CN205444724U - Installation structure for wall downspout of steel construction factory building - Google Patents

Installation structure for wall downspout of steel construction factory building Download PDF

Info

Publication number
CN205444724U
CN205444724U CN201620162538.7U CN201620162538U CN205444724U CN 205444724 U CN205444724 U CN 205444724U CN 201620162538 U CN201620162538 U CN 201620162538U CN 205444724 U CN205444724 U CN 205444724U
Authority
CN
China
Prior art keywords
screw rod
downpipe
pipe clamp
pipe
factory building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620162538.7U
Other languages
Chinese (zh)
Inventor
胡兴波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201620162538.7U priority Critical patent/CN205444724U/en
Application granted granted Critical
Publication of CN205444724U publication Critical patent/CN205444724U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a mounting structure that is used for steel construction factory building wall pipe in water, including pipe strap and screw rod, screw rod one end is fixed with the installation base open flutedly on the pipe strap inside wall, in the recess is arranged in to outer wall that screw rod other end tip runs through the pipe strap, be provided with two elasticity and be curved contact bar, two in that the tip of screw rod is reverse the contact bar end extends until the notch with the recess along the interior circumferencial direction of pipe strap respectively cover. Swing joint between screw rod and the pipe strap has directly optimized the installation flow of pipe in the water, and the erection joint spare of having avoided pipe in the water among the prior art unable interval size of adjusting between its clamping part and the fixed point fixed after further improves the installation effectiveness of pipe in the water.

Description

A kind of mounting structure for steel construction factory metope downpipe
Technical field
This utility model relates to a kind of steel-structure factory building, is specifically related to a kind of mounting structure for steel-structure factory building metope downpipe.
Background technology
Steel-structure factory building refers to be made up of the Architectural Equipment of main supporting member steel.Steel-structure factory building has following characteristics: 1, steel building light weight, intensity is high, and span is big;2, the steel building construction period is short, reduces cost of investment accordingly;3, steel building fire line is high, and anticorrosive property is strong;4, steel building is moved conveniently, reclaims pollution-free.And matched downpipe, then the rainwater on steel structural plant roof can be concentrated and cause in the rain pipe that below ground is laid, with the environmental condition being dried in ensureing Factory Building.
The installation of downpipe generally uses pipe clamp bearing to be fixed, and bearing need be adjacent to the trough of color corrugated sheet steel after together be fixed on metope wingceltis bar, to ensure the stable installation of downpipe.But common are three kinds of pipe clamp bearings on the market at present, but all cannot meet this condition;The first is to be because the standing part of bearing too greatly, more than the width of trough, it is impossible to be adjacent to trough;It is similar to cement nail that the second belongs to the pipe fitting being connected with concrete, brick wall, i.e. coupling part, and unstable when being connected with steel-structure factory building metope, and the end discontinuity of coupling part easily causes pipe clamp and comes off;The third directly uses clip to be surrounded by downpipe, and is fixed on steel-structure factory building face end, clip two ends by screw, is easily caused tube wall when downpipe affects by tube fluid and produces swing impaired, is unsatisfactory for requirement attractive in appearance simultaneously.
Utility model content
This utility model purpose is to provide a kind of mounting structure for steel-structure factory building metope downpipe, it is ensured that downpipe is stably connected with steel-structure factory building.
This utility model is achieved through the following technical solutions:
A kind of mounting structure for steel-structure factory building metope downpipe, including pipe clamp and screw rod, described screw rod one end is fixed with mounting seat, described pipe clamp medial wall has groove, screw rod other end end is run through the outer wall of pipe clamp and is placed in groove, oppositely arranged in the end of screw rod have two elasticity and curved bow strip, and two described bow strip ends extend up to along pipe clamp inner periphery direction to cover described in the notch of groove respectively.During the charity of steel-structure factory building, downpipe may select steel pipe or plastic tube, but for reducing cost, commonly used plastic tube;But the hardness of plastic tube is relatively low, when mounted hold-down support to the active force of body excessive time, easily lead to body impaired, this utility model passes through flexibly connecting between screw rod and pipe clamp, while ensureing that downpipe is stably connected with steel-structure factory building, also can to a certain extent the interaction force between pipe clamp and plastic tube be buffered, impaired with the local stress preventing plastic tube.During installation, the mounting seat being positioned at end, screw rod one end is directly welded with the metope of steel-structure factory building, adjusts the spacing between downpipe and metope, then is set in pipe clamp by downpipe, downpipe, pipe clamp and mounting seat is now utilized mutually to limit and support so that downpipe is stably fixed;And be in course of adjustment, screw rod moves, the one end of screw rod runs through pipe clamp and is placed in groove, and two are arranged dorsad and groove is covered by curved bow strip respectively along pipe clamp inner peripheral wall, when downpipe outer wall contacts with bow strip, bow strip is squeezed and deforms upon, the i.e. arc top of bow strip is divided and is compressed in groove, fluid flow in downpipe is excessive when impacting downpipe, interaction force between downpipe and pipe clamp can be offset a part by elastic bow strip, prevent the end of screw rod directly and the wall contacts of downpipe simultaneously, and then reduce the contact point part appearance damage of downpipe and pipe clamp, extend the service life of downpipe.
And, it is flexibly connected, between screw rod with pipe clamp, the installation procedure directly optimizing downpipe, avoid the installation connecting element of downpipe in prior art and cannot regulate the spacing size between its clamping part and fixing point after fixation, improve the installation effectiveness of downpipe further.
Described pipe clamp includes two semicircular clips, and the end of two clips realizes connecting by bolt.The pipe clamp of two clip compositions can regulate the internal diameter size of himself by bolt, to adapt to various sizes of downpipe, the most unified pipe clamp standard can popularization and application on the installation procedure of different steel-structure factory building downpipes, the convenient later stage to downpipe installation connecting element is changed and reclaims simultaneously.
Also include that adjusting nut, described adjusting nut coordinate with screw flight.The adjusting nut arranged on screw rod can carry out position change according to concrete installation situation, under normal circumstances, one end face of nut and the wall contacts of pipe clamp, spacing between pipe clamp and mounting seat too small or excessive time, rotating nut can make nut drive pipe clamp to move, i.e. realize the spacing size between increase and decrease pipe clamp and mounting seat, prevent from occurring between pipe clamp with screw rod being connected loosening simultaneously.Further, the number of adjusting nut can be two, and one directly contacts with pipe clamp, and another directly contacts with mounting seat, and during preventing from using, the end of screw rod and the junction of mounting seat stress concentration occur and impaired.
Described mounting seat has two screwed holes.As preferably, mounting seat can not only be attached with metope by the way of welding, also according to concrete installation site, it can be carried out bolt to fix, mounting seat fixed form flexibly, can further improve the fixed efficiency of downpipe mounting structure, facilitate simultaneously and mounting structure is recycled.
Described bow strip is rubber or sheet metal.As preferably, bow strip has elasticity, can slow down the interaction force between pipe clamp and downpipe, and use sheet metal or quality of rubber materials, while ensureing that it slows down function, moreover it is possible to reduce cost.
This utility model compared with prior art, has such advantages as and beneficial effect:
1, this utility model is in course of adjustment, screw rod moves, the one end of screw rod runs through pipe clamp and is placed in groove, and two are arranged dorsad and groove is covered by curved bow strip respectively along pipe clamp inner peripheral wall, when downpipe outer wall contacts with bow strip, bow strip is squeezed and deforms upon, the i.e. arc top of bow strip is divided and is compressed in groove, fluid flow in downpipe is excessive when impacting downpipe, interaction force between downpipe and pipe clamp can be offset a part by elastic bow strip, prevent the end of screw rod directly and the wall contacts of downpipe simultaneously, and then reduce the contact point part appearance damage of downpipe and pipe clamp, extend the service life of downpipe;
2, in this utility model, the adjusting nut arranged on screw rod can carry out position change according to concrete installation situation, under normal circumstances, one end face of nut and the wall contacts of pipe clamp, spacing between pipe clamp and mounting seat too small or excessive time, rotating nut can make nut drive pipe clamp to move, and i.e. realizes the spacing size between increase and decrease pipe clamp and mounting seat, prevents from occurring between pipe clamp with screw rod being connected loosening simultaneously;
3, in this utility model, mounting seat can not only be attached with metope by the way of welding, also according to concrete installation site, it can be carried out bolt to fix, mounting seat fixed form flexibly, can further improve the fixed efficiency of downpipe mounting structure, facilitate simultaneously and mounting structure is recycled.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing being further appreciated by this utility model embodiment, constitutes the part of the application, is not intended that the restriction to this utility model embodiment.In the accompanying drawings:
Fig. 1 is this utility model structural representation;
Fig. 2 is the profile in Fig. 1 at A.
The parts title of labelling and correspondence in accompanying drawing:
1-pipe clamp, 2-bolt, 3-screw rod, 4-adjusting nut, 5-mounting seat, 6-screwed hole, 7-bow strip, 8-groove.
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with embodiment and accompanying drawing, the utility model is described in further detail, exemplary embodiment of the present utility model and explanation thereof are only used for explaining this utility model, are not intended as restriction of the present utility model.
Embodiment 1
As depicted in figs. 1 and 2, the present embodiment includes pipe clamp 1 and screw rod 3, described screw rod 3 one end is fixed with mounting seat 5, described pipe clamp 1 medial wall has groove 8, screw rod 3 other end end is run through the outer wall of pipe clamp 1 and is placed in groove 8, oppositely arranged in the end of screw rod 3 have two elasticity and curved bow strip 7, and two described bow strip 7 ends extend up to along pipe clamp 1 inner periphery direction to cover described in the notch of groove 8 respectively.
During the charity of steel-structure factory building, downpipe may select steel pipe or plastic tube, but for reducing cost, commonly used plastic tube;But the hardness of plastic tube is relatively low, when mounted hold-down support to the active force of body excessive time, easily lead to body impaired, the present embodiment passes through flexibly connecting between screw rod 3 and pipe clamp 1, while ensureing that downpipe is stably connected with steel-structure factory building, also can to a certain extent the interaction force between pipe clamp 1 and plastic tube be buffered, impaired with the local stress preventing plastic tube.During installation, the mounting seat 5 being positioned at end, screw rod 3 one end is directly welded with the metope of steel-structure factory building, adjust the spacing between downpipe and metope, again downpipe is set in pipe clamp 1, downpipe, pipe clamp 1 and mounting seat 5 is now utilized mutually to limit and support so that downpipe is stably fixed;And be in course of adjustment, screw rod 3 moves, the one end of screw rod 3 runs through pipe clamp 1 and is placed in groove 8, and two are arranged dorsad and groove 8 is covered by curved bow strip 7 respectively along pipe clamp 1 inner peripheral wall, when downpipe outer wall contacts with bow strip 7, bow strip 7 is squeezed and deforms upon, the i.e. arc top of bow strip 7 is divided and is compressed in groove 8, fluid flow in downpipe is excessive when impacting downpipe, interaction force between downpipe and pipe clamp 1 can be offset a part by elastic bow strip 7, prevent the end of screw rod 3 directly and the wall contacts of downpipe simultaneously, and then reduce the contact point part appearance damage of downpipe and pipe clamp 1, extend the service life of downpipe.And, it is flexibly connected, between screw rod 3 with pipe clamp 1, the installation procedure directly optimizing downpipe, avoid the installation connecting element of downpipe in prior art and cannot regulate the spacing size between its clamping part and fixing point after fixation, improve the installation effectiveness of downpipe further.
The present embodiment also includes adjusting nut 4, described adjusting nut 4 and screw rod 3 threaded engagement.The adjusting nut 4 arranged on screw rod 3 can carry out position change according to concrete installation situation, under normal circumstances, one end face of nut and the wall contacts of pipe clamp 1, spacing between pipe clamp 1 and mounting seat 5 too small or excessive time, rotating nut can make nut drive pipe clamp 1 to move, i.e. realize the spacing size between increase and decrease pipe clamp 1 and mounting seat 5, prevent from occurring between pipe clamp 1 with screw rod 3 being connected loosening simultaneously.Further, the number of adjusting nut 4 can be two, and one directly contacts with pipe clamp 1, and another directly contacts with mounting seat 5, and during preventing from using, end and the junction of mounting seat 5 of screw rod 3 stress concentration occur and impaired.
As preferably, mounting seat 5 can not only be attached with metope by the way of welding, also by screwed hole 6, mounting seat 5 can be carried out bolt 2 according to concrete installation site to fix, mounting seat 5 fixed form flexibly, can further improve the fixed efficiency of downpipe mounting structure, facilitate simultaneously and mounting structure is recycled.
As preferably, bow strip 7 has elasticity, can slow down the interaction force between pipe clamp 1 and downpipe, and use sheet metal or quality of rubber materials, while ensureing that it slows down function, moreover it is possible to reduce cost.
Above-described detailed description of the invention; the purpose of this utility model, technical scheme and beneficial effect are further described; it is it should be understood that; the foregoing is only detailed description of the invention of the present utility model; it is not used to limit protection domain of the present utility model; all within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. done, within should be included in protection domain of the present utility model.

Claims (5)

1. the mounting structure for steel-structure factory building metope downpipe, including pipe clamp (1) and screw rod (3), it is characterized in that: described screw rod (3) one end is fixed with mounting seat (5), described pipe clamp (1) medial wall has groove (8), screw rod (3) other end end is run through the outer wall of pipe clamp (1) and is placed in groove (8), oppositely arranged in the end of screw rod (3) have two elasticity and curved bow strip (7), two described bow strip (7) ends extend up to along pipe clamp (1) inner periphery direction be covered the notch of groove (8) respectively.
A kind of mounting structure for steel-structure factory building metope downpipe the most according to claim 1, it is characterised in that: described pipe clamp (1) includes two semicircular clips, and the end of two clips realizes connecting by bolt (2).
A kind of mounting structure for steel-structure factory building metope downpipe the most according to claim 1, it is characterised in that: also include adjusting nut (4), described adjusting nut (4) and screw rod (3) threaded engagement.
A kind of mounting structure for steel-structure factory building metope downpipe the most according to claim 1, it is characterised in that: in described mounting seat (5), have two screwed holes (6).
A kind of mounting structure for steel-structure factory building metope downpipe the most according to claim 1, it is characterised in that: described bow strip (7) is rubber or sheet metal.
CN201620162538.7U 2016-03-04 2016-03-04 Installation structure for wall downspout of steel construction factory building Active CN205444724U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620162538.7U CN205444724U (en) 2016-03-04 2016-03-04 Installation structure for wall downspout of steel construction factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620162538.7U CN205444724U (en) 2016-03-04 2016-03-04 Installation structure for wall downspout of steel construction factory building

Publications (1)

Publication Number Publication Date
CN205444724U true CN205444724U (en) 2016-08-10

Family

ID=56604916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620162538.7U Active CN205444724U (en) 2016-03-04 2016-03-04 Installation structure for wall downspout of steel construction factory building

Country Status (1)

Country Link
CN (1) CN205444724U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592884A (en) * 2016-12-26 2017-04-26 东莞市格丹美五金工具有限公司 Drain pipe clamping sleeve
CN108643471A (en) * 2018-06-25 2018-10-12 中国五冶集团有限公司 A kind of Steel for Large Steel Column water supply and sewerage pipeline holder
CN108842972A (en) * 2018-06-15 2018-11-20 五冶集团上海有限公司 A kind of fixed bracket of Simple steel structure workshop PVC downpipe
CN110397228A (en) * 2019-08-02 2019-11-01 广西建工集团冶金建设有限公司 A kind of construction method of the compound compression color steel plate exterior wall stent preform pipe collar installation rain pipe of steel structure workshop
CN110512832A (en) * 2019-09-27 2019-11-29 上海宝冶集团南京建筑有限公司 A kind of lightweight segmented assembled architecture garbage transporting collection channel
CN111424893A (en) * 2020-03-25 2020-07-17 马鞍山宏合建筑工程有限公司 High-rise building outer wall drainage pipe connects erection equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592884A (en) * 2016-12-26 2017-04-26 东莞市格丹美五金工具有限公司 Drain pipe clamping sleeve
CN108842972A (en) * 2018-06-15 2018-11-20 五冶集团上海有限公司 A kind of fixed bracket of Simple steel structure workshop PVC downpipe
CN108643471A (en) * 2018-06-25 2018-10-12 中国五冶集团有限公司 A kind of Steel for Large Steel Column water supply and sewerage pipeline holder
CN110397228A (en) * 2019-08-02 2019-11-01 广西建工集团冶金建设有限公司 A kind of construction method of the compound compression color steel plate exterior wall stent preform pipe collar installation rain pipe of steel structure workshop
CN110512832A (en) * 2019-09-27 2019-11-29 上海宝冶集团南京建筑有限公司 A kind of lightweight segmented assembled architecture garbage transporting collection channel
CN111424893A (en) * 2020-03-25 2020-07-17 马鞍山宏合建筑工程有限公司 High-rise building outer wall drainage pipe connects erection equipment
CN111424893B (en) * 2020-03-25 2021-04-09 马鞍山宏合建筑工程有限公司 High-rise building outer wall drainage pipe connects erection equipment

Similar Documents

Publication Publication Date Title
CN205444724U (en) Installation structure for wall downspout of steel construction factory building
CN202231022U (en) Angle-adjustable minisize solar energy generating device
CN211873485U (en) Roof structure with adjustable angle
CN201635277U (en) Roof pipeline leakage-proof structure
CN204089082U (en) Lighting proof strip device
CN207664547U (en) A kind of novel PVC power cable protecting pipe
CN207134778U (en) A kind of high-rise lightning protection device of convenient installation
CN205371817U (en) Draw connecting piece and channel -section steel connection structure that can 180 degrees regulations to one side
CN209780056U (en) Soft basic roofing waterproofing membrane fastener
KR200289424Y1 (en) Strap structure for rain pipe
DE202006014470U1 (en) Fastening equipment for photovoltaic on tiled roofs includes element which can be fitted into existing roof, through which passes anchored threaded rod, or boring screw for water-tight screwing and taking up any type of forces
CN205534610U (en) Pipeline elevator
CN205136814U (en) Plastics elevator easy to assemble
CN216280901U (en) Bridge brightening lamp convenient to install and used for municipal brightening engineering
CN205394512U (en) Telescopic universal bulb dismouting device
CN215761784U (en) Stride rubber belt conveyor pipeline connecting device
CN204458719U (en) A kind of EXPANSION ANCHOR BOLTS effectively can avoiding getting loose
CN205102073U (en) A device that is used for support of column pipe intracavity to fix a position
CN217175114U (en) Drainage pipe erecting device for municipal works
CN204983161U (en) Connection structure is used in installation of adjustable outer acanthus leaf
CN109611729A (en) The LED projector lamp of adjusting irradiation angle
CN2735130Y (en) Double node end free point-seeking pipe joint installation
CN210739061U (en) Grid fastener
CN219734471U (en) Roof pipeline hanging structure
CN216085703U (en) Lightning receptor for protecting large-span wood structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant