CN205382483U - Drilling bored concrete pile drilling equipment in deep water sand boulder bed riverbed - Google Patents

Drilling bored concrete pile drilling equipment in deep water sand boulder bed riverbed Download PDF

Info

Publication number
CN205382483U
CN205382483U CN201620132598.4U CN201620132598U CN205382483U CN 205382483 U CN205382483 U CN 205382483U CN 201620132598 U CN201620132598 U CN 201620132598U CN 205382483 U CN205382483 U CN 205382483U
Authority
CN
China
Prior art keywords
section
casing
thick bamboo
drilling equipment
outer casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620132598.4U
Other languages
Chinese (zh)
Inventor
吴伟
贾洪涛
杨春景
曹明伟
耿会涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Conservancy Technical Institute
Original Assignee
Yellow River Conservancy Technical Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Conservancy Technical Institute filed Critical Yellow River Conservancy Technical Institute
Priority to CN201620132598.4U priority Critical patent/CN205382483U/en
Application granted granted Critical
Publication of CN205382483U publication Critical patent/CN205382483U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a drilling bored concrete pile drilling equipment in deep water sand boulder bed riverbed, upper end that protecting a section of thick bamboo outside including and protecting a section of thick bamboo in with, the bottom that a section of thick bamboo was protected in with to the bottom of protecting a section of thick bamboo outward sets up on same horizontal plane protected a section of thick bamboo in, is a bracket height with difference in height between the upper end protected tin outward, be equipped with sealing device outward between the interior outside of protecting a section of thick bamboo and the inboard protected tin, the bottom of protecting a section of thick bamboo outward is equipped with the sword foot. This structural design has rationally solved the drilled pile simply, smoothly and has protected a section of thick bamboo under water and at the pile foundation pore -forming with fill the technological problem that the hole appears scurrying in concrete process easily, ensured pile foundation concrete construction quality under water to ensured that stake footpath size is accurate more than the riverbed, shown and improving the appearance quality who probably exposes the pile foundation concrete of river surface, also any safety of not happening and environmental issue in the work progress.

Description

Cast-in-situ bored pile drilling equipment in deep water sand pebble layer riverbed
Technical field
This utility model belongs to hydraulic engineering technical field, is specifically related to cast-in-situ bored pile drilling equipment in a kind of deep water sand pebble layer riverbed.
Background technology
At present, at the sand pebble layer having thickness about 2 ~ 3m, the medium and small particle diameter of Φ 3 ~ 20cm at the bottom of the depth of water about 8 ~ 18m, riverbed, it is middle air slaking tufa stone under sand pebble layer.If directly burying common monolayer steel pile casting underground at permeable sand pebble layer, then under this hydrology and geological state, series of problems will be brought: cement mortar when 1. easily causing mud during pore-forming bottom steel pile casting with perfusion concrete alters hole, causes concrete piles mass defect to drilling pouring pile hole and underwater concrete pouring;2. needing dives under water cuts off monolayer steel pile casting and is embedded in the part in below riverbed, wastes steel pile casting material and adds consuming;3. river is very limpid, is exposed at the water king-pile part in more than riverbed, and its concrete appearance requirement is basically identical with pier stud, and the shape of common monolayer steel pile casting and diameter are difficult to meet this requirement, and waste concrete, and monolayer steel pile casting is 20cm bigger than design stake footpath generally.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art to provide cast-in-situ bored pile drilling equipment in a kind of deep water sand pebble layer riverbed, this reasonable in design is simple, can solve the problem that drilled pile casing under water at pile foundation pore-forming and perfusion concrete process easily there is altering the technical barrier in hole, guarantee pile foundation Underwater Concrete Construction quality, and guarantee that above stake footpath, riverbed size is accurate, significantly improve the presentation quality of the pile foundation concrete being likely to expose river surface.
In order to achieve the above object, this utility model adopts the following technical scheme that
This utility model provides cast-in-situ bored pile drilling equipment in a kind of deep water sand pebble layer riverbed, including outer casing and interior casing, the bottom of outer casing and the bottom of interior casing are arranged in same level, and the difference in height between upper end and the upper end of outer casing of interior casing is a bracket height;It is provided with sealing device between outside and the inner side of outer casing of interior casing;The bottom of described outer casing is provided with cutting shoe.
Gap, bottom between outside and the inner side of outer casing of described interior casing is banded with the water blockoff gunnysack of water-swellable.
The difference of the diameter of described outer casing and interior casing is △ R, 35cm≤△ R≤45cm.
Described interior casing is made up of two symmetrical half of casings, and the junction of two half of casings is equipped with pin hole, and two half of casings link together by ganging up pivot pin.
Described water blockoff gunnysack is fixed on the exterior bottom of interior casing by reinforcing bar press strip.
The steel plate thickness of described outer casing and interior casing is 10 ~ 13mm.
Compared with prior art, the beneficial effect that this utility model obtains:
1. this utility model device is during pore-forming, measure mud balance, calculate according to γ mud h mud=γ water h depth of water formula, determine the discrepancy in elevation between mud face absolute altitude and the outer river face of casing in casing, can ensure that the pressure of the outer river of mud and casing is equal in the casing of casing bottom position, make the mud of position at the bottom of outer casing will not inside and outside alter hole.
2. fix colligation gunnysack, gunnysack water-swellable outside at the bottom of at interior casing, it is possible to blocked in the space between at the bottom of interior casing and at the bottom of outer casing, when making drilled pile underwater concrete pouring, at the water-tight mud of casing bottom position.
3. add casing in a big vertical pivot pin pulling type the same as design stake footpath outside in casing again, so can ensure that the stake footpath irrigated and concrete outward appearance comply fully with requirement, and it is made without imderwater cutting, it is possible to remove on water surface trestle easily and reclaim inside and outside steel pile casting.
4. this utility model device solves drilled pile casing under water smoothly and easily occurs altering the technical barrier in hole at pile foundation pore-forming and perfusion concrete process, ensure that pile foundation Underwater Concrete Construction quality, and ensure that above stake footpath, riverbed size is accurate, significantly improve the presentation quality of the pile foundation concrete being likely to expose river surface, also without any safety and environmental issue occur in work progress.And, by using this engineering method, accomplish that lossless dismounting reclaims whole interior casings and outer casing, and interior casing has not wasted pile foundation concrete as pile foundation template, has saved considerable social resources and construction cost, and has shortened the duration.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is further illustrated:
With reference to shown in Fig. 1, cast-in-situ bored pile drilling equipment in a kind of deep water sand pebble layer riverbed, including outer casing 1 and interior casing 2, the bottom of outer casing 1 and the bottom of interior casing 2 are arranged in same level, difference in height between upper end and the upper end of outer casing 1 of interior casing 2 is a bracket height, the difference of the diameter of outer casing 1 and interior casing 2 is △ R, 35cm≤△ R≤45cm;Gap, bottom between outside and the inner side of outer casing 1 of interior casing 2 is banded with the water blockoff gunnysack 3 of water-swellable, and water blockoff gunnysack 3 is fixed on the exterior bottom of interior casing 2 by reinforcing bar press strip;The bottom of described outer casing is provided with cutting shoe 4;Described interior casing 2 is made up of two symmetrical half of casings, and the junction of two half of casings is equipped with pin hole, and two half of casings link together by ganging up pivot pin;Wherein, outer casing 1 is 10 ~ 13mm with the steel plate thickness of interior casing 2.
Work progress of the present utility model:
(1) with vibration hammer, the vibrations of outer steel pile casting are sunk to from river surface trestle, drop on tufa stone scar through channel sand boulder bed;
(2) with percussive drill punching to design end absolute altitude, and first time clear hole is carried out;
(3) transfer casing in arrangement outside in casing, and in advance outside interior casing and inside outer casing between the water blockoff gunnysack of colligation water-swellable, make steel pile casting sealed bottom not spillage;
(4) the conventionally operation such as construction drill pile cages, lower concrete conduit, the clear hole of second time, perfusion Underwater Concrete;
(5) on water surface trestle with crane or join vibration hammer promote extract recovery outer casing;
(6) after pile foundation concrete to intensity, with casing round steel pivot pin in bottle gouard moved by hands withdrawing on water surface trestle, lift by crane casing in two half ranges respectively with crane, reclaim completely.
Embodiment described above, the simply one of this utility model more preferably detailed description of the invention, those skilled in the art is adjusted within the scope of technical solutions of the utility model, modifies or replaces and should be included in protection domain of the present utility model.

Claims (6)

1. cast-in-situ bored pile drilling equipment in deep water sand pebble layer riverbed, it is characterized in that: include outer casing and interior casing, the bottom of outer casing and the bottom of interior casing are arranged in same level, and the difference in height between upper end and the upper end of outer casing of interior casing is a bracket height;It is provided with sealing device between outside and the inner side of outer casing of interior casing;The bottom of described outer casing is provided with cutting shoe.
2. cast-in-situ bored pile drilling equipment in deep water sand pebble layer riverbed according to claim 1, it is characterised in that: the gap, bottom between outside and the inner side of outer casing of described interior casing is banded with the water blockoff gunnysack of water-swellable.
3. cast-in-situ bored pile drilling equipment in deep water sand pebble layer riverbed according to claim 1, it is characterised in that: the difference of the diameter of described outer casing and interior casing is △ R, 35cm≤△ R≤45cm.
4. cast-in-situ bored pile drilling equipment in deep water sand pebble layer riverbed according to claim 1, it is characterized in that: described interior casing is made up of two symmetrical half of casings, the junction of two half of casings is equipped with pin hole, and two half of casings link together by ganging up pivot pin.
5. cast-in-situ bored pile drilling equipment in deep water sand pebble layer riverbed according to claim 2, it is characterised in that: described water blockoff gunnysack is fixed on the exterior bottom of interior casing by reinforcing bar press strip.
6. cast-in-situ bored pile drilling equipment in deep water sand pebble layer riverbed according to claim 3, it is characterised in that: the steel plate thickness of described outer casing and interior casing is 10 ~ 13mm.
CN201620132598.4U 2016-02-22 2016-02-22 Drilling bored concrete pile drilling equipment in deep water sand boulder bed riverbed Expired - Fee Related CN205382483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620132598.4U CN205382483U (en) 2016-02-22 2016-02-22 Drilling bored concrete pile drilling equipment in deep water sand boulder bed riverbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620132598.4U CN205382483U (en) 2016-02-22 2016-02-22 Drilling bored concrete pile drilling equipment in deep water sand boulder bed riverbed

Publications (1)

Publication Number Publication Date
CN205382483U true CN205382483U (en) 2016-07-13

Family

ID=56350818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620132598.4U Expired - Fee Related CN205382483U (en) 2016-02-22 2016-02-22 Drilling bored concrete pile drilling equipment in deep water sand boulder bed riverbed

Country Status (1)

Country Link
CN (1) CN205382483U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811764A (en) * 2019-03-28 2019-05-28 广东远大桥梁钢结构租赁有限公司 Bored pile construction recoverable steel pile casting and construction method
CN113309080A (en) * 2021-04-19 2021-08-27 中铁十九局集团第三工程有限公司 Construction method of double-casing cast-in-situ bored pile
CN114319337A (en) * 2021-12-15 2022-04-12 中铁二局第四工程有限公司 Leakage stopping device for bored pile construction and bored pile construction method
CN114753354A (en) * 2022-04-20 2022-07-15 中建八局第三建设有限公司 Water-rich sandy gravel geological pile forming construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109811764A (en) * 2019-03-28 2019-05-28 广东远大桥梁钢结构租赁有限公司 Bored pile construction recoverable steel pile casting and construction method
CN109811764B (en) * 2019-03-28 2024-06-04 广东远大路桥科技有限公司 Recyclable steel pile casing for bored pile construction and construction method
CN113309080A (en) * 2021-04-19 2021-08-27 中铁十九局集团第三工程有限公司 Construction method of double-casing cast-in-situ bored pile
CN114319337A (en) * 2021-12-15 2022-04-12 中铁二局第四工程有限公司 Leakage stopping device for bored pile construction and bored pile construction method
CN114319337B (en) * 2021-12-15 2023-10-13 中铁二局第四工程有限公司 Plugging device for bored pile construction and bored pile construction method
CN114753354A (en) * 2022-04-20 2022-07-15 中建八局第三建设有限公司 Water-rich sandy gravel geological pile forming construction method

Similar Documents

Publication Publication Date Title
CN110230309A (en) Karst region bridge solution cavity pile base construction method
CN205382483U (en) Drilling bored concrete pile drilling equipment in deep water sand boulder bed riverbed
CN104196044B (en) Cofferdam construction method combining impact drilling limiting hole forming and groove milling with steel sheet piles
CN203924085U (en) A kind of caisson structure that is applied to collecting well
CN210086275U (en) Double-wall hollow open caisson foundation
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN113605434A (en) Bridge pile foundation construction method for high-speed railway karst
CN104929135A (en) Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof
CN104762981A (en) Hole forming method of precipitation well
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN203654309U (en) Pile-caisson hydraulic structure
CN105569062A (en) Dewatering method implemented through permeation, weakening and emission reduction
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN104912093B (en) A kind of pile foundation in deep water positioning, the construction method of guide frame
CN209538258U (en) A kind of construction equipment for replacing bored concrete pile
CN104141300A (en) Foundation pile hole drilling construction process
CN108775009A (en) A kind of measure method preventing grooving spillage and leak
CN208152063U (en) A kind of superelevation infiltration coefficient sand ovum stratum Groundwater Control system
CN107012792B (en) A kind of construction method of bridge substructure
CN203247580U (en) Construction structure of cast-in-place concrete pile of deep soft soil foundation bridge girder
CN204690772U (en) A kind of pile foundation in deep water location, guide frame
CN108775036A (en) A kind of construction method for replacing bored concrete pile
CN207700180U (en) A kind of drilled pile protection structure
CN107476293A (en) A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160713