CN205369742U - A roofing system of falling into water for steel construction - Google Patents

A roofing system of falling into water for steel construction Download PDF

Info

Publication number
CN205369742U
CN205369742U CN201620008560.6U CN201620008560U CN205369742U CN 205369742 U CN205369742 U CN 205369742U CN 201620008560 U CN201620008560 U CN 201620008560U CN 205369742 U CN205369742 U CN 205369742U
Authority
CN
China
Prior art keywords
gutter
roof truss
steel
water
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620008560.6U
Other languages
Chinese (zh)
Inventor
吴国瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620008560.6U priority Critical patent/CN205369742U/en
Application granted granted Critical
Publication of CN205369742U publication Critical patent/CN205369742U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses a roofing system of falling into water for steel construction, include that steel column, roof truss, roof truss wind up, C appears steel purlin strip, roof boarding, mounting bracket, gutter, the outer hoop of pipe in the water, pipe in the water and brace, the roof truss is established at the steel column top, and C shape steel purlin strip is connected between roof boarding and roof truss wind up, and C shape steel purlin strip and roof truss wind up perpendicularly, and install and set up on the steel column, the pipe in the water passes through the outer hoop of pipe in the water and establishes on the steel column, the gutter bottom has an inside horizontal extension's extension, the mounting bracket front end has a perk end that is used for supporting gutter inclined part, the perk is served has the turn -ups, be equipped with the tight screw rod in top on the turn -ups, the pipe in the water top communicates with each other with the extension of gutter. This kind of a roofing system of falling into water for steel construction has saved the connecting bend among the prior art, has just also saved the easily stifled trouble of current connecting bend, makes the drainage more smooth, it is also more convenient when this kind of roofing falls into water ystem installation simultaneously.

Description

A kind of overboard system of the roofing for steel construction
Technical field
This utility model relates to a kind of steel construction, especially a kind of overboard system of the roofing for steel construction.
Background technology
Steel construction is the structure being mainly made up of steel material, is one of main building construction types.The components such as girder steel that structure is mainly made up of shaped steel and steel plate etc., steel column, steel truss form, and generally adopt weld seam, bolt or rivet interlacement between each component or parts.Because its deadweight is relatively light, and easy construction, it is widely used in the fields such as large-sized workshop, venue, Super High.
The overboard system of steel structural roof mainly includes gutter and downpipe, owing to there being certain spacing between existing gutter and downpipe, therefore, need between gutter and downpipe, arrange connecting bend, owing to connecting bend structure is bending, therefore easily block, affect draining, owing to there is problems in that, it is therefore necessary to the existing overboard system of the roofing for steel construction is improved.
Summary of the invention
The purpose of this utility model is a kind of not easily stifled overboard system of the roofing for steel construction designed to solve the deficiency of above-mentioned technology.
A kind of overboard system of the roofing for steel construction designed by this utility model, winds up including steel column, roof truss, roof truss, C shape steel purlin bar, roof boarding, installing rack, gutter, downpipe outer hoop, downpipe and brace;Described roof truss is located at steel column top, and described roof truss winds up and is positioned at above roof truss and roof truss winds up inclined shape;Between C shape steel purlin bar is connected to roof boarding and roof truss winds up, C shape steel purlin bar winds up vertical with roof truss, and described installing rack is located on steel column, and described downpipe is located on steel column by downpipe outer hoop;Described brace one end is connected on roof truss winds up, the other end connects C shape steel purlin bar, described gutter is located on installing rack, it is characterized in that there is bottom described gutter an extension being laterally inward extension, the top of gutter is in parallel with C shape steel purlin bar skewed, described installing rack front end has a tilting end for supporting gutter sloping portion, described tilting end has flange, described flange is provided with fastening screw, the medial surface of gutter is held out against on C shape steel purlin bar by this fastening screw after the lateral surface of gutter, described downpipe top communicates with the extension of gutter.
As preferably:
Roof boarding is sandwich color steel plate.
The overboard system of roofing for steel construction designed by this utility model, it provides the benefit that: first, there is bottom gutter an extension being laterally inward extension, downpipe top communicates with the extension of gutter, owing to extension is in the lowest point of gutter, because water is easily accessible in extension, and extension directly connects with downpipe, this eliminate connecting bend of the prior art, also just eliminate the trouble that existing connecting bend easily blocks up, make draining more smooth;The top of gutter is in parallel with C shape steel purlin bar skewed, described installing rack front end has a tilting end for supporting gutter sloping portion, described tilting end has flange, described flange is provided with fastening screw, the medial surface of gutter is held out against on C shape steel purlin bar by this fastening screw after the lateral surface of gutter, such structure, the gutter with special construction (i.e. extension) is reasonably strutted, make its firmly type simultaneously, making the water on roofing conveniently and accurately to flow in gutter, this roofing overboard system is also more convenient when installing.
Accompanying drawing explanation
Fig. 1 is the embodiment 1 structural representation for the overboard system of roofing of steel construction;
In figure: include steel column 1, roof truss 2, roof truss wind up 3, C shape steel purlin bar 4, roof boarding 5, installing rack 6, gutter 7, downpipe outer hoop 8, downpipe 9, brace 10, extension 11, tilt end 12, flange 13, fastening screw 14.
Detailed description of the invention
In conjunction with accompanying drawing, the utility model will be further described by the examples below.
Embodiment 1:
As it is shown in figure 1, described by the present embodiment for the overboard system of roofing of steel construction, wind up 3 including steel column 1, roof truss 2, roof truss, C shape steel purlin bar 4, roof boarding 5, installing rack 6, gutter 7, downpipe outer hoop 8, downpipe 9 and brace 10;Described roof truss 2 is located at steel column 1 top, and described roof truss winds up and 3 is positioned at above roof truss 2 and roof truss winds up 3 inclined shapes;C shape steel purlin bar 4 is connected to roof boarding 5 and roof truss winds up between 3, and C shape steel purlin bar 4 winds up 3 vertical with roof truss, and described installing rack 6 is located on steel column 1, and described downpipe 9 is located on steel column 1 by downpipe outer hoop 8;nullDescribed brace 10 one end is connected to roof truss and winds up on 3、The other end connects C shape steel purlin bar 4,Described gutter 7 is located on installing rack 6,It is characterized in that there is bottom described gutter 7 extension 11 being laterally inward extension,The top of gutter 7 is in parallel with C shape steel purlin bar 4 skewed,Described installing rack 6 front end has a tilting end 12 for supporting gutter 7 sloping portion,Tilting end 12 shape sky coordinates the structure of gutter 7 effectively to support so that it to be formed,Described tilting end 12 has flange 13,Described flange 13 is provided with fastening screw 14,The existence of flange 13 increases the supporting surface to gutter 7 and makes fastening screw 14 can find local installation simultaneously,The medial surface of gutter 7 is held out against on C shape steel purlin bar 4 by this fastening screw 14 after the lateral surface of gutter 7,Described downpipe 9 top communicates with the extension 11 of gutter 7.Wherein, roof boarding 5 is sandwich color steel plate.
The overboard system of roofing for steel construction described by the present embodiment, it provides the benefit that: first, there is bottom gutter 7 extension 11 being laterally inward extension, downpipe 9 top communicates with the extension 11 of gutter 7, owing to extension 11 is in the lowest point of gutter 7, because water is easily accessible in extension 11, and extension 11 directly connects with downpipe 9, this eliminate connecting bend of the prior art, also just eliminate the trouble that existing connecting bend easily blocks up, make draining more smooth;The top of gutter 7 is in parallel with C shape steel purlin bar 4 skewed, described installing rack 6 front end has a tilting end 12 for supporting gutter 7 sloping portion, described tilting end 12 has flange 13, described flange 13 is provided with fastening screw 14, the medial surface of gutter 7 is held out against on C shape steel purlin bar 4 by this fastening screw 14 after the lateral surface of gutter 7, such structure, the gutter 7 with special construction (i.e. extension 11) is reasonably strutted, make its firmly type simultaneously, the water on roofing is made can conveniently and accurately to flow in gutter 7, this roofing overboard system is also more convenient when installing.
Above-described embodiment is only to design of the present utility model explanation for example, it will be apparent that, the protection domain of this patent is not limited to above-described embodiment.
The various equivalent modifications or supplementary that above-described embodiment is made by those skilled in the art, all should fall into the protection domain of this patent.

Claims (2)

1., for the overboard system of roofing of steel construction, wind up (3) including steel column (1), roof truss (2), roof truss, C shape steel purlin bar (4), roof boarding (5), installing rack (6), gutter (7), downpipe outer hoop (8), downpipe (9) and brace (10);Described roof truss (2) is located at steel column (1) top, described roof truss wind up (3) be positioned at roof truss (2) top and roof truss winds up (3) inclined shape;C shape steel purlin bar (4) is connected to roof boarding (5) and roof truss winds up between (3), C shape steel purlin bar (4) wind up with roof truss (3) vertical, described installing rack (6) is located on steel column (1), and described downpipe (9) is located on steel column (1) by downpipe outer hoop (8);Described brace (10) one end is connected to roof truss and winds up on (3), the other end connects C shape steel purlin bar (4), described gutter (7) is located on installing rack (6), it is characterized in that described gutter (7) bottom has an extension (11) being laterally inward extension, the top of gutter (7) is in parallel with C shape steel purlin bar (4) skewed, described installing rack (6) front end has a tilting end (12) for supporting gutter (7) sloping portion, described tilting end (12) has flange (13), described flange (13) is provided with fastening screw (14), the medial surface of gutter (7) is held out against on C shape steel purlin bar (4) by this fastening screw (14) after the lateral surface of gutter (7), described downpipe (9) top communicates with the extension (11) of gutter (7).
2. the overboard system of the roofing for steel construction according to claim 1, is characterized in that roof boarding (5) is sandwich color steel plate.
CN201620008560.6U 2016-01-03 2016-01-03 A roofing system of falling into water for steel construction Expired - Fee Related CN205369742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620008560.6U CN205369742U (en) 2016-01-03 2016-01-03 A roofing system of falling into water for steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620008560.6U CN205369742U (en) 2016-01-03 2016-01-03 A roofing system of falling into water for steel construction

Publications (1)

Publication Number Publication Date
CN205369742U true CN205369742U (en) 2016-07-06

Family

ID=56276117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620008560.6U Expired - Fee Related CN205369742U (en) 2016-01-03 2016-01-03 A roofing system of falling into water for steel construction

Country Status (1)

Country Link
CN (1) CN205369742U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503476A (en) * 2017-09-29 2017-12-22 精工工业建筑***有限公司 A kind of gutter strut

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503476A (en) * 2017-09-29 2017-12-22 精工工业建筑***有限公司 A kind of gutter strut

Similar Documents

Publication Publication Date Title
CN110552450A (en) Construction method of large-span short-vertical-edge vertical double-lock-edge titanium-zinc alloy metal roof
CN205369742U (en) A roofing system of falling into water for steel construction
CN212271362U (en) Metal roof windproof system
CN205024978U (en) Keel structure and roofing system
CN205604550U (en) Steel construction eaves mouth
CN104481087A (en) Light firm canopy easy for discharging water
CN204418541U (en) A kind of bent vertical seam metal roofing board system
CN207686133U (en) A kind of assembling truss purlin system
CN105155782A (en) Keel structure and roof system
CN205206162U (en) Cornice structure
CN112982755A (en) Stone curtain wall and glass awning handing-over constructional system
CN209353580U (en) A kind of overhead type tile batten
CN209129235U (en) Ceiling structure and hanger system for ceiling structure
CN203097128U (en) Central support wind-proof fixture for JCH-III roof boarding
CN204059749U (en) A kind of tubing rod member of space structures framework
CN208329326U (en) Water proof type steel structural roof structure
CN201378977Y (en) Rain water drainage steel post
CN207453290U (en) A kind of laterally attached roofing bottom plate and roof board system
CN205444710U (en) Roof boarding sliding bracket
CN204691315U (en) A kind of combined type sunshade
CN205591439U (en) Metal roofing the annular clamped structure
CN206205288U (en) A kind of gutter system for steel construction
CN205712649U (en) A kind of building roof structure
CN208441362U (en) Prevent aqueous reflux from protecting system for roofing
CN219808600U (en) Roof side gutter structure with grid structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160706

Termination date: 20180103

CF01 Termination of patent right due to non-payment of annual fee