CN205474855U - Rectangle pier shaft rebar installation support - Google Patents

Rectangle pier shaft rebar installation support Download PDF

Info

Publication number
CN205474855U
CN205474855U CN201620131676.9U CN201620131676U CN205474855U CN 205474855 U CN205474855 U CN 205474855U CN 201620131676 U CN201620131676 U CN 201620131676U CN 205474855 U CN205474855 U CN 205474855U
Authority
CN
China
Prior art keywords
layer
pier shaft
rectangle
support
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620131676.9U
Other languages
Chinese (zh)
Inventor
祝长春
郭常瑞
宋冰
刘江
强耀锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Original Assignee
Road and Bridge East China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge East China Engineering Co Ltd filed Critical Road and Bridge East China Engineering Co Ltd
Priority to CN201620131676.9U priority Critical patent/CN205474855U/en
Application granted granted Critical
Publication of CN205474855U publication Critical patent/CN205474855U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a rectangle pier shaft rebar installation support. It includes rectangle support, and this rectangle support has a plurality of layers, and each layer all has a safe dense mesh who lays on security fence, and each layer security fence bottom all the ring establish one deck operation platform, each layer operation platform outside all is connected with each layer security fence of security fence, a plurality of cantilever beam of this rectangle support lower extreme parallel arrangement, and equidistant the placing of this cantilever beam save between the vertical main muscle of pier shaft concrete top surface under adopt spacing reinforcing bar respectively with the cantilever beam and the vertical main muscle welding of stretching out the concrete top surface. It utilizes the pier shaft structural steel reinforcement fixed, has operation platform and rebar positioning function concurrently, but integral hoisting turnover use, and cost input is hanged down, the efficiency of construction is high.

Description

A kind of rectangle pier shaft reinforcement installation support
Technical field
This utility model relates to common bridge square pier shaft reinforcement installation auxiliary construction component, particularly a kind of rectangle pier shaft reinforcement installation support.
Background technology
At present, common bridge square pier shaft reinforcement construction typically uses Specialty Design platform (such as cantilever form, overmolded) or sets up landing leg hand cradle;Reinforcing bar location is general uses fixing shaped steel locating support or temporary steel support.
Operation platform use Specialty Design platform (such as cantilever form, overmolded), take support time length, template turnover utilization ratio low;Landing leg hand cradle is set up at employing scene, then material input is big, holding time is long.
Reinforcing bar location uses fixing shaped steel locating support, and material puts into big;Use temporary steel support, construction and installation and dismounting inconvenience.
Utility model content
The purpose of this utility model is to provide a kind of rectangle pier shaft reinforcement installation support, solving above-mentioned the deficiencies in the prior art, it utilizes pier shaft structure reinforcing bars to fix, and has operating platform and reinforcing bar positioning function concurrently, can integral hoisting turnover use, cost input is low, efficiency of construction is high.
For achieving the above object, the technical solution of the utility model is:
A kind of rectangle pier shaft reinforcement installation support, it is characterized in that: it includes rectangle support, if this rectangle support has dried layer, each layer is respectively provided with the safe Dense mesh screen being laid on safe fence, and equal ring sets a layer operation platform bottom each layer of safe fence, outside each layer operation platform, all each with safe fence layer safe fence is connected;This rectangle support lower end be arranged in parallel some Cantilever Beams, and this Cantilever Beams is spaced at equal intervals between the vertical main muscle of lower joint pier shaft top of concrete, uses limit steel bar to be welded with the vertical main muscle stretching out top of concrete by Cantilever Beams respectively.
This utility model has the advantage that use this utility model structure, and job site can fast and effeciently carry out rectangle pier shaft reinforcement installation, puts into operation little, easy, effect fast;Relative to tradition landing leg hand cradle, often joint pier shaft averagely can save the duration nearly 1 day, especially pronounced at high pier.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the frame structure schematic diagram of rectangle support in this utility model.
Fig. 3 is the frame structure schematic diagram of rectangle support in this utility model.
Fig. 4 is the lower structural representation saving pier shaft concrete in this utility model.
Fig. 5 is Cantilever Beams and the vertical main muscle Welding Structure schematic diagram stretching out top of concrete in this utility model.
Detailed description of the invention
The utility model will be further described below in conjunction with the accompanying drawings.
Referring to Fig. 1-5, it is this utility model one rectangle pier shaft reinforcement installation support.As shown in the figure: it includes rectangle support, if this rectangle support has dried layer, each layer is respectively provided with the safe Dense mesh screen 9 being laid on safe fence 6, and bottom each layer of safe fence 6, equal ring sets a layer operation platform 8, is all connected with 6 each layers of safe fence of safe fence 6 outside each layer operation platform 8;This rectangle support lower end be arranged in parallel some Cantilever Beams 7, and this Cantilever Beams 7 is spaced at equal intervals between the vertical main muscle 11 of lower joint pier shaft concrete 12 end face, uses limit steel bar 10 to be welded with the vertical main muscle 11 stretching out concrete 12 end face by Cantilever Beams 7 respectively.
The manufacture method of rectangle support of the present utility model is:
(1) scaffolding steel pipe vertical rod 1, vertical rod 2, leger 3, little cross bar 4, lateral bar 5 according to Fig. 2, are carried out welding and form the framework of rectangle support.
(2) such as Fig. 3, Welding Safety fence 6, process Cantilever Beams 7, and process limit steel bar 1, lay-up operation platform 8, safe Dense mesh screen 9 is installed.
The installation of this utility model rectangle pier shaft steel bar operation platform and reinforcing bar localization method:
(1) such as Fig. 4, it is spaced at equal intervals Cantilever Beams 7 at lower joint pier shaft concrete 12 end face.
(2) such as Fig. 5, use limit steel bar 10 to be welded with the vertical main muscle 11 stretching out top of concrete by Cantilever Beams 7, play position-limiting action.
(3) check support quality, it is ensured that operating platform 8, safe Dense mesh screen 9 are reliable with the attachment security of support.
(4) integral hoisting rectangle support is placed on Cantilever Beams 7 and by rectangle support and Cantilever Beams 7 firm welding, its effect such as Fig. 1.
(5) one circle temporary spacing stirrup is set in table top, is used for positioning and fix the main muscle of pier shaft.
The method for dismounting of rectangle pier shaft reinforcement installation support of the present utility model:
(1) releasing is connected with vertical all interim of main muscle 11.
(2) releasing the connection of Cantilever Beams 7 and rectangle support, entirety hangs out rectangle support.
(3) release the connection of limit steel bar 10 and vertical main muscle 11, extract Cantilever Beams 7 out.
It is only preferred embodiment of the present utility model in sum, is not used for limiting practical range of the present utility model.The most all equivalence changes made according to the content of this utility model claim and modification, all should be technology category of the present utility model.

Claims (1)

1. a rectangle pier shaft reinforcement installation support, it is characterized in that: it includes rectangle support, if this rectangle support has dried layer, each layer is respectively provided with the safe Dense mesh screen (9) being laid on safe fence (6), and each layer of safe fence (6) bottom all ring sets a layer operation platform (8), each layer operation platform (8) outside is all connected with each layer of safe fence (6) of safe fence (6);This rectangle support lower end be arranged in parallel some Cantilever Beams (7), and this Cantilever Beams (7) is spaced at equal intervals between the vertical main muscle (11) of lower joint pier shaft concrete (12) end face, limit steel bar (10) is used to be welded with the vertical main muscle (11) stretching out concrete (12) end face by Cantilever Beams (7) respectively.
CN201620131676.9U 2016-02-22 2016-02-22 Rectangle pier shaft rebar installation support Expired - Fee Related CN205474855U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620131676.9U CN205474855U (en) 2016-02-22 2016-02-22 Rectangle pier shaft rebar installation support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620131676.9U CN205474855U (en) 2016-02-22 2016-02-22 Rectangle pier shaft rebar installation support

Publications (1)

Publication Number Publication Date
CN205474855U true CN205474855U (en) 2016-08-17

Family

ID=56678650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620131676.9U Expired - Fee Related CN205474855U (en) 2016-02-22 2016-02-22 Rectangle pier shaft rebar installation support

Country Status (1)

Country Link
CN (1) CN205474855U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119576A (en) * 2017-06-28 2017-09-01 中交路桥华南工程有限公司 Pier construction security protection platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119576A (en) * 2017-06-28 2017-09-01 中交路桥华南工程有限公司 Pier construction security protection platform
CN114197325A (en) * 2017-06-28 2022-03-18 中交路桥华南工程有限公司 Pier shaft construction safety protection platform

Similar Documents

Publication Publication Date Title
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN201962932U (en) Building construction segmented overhung outer scaffold
CN202810204U (en) Self-balancing formwork system structure for inclined reinforced column
CN208056469U (en) Coupling beam framework of steel reinforcement fixing device between a kind of assembled superimposed sheet
CN205474855U (en) Rectangle pier shaft rebar installation support
CN109853945A (en) A kind of new concrete column template device and its construction method
CN104499706A (en) Elevator well template platform and construction method thereof
CN203230165U (en) Template support platform for ultra-high cantilever structure
CN203475801U (en) Telescopic steel platform for elevator shaft
CN206267425U (en) A kind of device for being used in turn steel bar horse-shaped bench
CN201826438U (en) Steel column convenient for constructing temporary operating platform
CN103938642B (en) A kind of pile foundation reinforcement cover adjusting device
CN209723565U (en) Attached tower crane attachment construction operation platform outside a kind of steel-core wall structure
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN203961258U (en) Builder's jack foot guard structure
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN203977836U (en) A kind of tool-type escalator building formwork platform
CN206903178U (en) Hoisting type elevator steel platform
CN204370796U (en) Hoistway formwork platform
CN206476686U (en) A kind of gate-type hoisting bracket
CN204163367U (en) Cat ladder frame operating platform
CN202766094U (en) Hoisting clamp for steel reinforcement cage
CN203394035U (en) Plugging reinforcing device for reserved hole formworks of concrete platforms

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170103

Address after: 201203 Shanghai, Liuzhou East Road, No. 3000, building 4, floor 7, Pudong New Area

Patentee after: ROAD AND BRIDGE EAST CHINA ENGINEERING CO., LTD.

Patentee after: Road & Bridge International Co., Ltd.

Address before: 201203 Shanghai, Liuzhou East Road, No. 3000, building 4, floor 7, Pudong New Area

Patentee before: ROAD AND BRIDGE EAST CHINA ENGINEERING CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20210222