CN205502001U - Anti -floating anchor rod waterproof construction - Google Patents

Anti -floating anchor rod waterproof construction Download PDF

Info

Publication number
CN205502001U
CN205502001U CN201620238447.7U CN201620238447U CN205502001U CN 205502001 U CN205502001 U CN 205502001U CN 201620238447 U CN201620238447 U CN 201620238447U CN 205502001 U CN205502001 U CN 205502001U
Authority
CN
China
Prior art keywords
concrete platform
rod
anchor pole
anchor rod
sealing rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620238447.7U
Other languages
Chinese (zh)
Inventor
王云岗
陈仁勇
王萧博
陈洁英
张苑竹
廖娟
赵圣民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huayi Building Design Co Ltd
Zhejiang University City College ZUCC
Original Assignee
Zhejiang Huayi Building Design Co Ltd
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Huayi Building Design Co Ltd, Zhejiang University City College ZUCC filed Critical Zhejiang Huayi Building Design Co Ltd
Priority to CN201620238447.7U priority Critical patent/CN205502001U/en
Application granted granted Critical
Publication of CN205502001U publication Critical patent/CN205502001U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides an anti -floating anchor rod waterproof construction includes stock, sealing rod, pitch oleamen, concrete platform, infiltration crystallization coating, waterproof layer and locator at least, the concrete platform sets up the one end at the anti -floating anchor rod device, the sealing rod sets up directly over the centre of concrete platform, pitch oleamen is closely attached in the middle of sealing rod and concrete platform, infiltration crystallization coating sets up and closely links to each other in concrete platform below and with the concrete platform, waterproof layer sets up at infiltration crystallization coating lower extreme and near infiltration crystallization coating, the stock setting is at the middle and vertical whole device of interlude of placing of whole device, the locator setting is at the stock lower extreme and inlay on the stock, this anti -floating anchor rod waterproof construction has shortened construction period, has practiced thrift construction cost, to stock node water repellent, has solved anti -floating anchor rod's leakage problem effectively, is fit for using widely.

Description

A kind of anti-float anchor rod waterproof construction
Technical field
This utility model relates to the anti-floating technical field of underground structure, especially a kind of anti-floating anchor Bar waterproof construction.
Background technology
Along with the rise of skyscraper, the construction of anti-float anchor rod is used in work the most more and more Cheng Zhong, Tall Building Foundation is relatively deep, and level of ground water is higher, rich under subsoil water geological conditions Anti-float anchor rod construction, there is construction difficulties such as ensureing water-proofing treatment at grouting quality and node Topic, owing to local anchor pole is closeer, anchor bolt construction is inconvenient;Basement bottom board beam slab arrangement of reinforcement is bigger Vertical force that superstructure transmits can not be made full use of to balance a part of water buoyancy requirement anchor Being fixed in harder rock mass, basement bottom board plate arrangement of reinforcement is bigger.And in anchor trend welding only use Water steel plate, it is impossible to meet duration schedule requirement, the shortcomings such as the construction period is long, and construction cost is high, Therefore, for the problems referred to above, a kind of anti-float anchor rod waterproof construction is proposed.
Utility model content
Prior art can not meet the needs of people, not enough for making up prior art, and this practicality is new Type aims to provide one and shortens the construction period, has saved construction cost, to anchor pole node waterproof Process, efficiently solve the anti-float anchor rod waterproof construction of the seepage of anti-float anchor rod.
For achieving the above object, this utility model is by the following technical solutions: a kind of anti-float anchor rod Waterproof construction, at least include anchor pole, sealing rod, Colophonium ointment, concrete platform, penetrant crystalline coating, Fish tail and waterproof layer and localizer;Described concrete platform is arranged on one end of anti-float anchor rod device;Described only Water bar is arranged on directly over the centre of concrete platform;Described Colophonium ointment is closely attached to sealing rod and concrete In the middle of platform;Described penetrant crystalline coating is arranged on below concrete platform and closely coupled with concrete platform;Described Fish tail and waterproof layer is arranged on penetrant crystalline coating lower end and against penetrant crystalline coating;Described anchor pole It is arranged in the middle of whole device and vertically places interspersed whole device;Described localizer is arranged on anchor Bar lower end is also embedded on anchor pole.
As optimisation technique scheme of the present utility model: described Colophonium ointment is by anchor pole and sealing rod Compact siro spinning technology, and Colophonium ointment is by sealing rod and concrete platform compact siro spinning technology;Described anchor sleeve is contained in Inside sealing rod, and anchor pole is T-shaped structure.
Compared with prior art, the beneficial effects of the utility model are: described anti-float anchor rod is waterproof Structure effectively prevent the problem that mortar produces isolation in filling process, it is ensured that anti-floating anchor The construction quality of bar, does not use machinery, and manual operation more has safety guarantee, the most more may be used Lean on, it is ensured that the construction quality of anti-float anchor rod is by the water-proofing treatment to anchor pole node, effectively Solve the leakage problems of anti-float anchor rod, both ensure that the grouting quality of anti-float anchor rod, and improved again Effect, it is to avoid the loss caused of doing over again, relatively shortens the construction period, has saved construction Cost, is suitable for promoting the use of.
Accompanying drawing explanation
Fig. 1 is this utility model overall structure schematic diagram;
Fig. 2 is this utility model entirety slip casting schematic diagram;
Wherein: 1, anchor pole, 2, sealing rod, 3, Colophonium ointment, 4, concrete platform, 5, infiltration Crystallization coating, 6, fish tail and waterproof layer, 7, localizer.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, in this utility model embodiment Technical scheme be clearly and completely described, it is clear that described embodiment be only this The a part of embodiment of utility model rather than whole embodiments.Based in this utility model Embodiment, those of ordinary skill in the art are obtained under not making creative work premise All other embodiments, broadly fall into the scope of this utility model protection.
Refer to Fig. 1~2, in this utility model embodiment, a kind of anti-float anchor rod waterproof construction, Including anchor pole 1, sealing rod 2, Colophonium ointment 3, concrete platform 4, penetrant crystalline coating 5, waterproof Protective layer 6 and localizer 7;Described concrete platform 4 is arranged on one end of anti-float anchor rod device; Described sealing rod 2 is arranged on directly over the centre of concrete platform 4;Described Colophonium ointment 3 closely attaches In the middle of sealing rod 2 and concrete platform 4;Described penetrant crystalline coating 5 is arranged on below concrete platform 4 also Closely coupled with concrete platform 4;Described fish tail and waterproof layer 6 is arranged on penetrant crystalline coating 5 lower end also Against penetrant crystalline coating 5;Described anchor pole 1 is arranged in the middle of whole device and vertically places and wears Insert whole device;Described localizer 7 is arranged on anchor pole 1 lower end and is embedded on anchor pole 1.
As optimisation technique scheme of the present utility model: described Colophonium ointment 3 is by anchor pole 1 and stops Water bar 2 compact siro spinning technology, and Colophonium ointment 3 is by sealing rod 2 and concrete platform 4 compact siro spinning technology;Institute State anchor pole 1 and be sleeved on sealing rod 2 inside, and anchor pole 1 is T-shaped structure.
As installation principle of the present utility model: the cardinal principle of described anti-float anchor rod is that total length is glued Junction type anchor pole, this anchor pole uses the grouting of C40 fine-stone concrete, plays to greatest extent and compensate concrete effect, The frictional force making anchor pole is more than hydraulic pressure buoyancy, thus reaches the purpose of anti-float anchor rod, at base plate It is designed with catch pit, considers employing french drain simultaneously when earth excavation and get rid of rainwater, using again Water in Rainwater Drainage is removed by water pump.Additionally setting up that sealing rod changes and extend can porous capillary water route Footpath, stops capillary water to drive straight in along anchor pole reinforcing bar so that it is to be difficult to penetrate base plate, anti-float anchor rod Construction uses mechanical hole building, punching, and artificial compensates concrete, easy and simple to handle, quick construction, It is easy to improve quality and efficiency.
It is obvious to a person skilled in the art that this utility model is not limited to above-mentioned exemplary reality Execute the details of example, and in the case of without departing substantially from spirit or essential attributes of the present utility model, This utility model can be realized in other specific forms.Therefore, no matter from the point of view of which point, Embodiment all should be regarded as exemplary, and be nonrestrictive, model of the present utility model Enclose and limited by claims rather than described above, it is intended that will fall in claim All changes in the implication of equivalency and scope are included in this utility model.Should will not weigh Any reference during profit requires is considered as limiting involved claim.
The above, preferred embodiment the most of the present utility model, not in order to limit this practicality Novel, every according to technical spirit of the present utility model, above example is made any trickle Amendment, equivalent and improvement, should be included in the protection domain of technical solutions of the utility model Within.

Claims (3)

1. an anti-float anchor rod waterproof construction, at least include anchor pole (1), sealing rod (2), Colophonium ointment (3), concrete platform (4), penetrant crystalline coating (5), fish tail and waterproof layer (6) With localizer (7);It is characterized in that: described concrete platform (4) is arranged on anti-float anchor rod device One end;Described sealing rod (2) is arranged on directly over the centre of concrete platform (4);Described coal tar Cream (3) is closely attached in the middle of sealing rod (2) and concrete platform (4);Described penetrant crystalline is coated with Material (5) be arranged on concrete platform (4) lower section and closely coupled with concrete platform (4);Described waterproof guarantor Sheath (6) is arranged on penetrant crystalline coating (5) lower end and against penetrant crystalline coating (5); Described anchor pole (1) is arranged in the middle of whole device and vertically places interspersed whole device;Described Localizer (7) is arranged on anchor pole (1) lower end and is embedded on anchor pole (1).
A kind of anti-float anchor rod waterproof construction the most according to claim 1, it is characterised in that: Described Colophonium ointment (3) is by anchor pole (1) and sealing rod (2) compact siro spinning technology, and Colophonium Ointment (3) is by sealing rod (2) and concrete platform (4) compact siro spinning technology.
A kind of anti-float anchor rod waterproof construction the most according to claim 1, it is characterised in that: It is internal that described anchor pole (1) is sleeved on sealing rod (2), and anchor pole (1) is T-shaped structure.
CN201620238447.7U 2016-03-21 2016-03-21 Anti -floating anchor rod waterproof construction Expired - Fee Related CN205502001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620238447.7U CN205502001U (en) 2016-03-21 2016-03-21 Anti -floating anchor rod waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620238447.7U CN205502001U (en) 2016-03-21 2016-03-21 Anti -floating anchor rod waterproof construction

Publications (1)

Publication Number Publication Date
CN205502001U true CN205502001U (en) 2016-08-24

Family

ID=56732861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620238447.7U Expired - Fee Related CN205502001U (en) 2016-03-21 2016-03-21 Anti -floating anchor rod waterproof construction

Country Status (1)

Country Link
CN (1) CN205502001U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982502A (en) * 2021-03-11 2021-06-18 中国二十二冶集团有限公司 Waterproof construction method for anti-floating anchor rod leakage part in strongly weathered rock rich in fracture water

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982502A (en) * 2021-03-11 2021-06-18 中国二十二冶集团有限公司 Waterproof construction method for anti-floating anchor rod leakage part in strongly weathered rock rich in fracture water

Similar Documents

Publication Publication Date Title
CN104120731B (en) A kind of tunnel subsidence protector and construction method thereof
CN101446088B (en) Construction method for pole and tower foundation in Gobi Desert gravelly soil area
CN202466594U (en) Horizontal jet grouting soil anchoring and cast-in-place pile compound foundation pit supporting structure
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN201433396Y (en) Anchor cable steel rail pile wall
CN107905224A (en) It is a kind of to expand head in perforate steel pipe to improve the anchor structure of anti-pulling of anchor bar and construction method using expanding cement
CN102002957A (en) Slope retaining structure
CN112431213B (en) Ecological comprehensive treatment structure for semi-rigid support of artificial slope and construction method thereof
CN108385715A (en) A kind of assembled stake arch combination retaining wall and its construction method
CN109505641A (en) A kind of soft-rock tunnel bottom plate anchor pouring reinforcement method
CN108824471A (en) A kind of deep water drift net multi-column pier foundation and its construction method
CN105386610A (en) Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN205502001U (en) Anti -floating anchor rod waterproof construction
CN203654301U (en) Expanding soil slope protection system
CN113668576A (en) Assembled type flaky stone slope surface protection structure and construction method
CN205653804U (en) Slope assembled warp self -adaptation protection skeleton
CN209397564U (en) A kind of assembled pile foundation wharfs structure
CN103306248A (en) High dam spillway foundation drainage system and excavation method
CN206220121U (en) Assembled point anchor barricade
CN205742221U (en) A kind of dark beam type anchor-pull brace structure being applicable to loosely-packed covering layer slope
CN205857220U (en) Blinding layer structure under level of ground water
CN104420479A (en) Anchor rod base structure with concrete block of photovoltaic module bracket and setting method
CN103306293A (en) Reinforcement structure and construction method for water-rich landslide
CN203924043U (en) A kind of bamboo concrete stake

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20170321