CN205503143U - Primary waste rock is broken system in pit - Google Patents

Primary waste rock is broken system in pit Download PDF

Info

Publication number
CN205503143U
CN205503143U CN201620335785.2U CN201620335785U CN205503143U CN 205503143 U CN205503143 U CN 205503143U CN 201620335785 U CN201620335785 U CN 201620335785U CN 205503143 U CN205503143 U CN 205503143U
Authority
CN
China
Prior art keywords
waste bin
hole
primary
drag conveyor
broken
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620335785.2U
Other languages
Chinese (zh)
Inventor
江宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201620335785.2U priority Critical patent/CN205503143U/en
Application granted granted Critical
Publication of CN205503143U publication Critical patent/CN205503143U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Refuse Collection And Transfer (AREA)

Abstract

The utility model discloses a primary waste rock is broken system in pit, unload hole, scraper conveyor, vibrating feeder, jaw breaker and waste bin including bottom discharge mine car, the end, the bottom discharge mine car with the hole is unloaded through track swing joint in the end, the end is unloaded and is installed scraper conveyor in the hole, scraper conveyor's discharge end extends to the waste bin top, scraper conveyor with the vibrating feeder overlap joint, vibrating feeder's discharge gate with jaw breaker's feed inlet overlap joint, jaw breaker's discharge gate with the waste bin overlap joint. The utility model discloses can realize the broken of primary waste rock in the pit, reduce and transport and promote the link, reduce the mine production cost, optimize waste rock grain diameter class and join in marriage, reduce the dynamic porosity, improve the motion of control overlying rock and slow down the ground subsidence effect, the system is simple, and the practicality is strong.

Description

A kind of primary gangue underground crushing system
Technical field
This utility model relates to coal mine machinery technical field, particularly relates to a kind of primary gangue underground crushing system.
Background technology
Gangue is the garbage produced in coal production and washing process, and every annual emissions is equivalent to the 10%~15% of coal production.The whole nation total burden of gangue has reached 4,500,000,000 t at present, forms hillock more than 1700, takes up an area ha more than 30,000, and just with the speed increment of annual 100000000 t.Gangue is stored up for a long time, takies a large amount of soil, generates H after polluted source, and spontaneous combustion2S、SO2Etc. harmful gas, ecological environment is constituted significant damage.
Waste filling is that primary for down-hole spoil or earth's surface hillock spoil are transported to underground goaf, with filling goaf by gangue, reaches to control movement, slows down the purpose of surface subsidence.Primary immediate stowing of refuse goaf, down-hole can realize gangue not gug, reduces cost of transportation.But existing downhole gangue filling is all to goaf by primary immediate stowing of refuse, primary spoil size grading is unreasonable, and voidage is big, and decrement is big, controls movement, slows down surface subsidence effect poor.
Summary of the invention
For solving above-mentioned problems of the prior art, the utility model proposes a kind of primary gangue underground crushing system, this system can realize the downhole crushed of primary spoil, reduces transhipment and hoist links, reduces mine production costs;Optimize spoil size grading, reduce voidage, improve and control movement and slow down surface subsidence effect;System is simple, practical.
This utility model adopts the following technical scheme that
A kind of primary gangue underground crushing system, hole, drag conveyor, oscillating feeder, jaw crusher and waste bin is unloaded including drop-bottom car, the end, described drop-bottom car is unloaded hole and is flexibly connected by track with the described end, the described end, is provided with drag conveyor in unloading hole, the discharge end of described drag conveyor extends to waste bin top, described drag conveyor overlaps with described oscillating feeder, the discharging opening of described oscillating feeder overlaps with the charging aperture of described jaw crusher, and the discharging opening of described jaw crusher overlaps with described waste bin.
Further, described waste bin top is provided with the anti-drop net preventing personnel from falling.
Further, described waste bin discharging opening is provided with discharging lock, it is simple in controlling storehouse, broken spoil goes out cash amount.
Further, described waste bin is concrete side walls, to reduce the lower slip resistance of broken spoil, it is simple to broken spoil flows out from waste bin.
The Advantageous Effects using as above technical scheme to obtain is:
The down-hole that can realize primary spoil crushes on the spot, the spoil after broken is used for bashing, it is achieved that spoil not gug, decreases transhipment and the hoist links of spoil, reduces mine production costs;Optimize spoil size grading, reduce voidage, improve and control movement and slow down surface subsidence effect;System is simple, practical.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in describing below is only embodiments more of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is a kind of primary gangue underground crushing system schematic diagram.
Description of reference numerals: 1, drop-bottom car, 2, the end unload hole, 3, drag conveyor, 4, oscillating feeder, 5, jaw crusher, 6, waste bin, 7, discharging lock.
Detailed description of the invention
In conjunction with accompanying drawing 1, detailed description of the invention of the present utility model is described further:
A kind of primary gangue underground crushing system, hole 2, drag conveyor 3, oscillating feeder 4, jaw crusher 5 and waste bin 6 is unloaded including drop-bottom car 1, the end, drop-bottom car 1 is unloaded hole 2 and is flexibly connected by track the end of with, the end, is provided with drag conveyor 3 in unloading hole 2, the discharge end of drag conveyor 3 extends to waste bin 6 top, drag conveyor 3 overlaps with oscillating feeder 4, the discharging opening of oscillating feeder 4 overlaps with the charging aperture of jaw crusher 5, and the discharging opening of jaw crusher 5 overlaps with waste bin 6.Waste bin 6 top is provided with the anti-drop net preventing personnel from falling.Waste bin 6 discharging opening is provided with discharging lock 7, it is simple in controlling storehouse, broken spoil goes out cash amount.Waste bin 6 is concrete side walls, to reduce the lower slip resistance of broken spoil, it is simple to broken spoil flows out from waste bin 6.
The shattering process of the primary spoil in down-hole is: the primary spoil in down-hole is transported to the end through drop-bottom car 1 and unloads hole 2, then it is transported to oscillating feeder 4 through drag conveyor 3, primary spoil uniformly continuous is sent into jaw crusher 5 by oscillating feeder 4, primary spoil is stored in waste bin 6 after jaw crusher 5 is broken, the broken spoil being stored in waste bin 6 flows out to mine car through waste bin discharging lock 7, is finally transported to goaf through mine car.
Certainly; only preferred embodiment of the present utility model described above; this utility model is not limited to enumerate above-described embodiment; should be noted that; any those of ordinary skill in the art are under the guidance of this specification; the all equivalents made substitute, obvious variant, within all falling within the essential scope of this specification, and ought to be by protection of the present utility model.

Claims (4)

1. a primary gangue underground crushing system, it is characterized in that, hole, drag conveyor, oscillating feeder, jaw crusher and waste bin is unloaded including drop-bottom car, the end, described drop-bottom car is unloaded hole and is flexibly connected by track with the described end, the described end, is provided with drag conveyor in unloading hole, the discharge end of described drag conveyor extends to waste bin top, described drag conveyor overlaps with described oscillating feeder, the discharging opening of described oscillating feeder overlaps with the charging aperture of described jaw crusher, and the discharging opening of described jaw crusher overlaps with described waste bin.
A kind of primary gangue underground crushing system the most according to claim 1, it is characterised in that described waste bin top is provided with the anti-drop net preventing personnel from falling.
A kind of primary gangue underground crushing system the most according to claim 1, it is characterised in that described waste bin discharging opening is provided with discharging lock, it is simple in controlling storehouse, broken spoil goes out cash amount.
A kind of primary gangue underground crushing system the most according to claim 1, it is characterised in that described waste bin is concrete side walls, to reduce the lower slip resistance of broken spoil, it is simple to broken spoil flows out from waste bin.
CN201620335785.2U 2016-04-20 2016-04-20 Primary waste rock is broken system in pit Expired - Fee Related CN205503143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620335785.2U CN205503143U (en) 2016-04-20 2016-04-20 Primary waste rock is broken system in pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620335785.2U CN205503143U (en) 2016-04-20 2016-04-20 Primary waste rock is broken system in pit

Publications (1)

Publication Number Publication Date
CN205503143U true CN205503143U (en) 2016-08-24

Family

ID=56706094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620335785.2U Expired - Fee Related CN205503143U (en) 2016-04-20 2016-04-20 Primary waste rock is broken system in pit

Country Status (1)

Country Link
CN (1) CN205503143U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331581A (en) * 2018-03-27 2018-07-27 新汶矿业集团有限责任公司翟镇煤矿 A kind of system that single block filling mining can be achieved

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331581A (en) * 2018-03-27 2018-07-27 新汶矿业集团有限责任公司翟镇煤矿 A kind of system that single block filling mining can be achieved

Similar Documents

Publication Publication Date Title
CN102748071B (en) Underground backfilling and transporting method for ground gangue of coal mine
WO2016095538A1 (en) Double-roadway combined speedy tunnelling and waste rock removal system and method
CN109488301A (en) A kind of mine, which picks up, fills place's recovery method
WO2015161771A1 (en) Matching method for equipment for solid-filling coal face of coal mine
CN112377247B (en) In-situ grouting filling method for in-situ separation of coal mine underground gangue
AU2014223132B2 (en) Method and device for using gangue aboveground to backfill mine goaf
CN205288654U (en) Broken system is transported to waste rock in pit
CN105736045B (en) A kind of the pocket type filling system and its placement method of control gob floor gushing water
Ju et al. Vertical transportation system of solid material for backfilling coal mining technology
CN109209491A (en) A kind of waste filling method
CN205503143U (en) Primary waste rock is broken system in pit
CN205503179U (en) Pocket type filling system of control collecting space area bottom plate gushing water
CN110284883A (en) Recovery method is filled by a kind of row of adopting, open coal mine end side
CN107419760A (en) A kind of new construction husky special forklift of sieve
CN103723447B (en) A kind of airborne split type multi-angle scraper conveyor
CN105971605A (en) A non-waste mining method for underground mines
CN101463732A (en) Continuous waste rock back-filling system for coal mine down-hole goaf
CN205638453U (en) Supporting waste rock quick transportation in quick -witted rear portion and processing system of digging is combined to colliery rock gangway
WO2016065906A1 (en) Ground material feeding system and feeding process for solid backfilling mining of coal mine
CN205503124U (en) System of portable waste rock breakage in pit
CN104481533A (en) Underground mine and ore lifting method
CN202745931U (en) Underground backfilling and conveying system for ground gangue of coal mine
CN105697016B (en) System and method for quickly transporting and disposing gangue matched with rear part of coal mine rock roadway fully-mechanized roadheader
CN205400806U (en) Handle mining filling system in collecting space area
CN102716901A (en) Method for disposing and reusing building waste nearby coal mine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20170420

CF01 Termination of patent right due to non-payment of annual fee