing groove bearing (7), fixed screw one (8), clip assembly one (9), Fixed screw two (10), clip assembly two (11), bearing fixation kit one (12) and bearing are solid Determine assembly two (13) composition, it is characterised in that: fixed panel (1) side is provided with azimuth scale Marked area (2), scale marked area, azimuth (2) is respectively arranged at two ends with horizontal bubble (3), fixing Panel (1) home position is provided with fixing groove bearing (7), and fixing groove bearing (7) is provided with and can revolve Turning fixing groove (6), rotatable fixing groove (6) is provided with clip assembly two (11), clip group Part two (11) upper end is installed clip assembly one (9) and is fixed by fixed screw two (10), fixing Panel (1) edge is provided with supporting leg and fixes groove (5), and supporting leg installs supporting leg (4) in fixing groove (5) Fixed by fixed screw one (8), bearing fixation kit one (12) and bearing fixation kit two (13) Fixing groove bearing (7) is fixed on fixed panel (1).
The most according to claim 1, the leveling for geophysics mt instrument magnetic probe fixes special Frame, it is characterised in that: supporting leg (4) can move up and down regulation height in supporting leg fixes groove (5), Reach the purpose of leveling fixed panel (1).
The most according to claim 1, the leveling for geophysics mt instrument magnetic probe fixes special Frame, it is characterised in that: fixed panel (1) is circular.
The most according to claim 1, the leveling for geophysics mt instrument magnetic probe fixes special Frame, it is characterised in that: rotatable fixing groove (6) extremely can be appointed upper rotation of fixing groove bearing (7) Meaning angle.
The most according to claim 1, the leveling for geophysics mt instrument magnetic probe fixes special Frame, it is characterised in that: owing to magnetic probe installation position can not have external magnetic bodies to disturb, stationary plane Plate (1), scale marked area, azimuth (2), horizontal bubble (3), supporting leg (4), supporting leg fix groove (5), rotatable fixing groove (6), fixing groove bearing (7), fixed screw one (8), clip group Part one (9), fixed screw two (10) and clip assembly two (11) are nonmetallic materials and make.
CN201620302013.9U 2016-04-12 2016-04-12 A special stand is fixed in leveling that is used for geophysics earth electromagnetism appearance magnetic probe Expired - Fee Related CN205539517U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620302013.9U CN205539517U (en) 2016-04-12 2016-04-12 A special stand is fixed in leveling that is used for geophysics earth electromagnetism appearance magnetic probe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620302013.9U CN205539517U (en) 2016-04-12 2016-04-12 A special stand is fixed in leveling that is used for geophysics earth electromagnetism appearance magnetic probe

Publications (1)

Publication Number Publication Date
CN205539517U true CN205539517U (en) 2016-08-31

Family

ID=56790396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620302013.9U Expired - Fee Related CN205539517U (en) 2016-04-12 2016-04-12 A special stand is fixed in leveling that is used for geophysics earth electromagnetism appearance magnetic probe

Country Status (1)

Country Link
CN (1) CN205539517U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112198555A (en) * 2020-08-24 2021-01-08 中国科学院南海海洋研究所 Magnetobar installing support for magnetotelluric
CN115356773A (en) * 2022-10-21 2022-11-18 四川中成煤田物探工程院有限公司 Magnetic rod posture adjusting device, using method and manufacturing method thereof
CN117686544A (en) * 2024-02-02 2024-03-12 中国科学院武汉岩土力学研究所 Multi-probe nuclear magnetic resonance and conductivity combined in-situ underground monitoring system and method
CN117761784A (en) * 2024-02-19 2024-03-26 山东省煤田地质局第三勘探队 Device for exploring fixed magnetic rod by geophysical magnetotelluric method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112198555A (en) * 2020-08-24 2021-01-08 中国科学院南海海洋研究所 Magnetobar installing support for magnetotelluric
WO2021159937A1 (en) * 2020-08-24 2021-08-19 中国科学院南海海洋研究所 Stable measurement installation support for magnetotellurics magnetobars
CN115356773A (en) * 2022-10-21 2022-11-18 四川中成煤田物探工程院有限公司 Magnetic rod posture adjusting device, using method and manufacturing method thereof
CN115356773B (en) * 2022-10-21 2023-01-10 四川中成煤田物探工程院有限公司 Magnetic rod posture adjusting device, using method and manufacturing method thereof
CN117686544A (en) * 2024-02-02 2024-03-12 中国科学院武汉岩土力学研究所 Multi-probe nuclear magnetic resonance and conductivity combined in-situ underground monitoring system and method
CN117686544B (en) * 2024-02-02 2024-04-30 中国科学院武汉岩土力学研究所 Multi-probe nuclear magnetic resonance and conductivity combined in-situ underground monitoring system and method
CN117761784A (en) * 2024-02-19 2024-03-26 山东省煤田地质局第三勘探队 Device for exploring fixed magnetic rod by geophysical magnetotelluric method
CN117761784B (en) * 2024-02-19 2024-05-03 山东省煤田地质局第三勘探队 Device for exploring fixed magnetic rod by geophysical magnetotelluric method

Similar Documents

Publication Publication Date Title
CN205539517U (en) A special stand is fixed in leveling that is used for geophysics earth electromagnetism appearance magnetic probe
CN1950721B (en) Electromagnetic surveying for hydrocarbon reservoirs
US10809412B2 (en) WEM-based method for deep resource detection using sky waves
US8407005B2 (en) Method and apparatus for gradient electromagnetic induction well logging
CA2919726A1 (en) A high precision field measurement method for geomagnetic vectors and a device thereof
Streich et al. Strategies for land-based controlled-source electromagnetic surveying in high-noise regions
Xue The development of near-source electromagnetic methods in China
MX2011009449A (en) Electromagnetic survey using naturally occurring electromagnetic fields as a source.
Yan et al. Continuous TDEM for monitoring shale hydraulic fracturing
Saracco et al. Localization of self‐potential sources in volcano‐electric effect with complex continuous wavelet transform and electrical tomography methods for an active volcano
US2723374A (en) Electromagnetic prospecting from bore holes
Chen et al. A surface-to-borehole TEM system based on grounded-wire sources: synthetic modeling and data inversion
CN103809218A (en) Calibration device and calibration method for magnetic probe in TEM well
ITMI20110228A1 (en) SYSTEM FOR DETECTION OF GEOLOGICAL FORMATIONS
Khomutov Magnetic observations at Geophysical Observatory Paratunka IKIR FEB RAS: tasks, possibilities and future prospects
Csontos et al. How to control a temporary DIDD based observatory in the field?
Szarka Geophysical mapping by stationary electric and magnetic field components: a combination of potential gradient mapping and magnetometric resistivity (MMR) methods
Meying et al. Evidence of fractures from the image of the subsurface in the Akonolinga-Ayos area (Cameroon) by combining the Classical and the Bostick approaches in the interpretation of audio-magnetotelluric data
Lindau et al. Using impressed current cathodic protection systems of pipelines for electromagnetic exploration
BRPI0917820B1 (en) METHOD AND SYSTEM FOR INCREASING SENSITIVITY IN MAGNITUDE MEASUREMENT AND RESISTIVITY DIRECTION
Shan et al. Portable audio magnetotellurics-experimental measurements and joint inversion with radiomagnetotelluric data from Gotland, Sweden
Oskooi 1D interpretation of the Magnetotelluric data from Travale Geothermal Field in Italy
West et al. The borehole controlled-source audiomagnetotelluric response of a three-dimensional fracture zone
Zhamaletdinov et al. Electromagnetic sounding of the Earth’s crust in the region of superdeep boreholes of Yamal-Nenets autonomous district using the fields of natural and controlled sources
Phani Chandrasekhar et al. One second vector and scalar magnetic measurements at the low-latitude Choutuppal (CPL) magnetic observatory

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20190412