CN205465158U - Electronic vaulting pole production line - Google Patents
Electronic vaulting pole production line Download PDFInfo
- Publication number
- CN205465158U CN205465158U CN201620149986.3U CN201620149986U CN205465158U CN 205465158 U CN205465158 U CN 205465158U CN 201620149986 U CN201620149986 U CN 201620149986U CN 205465158 U CN205465158 U CN 205465158U
- Authority
- CN
- China
- Prior art keywords
- cylinder
- screw mandrel
- equipment
- block
- slide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jigs For Machine Tools (AREA)
Abstract
The utility model discloses an electronic vaulting pole production line belongs to automobile parts technical field, erection equipment, nut sleeve pipe and lead screw bearing housing erection equipment, lead screw end bulb erection equipment, spare part erection equipment, vaulting pole shell erection equipment were overlapped in the lead screw riveting in it contained electronic vaulting pole, electronic vaulting pole in lead screw riveting cover erection equipment, nut sleeve pipe and lead screw bearing housing erection equipment, lead screw end bulb erection equipment, spare part erection equipment, vaulting pole shell erection equipment consecutive, the top of longmen backup pad be equipped with the connecting plate, the top of connecting plate be equipped with boost cylinder, boost cylinder the bottom with be connected through connector and backing plate, the bottom of backing plate be equipped with the several optical axis, the photographic plate on be equipped with the slide rail, copying fixture set up on the slide rail, copying fixture on be equipped with the rotary clamping cylinder, its reasonable in design, the workshop section is clearly demarcated, and processing stability is good, has solved the problem that meets in current assembling process.
Description
Technical field:
This utility model relates to technical field of automobile parts, is specifically related to electronic strut production line.
Background technology:
The most domestic to the superior automobile case cover unlatching great majority manually opened strut of outfit, seldom equipped with electronic support
Bar.Occur that one of this phenomenon reason is owing to electronic strut mounting technology difficulty is big, complex procedures, assembly process technology requirement
High.
Utility model content:
For the problems referred to above, the technical problems to be solved in the utility model is to provide a kind of reasonable in design, operation side
Just, working (machining) efficiency is high and stay-in-grade electronic strut production line.
Electronic strut production line of the present utility model, in it comprises electronic strut, screw mandrel riveting sleeve installs equipment, nut sleeve
Pipe and screw axis bearing sleeve install equipment, screw mandrel end bulb installs equipment, parts mounting machine, strut shell install equipment;Institute
In the electronic strut stated, screw mandrel riveting sleeve is installed equipment, nut casing and screw axis bearing sleeve and is installed equipment, the installation of screw mandrel end bulb
Equipment, strut shell are installed equipment and are formed by support body, material frame, mechanical part and electric component;In described electronic strut
Screw mandrel riveting sleeve is installed the mechanical part of equipment and is made up of pressurized part and clamp member;Described pressurized part includes supercharging
Cylinder, connecting plate, gantry gripper shoe, union joint, backing plate, optical axis;The top of described gantry gripper shoe is provided with connecting plate;Described
Connecting plate be arranged over pressurized cylinder;The bottom of described pressurized cylinder is connected with backing plate with by union joint;Described
The bottom of backing plate is provided with several optical axis;Described clamp assembly includes push-and-pull cylinder, slide rail, base plate, rotation clamping cylinder, pad
Block, profiling jig;Described base plate is provided with slide rail;Described profiling jig is arranged on slide rail;On described profiling jig
It is provided with rotation clamping cylinder;The edge of described base plate is provided with push-and-pull cylinder;The top of described slide rail is provided with cushion block;Described
Nut casing and screw axis bearing sleeve are installed the mechanical part of equipment and are comprised push-and-pull cylinder A, union joint A, contiguous block, profiling jig
A, rotary cylinder, profiling jig B, base plate A, slide rail A;Described base plate A is provided with slide rail A;One end of described slide rail A sets
There is profiling jig B;The other end of described slide rail A is provided with profiling jig A;Described profiling jig A is provided with contiguous block;
Described push-and-pull cylinder A is connected with contiguous block by union joint A;Described profiling jig B is connected with the rotary cylinder of side;
Described screw mandrel end bulb is installed the mechanical part of equipment and is tied with the mechanical part that screw mandrel riveting sleeve in electronic strut installs equipment
Structure is identical;Described screw mandrel end bulb installation equipment is provided with screw component;Described screw component comprises plexiglass tent, step
Enter motor, screw mandrel, slide rail B, base plate B, profiling jig C, clamping cylinder;The described bottom in plexiglass tent is provided with the end
Plate B;Described base plate B is provided with slide rail B;One end of described slide rail B is provided with profiling jig C;Described profiling jig C
It is provided with clamping cylinder;Described profiling jig C is connected with stepper motor by screw mandrel;Described parts mounting machine bag
Containing riveting assembly, aluminium section frame, spring assembly, square tube frame;Described square tube frame is provided with aluminium section frame;Described spring
Assemble assembly to be arranged between aluminium section frame and square tube frame;Described riveting assembly is arranged in aluminium section frame;Described
Riveting assembly is provided with riveting machine;Described riveting machine is fixed in riveting machine fixed plate;The lower section of described riveting machine is provided with
Screw mandrel fixation kit and screw mandrel riveted joint assembly;Described spring assembly is provided with spring retainer elements;Described spring is fixed
Assembly is connected with reductor by screw mandrel;Described reductor is connected with servomotor and push-and-pull cylinder;Described strut shell
Installation equipment is provided with four pressurized parts, described pressurized part comprise gas-liquid pressure-boosting cylinder, optical axis C, copper sheathing, pressuring plate,
Fixed plate, connecting plate;Described gas-liquid pressure-boosting cylinder is connected with fixed plate;Described pressuring plate is by connecting plate with fixed plate even
Connect;Described optical axis C is connected through connecting plate with pressuring plate, and is arranged with copper sheathing on optical axis C;Described strut shell is installed
Equipment is provided with break-in assembly and clamp mechanism;Described break-in assembly comprises slide rail, upper break-in block, upper contiguous block, upper locking
Cylinder, lower break-in block, lower connecting block, lower locking cylinder;The outside of described upper break-in block is provided with contiguous block;Described upper mill
The inner side closing block is provided with locking cylinder;The outside of described lower break-in block is provided with lower connecting block;Described lower break-in block interior
Side is provided with lower locking cylinder;Described upper break-in block cooperates with lower break-in block;Described slide rail be arranged on break-in block with
The left side of lower break-in block.
When screw mandrel riveting sleeve installs equipment operation in dynamic strut in this utility model, by screw mandrel placing clamp, press and open
Dynamic button, screw mandrel is compressed by rotary cylinder.Push-and-pull cylinders retract drives clamp body to move to hold down gag, by detection sensor
Detecting when clamp body is moved into hold down gag, hydraulic cylinder starts hydraulic screw rod and riveting sleeve.Hydraulic cylinder is according to thing
First in touch screen interface, setup parameter rivets.Rear hydraulic cylinder, push-and-pull cylinder, rotary cylinder return, people are riveted
Work is taken out riveting parts and is flowed to electronic strut operation two.
When in this utility model, nut casing and screw axis bearing sleeve install equipment operation, by the silk riveted of a upper operation
Bar carries out oiling, is manually assembled by screw axis set, places in profiling jig, gets on nut casing from feed thing frame, puts into
In the profiling jig of compression cylinder end, pressing start button, rotary cylinder compresses, and compression cylinder starts to say that bearing holder (housing, cover) is expressed to silk
On bar.Extrude complete compression cylinder, rotary cylinder return.Manually take out workpiece.Workpiece flows into screw mandrel end bulb install
Equipment;To process member and sleeve end bulb is manually placed in profiling jig, after pressing start button, push-and-pull cylinder drives
Profiling jig is interval to punching press, is put in place by detection sensor detection, and pneumohydraulic pressure-cylinder starts workpiece punching press.After punching press terminates
Pneumohydraulic pressure-cylinder return, push-and-pull cylinder return, manually takes out workpiece in profiling jig.Because after processing, screw mandrel length differs,
Manually being put in the another one profiling jig of side by the workpiece processed, after detection sensor detects, stepper motor drives
Screw mandrel is pullover goes to appointment position, screw mandrel is moved to the longest position and stops.
In this utility model during parts mounting machine operation, servomotor is at initial position, lead spindle jaw
Open.First the workpiece of upper operation is put in profiling jig, then spring and spring positioning sleeve is placed in screw mandrel, main shaft coupling
Device is placed in jaw, and jaw clamps.Pressing start button, servomotor drives lead spindle jaw and compression spring to stretch out gas
Cylinder begins to decline, and after detecting that servomotor drops to rigging position by detection sensor, servomotor stops declining.At this moment
Spring mountings part is pushed into installation duplicate invoice axial organ chucking position by push-and-pull cylinder, after detection sensor detection puts in place, by hand will
Duplicate invoice axial organ is installed on jaw, again presses start button, and riveter begins to decline the rotation riveting of duplicate invoice axial organ to screw mandrel termination
Spring is fixed at place.Riveter return after rotation riveting, this time, duplicate invoice axial organ was installed on screw mandrel, also fixed spring.
Duplicate invoice axial organ jaw return, riveter return, then push-and-pull cylinder return, servomotor return again.Treat that servomotor return is complete
Workpiece is manually taken out after one-tenth.
When in this utility model, strut shell installs equipment operation, the spring upper workshop section assembled, in installing by hand
Place's pipe assembly and electric machine assembly.It is placed into installing motor side in the damping detent mechanism on the left side, then by other side off normal
Bulb is put in right positioner rotating mechanism.After putting workpiece well, pressing start button, direction locating mechanism clamps workpiece, now
Operator need to hold under trocar sheath rotation, does not rotates in detent mechanism if being stuck in after Xuan Zhuaning to put, then be normal rectification
The original state of workpiece.Press start button, the most each two groups of pneumohydraulic pressure-cylinders action simultaneously again, sleeve pipe and screw mandrel are locked
Mouthful.After riveting completes for the first time, trocar sheath gas pawl unclamps, and after right positioner rotator 90-degree rotation, starts again at riveting.Above-mentioned
Two groups of pneumohydraulic pressure-cylinder palikinesia secondaries after sleeve pipe has been pressed, last artificial take out finished parts after processing.
The beneficial effects of the utility model: it is reasonable in design, workshop section is clearly demarcated, and good processing stability solves at existing dress
The problem run into during joining, belongs to domestic initiation at present.
Accompanying drawing illustrates:
For ease of explanation, this utility model is embodied as and accompanying drawing is described in detail by following.
Fig. 1 is the structural representation of clamp assembly in this utility model;
Fig. 2 is the structural representation of pressurized part in this utility model;
Fig. 3 is the mechanical part structural representation that in this utility model, nut casing and screw axis bearing sleeve install equipment;
Fig. 4 is the structural representation of screw component in this utility model;
Fig. 5 is the structural representation of parts mounting machine in this utility model;
Fig. 6 is the structural representation of spring assembly in this utility model;
Fig. 7 is the structural representation of pressurized part A in this utility model;
Fig. 8 is the structural representation of break-in assembly in this utility model;
Detailed description of the invention:
As shown in Figures 1 to 8, this detailed description of the invention is by the following technical solutions: it comprises screw mandrel riveting in electronic strut
Female connector installs equipment, nut casing and screw axis bearing sleeve install equipment, screw mandrel end bulb installs equipment, parts mounting machine,
Strut shell installs equipment;In described electronic strut, screw mandrel riveting sleeve installs equipment, nut casing and the installation of screw axis bearing sleeve
Equipment, screw mandrel end bulb install equipment, strut shell installs equipment by support body, material frame, mechanical part and electric component group
Become;In described electronic strut, the mechanical part of screw mandrel riveting sleeve installation equipment is made up of pressurized part 3 and clamp member 4;Institute
The pressurized part 3 stated includes pressurized cylinder 31, connecting plate 32, gantry gripper shoe 33, union joint 34, backing plate 35, optical axis 36;Institute
The top of gantry gripper shoe 33 stated is provided with connecting plate 32;Described connecting plate 32 be arranged over pressurized cylinder 31;Described
The bottom of pressurized cylinder 31 is connected with backing plate 35 with by union joint 34;The bottom of described backing plate 35 is provided with several optical axis 36;
Described clamp assembly 4 includes push-and-pull cylinder 41, slide rail 42, base plate 43, rotates clamping cylinder 44, cushion block 45, profiling jig
46;Described base plate 43 is provided with slide rail 42;Described profiling jig 46 is arranged on slide rail 42;On described profiling jig 46
It is provided with rotation clamping cylinder 44;The edge of described base plate 43 is provided with push-and-pull cylinder 41;The top of described slide rail 42 is provided with pad
Block 45;Described nut casing and screw axis bearing sleeve install the mechanical part of equipment comprise push-and-pull cylinder A 21, union joint A 22,
Contiguous block 23, profiling jig A 24, rotary cylinder 25, profiling jig B 26, base plate A 27, slide rail A 28;Described base plate A
27 are provided with slide rail A 28;One end of described slide rail A 28 is provided with profiling jig B 26;The other end of described slide rail A 28
It is provided with profiling jig A 24;Described profiling jig A 24 is provided with contiguous block 23;Described push-and-pull cylinder A 21 is by connecting
Head A 22 is connected with contiguous block 23;Described profiling jig B 26 is connected with the rotary cylinder 25 of side;Described screw mandrel end ball
The mechanical part that head installs equipment is identical with the mechanical part structure that screw mandrel riveting sleeve in electronic strut installs equipment;Described silk
Rod end bulb installation equipment is provided with screw component;Described screw component comprises plexiglass tent 321, stepper motor 322, silk
Bar 323, slide rail B 324, base plate B 325, profiling jig C 326, clamping cylinder 327;The described end in plexiglass tent 321
Portion is provided with base plate B 325;Described base plate B 325 is provided with slide rail B 324;One end of described slide rail B 324 is provided with profiling
Fixture C 326;Described profiling jig C 326 is provided with clamping cylinder 327;Described profiling jig C 326 is by screw mandrel 323
It is connected with stepper motor 322;Described parts mounting machine comprises riveting assembly 401, aluminium section frame 402, spring assembly
403, square tube frame 404;Described square tube frame 404 is provided with aluminium section frame 402;Described spring assembling assembly 403 is arranged on
Between aluminium section frame 402 and square tube frame 404;Described riveting assembly 401 is arranged in aluminium section frame 402;Described riveting
Connected components 401 is provided with riveting machine 405;Described riveting machine 405 is fixed in riveting machine fixed plate 406;Described riveting machine
The lower section of 405 is provided with screw mandrel fixation kit 407 and screw mandrel riveted joint assembly 408;It is solid that described spring assembly 403 is provided with spring
Determine assembly 431;Described spring retainer elements 431 is connected with reductor 433 by screw mandrel;Described reductor 433 and servo
Motor 434 and push-and-pull cylinder 435 connect;Described strut shell installation equipment is provided with four pressurized part A, described supercharging
Components A comprises gas-liquid pressure-boosting cylinder 541, optical axis C 542, copper sheathing 543, pressuring plate 544, fixed plate 545, connecting plate 546;Described
Gas-liquid pressure-boosting cylinder 541 be connected with fixed plate 545;Described pressuring plate 544 is connected with fixed plate 545 by connecting plate 546;
Described optical axis C 542 is connected through connecting plate 546 with pressuring plate 544, and is arranged with copper sheathing 543 on optical axis C 543;Described
Strut shell installation equipment is provided with break-in assembly and clamp mechanism;Described break-in assembly comprises slide rail 547, upper break-in block
548, upper contiguous block 549, upper locking cylinder 550, lower break-in block 551, lower connecting block 552, lower locking cylinder 553;Described is upper
The outside of break-in block 548 is provided with contiguous block 549;The inner side of described upper break-in block 548 is provided with locking cylinder 550;Described
The outside of lower break-in block 551 be provided with lower connecting block 552;The inner side of described lower break-in block 551 is provided with lower locking cylinder 553;
Described upper break-in block 548 cooperates with lower break-in block 551;Described slide rail 547 is arranged on break-in block 548 and lower break-in
The left side of block 551.
When in this detailed description of the invention, in dynamic strut, screw mandrel riveting sleeve installs equipment operation, by screw mandrel placing clamp, press
Dynamic start button, screw mandrel is compressed by rotary cylinder.Push-and-pull cylinders retract drives clamp body to move to hold down gag, is passed by detection
Sensor detects when clamp body is moved into hold down gag, and hydraulic cylinder starts hydraulic screw rod and riveting sleeve.Hydraulic cylinder root
According in advance in touch screen interface setup parameter rivet.Riveted rear hydraulic cylinder, push-and-pull cylinder, rotary cylinder return
Position, the artificial riveting parts that takes out flows to electronic strut operation two;The screw mandrel riveted of a upper operation is carried out oiling, manually by silk
Rod sleeve assembles, and places in profiling jig, gets on nut casing from feed thing frame, puts into the profiling jig of compression cylinder end
In, press start button, rotary cylinder compresses, and compression cylinder starts to say that bearing holder (housing, cover) is expressed on screw mandrel.Extrude complete compression gas
Cylinder, rotary cylinder return.Manually take out workpiece.Workpiece is flowed into screw mandrel end bulb equipment is installed;To process member and
Sleeve end bulb is manually placed in profiling jig, and after pressing start button, push-and-pull cylinder drives profiling jig interval to punching press,
Being put in place by detection sensor detection, pneumohydraulic pressure-cylinder starts workpiece punching press.Punching press terminates rear pneumohydraulic pressure-cylinder return, push-and-pull
Cylinder return, manually takes out workpiece in profiling jig.Because after processing, screw mandrel length differs, manually the workpiece processed is put
In the another one profiling jig of side, after detection sensor detects, stepper motor drives pullover the going to of screw mandrel to specify position,
Screw mandrel is moved to the longest position stop.The servomotor of parts mounting machine is at initial position, lead spindle jaw
Open.First the workpiece of upper operation is put in profiling jig, then spring and spring positioning sleeve is placed in screw mandrel, main shaft coupling
Device is placed in jaw, and jaw clamps.Pressing start button, servomotor drives lead spindle jaw and compression spring to stretch out gas
Cylinder begins to decline, and after detecting that servomotor drops to rigging position by detection sensor, servomotor stops declining.At this moment
Spring mountings part is pushed into installation duplicate invoice axial organ chucking position by push-and-pull cylinder, after detection sensor detection puts in place, by hand will
Duplicate invoice axial organ is installed on jaw, again presses start button, and riveter begins to decline the rotation riveting of duplicate invoice axial organ to screw mandrel termination
Spring is fixed at place.Riveter return after rotation riveting, this time, duplicate invoice axial organ was installed on screw mandrel, also fixed spring.
Duplicate invoice axial organ jaw return, riveter return, then push-and-pull cylinder return, servomotor return again.Treat that servomotor return is complete
Workpiece is manually taken out after one-tenth.The spring upper workshop section assembled, installs interior place pipe assembly and electric machine assembly by hand.To install
Motor side is placed in the damping detent mechanism on the left side, then other side off normal bulb is put into right positioner rotating mechanism
In.After putting workpiece well, pressing start button, direction locating mechanism clamping workpiece, now operator need to hold trocar sheath rotation
Under, do not rotate in detent mechanism if being stuck in after Xuan Zhuaning to put, then for normally having corrected the original state of workpiece.Press again and open
Dynamic button, the most each two groups of pneumohydraulic pressure-cylinders action simultaneously, by sleeve pipe and screw mandrel fore shaft.After riveting completes for the first time, trocar sheath
Gas pawl unclamps, and after right positioner rotator 90-degree rotation, starts again at riveting.Two groups of above-mentioned pneumohydraulic pressure-cylinder palikinesias two
After secondary, sleeve pipe is pressed, finished parts after last artificial taking-up processing.
This detailed description of the invention is reasonable in design, and workshop section is clearly demarcated, good processing stability, solves and meets during existing assembling
The problem arrived, belongs to domestic initiation at present.
Of the present utility model ultimate principle and principal character and of the present utility model advantage have more than been shown and described.This
Skilled person will appreciate that of industry, this utility model is not restricted to the described embodiments, and retouches in above-described embodiment and description
That states simply illustrates principle of the present utility model, on the premise of without departing from this utility model spirit and scope, and this utility model
Also have various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This practicality is new
Type claims scope and is defined by appending claims and equivalent thereof.
Claims (1)
- The most electronic strut production line, it is characterised in that it comprise screw mandrel riveting sleeve in electronic strut install equipment, nut casing and Screw axis bearing sleeve installs equipment, screw mandrel end bulb installs equipment, parts mounting machine, strut shell install equipment;Described In electronic strut, screw mandrel riveting sleeve installation equipment, nut casing and screw axis bearing sleeve install equipment, screw mandrel end bulb installs equipment, Parts mounting machine, strut shell are installed equipment and are sequentially connected;In described electronic strut, screw mandrel riveting sleeve installs equipment, spiral shell Mother set pipe and screw axis bearing sleeve install equipment, screw mandrel end bulb installs equipment, strut shell installs equipment by support body, material Frame, mechanical part and electric component composition;In described electronic strut, screw mandrel riveting sleeve installs the mechanical part of equipment by supercharging Parts and clamp member composition;Described pressurized part includes pressurized cylinder, connecting plate, gantry gripper shoe, union joint, pad Plate, optical axis;The top of described gantry gripper shoe is provided with connecting plate;Described connecting plate be arranged over pressurized cylinder;Described The bottom of pressurized cylinder be connected with backing plate with by union joint;The bottom of described backing plate is provided with several optical axis;Described folder Tool assembly includes push-and-pull cylinder, slide rail, base plate, rotation clamping cylinder, cushion block, profiling jig;Described base plate is provided with cunning Rail;Described profiling jig is arranged on slide rail;Described profiling jig is provided with rotation clamping cylinder;The limit of described base plate Along being provided with push-and-pull cylinder;The top of described slide rail is provided with cushion block;Described nut casing and screw axis bearing sleeve install equipment Mechanical part comprises push-and-pull cylinder A, union joint A, contiguous block, profiling jig A, rotary cylinder, profiling jig B, base plate A, slide rail A ;Described base plate A is provided with slide rail A;One end of described slide rail A is provided with profiling jig B;Another of described slide rail A End is provided with profiling jig A;Described profiling jig A is provided with contiguous block;Described push-and-pull cylinder A by union joint A with Contiguous block connects;Described profiling jig B is connected with the rotary cylinder of side;Described screw mandrel end bulb installs the machinery of equipment The mechanical part structure that parts install equipment with screw mandrel riveting sleeve in electronic strut is identical;Described screw mandrel end bulb installs equipment It is provided with screw component;Described screw component comprises plexiglass tent, stepper motor, screw mandrel, slide rail B, base plate B, profiling Fixture C, clamping cylinder;The described bottom in plexiglass tent is provided with base plate B;Described base plate B is provided with slide rail B; One end of described slide rail B is provided with profiling jig C;Described profiling jig C is provided with clamping cylinder;Described profiling jig C is connected with stepper motor by screw mandrel;Described parts mounting machine comprises riveting assembly, aluminium section frame, groups of springs Part, square tube frame;Described square tube frame is provided with aluminium section frame;Described spring assembling assembly is arranged on aluminium section frame and side Between pipe support;Described riveting assembly is arranged in aluminium section frame;Described riveting assembly is provided with riveting machine;Described riveting Pick and be fixed in riveting machine fixed plate;The lower section of described riveting machine is provided with screw mandrel fixation kit and screw mandrel riveted joint assembly; Described spring assembly is provided with spring retainer elements;Described spring retainer elements is connected with reductor by screw mandrel;Described Reductor be connected with servomotor and push-and-pull cylinder;Described strut shell installation equipment is provided with four pressurized parts, institute The pressurized part stated comprises gas-liquid pressure-boosting cylinder, optical axis C, copper sheathing, pressuring plate, fixed plate, connecting plate;Described gas-liquid pressure-boosting Cylinder is connected with fixed plate;Described pressuring plate is connected with fixed plate by connecting plate;Described optical axis C through connecting plate with Pressuring plate connects, and is arranged with copper sheathing on optical axis C;Described strut shell installation equipment is provided with break-in assembly and clamp machine Structure;Described break-in assembly comprises slide rail, upper break-in block, upper contiguous block, upper locking cylinder, lower break-in block, lower connecting block, lower lock Tight cylinder;The outside of described upper break-in block is provided with contiguous block;The inner side of described upper break-in block is provided with locking cylinder;Institute The outside of the lower break-in block stated is provided with lower connecting block;The inner side of described lower break-in block is provided with lower locking cylinder;Described upper mill Close block to cooperate with lower break-in block;Described slide rail is arranged on the left side of break-in block and lower break-in block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620149986.3U CN205465158U (en) | 2016-02-29 | 2016-02-29 | Electronic vaulting pole production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620149986.3U CN205465158U (en) | 2016-02-29 | 2016-02-29 | Electronic vaulting pole production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205465158U true CN205465158U (en) | 2016-08-17 |
Family
ID=56679413
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620149986.3U Expired - Fee Related CN205465158U (en) | 2016-02-29 | 2016-02-29 | Electronic vaulting pole production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205465158U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105537940A (en) * | 2016-02-29 | 2016-05-04 | 合肥秦益机电科技有限公司 | Electric jackstay production line |
CN110193727A (en) * | 2019-07-09 | 2019-09-03 | 东莞新嘉和汽车配件有限公司 | A kind of assembled fixture of automobile tail gate push rod |
-
2016
- 2016-02-29 CN CN201620149986.3U patent/CN205465158U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105537940A (en) * | 2016-02-29 | 2016-05-04 | 合肥秦益机电科技有限公司 | Electric jackstay production line |
CN110193727A (en) * | 2019-07-09 | 2019-09-03 | 东莞新嘉和汽车配件有限公司 | A kind of assembled fixture of automobile tail gate push rod |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101362302B (en) | C type folded milling-drilling-riveting combined processing center and method of use thereof | |
CN205363365U (en) | Spindle frock | |
CN205465158U (en) | Electronic vaulting pole production line | |
CN206200611U (en) | A kind of polygonal part Automatic-clamping centering machine | |
CN103231250A (en) | Multi-functional drilling-riveting actuator | |
CN108435945B (en) | A kind of punching machine automatic charging machinery hand | |
CN106826320A (en) | A kind of automatic plate press air-actuated jaw and clamping method | |
CN105750577B (en) | A kind of bearing ring turning inner clamping type floating clamp | |
CN105537940A (en) | Electric jackstay production line | |
CN207189225U (en) | Process the vertical vehicle hydraulic pressure fixture at automobile turbocharger housing volute end | |
CN206677615U (en) | A kind of automatic plate press air-actuated jaw | |
CN209477454U (en) | A kind of gear ring gear-hobbing clamp | |
CN109604656A (en) | Synchronizer lever ring workpiece machining clamp and processing method | |
CN205817074U (en) | A kind of spot welding fixture (SWFX) clamping device | |
CN208991810U (en) | A kind of automation drilling jig gripper for drilling tool | |
CN208866815U (en) | Air compressor piston connecting rod boring processing tool | |
CN207746764U (en) | Process the frock clamp of positioning sleeve | |
CN106363203A (en) | Chuck used for machining synchronizer friction ring thin-walled parts | |
CN209140823U (en) | A kind of piston elastic spring tooling | |
CN107877173A (en) | The servo frock of large-scale ellipsoid face milling and agitating friction welding integration | |
CN209453205U (en) | A kind of fixture by pull rod effect automatic impaction workpiece | |
CN202292094U (en) | Compound riveting unit | |
CN111069631A (en) | Special numerical control machine tool for turning inner circle and outer circle of piston ring | |
CN206702685U (en) | One kind machining multipurpose parts fixation frock | |
CN109128915A (en) | A kind of air compressor piston connecting rod boring processing tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20190228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |