CN205449111U - Industrial instrument's mounting structure - Google Patents

Industrial instrument's mounting structure Download PDF

Info

Publication number
CN205449111U
CN205449111U CN201620167188.3U CN201620167188U CN205449111U CN 205449111 U CN205449111 U CN 205449111U CN 201620167188 U CN201620167188 U CN 201620167188U CN 205449111 U CN205449111 U CN 205449111U
Authority
CN
China
Prior art keywords
water inlet
industrial instrument
joint assembly
mounting structure
clamp nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620167188.3U
Other languages
Chinese (zh)
Inventor
李锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620167188.3U priority Critical patent/CN205449111U/en
Application granted granted Critical
Publication of CN205449111U publication Critical patent/CN205449111U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

The utility model relates to an industrial instrument's technical field, especially, industrial instrument's mounting structure, mainly by cascaded body, the panel board, a water inlet, the delivery port, the sealed pad, spring washer, fastening nut and pipe joint Assembly constitute, the water inlet sets up the lower extreme at cascaded body, the delivery port sets up the one side at cascaded body, the fixed upper end that sets up at cascaded body of panel board, the water inlet has outwards set gradually sealed the pad, spring washer, fastening nut and pipe joint Assembly, the delivery port has outwards set gradually sealed the pad, spring washer, fastening nut and pipe joint Assembly, pipe joint Assembly is mainly by the back taper hose, the stagnant water layer is formed with fixed cover, the stagnant water layer sets up between back taper hose and fixed cover. This industrial instrument's mounting structure is simple, and simple to operate can reach fine sealed effect through sealed the pad, improves industrial instrument's life, reduces cost of maintenance, improves economic benefits.

Description

A kind of mounting structure of industrial instrument
Technical field
This utility model relates to the technical field of industrial instrument, the mounting structure of a kind of industrial instrument.
Background technology
Industrial acidity meter, is a kind of conventional industrial instrumentation equipment, is the research and development specializing in Online monitoring of pollution sources, manufactures, and sells, site installation test, and the comprehensive entity of service is built in technical support and operational management etc..
In the mounting structure of traditional industrial acidity meter, usually there will be the instrument damage that the phenomenon of seepage causes, cause the problem that certainty of measurement is the highest, and installation procedure is comparatively laborious, inefficiency.In sum, being arranged in structure and design of existing industrial instrument there is also the biggest defect, it is impossible to meets the needs of modern actual production.
Utility model content
The technical problems to be solved in the utility model is: in order to solve the problem that the prior art in above-mentioned background technology exists, the mounting structure of a kind of industrial instrument is provided, simple in construction, easy for installation, good sealing effectiveness can be reached by sealing gasket, improve the service life of industrial instrument, reduce maintenance cost, increase economic efficiency.
This utility model solves its technical problem and be the technical scheme is that the mounting structure of a kind of industrial instrument, main by staged body, instrumental panel, water inlet, outlet, sealing gasket, elastomeric pad, clamp nut and tube joint assembly composition, described water inlet is arranged on the lower end of staged body, described outlet is arranged on the side of staged body, described instrumental panel is fixedly installed on the upper end of staged body, described water inlet is outwards disposed with sealing gasket, elastomeric pad, clamp nut and tube joint assembly, described outlet is outwards disposed with sealing gasket, elastomeric pad, clamp nut and tube joint assembly, described tube joint assembly is mainly by inverted cone flexible pipe, sealing layer and fixed cover composition, described sealing layer is arranged between inverted cone flexible pipe and fixed cover.
The most specifically, in technique scheme, described water inlet is provided with external screw thread, is threaded connection between described water inlet and clamp nut.Such design facilitates follow-up easy accessibility.
The most specifically, in technique scheme, described outlet is provided with external screw thread, is threaded connection between described outlet and clamp nut.Such design facilitates follow-up easy accessibility.
The most specifically, in technique scheme, on described water inlet, externally threaded upper end is additionally provided with ring for fixing.Such design is the effect that the sealing gasket to subsequent installation plays location.
The most specifically, in technique scheme, on described outlet, externally threaded upper end is additionally provided with ring for fixing.Such design is the effect that the sealing gasket to subsequent installation plays location.
The beneficial effects of the utility model are: the mounting structure of this kind of industrial instrument, and simple in construction is easy for installation, can reach good sealing effectiveness by sealing gasket, improve the service life of industrial instrument, reduce maintenance cost, increase economic efficiency.
Accompanying drawing explanation
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model.
In figure: 1, staged body, 2, instrumental panel, 3, water inlet, 4, outlet, 5, sealing gasket, 6, elastomeric pad, 7, clamp nut, 8, inverted cone flexible pipe, 9, sealing layer, 10, fixed cover, 11, external screw thread, 12, ring for fixing.
Detailed description of the invention
Presently in connection with accompanying drawing, this utility model is described in further detail.These accompanying drawings are the schematic diagram of simplification, and basic structure of the present utility model is described the most in a schematic way, and therefore it only shows the composition relevant with this utility model.
The mounting structure of a kind of industrial instrument as shown in Figure 1, main by staged body 1, instrumental panel 2, water inlet 3, outlet 4, sealing gasket 5, elastomeric pad 6, clamp nut 7 and tube joint assembly composition, water inlet 3 is arranged on the lower end of staged body 1, outlet 4 is arranged on the side of staged body 1, instrumental panel 2 is fixedly installed on the upper end of staged body 1, water inlet 3 is outwards disposed with sealing gasket 5, elastomeric pad 6, clamp nut 7 and tube joint assembly, outlet 4 is outwards disposed with sealing gasket 5, elastomeric pad 6, clamp nut 7 and tube joint assembly, tube joint assembly is mainly by inverted cone flexible pipe 8, sealing layer 9 and fixed cover 10 form, sealing layer 9 is arranged between inverted cone flexible pipe 8 and fixed cover 10.
Wherein, water inlet 3 is provided with external screw thread 11, is threaded connection between water inlet 3 and clamp nut 7.It is provided with external screw thread 11 on outlet 4, is threaded connection between outlet 4 and clamp nut 7.On water inlet 3, the upper end of external screw thread 11 is additionally provided with ring for fixing 12.On outlet 4, the upper end of external screw thread 11 is additionally provided with ring for fixing 12.
The concrete installation procedure of this industrial instrument is as follows:
First instrumental panel 2 is plugged on staged body 1, then sealing gasket 5 and elastomeric pad 6 are successively placed on water inlet 3 and outlet 4, fixed by clamp nut 7, on external screw thread 11 on the external screw thread 11 finally tube joint assembly being threaded on water inlet 3 by fixed cover 10 and outlet 4, it is fixed.So when needs measure when, it is only necessary to tube joint assembly is accessed and measures.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff can carry out various change and amendment completely in the range of without departing from this utility model technological thought.The content that the technical scope of this utility model is not limited in description, it is necessary to determine its technical scope according to right.

Claims (5)

  1. null1. the mounting structure of an industrial instrument,It is characterized in that: main by staged body (1)、Instrumental panel (2)、Water inlet (3)、Outlet (4)、Sealing gasket (5)、Elastomeric pad (6)、Clamp nut (7) and tube joint assembly composition,Described water inlet (3) is arranged on the lower end of staged body (1),Described outlet (4) is arranged on the side of staged body (1),Described instrumental panel (2) is fixedly installed on the upper end of staged body (1),Described water inlet (3) is outwards disposed with sealing gasket (5)、Elastomeric pad (6)、Clamp nut (7) and tube joint assembly,Described outlet (4) is outwards disposed with sealing gasket (5)、Elastomeric pad (6)、Clamp nut (7) and tube joint assembly,Described tube joint assembly is mainly by inverted cone flexible pipe (8)、Sealing layer (9) and fixed cover (10) composition,Described sealing layer (9) is arranged between inverted cone flexible pipe (8) and fixed cover (10).
  2. The mounting structure of a kind of industrial instrument the most according to claim 1, is characterized in that: is provided with external screw thread (11) on described water inlet (3), is threaded connection between described water inlet (3) and clamp nut (7).
  3. The mounting structure of a kind of industrial instrument the most according to claim 1, is characterized in that: is provided with external screw thread (11) on described outlet (4), is threaded connection between described outlet (4) and clamp nut (7).
  4. The mounting structure of a kind of industrial instrument the most according to claim 2, is characterized in that: the upper end of the upper external screw thread (11) of described water inlet (3) is additionally provided with ring for fixing (12).
  5. The mounting structure of a kind of industrial instrument the most according to claim 3, is characterized in that: the upper end of the upper external screw thread (11) of described outlet (4) is additionally provided with ring for fixing (12).
CN201620167188.3U 2016-03-06 2016-03-06 Industrial instrument's mounting structure Expired - Fee Related CN205449111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620167188.3U CN205449111U (en) 2016-03-06 2016-03-06 Industrial instrument's mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620167188.3U CN205449111U (en) 2016-03-06 2016-03-06 Industrial instrument's mounting structure

Publications (1)

Publication Number Publication Date
CN205449111U true CN205449111U (en) 2016-08-10

Family

ID=56605595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620167188.3U Expired - Fee Related CN205449111U (en) 2016-03-06 2016-03-06 Industrial instrument's mounting structure

Country Status (1)

Country Link
CN (1) CN205449111U (en)

Similar Documents

Publication Publication Date Title
CN205449111U (en) Industrial instrument's mounting structure
CN208348729U (en) Water level observation pipe connection
CN208486311U (en) A kind of wall-mounted mute supply equipment
CN207999516U (en) A kind of novel hydraulic spool
CN203224332U (en) Novel installing structure for water treating equipment pressure meter
CN201462275U (en) Pipe saddle
CN207636009U (en) A kind of spraying pipeline angle measurement fixture
CN209362810U (en) A kind of atomising device
CN205261071U (en) Flange structure
CN109631149A (en) A kind of long range heat distribution pipeline monitoring system
CN203573014U (en) High-pressure lens pad throttling device
CN209014077U (en) A kind of water meter maintained easily
CN203730900U (en) Float ball tank for valve
CN203718199U (en) Novel flange integration mounting plate for pipeline equipment
CN204114285U (en) A kind of pressure-detecting device
CN206221869U (en) A kind of water collecting and diversifying device structure
CN208845914U (en) Flange insulation group
CN220418718U (en) Ore pulp pressure measuring instrument
CN206862450U (en) A kind of single tube liquid level gauge
CN209857997U (en) Flow meter convenient for controlling flow
CN208011104U (en) A kind of metric and English quick switching joint
CN203052095U (en) Pipe saddle bolt stopping device
CN208476332U (en) A kind of protective device preventing water meter low temperature bursting by freezing
CN209014023U (en) A kind of transmitter defroster
CN208364995U (en) Resistance to organic fluid corrodes special fastener

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

Termination date: 20170306

CF01 Termination of patent right due to non-payment of annual fee