CN205423143U - Welding neck flange of petrochemical industry pump installation usefulness - Google Patents

Welding neck flange of petrochemical industry pump installation usefulness Download PDF

Info

Publication number
CN205423143U
CN205423143U CN201521007824.8U CN201521007824U CN205423143U CN 205423143 U CN205423143 U CN 205423143U CN 201521007824 U CN201521007824 U CN 201521007824U CN 205423143 U CN205423143 U CN 205423143U
Authority
CN
China
Prior art keywords
connecting hole
rhone
petrochemical industry
industry pump
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521007824.8U
Other languages
Chinese (zh)
Inventor
李勇
陈海波
沈宇忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Tesu Machinery Equipment Co ltd
Original Assignee
Wenzhou Tesu Machinery Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Tesu Machinery Equipment Co ltd filed Critical Wenzhou Tesu Machinery Equipment Co ltd
Priority to CN201521007824.8U priority Critical patent/CN205423143U/en
Application granted granted Critical
Publication of CN205423143U publication Critical patent/CN205423143U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Branch Pipes, Bends, And The Like (AREA)

Abstract

The utility model discloses a welding neck flange of petrochemical industry pump installation usefulness, including being the body that ring form set up, the center of body is provided with the water conservancy diversion passageway, and the body corresponds the connecting hole that water conservancy diversion passageway outside position was provided with a plurality of quantity, and the photogenic periphery axial to the water conservancy diversion passageway in a side end face of body is connected and is provided with toper welded connection pipe, the body be provided with the scrobicular ring that converges around toper welded connection pipe a week for the outer wall base department of toper welded connection pipe, be provided with mutual central symmetry of multichannel and outer end on the scrobicular ring that converges and be located the water drainage tank on the body circumference wall, water drainage tank be the arc, and water drainage tank's the degree of depth deepens to set up to the outer end from its the inner gradually. The utility model has the advantages that can reduce the water droplet that condenses flows in in the connecting hole.

Description

The W.N flange that petrochemical industry pump is installed
Technical field
This utility model relates to a kind of W.N flange, specifically refers to the W.N flange that petrochemical industry pump is installed.
Background technology
Petrochemical industry pump (petrochemical industry pump) is for oil and the spcific power equipment transported of inflammable, explosive, the poisonous or valuable medium of chemical field.Existing petrochemical industry pump typically all uses W.N flange to carry out installation with pipeline to be connected, to ensure sealing when mounted.
The structure of existing W.N flange generally includes the body in circular setting, body be provided centrally with flow-guiding channel, body correspondence flow-guiding channel outer fix is provided with a number of connecting hole, it is provided with boss on the axial end face of body, it is provided with taper connection pipe on the axial other end of body, during use, the side being correspondingly arranged on boss of W.N flange and the Flange joint on petrochemical industry pump, taper connection tube and tube welds mutually.
Owing to petrochemical industry pump is the most all installed on open air, the surface of W.N flange there will be condensation vapor at night, on the other hand, due to when W.N flange docks with the flange on petrochemical industry pump all be use screw bolt and nut dock, the water droplet being condensed on W.N flange is often flowed into inside the connecting hole at bolt place, thus cause bolt to get rusty in connecting hole, and then bring much inconvenience to the dismounting maintenance of bolt.
Utility model content
The purpose of this utility model is the shortcoming and defect in order to overcome prior art to exist, and provides a kind of W.N flange that can reduce the petrochemical industry pump installation that the water droplet condensed is flowed in connecting hole.
For achieving the above object, the technical solution of the utility model is to include the body in circular setting, body be provided centrally with flow-guiding channel, body correspondence flow-guiding channel outer fix is provided with a number of connecting hole, on one side end face of body, the periphery relative to flow-guiding channel is axially connected with taper welding connecting tube, described body is relative to being provided with around the taper welding connecting tube scrobicular ring that confluxes of a week at the outer wall base of taper welding connecting tube, conflux and be provided with the mutual centrosymmetry of multiple tracks on scrobicular ring and outer end is positioned at the rhone in body circumferential wall, described rhone is curved, and the degree of depth of rhone from its inner the most gradually deepen arrange.
By this setting, the water droplet being condensed on taper welding connecting tube is collected by the bulge loop that confluxes, and is then flowed out from body by water droplet by rhone, thus reduce water droplet and enter in connecting hole, get rusty reducing bolt, and this setting, multiple rhones are centrosymmetric setting, do not interfere with the weight distribution of body, the gravitational equilibrium contributing to maintaining body is constant, it addition, rhone camber is arranged, the infringement of the stress structure to body, reasonable in design can be reduced.
Arranging the connecting hole being described further and include four, and these four connecting hole circumference uniform distributions are on body, described rhone is also equipped with four roads, and per pass rhone is distributed between adjacent two connecting hole.By this setting, structure arranges more reasonable, and gravitational equilibrium is good.
Below in conjunction with specification drawings and specific embodiments, this utility model is described further.
Accompanying drawing explanation
Fig. 1 this utility model detailed description of the invention axonometric chart;
Fig. 2 this utility model detailed description of the invention top view;
Fig. 3 is the A-A sectional view of Fig. 2.
Detailed description of the invention
Below by embodiment, this utility model is specifically described, is served only for this utility model is further described, it is impossible to be interpreted as the restriction to this utility model protection domain.
Detailed description of the invention of the present utility model as Figure 1-3, including the body 1 in circular setting, body 1 be provided centrally with flow-guiding channel 11, body correspondence flow-guiding channel outer fix is provided with a number of connecting hole 12, on one side end face of body 1, the periphery relative to flow-guiding channel is axially connected with taper welding connecting tube 13, described body 1 is relative to being provided with around the taper welding connecting tube scrobicular ring 14 that confluxes of a week at the outer wall base of taper welding connecting tube 13, conflux and be provided with the mutual centrosymmetry of multiple tracks on scrobicular ring 14 and rhone 15 that outer end is positioned in body circumferential wall, described rhone 15 is curved, and the degree of depth of rhone 15 from its inner the most gradually deepen arrange.
It addition, the connecting hole 12 described in the present embodiment includes four, and these four connecting hole 12 circumference uniform distributions are on body, and described rhone is also equipped with four roads, and per pass rhone 15 is distributed between adjacent two connecting hole.

Claims (2)

1. the W.N flange that a petrochemical industry pump is installed, including the body in circular setting, body be provided centrally with flow-guiding channel, body correspondence flow-guiding channel outer fix is provided with a number of connecting hole, on one side end face of body, the periphery relative to flow-guiding channel is axially connected with taper welding connecting tube, it is characterized in that: described body is relative to being provided with around the taper welding connecting tube scrobicular ring that confluxes of a week at the outer wall base of taper welding connecting tube, conflux and be provided with the mutual centrosymmetry of multiple tracks on scrobicular ring and outer end is positioned at the rhone in body circumferential wall, described rhone is curved, and the degree of depth of rhone from its inner the most gradually deepen arrange.
The W.N flange that a kind of petrochemical industry pump the most according to claim 1 is installed, it is characterized in that: described connecting hole includes four, and these four connecting hole circumference uniform distributions are on body, described rhone is also equipped with four roads, and per pass rhone is distributed between adjacent two connecting hole.
CN201521007824.8U 2015-12-08 2015-12-08 Welding neck flange of petrochemical industry pump installation usefulness Expired - Fee Related CN205423143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521007824.8U CN205423143U (en) 2015-12-08 2015-12-08 Welding neck flange of petrochemical industry pump installation usefulness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521007824.8U CN205423143U (en) 2015-12-08 2015-12-08 Welding neck flange of petrochemical industry pump installation usefulness

Publications (1)

Publication Number Publication Date
CN205423143U true CN205423143U (en) 2016-08-03

Family

ID=56516466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521007824.8U Expired - Fee Related CN205423143U (en) 2015-12-08 2015-12-08 Welding neck flange of petrochemical industry pump installation usefulness

Country Status (1)

Country Link
CN (1) CN205423143U (en)

Similar Documents

Publication Publication Date Title
KR101991395B1 (en) Air distributor
CN206112270U (en) Pipeline placing rack
CN205423143U (en) Welding neck flange of petrochemical industry pump installation usefulness
CN205534596U (en) Pipe clamp
US9068421B2 (en) Molded well head cover
CN207034407U (en) A kind of nuclear power pipe-hanger support
CN205172931U (en) Be applied to flange of petrochemical industry pump
CN104089117A (en) Welding neck lined flange
CN208296909U (en) A kind of Venturi tube
CN209876192U (en) Sealing sleeve for support
CN204573376U (en) A kind of flexible water route cardan
CN209622256U (en) Oil transfer pump outlet line connecting pipe device
CN209872456U (en) Garbage leachate treatment membrane column
CN207486271U (en) A kind of polyethylene outer protective pipe
CN201982860U (en) Adding interface
CN106149802A (en) A kind of grid of water intake
CN207421523U (en) Architectural design pipeline fixing device
CN220205073U (en) Environment-friendly pipeline for climbing mountain high-pressure pipe
CN104986288B (en) Gun wale energy pipeline support
CN213776717U (en) Novel steel flange of color steel composite air duct
CN208372582U (en) A kind of quick-installed slurry contaminant filter case
CN204942820U (en) Sewer SEALING FITTING
CN219366820U (en) Stop valve
CN207715114U (en) A kind of anti-clogging device
CN212028734U (en) Seamless steel pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20161208

CF01 Termination of patent right due to non-payment of annual fee