CN205530314U - Cast -in -place open caisson formwork system - Google Patents

Cast -in -place open caisson formwork system Download PDF

Info

Publication number
CN205530314U
CN205530314U CN201620070784.XU CN201620070784U CN205530314U CN 205530314 U CN205530314 U CN 205530314U CN 201620070784 U CN201620070784 U CN 201620070784U CN 205530314 U CN205530314 U CN 205530314U
Authority
CN
China
Prior art keywords
template
screw rod
movable bar
open caisson
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620070784.XU
Other languages
Chinese (zh)
Inventor
吴添财
潘攀
张文妍
陈雁飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Baotian Environment Construction Co Ltd
Original Assignee
Zhejiang Baotian Environment Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Baotian Environment Construction Co Ltd filed Critical Zhejiang Baotian Environment Construction Co Ltd
Priority to CN201620070784.XU priority Critical patent/CN205530314U/en
Application granted granted Critical
Publication of CN205530314U publication Critical patent/CN205530314U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a cast -in -place open caisson formwork system, formwork system comprises poppet, wall of a well template, screw rod, bearing diagonal, movable bar, double scaffold frame, the tough foot template settings of department poppet, the poppet left side sets up spacing flitch, wall of a well template is in the same place to drawing through the screw rod, the inboard template settings bearing diagonal of the wall of a well, and wall of a well outside template settings transversal branch props, and the transversal branch props one end and fixes on wall of a well lateral modes board, and the other end is fixed on movable bar, double scaffold frame horizontal pole one end is groove structure, and movable bar setting accessible screw rod in the recess is fixed, the utility model relates to a structure has easy dismounting, and the efficiency of construction is high, need not set up the scaffold frame in the well and realize that template horizontal migration has better economic technology benefit.

Description

A kind of cast-in-place open caisson formwork system
Technical field
This utility model relates to a kind of cast-in-place open caisson formwork system.
Technical background
Open caisson application in Practical Project gets more and more, but, owing to open caisson construction is affected by the complexity etc. of the multiformity construction management of the uncertain construction environment of geological state so that the construction of open caisson has the feature of uncertainty.Meanwhile, mould in caisson wall, during due to concrete construction, affected by the lateral pressure of concrete, so beating tightr and tightr, will not produce burst apart, be not easy to produce spillage.But the necessary firm supporting of the interior mould of open caisson, to prevent bigger deformation.
Traditional open caisson formwork uses steel pipe to set up the framed bent support system as template, and this technique uses steel pipe quantity big, and the cycle of setting up is long, and the defects such as Form floating, swollen mould, concrete walls surface evenness, perpendicularity difference easily occurs, and construction quality is difficult to ensure that.Open caisson inner side template installs needs to set up from top to down scaffold, due to the excavation of the internal soil body of open caisson, need that repeats to set up and remove scaffold, and along with the excavation of the soil body in well, underground construction is more complicated, sets up scaffold for sunk well without bailing construction inside more difficult;Open caisson outboard template is also required to repeat assembling and disassembling, and efficiency of construction is low.
In consideration of it, need a kind of Stability Analysis of Structures of invention at present badly, be prone to dismounting, easy to operate, need not in well set up scaffold and realize template move horizontally, be suitable for differing heights open caisson formwork system.
Summary of the invention
The purpose of this utility model is to provide a kind of Stability Analysis of Structures, is prone to dismounting, easy to operate, need not set up scaffold from bottom to top and realize template move horizontally, be suitable for differing heights open caisson formwork system in well.
For achieving the above object, this utility model have employed techniques below scheme:
A kind of cast-in-place open caisson formwork system, it is characterised in that: include poppet, inner side template, outboard template, screw rod, bearing diagonal, horizontal support, movable bar and double-pole scaffold;Template-setup poppet at cutting shoe, arranges spacing flitch on the left of poppet;Borehole wall inner side template and outboard template to being pulled together, screw rod are provided with sealing piece by screw rod;Inner side template arranges bearing diagonal, and bearing diagonal one end is fixed in borehole wall inner side template, and the other end supports on the ground;Outboard template arranges horizontal support, and horizontal support one end is fixed on outboard template, and the other end is fixed on movable bar;Movable bar is connected with the cross bar of double-pole scaffold;At steel reinforcement cage upper position, pre-buried pvc pipe is set.
Further, screw rod is three joints, and middle part one joint is stayed in the borehole wall, and two ends screw rod is connected with middle part one joint by taper bolt respectively, arranges 2 steel pipes respectively between borehole wall inner side template, outboard template and three row fasteners.
Cross bar one end of double-pole scaffold is groove structure, and movable bar is arranged in groove and is bolted, and after removing bolt, movable bar can move in groove.
This utility model has following feature and a beneficial effect:
(1) after first segment open caisson construction, without again dismounting, only need to remove Screw arbor with nut at both-ends, outboard template can move horizontally laterally and be fixed on double-pole scaffold, treating that well sinking postpones to specific bit and be fixed formwork again, construction period substantially shortens.
(2) the removable split bolt used is three joints, middle part one joint is stayed in body of wall, interior band seal ring, two ends screw rod is connected with middle part one joint by taper bolt respectively, after form removal, two ends screw rod and taper bolt can be removed and recycle, and has easy accessibility, saves material, reduce operation, the feature of reduction of erection time.
(3) carry out skewed horizontal load during cast-in-place open caisson formwork, only set up scaffold in double-pole scaffold coordinates than conventional construction method in open caisson lateral wall and carry out formwork or add level land diagonal brace, there is higher stable and property safety.
Accompanying drawing explanation
Fig. 1 is this utility model cast-in-place open caisson formwork system structural representation;
Fig. 2 is can to move bar to connect detail drawing;
In figure: 1. sand-gravel cushion;2. plain concrete cushion layer;3. backing plate;4. poppet;The most spacing flitch;6. bear foot;7. inner side template;8. outboard template;9. jack rafter;10. construction joint groove;11. screw rods;12. 3 row fasteners;13. taper bolts;14. bearing diagonals;15. steel pipes;16. horizontal supports;17. double-pole scaffolds;18. steel pipe diagonal braces;19, pre-buried pvc pipe;20. movable bars;21. cross bars;22, bolt;23. steel reinforcement cages;24. grooves;25, sealing piece.
Detailed description of the invention
Just being not repeated in these enforcements such as present embodiment welding for steel structure technique, bolt connection construction technique, template-setup technique and concrete pouring construction technique, emphasis illustrates that this utility model relates to the embodiment of structure.
Fig. 1 is this utility model cast-in-place open caisson formwork system first segment open caisson formwork erecting structure schematic diagram.With reference to shown in Fig. 1, this utility model cast-in-place open caisson formwork system specifically includes that poppet 4, inner side template 7, outboard template 8, screw rod 11, three row fastener 12, taper bolt 13, bearing diagonal 14, steel pipe 15, horizontal support 16, movable bar 20 and double-pole scaffold 17.
With reference to shown in Fig. 1, before open caisson template construction, bottom open caisson, first lay one layer of sand-gravel cushion 1, a laminin concrete cushion 2 is poured on sand-gravel cushion, arranging backing plate 3 bottom cutting shoe 6, at cutting shoe 6, formwork uses poppet method, poppet 4 to be positioned on backing plate 3 by spacing flitch 5.
Blade foot model starts borehole wall formwork erection after installing, template surface should be cleaned out before installation form, brush interleaving agent, brushing is uniformly, brush must not be leaked, in place for the most assembled good borehole wall inner side template 7 opsition dependent, then bearing diagonal 14 is installed, install Screw arbor with nut at both-ends 11, with galvanized wire by taper bolt 13 colligation on framework of steel reinforcement.Borehole wall inner side template 7 and outboard template 8 are by screw rod 11 to being pulled together, and borehole wall inner side template 7 arranges bearing diagonal 14, and borehole wall outboard template 8 is supported on the movable bar 20 of double-pole scaffold 17 by horizontal support 16;Movable bar 20 is connected with the cross bar 21 of double-pole scaffold 17.Borehole wall specific bit installs to reserve buries pvc pipe 19;Double-pole scaffold 17 arranges ground connection steel pipe diagonal brace 18.
With reference to shown in Fig. 2, double-pole scaffold cross bar 21 one end is groove structure, fixes in movable bar 20 is arranged on groove 24 and by bolt 22, and after removing bolt 22, movable bar 26 can move in groove 24.

Claims (3)

1. a cast-in-place open caisson formwork system, it is characterised in that: include poppet (4), inner side template (7), outboard template (8), screw rod (11), bearing diagonal (14), horizontal support (16), movable bar (20) and double-pole scaffold (17);Template-setup poppet (4) at cutting shoe, poppet (4) left side arranges spacing flitch (5);Borehole wall inner side template (7) and outboard template (8) are by screw rod (11) to being pulled together, and screw rod is provided with sealing piece on (11);Inner side template (7) arranges bearing diagonal (14), and bearing diagonal (14) one end is fixed in borehole wall inner side template (7), and the other end supports on the ground;Outboard template (8) arranges horizontal support (16), and horizontal support (16) one end is fixed on outboard template (8), and the other end is fixed on movable bar (20);Movable bar (20) is connected with the cross bar (21) of double-pole scaffold (17);At steel reinforcement cage upper position, pre-buried pvc pipe (19) is set.
Cast-in-place open caisson formwork system the most according to claim 1, it is characterized in that: described screw rod (11) is three joints, middle part one joint is stayed in the borehole wall, two ends screw rod is connected with middle part one joint by taper bolt respectively, arranges 2 steel pipes respectively between borehole wall inner side template (7), outboard template (8) and three row fasteners.
Cast-in-place open caisson formwork system the most according to claim 1, it is characterized in that: cross bar (21) one end of double-pole scaffold is groove structure, fix in movable bar (20) is arranged on groove (24) and by bolt (22), after removing bolt (22), movable bar (20) can move in groove (24).
CN201620070784.XU 2016-01-25 2016-01-25 Cast -in -place open caisson formwork system Active CN205530314U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620070784.XU CN205530314U (en) 2016-01-25 2016-01-25 Cast -in -place open caisson formwork system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620070784.XU CN205530314U (en) 2016-01-25 2016-01-25 Cast -in -place open caisson formwork system

Publications (1)

Publication Number Publication Date
CN205530314U true CN205530314U (en) 2016-08-31

Family

ID=56769353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620070784.XU Active CN205530314U (en) 2016-01-25 2016-01-25 Cast -in -place open caisson formwork system

Country Status (1)

Country Link
CN (1) CN205530314U (en)

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN105672337B (en) The construction method of cast-in-place open caisson formwork system
CN104060617B (en) The prefabricated assembled inner support system of foundation pit support system and construction method
CN108999212A (en) The template construction method of underground concrete pool wall antiseep
CN104947681A (en) Super large super deep basement ground pit construction method
CN110777802A (en) Deep foundation pit high-low span supporting structure and construction method thereof
CN113074003B (en) Small clear distance tunnel deformation inhibition method for argillaceous sandstone stratum
CN103122642B (en) Construction method of vertical post support change
CN104452775A (en) Prestress support used for foundation pit and construction method
CN205530314U (en) Cast -in -place open caisson formwork system
CN205530315U (en) Cast -in -place open caisson formwork system
CN107299596B (en) Concrete support trestle plate lower supporting beam template system and construction method thereof
CN108104506A (en) It is a kind of to be used for structural demolition and the temporary facility rebuilded and its construction method
CN209082534U (en) Hanging operating platform sets up device in a kind of more piece open caisson
CN113944479A (en) Unfavorable geological tunnel three-fork construction method
CN204282371U (en) A kind of pre-loaded support struts for foundation ditch
CN210289112U (en) Through type support template system
CN113322978A (en) Warehouse-separated pier type foundation pit supporting structure and construction method
CN110847445A (en) Construction method for integrally forming outer wall and bottom plate of cast-in-place concrete structure of structure
CN112593749A (en) Construction method of anti-seepage concrete of MBBR water treatment process structure
CN206396764U (en) A kind of supporting pile column of deep basal pit
RU2312188C1 (en) Method for reinforced pole foundation recovery and jacket for damaged power transmission pole foundation repair
CN105756067B (en) A kind of method of horizontal temporary support support replacement in deep basal pit
CN111946036B (en) Reverse landing conversion construction method for section steel cantilever scaffold
CN220847608U (en) Deep foundation pit supporting structure of mountain body is close to in karst area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant