CN205369235U CN201521143794.3U CN201521143794U CN205369235U CN 205369235 U CN205369235 U CN 205369235U CN 201521143794 U CN201521143794 U CN 201521143794U CN 205369235 U CN205369235 U CN 205369235U
Authority
CN
China
Prior art keywords
ground
friction pile
static pressure
high pressure
dado
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521143794.3U
Other languages
Chinese (zh)
Inventor
余剑英
陆其荣
来林方
俞剑
王玉明
方剑平
陈春来
朱萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG TIANHUA CONSTRUCTION GROUP Co Ltd
ZHEJIANG ZHENFENG CONSTRUCTION Co Ltd
Zhejiang University City College ZUCC
Original Assignee
ZHEJIANG TIANHUA CONSTRUCTION GROUP Co Ltd
ZHEJIANG ZHENFENG CONSTRUCTION Co Ltd
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG TIANHUA CONSTRUCTION GROUP Co Ltd, ZHEJIANG ZHENFENG CONSTRUCTION Co Ltd, Zhejiang University City College ZUCC filed Critical ZHEJIANG TIANHUA CONSTRUCTION GROUP Co Ltd
Priority to CN201521143794.3U priority Critical patent/CN205369235U/en
Application granted granted Critical
Publication of CN205369235U publication Critical patent/CN205369235U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a high pressure jet grouting pile structure includes friction pile, ground, dado, high pressure jet curtain and the static pressure slip casting district that intercepts water at least, the friction pile sets up at holistic first intermediate position, the dado sets up the outside at the friction pile to the dado wraps up the friction pile in the centre, divide into two parts from top to bottom, ground sets up side about holistic upper portion to ground is located around the dado, static pressure slip casting district sets up around the dado to static pressure slip casting district extends to whole bottom from ground, whose curtain set the high pressure selects around static pressure slip casting district to whose curtain the high pressure selects install perpendicularly in holistic the latter half, this high pressure jet grouting pile structure is simple, connects closely, has overcome the hole bottom and has gushed the phenomenon that mud emits the thick liquid, and the manual work of being convenient for is dug and is dug under the pile driving construction continuation, has guaranteed construction quality, and the practicality is strong, is fit for using widely.

Description

A kind of high-pressure rotary-spray pilework
Technical field
This utility model relates to rotary churning pile structure applied technical field, especially a kind of high-pressure rotary-spray pilework.
Background technology
Rotary churning pile be utilize rig rotary jet grouting pipe and shower nozzle are bored be placed at the bottom of design altitude, after making liquid stream obtain huge energy by high-voltage generator in the serosity prepared in advance, eject from the nozzle high speed of slip casting tube edge, form the liquid stream that one energy height is concentrated, directly destroy the soil body, in course of injection, rotation limit, drilling rod limit promotes, make serosity be sufficiently stirred for the soil body to mix, soil is formed the column induration of certain diameter, so that ground reaches to reinforce.Construction is generally divided into two workflows, namely after subdrilling spray, then under bore injection, it is then lifted out stirring, it is ensured that every meter of stake puddled soil ratio and quality, but traditional grout cures effect of contraction construction stake top mark is high, therefore, for the problems referred to above it is proposed that a kind of high-pressure rotary-spray pilework.
Utility model content
Prior art can not meet the needs of people, and for making up prior art deficiency, this utility model aims to provide a kind of simple in construction, it is completely embedded, overcome the phenomenon of hole ground swell mud grout, it is simple to excavated by manual work pile driving construction digs under continuing, it is ensured that the high-pressure rotary-spray pilework of construction quality.
For achieving the above object, this utility model by the following technical solutions: a kind of high-pressure rotary-spray pilework, at least include friction pile, ground, retaining wall, high-pressure rotary-spray waterproof of man and static pressure grouting district;Described friction pile is arranged on the first half centre position of entirety;Described retaining wall is arranged on the outside of friction pile, and friction pile is wrapped in centre, is divided into upper and lower two parts by retaining wall;Described ground is arranged on the top left and right sides of entirety, and ground is positioned at around retaining wall;Described static pressure grouting district is arranged on around retaining wall, and static pressure grouting district extends to bottom entirety from ground;Whose curtain described high pressure selects be arranged on around static pressure grouting district, and whose curtain high pressure selects be installed vertically on the latter half of entirety.
As optimisation technique scheme of the present utility model: described friction pile is vertically set on inside retaining wall, and friction pile is cylindrical structural;Slip casting district is forge piece of step type structure by described static pressure grouting district.
Compared with prior art, the beneficial effects of the utility model are: this high-pressure rotary-spray waterproof of man is positioned at the outside of entirety, a part is soil blocking pile part, the effect playing retaining wall that its effect is main, form is likely to the stake having deposited reinforced concrete pile or other form, certain space is had between stake and stake, but soil can be kept off, two parts are water-stop curtain parts, its effect is the soil solidifying after making retaining wall, block the water layer exchange inside and outside foundation ditch, form is probably cement mixing method or compaction grouting, three parts are to support, slip casting district is maintained under static pressure environment by described static pressure grouting district, in advance the soft soil body at the bottom of hole and between hole wall and curtain is carried out suitable grouting and reinforcing, form skeleton, to avoid in digging a process, hole wall or hole subsoil body cave in or on gush.
Accompanying drawing explanation
Fig. 1 is this utility model overall structure schematic diagram;
Fig. 2 is this utility model integral planar schematic diagram;
Wherein: 1, friction pile, 2, ground, 3, retaining wall, 4, high-pressure rotary-spray waterproof of man, 5, static pressure grouting district.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments.Based on the embodiment in this utility model, all other embodiments that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection.
Refer to Fig. 1~2, in this utility model embodiment, a kind of high-pressure rotary-spray pilework, at least include friction pile 1, ground 2, retaining wall 3, high-pressure rotary-spray waterproof of man 4 and static pressure grouting district 5;Described friction pile 1 is arranged on the first half centre position of entirety;Described retaining wall 3 is arranged on the outside of friction pile 1, and friction pile 1 is wrapped in centre, is divided into upper and lower two parts by retaining wall 3;Described ground 2 is arranged on the top left and right sides of entirety, and ground 2 is positioned at around retaining wall 3;Described static pressure grouting district 5 is arranged on retaining wall 3 around, and static pressure grouting district 5 extends to bottom entirety from ground;Described high pressure selects whose curtain 4 to be arranged on static pressure grouting district 5 around, and high pressure selects whose curtain 4 to be installed vertically on the latter half of entirety.
As optimisation technique scheme of the present utility model: it is internal that described friction pile 1 is vertically set on retaining wall 3, and friction pile 1 is cylindrical structural;Slip casting district 5 is forge piece of step type structure by described static pressure grouting district.
As operation principle of the present utility model: boring type hydraulic feed drill, under low pressure utilize platform gold drill bit, convolution rotates into, mud off, form a boring, intubate, drilling tool is proposed, change special horizontal nozzle, there is the round nozzle in two apertures, and desired depth in discharge hole, with high-pressure hose, high-pressure pump and drilling tool are connected simultaneously, spraying operation, the cement mortar that will prepare, and water ash is equal, add waterglass, with high-pressure pump, cement mortar reached by high-pressure hose and drilling rod horizontal nozzle transverse injection, rotary churning pile is formed, nozzle ultimately forms a concrete stake from bottom to top, namely churning comes to an end, construct complete, the plant clear water such as Grouting Pipe should be rinsed well, in pipe, in machine must not remaining cement mortar, telephone-moving carries out next hole construction again.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and when without departing substantially from spirit of the present utility model or basic feature, it is possible to realize this utility model in other specific forms.Therefore, no matter from which point, embodiment all should be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims rather than described above, it is intended that all changes in the implication of the equivalency dropping on claim and scope included in this utility model.Any accompanying drawing labelling in claim should be considered as the claim that restriction is involved.
The above; it is only preferred embodiment of the present utility model; not in order to limit this utility model, every any trickle amendment, equivalent replacement and improvement above example made according to technical spirit of the present utility model, should be included within the protection domain of technical solutions of the utility model.

Claims (3)

1. a high-pressure rotary-spray pilework, at least includes friction pile (1), ground (2), retaining wall (3), high-pressure rotary-spray waterproof of man (4) and static pressure grouting district (5);It is characterized in that: described friction pile (1) is arranged on the first half centre position of entirety;Described retaining wall (3) is arranged on the outside of friction pile (1), and friction pile (1) is wrapped in centre, is divided into upper and lower two parts by retaining wall (3);Described ground (2) is arranged on the top left and right sides of entirety, and ground (2) are positioned at retaining wall (3) around;Described static pressure grouting district (5) is arranged on retaining wall (3) around, and static pressure grouting district (5) extend to bottom entirety from ground;Described high pressure selects whose curtain (4) to be arranged on static pressure grouting district (5) around, and high pressure selects whose curtain (4) to be installed vertically on the latter half of entirety.
2. a kind of high-pressure rotary-spray pilework according to claim 1, it is characterised in that: it is internal that described friction pile (1) is vertically set on retaining wall (3), and friction pile (1) is cylindrical structural.
3. a kind of high-pressure rotary-spray pilework according to claim 1, it is characterised in that: slip casting district (5) are forge piece of step type structure by described static pressure grouting district.
CN201521143794.3U 2015-12-29 2015-12-29 High pressure jet grouting pile structure Expired - Fee Related CN205369235U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521143794.3U CN205369235U (en) 2015-12-29 2015-12-29 High pressure jet grouting pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521143794.3U CN205369235U (en) 2015-12-29 2015-12-29 High pressure jet grouting pile structure

Publications (1)

Publication Number Publication Date
CN205369235U true CN205369235U (en) 2016-07-06

Family

ID=56274738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521143794.3U Expired - Fee Related CN205369235U (en) 2015-12-29 2015-12-29 High pressure jet grouting pile structure

Country Status (1)

Country Link
CN (1) CN205369235U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115404861A (en) * 2022-10-12 2022-11-29 驻马店职业技术学院 High-pressure injection slip casting device for civil engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115404861A (en) * 2022-10-12 2022-11-29 驻马店职业技术学院 High-pressure injection slip casting device for civil engineering
CN115404861B (en) * 2022-10-12 2023-09-22 驻马店职业技术学院 High-pressure jet grouting device for civil engineering

Similar Documents

Publication Publication Date Title
CN102418344B (en) Injector, drill bit combination structure and combination drilling tool
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN102691296A (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN103015413B (en) Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum
CN203452083U (en) Rotary expanding pile construction equipment and grout feeding device
CN101962949A (en) Long spiral double-pipe high-pressure stir-jet grouting pile construction method and device
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN102286984A (en) Water-stop curtain and construction method thereof
CN204753574U (en) High pressure jet grouting pile stagnant water curtain construction equipment
CN103806479A (en) Pile foundation combined grouting reinforcement construction method combining waterproof curtain
CN203361143U (en) Combination structure of high-pressure jet grouting pile and prestressed pipe pile
CN101498220B (en) Vertical shaft working surface artesian flow sand layer slurry protecting rotary spraying grouting process
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN201395793Y (en) Long spiral high-pressure spraying mud injecting stirring pile-forming device
CN1265062C (en) Construction for making piles and tools
CN202194149U (en) Water-proof curtain
CN106284295A (en) Multichannel high-pressure vibro-grouting jet groutinl construction method
CN104278679A (en) Envelope structure combining five (six) shaft mixing piles with precast tubular piles and construction method
CN104563100A (en) Cement mixing pile later embedding press-grouting pile support structure and construction method
CN106677190A (en) Grouting construction method for underwater pebble bed foundation pit curtain
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN205369235U (en) High pressure jet grouting pile structure
CN105350544B (en) For water-stop curtain and its construction method containing block stone region
CN101793024B (en) Construction method for multi-head small-diameter deep mixing and high-pressure jet combined anti-seepage wall of foundation pit
CN110318392A (en) A kind of major diameter cement earth pile method of construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160706

Termination date: 20171229

CF01 Termination of patent right due to non-payment of annual fee