CN205509398U - PRE tubular construction - Google Patents
PRE tubular construction Download PDFInfo
- Publication number
- CN205509398U CN205509398U CN201620246855.7U CN201620246855U CN205509398U CN 205509398 U CN205509398 U CN 205509398U CN 201620246855 U CN201620246855 U CN 201620246855U CN 205509398 U CN205509398 U CN 205509398U
- Authority
- CN
- China
- Prior art keywords
- parts
- line
- spool
- bolt
- tubular construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Catching Or Destruction (AREA)
Abstract
The utility model relates to the field of machinary, especially, relate to PRE tubular construction. The bearing body comprises two parts, articulated through the pin joint between two parts, two parts avris all contains the stationary blade, all containing the hole on the stationary blade, still containing the bolt, the bolt can pass two stationary blades and fix two parts, and two parts are arc shape, and its inside can hold the line, and two parts are the PRE pipe. Beneficial effect: change the spool into the divided pipe, consequently in the later stage, need directly open the bolt in the ledger line of spool the inside, just can fill in two parts with the line in the middle of, spool originally is closed spool, continuing to walk the line, just must to chisel wall tube replacement again young.
Description
Technical field
This utility model relates to mechanical field, particularly relates to PRE tubular construction.
Background technology
The defect of prior art is:
Cabling is complicated, and circuit is difficult to effectively be fixed, and radiating efficiency is the highest, it is not easy to ledger line.
Utility model content
The purpose of utility model: in order to provide a kind of effect more preferable PRE tubular construction, specific purposes are shown in the multiple substantial technological effects being embodied as part.
In order to reach as above purpose, this utility model adopts the following technical scheme that:
PRE tubular construction, it is characterized in that, comprising two parts, hinged by pin joint between described two parts, two parts avris all comprises stator, hole is all comprised on described stator, also comprising bolt, two parts can be fixed up by bolt through two stators, and two parts are circular shape, can accommodate line inside it, two parts are PRE pipe.
The further technical scheme of this utility model is, described two-part housing all comprises groove, can accommodate line in groove.
The further technical scheme of this utility model is, described groove is arc.
The further technical scheme of this utility model is, also comprises water pipe in the space that described two parts surround.
Use this utility model of as above technical scheme, have the advantages that relative to prior art: spool is changed into discerptible pipe, therefore in the later stage, need inside spool when of ledger line, directly open bolt, just can fill in the middle of two parts by line, spool originally is enclosed spool, and cabling to be continued is necessary for again chiseling wall and retubes.
Accompanying drawing explanation
In order to further illustrate this utility model, it is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is utility model structural representation;
Wherein: 1. bolt;2. stator;3. groove;4. line;5. pipeline shell;6. pin joint.
Detailed description of the invention
Illustrating embodiment of the present utility model below in conjunction with the accompanying drawings, embodiment does not constitute restriction of the present utility model:
PRE tubular construction, it is characterized in that, comprising two parts, hinged by pin joint between described two parts, two parts avris all comprises stator, hole is all comprised on described stator, also comprising bolt, two parts can be fixed up by bolt through two stators, and two parts are circular shape, can accommodate line inside it, two parts are PRE pipe.Technique effect and the process that realizes thereof of the essence that the technical scheme at this place is played are as follows: spool changes into discerptible pipe, therefore in the later stage, need inside spool when of ledger line, directly open bolt, just can line be filled in the middle of two parts, spool originally is enclosed spool, and cabling to be continued is necessary for again chiseling wall and retubes.
As the most preferably, in conjunction with Fig. 1, described two-part housing all comprises groove, groove can accommodate line.Technique effect and the process that realizes thereof of the essence that the technical scheme at this place is played are as follows: groove can clamp line so that fixing of overall line is more firm, does not haves the rough-and-tumble situation of line.
As the most preferably, described groove is arc.Technique effect and the process that realizes thereof of the essence that the technical scheme at this place is played are as follows: the groove of arc can effectively realize the clamping to line.
The space that described two parts surround also comprises water pipe.Technique effect and the process that realizes thereof of the essence that the technical scheme at this place is played are as follows: described water pipe and line are placed side by side, and therefore the water within water pipe can effectively take away heat when of flowing.
In a creative way, each effect above is individually present, moreover it is possible to complete the combination of the above results with a nested structure.
The technique effect that above structure realizes realizes clear, and discounting for additional technical scheme, this patent title can also is that one walks spool.As preferably, described two parts all comprising transparent window, people sees the cabling of inside from external energy.Part details not shown in figure.
It should be noted that multiple schemes that this patent provides comprise the basic scheme of itself, separate, the most mutually restrict, but it can also be mutually combined in the case of not conflicting, reach multiple effect and jointly realize.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.Those skilled in the art is it should be recognized that this utility model is not restricted to the described embodiments; described in above-described embodiment and description, principle of the present utility model is simply described; on the premise of without departing from this utility model spirit and scope; this utility model also has various changes and modifications, and these changes and improvements both fall within claimed scope.
Claims (4)
1.PRE tubular construction, it is characterized in that, comprising two parts, hinged by pin joint between described two parts, two parts avris all comprises stator, hole is all comprised on described stator, also comprising bolt, two parts can be fixed up by bolt through two stators, and two parts are circular shape, can accommodate line inside it, two parts are PRE pipe.
2. PRE tubular construction as claimed in claim 1, it is characterised in that all comprise groove on described two-part housing, line can be accommodated in groove.
3. PRE tubular construction as claimed in claim 2, it is characterised in that described groove is arc.
4. PRE tubular construction as claimed in claim 1, it is characterised in that also comprise water pipe in the space that described two parts surround.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620246855.7U CN205509398U (en) | 2016-03-29 | 2016-03-29 | PRE tubular construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620246855.7U CN205509398U (en) | 2016-03-29 | 2016-03-29 | PRE tubular construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205509398U true CN205509398U (en) | 2016-08-24 |
Family
ID=56734338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620246855.7U Expired - Fee Related CN205509398U (en) | 2016-03-29 | 2016-03-29 | PRE tubular construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205509398U (en) |
-
2016
- 2016-03-29 CN CN201620246855.7U patent/CN205509398U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205745668U (en) | A kind of multi-functional suspension and support used in subway engineering | |
CN205509398U (en) | PRE tubular construction | |
CN209896371U (en) | Computer connecting wire dropout prevention means | |
CN206690209U (en) | A kind of plastic tube drilling equipment | |
CN204226851U (en) | Assembly type cable bearer | |
CN208167786U (en) | A kind of underground engineering piping lane security protection support frame | |
CN208289434U (en) | Improve the gasket boring grab of working efficiency | |
CN103672391A (en) | Movable ammonia filling equipment | |
CN210304896U (en) | Floating cleaning machine for petroleum pipe | |
CN202637092U (en) | Drill bushing for intramedullary nail | |
CN204372387U (en) | A kind of large tubule | |
CN202610102U (en) | Leakage plate used for fiberglass production | |
CN205009106U (en) | Cavity aluminum strip joint frame | |
CN205349244U (en) | Nipple joint is hung in coiled tubing well logging | |
CN207069137U (en) | A kind of spring-piece type adapter | |
CN204356413U (en) | A kind of oxyhydrogen generator of automatic loading water | |
CN205857888U (en) | A kind of telescopic flagpole | |
CN205214923U (en) | Electrically driven window curtain structure | |
CN207522424U (en) | A kind of seamless quarter bend butt junction location device | |
CN203743825U (en) | Movable nitrogen filling equipment | |
CN211664770U (en) | Chlorination device for tap water treatment | |
CN208947520U (en) | Assembling structure and bicycle for bicycle brake line | |
CN213897205U (en) | Stable fixing structure of steel bridge steel pipe pile | |
CN207297054U (en) | The special note anchor device of drill carriage | |
CN204358335U (en) | A kind of oxyhydrogen generator pipeline regulating controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160824 Termination date: 20170329 |
|
CF01 | Termination of patent right due to non-payment of annual fee |