CN205500714U - Communication line maintains work platform - Google Patents
Communication line maintains work platform Download PDFInfo
- Publication number
- CN205500714U CN205500714U CN201620346008.8U CN201620346008U CN205500714U CN 205500714 U CN205500714 U CN 205500714U CN 201620346008 U CN201620346008 U CN 201620346008U CN 205500714 U CN205500714 U CN 205500714U
- Authority
- CN
- China
- Prior art keywords
- platform
- communication line
- fixing device
- base plate
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004891 communication Methods 0.000 title claims abstract description 44
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract description 11
- 230000009194 climbing Effects 0.000 description 4
- 238000005457 optimization Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
The utility model relates to a communication engineering technical field, the more specifically communication line maintains work platform that says so has perfect ascend a height ladder and high altitude workstation on the platform, the staff maintains that high altitude communication line just need not to climb the communication pole, has improved the security of maintaining the operation, and setting up of case, article overhead hoist is placed to the instrument makes the maintenance work light convenient, relies on platform stable parking fixing device, and the staff can high -efficiently accomplish rural area and open -air communication line maintenance work. Four wheels are all connected in the bottom of bottom plate, and spiral fixing device passes through threaded connection at the middle part of bottom plate, and two sets of ladders all set up on the stand, and guardrail fixed connection is on the top of enclosure, and support fixed connection is at pedestrian platform's middle part, and the equal fixed connection in both ends of dabber is on the support, and loose pulley assembly installs at the spindle, and the handrail is located the lower part of stand, and the toolbox setting is on the bottom plate to the toolbox is located the right side of bottom plate.
Description
Technical field
This utility model relates to communication engineering technical field, more specifically a kind of communication line upkeep operation
Platform.
Background technology
Along with the development of China's information technology, means of communication is increasingly advanced, and communication line also covers
Each corner of motherland, when communication line breaks down, it is necessary to staff goes out to carry out to safeguard,
Repairing, owing to most of communication lines are erected on communication pole, the maintenance of this communication line is exactly high
Idle job, staff needs to climb up communication pole, dangerous high, is especially distributed in field, rural
Communication line, its maintenance work is extremely difficult.
Summary of the invention
This utility model mainly solving the technical problems that: a kind of communication line upkeep operation platform is provided, flat
Having perfect ascend a height ladder and aloft work platform on platform, staff safeguards that high altitude communication circuit is just without climbing
Upper communication pole, improves the safety of upkeep operation, and instrument placing box, the setting of article handling apparatus make dimension
Nurse makees easy and convenient, relies on platform to come to a complete stop fixing device, and staff can efficiently complete rural area and field
Communication line maintenance work.
For solving above-mentioned technical problem, this utility model relates to communication engineering technical field, more specifically
A kind of communication line upkeep operation platform, including wheel, base plate, spiral fixing device, ladder, guardrail,
Support, mandrel, pulley assembly, workbench, handrail, column and workbox, platform has perfect stepping on
High ladder and aloft work platform, staff safeguards that high altitude communication circuit, just without climbing up communication pole, improves
The safety of upkeep operation, instrument placing box, the setting of article handling apparatus make maintenance work easy and convenient,
Relying on platform to come to a complete stop fixing device, staff can efficiently complete the communication line in rural area and field and safeguard work
Make.
Being provided with handwheel on spiral fixing device, the top being connected on spiral fixing device fixed by handwheel.
Pulley assembly includes pulley, steel wire rope and hook, and steel wire rope walks around pulley, and one end of steel wire rope
Fix with hook and be connected.
Workbench includes People's Bank of China's platform and enclosure wall, and enclosure wall is arranged on around People's Bank of China's platform.
Wheel has four, and four wheels is both connected to the bottom of base plate, and four wheels is evenly distributed in
The corner of base plate, spiral fixing device is threadedly attached in the middle part of base plate, and column has multiple, Duo Geli
The lower end of post is fixedly connected with on base plate, and the upper end of multiple columns is all fixing with workbench to be connected, and ladder has
Two groups, two groups of ladders are arranged on column, and guardrail is fixedly connected on the top of enclosure wall, and support is fixing to be connected
At the middle part of People's Bank of China's platform, the two ends of mandrel are fixedly connected with on support, and pulley assembly is arranged on mandrel,
The two ends of handrail are fixedly connected with on column, and handrail is positioned at the bottom of column, and workbox is arranged on the end
On plate, and workbox is positioned at the right side of base plate.
As the further optimization of the technical program, this utility model one communication line upkeep operation platform institute
The bottom of the spiral fixing device stated is cone.
As the further optimization of the technical program, this utility model one communication line upkeep operation platform institute
The middle part of the People's Bank of China's platform stated is provided with penetrating square hole.
As the further optimization of the technical program, this utility model one communication line upkeep operation platform institute
The middle part of the base plate stated is provided with the screwed hole of corresponding spiral fixing device.
Having the beneficial effect that of this utility model a kind of communication line upkeep operation platform
This utility model one communication line upkeep operation platform, platform has perfect ascend a height ladder and height
Empty workbench, staff safeguards that high altitude communication circuit, just without climbing up communication pole, improves upkeep operation
Safety, instrument placing box, the setting of article handling apparatus make maintenance work easy and convenient, rely on platform to stop
Steady fixing device, staff can efficiently complete the communication line maintenance work in rural area and field.
Accompanying drawing explanation
The utility model is described in more detail with specific implementation method below in conjunction with the accompanying drawings.
Fig. 1 is the structural representation of this utility model a kind of communication line upkeep operation platform.
Fig. 2 is this utility model a kind of communication line upkeep operation platform structural representation at other direction.
In figure: wheel 1;Base plate 2;Spiral fixing device 3;Handwheel 3-1;Ladder 4;Guardrail 5;Support
6;Mandrel 7;Pulley assembly 8;Pulley 8-1;Steel wire rope 8-2;Hook 8-3;Workbench 9;People's Bank of China puts down
Platform 9-1;Enclosure wall 9-2;Handrail 10;Column 11;Workbox 12.
Detailed description of the invention
Detailed description of the invention one:
Below in conjunction with Fig. 1,2 explanation present embodiments, this utility model relates to communication engineering technical field, more
Specifically a kind of communication line upkeep operation platform, including: wheel 1, base plate 2, spiral fixing device
3, ladder 4, guardrail 5, support 6, mandrel 7, pulley assembly 8, workbench 9, handrail 10, column 11
With workbox 12, platform having perfect ascend a height ladder and aloft work platform, staff safeguards that high-altitude leads to
Letter circuit, just without climbing up communication pole, improves the safety of upkeep operation, instrument placing box, article handling
The setting of device makes maintenance work easy and convenient, relies on platform to come to a complete stop fixing device, and staff can be efficient
Complete the communication line maintenance work in rural area and field.
It is provided with handwheel 3-1, handwheel 3-1 on spiral fixing device 3 to fix connection and be connected on spiral fixing device 3
Top.
Pulley assembly 8 includes that pulley 8-1, steel wire rope 8-2 and hook 8-3, steel wire rope 8-2 walk around pulley 8-1,
And one end of steel wire rope 8-2 is fixing with hook 8-3 to be connected.
Workbench 9 includes that People's Bank of China platform 9-1 and enclosure wall 9-2, enclosure wall 9-2 are arranged on the week of People's Bank of China platform 9-1
Enclose.
Wheel 1 has four, and four wheels 1 is both connected to the bottom of base plate 2, and four wheels 1 is uniform
Be distributed in the corner of base plate 2, the setting of wheel 1 makes this platform be easily moved, and spiral fixing device 3 leads to
Cross the middle part being threaded in base plate 2, after platform comes to a complete stop, make the fixing dress of spiral by rotation hand wheel 3-1
The bottom putting 3 penetrates in soil, is securely fixed by platform, and column 11 has multiple, multiple columns 11
Lower end is fixedly connected with on a base plate 2, and the upper end of multiple columns 11 is all fixing with workbench 9 to be connected, ladder
4 have two groups, and two groups of ladders 4 are arranged on column 11, and ladder 4 is used for staff's lower work platform 9,
Guardrail 5 is fixedly connected on the top of enclosure wall 9-2, guardrail 5 and enclosure wall 9-2 can ensure the work on workbench 9
Making the safety of personnel, support 6 is fixedly connected on the middle part of People's Bank of China platform 9-1, and the two ends of mandrel 7 are the most fixing
Connecting on the frame 6, pulley assembly 8 is arranged on mandrel 7, by using pulley assembly 8, it is convenient to
Carrying out instrument and the transport of article between ground and high-altitude, the two ends of handrail 10 are fixedly connected with at column 11
On, and handrail 10 is positioned at the bottom of column 11, and workbox 12 is arranged on a base plate 2, and workbox
12 right sides being positioned at base plate 2, workbox 12 is for maintenance tool sorting placement, convenient practicality.
Detailed description of the invention two:
Below in conjunction with Fig. 1,2 explanation present embodiments, embodiment one is described further by present embodiment,
The bottom of described spiral fixing device 3 is cone.
Detailed description of the invention three:
Below in conjunction with Fig. 1,2 explanation present embodiments, embodiment one is described further by present embodiment,
The middle part of described People's Bank of China platform 9-1 is provided with penetrating square hole.
Detailed description of the invention four:
Below in conjunction with Fig. 1,2 explanation present embodiments, embodiment one is described further by present embodiment,
The middle part of described base plate 2 is provided with the screwed hole of corresponding spiral fixing device 3.
Certainly, described above is not limitation of the utility model, and this utility model is also not limited to above-mentioned act
Example, change that those skilled in the art are made in essential scope of the present utility model, changes
Type, add or replace, falling within protection domain of the present utility model.
Claims (4)
1. a communication line upkeep operation platform, including wheel (1), base plate (2), spiral fixing device (3), ladder (4), guardrail (5), support (6), mandrel (7), pulley assembly (8), workbench (9), handrail (10), column (11) and workbox (12), it is characterized in that: be provided with handwheel (3-1) on spiral fixing device (3), handwheel (3-1) is fixedly connected on the top of spiral fixing device (3);
Pulley assembly (8) includes pulley (8-1), steel wire rope (8-2) and hook (8-3), pulley (8-1) walked around by steel wire rope (8-2), and one end of steel wire rope (8-2) is fixed with hook (8-3) and is connected;
Workbench (9) includes People's Bank of China's platform (9-1) and enclosure wall (9-2), and enclosure wall (9-2) is arranged on People's Bank of China's platform (9-1) around;
nullWheel (1) has four,Four wheels (1) is both connected to the bottom of base plate (2),And four wheels (1) is evenly distributed in the corner of base plate (2),Spiral fixing device (3) is threadedly attached in the middle part of base plate (2),Column (11) has multiple,The lower end of multiple columns (11) is fixedly connected with on base plate (2),The upper end of multiple columns (11) is all fixing with workbench (9) to be connected,Ladder (4) has two groups,Two groups of ladders (4) are arranged on column (11),Guardrail (5) is fixedly connected on the top of enclosure wall (9-2),Support (6) is fixedly connected on the middle part of People's Bank of China's platform (9-1),The two ends of mandrel (7) are fixedly connected with on support (6),Pulley assembly (8) is arranged on mandrel (7),The two ends of handrail (10) are fixedly connected with on column (11),And handrail (10) is positioned at the bottom of column (11),Workbox (12) is arranged on base plate (2),And workbox (12) are positioned at the right side of base plate (2).
A kind of communication line upkeep operation platform the most according to claim 1, it is characterised in that: the bottom of described spiral fixing device (3) is cone.
A kind of communication line upkeep operation platform the most according to claim 1, it is characterised in that: the middle part of described People's Bank of China's platform (9-1) is provided with penetrating square hole.
A kind of communication line upkeep operation platform the most according to claim 1, it is characterised in that: the middle part of described base plate (2) is provided with the screwed hole of corresponding spiral fixing device (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620346008.8U CN205500714U (en) | 2016-04-22 | 2016-04-22 | Communication line maintains work platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620346008.8U CN205500714U (en) | 2016-04-22 | 2016-04-22 | Communication line maintains work platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205500714U true CN205500714U (en) | 2016-08-24 |
Family
ID=56705952
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620346008.8U Expired - Fee Related CN205500714U (en) | 2016-04-22 | 2016-04-22 | Communication line maintains work platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205500714U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107284336A (en) * | 2017-06-29 | 2017-10-24 | 国网河南省电力公司济源供电公司 | One kind communication emergency first-aid repair platform |
CN107512685A (en) * | 2017-09-28 | 2017-12-26 | 郑州科净环境工程有限公司 | A kind of central air-conditioning filter element replacing instrument |
CN107651598A (en) * | 2017-10-31 | 2018-02-02 | 天津百纳兴科技有限公司 | A kind of small building material elevator electric equipment |
CN108448490A (en) * | 2018-04-04 | 2018-08-24 | 戴玉澈 | A kind of communications cable installation supporting apparatus |
CN110027988A (en) * | 2019-04-17 | 2019-07-19 | 湖南文理学院 | A kind of electromechanical maintenance Multi-function overhaul platform facilitating adjustment |
CN110217736A (en) * | 2019-06-03 | 2019-09-10 | 中建四局安装工程有限公司 | A kind of high stability electromechanics installation lifting device |
-
2016
- 2016-04-22 CN CN201620346008.8U patent/CN205500714U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107284336A (en) * | 2017-06-29 | 2017-10-24 | 国网河南省电力公司济源供电公司 | One kind communication emergency first-aid repair platform |
CN107512685A (en) * | 2017-09-28 | 2017-12-26 | 郑州科净环境工程有限公司 | A kind of central air-conditioning filter element replacing instrument |
CN107651598A (en) * | 2017-10-31 | 2018-02-02 | 天津百纳兴科技有限公司 | A kind of small building material elevator electric equipment |
CN108448490A (en) * | 2018-04-04 | 2018-08-24 | 戴玉澈 | A kind of communications cable installation supporting apparatus |
CN110027988A (en) * | 2019-04-17 | 2019-07-19 | 湖南文理学院 | A kind of electromechanical maintenance Multi-function overhaul platform facilitating adjustment |
CN110217736A (en) * | 2019-06-03 | 2019-09-10 | 中建四局安装工程有限公司 | A kind of high stability electromechanics installation lifting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205500714U (en) | Communication line maintains work platform | |
CN203242941U (en) | Novel electric power overhaul frame | |
CN203895813U (en) | Power transformer equipment maintenance rack | |
CN204800543U (en) | Lifting device is installed and removed to lamp decoration | |
CN205348009U (en) | Hanging flower basket device of bridge construction | |
CN206376854U (en) | Well testing operation platform | |
CN210049566U (en) | Overhead rotary suspension bridge type operation platform | |
CN204475182U (en) | Installation frock of railway pier mound top hanging flower basket | |
CN203545583U (en) | Low-pressure meter box replacement device | |
CN206636164U (en) | A kind of finishing ladder for being equipped with foldable object disposing platform | |
CN205153501U (en) | Exhibition room is built and is used rack with adjustable height | |
CN211548666U (en) | Scaffold with protective device for plastering wall top | |
CN204357338U (en) | A kind of electric power overhaul frame | |
CN204530492U (en) | A kind of hydraulic climbing mould construction platform | |
CN203345999U (en) | Special multifunctional lifting frame for busbar bridge | |
CN203050474U (en) | Lifting ladder for tunnel | |
CN106401157A (en) | Movable operation platform and high-altitude construction method | |
CN203488077U (en) | Ladder for building workers | |
CN203632113U (en) | Portable safety string bag for electric pole | |
CN206088963U (en) | Improve distribution lines instrument of ascending a height of structure | |
CN205822815U (en) | Protection device of elevator shaft | |
CN206908169U (en) | A kind of electric apparatus Commissioning field job platform | |
CN205895120U (en) | Adjustable maintenance ladder | |
CN205638200U (en) | Safety maintenance instrument of high strength | |
CN202324573U (en) | Cable tower working platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170613 Address after: 730050 No. 1 northwest village, Lanzhou, Gansu Patentee after: Northwest University for nationalities Address before: 730050, No. 1101, Lanzhou, Qilihe branch of Qilihe Telecom Branch, Gansu, China Patentee before: Hao Jie |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160824 Termination date: 20180422 |