CN205346757U - Double dynamical construction platform - Google Patents
Double dynamical construction platform Download PDFInfo
- Publication number
- CN205346757U CN205346757U CN201521043431.2U CN201521043431U CN205346757U CN 205346757 U CN205346757 U CN 205346757U CN 201521043431 U CN201521043431 U CN 201521043431U CN 205346757 U CN205346757 U CN 205346757U
- Authority
- CN
- China
- Prior art keywords
- elevator
- main rope
- wire rope
- operation platform
- safety
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model provides a double dynamical construction platform, include: the support mechanism, hoist mechanism, including first main wire rope, second owner wire rope, first lifting machine and second lifting machine, first main wire rope one end is fixed on the support mechanism, and the other end is installed in the first lifting machine, second owner wire rope one end is fixed on the support mechanism, the other end is installed in the second lifting machine, the release mechanism, the release mechanism includes safe wire rope and safety lock, safe wire rope sets up between first main wire rope and the second owner wire rope, safe wire rope one end is fixed on the support mechanism, the other end passes the safety lock, the safety lock with operation platform fixed connection, operation platform, with first lifting machine and the equal fixed connection of second lifting machine. The utility model provides a double dynamical construction platform, its installation is reasonable, construction convenience, the commonality is strong and be difficult for the wear -out life height.
Description
Technical field
This utility model relates to a kind of double dynamical operation platform, belongs to construction engineering technical field.
Background technology
In traditional architecture industry, mostly adopt the method building scaffold in elevator hoistways to realize the installation of elevator.Although adopting scaffold can realize the installation of elevator, but it being cumbersome to build scaffold, time-consuming more, work efficiency is not high, but also very dangerous.At present, also there is employing Elevator Installation Hanging Baskets to carry out elevator installation, namely creeped on fixing steel wire rope by lifting motor, thus the operation platform that band is automatically connected on elevator moves, workmen may stand in and constructs on operation platform, eliminate the time building scaffold, and safety coefficient is higher.
Operation platform of the prior art has single-power operation platform, also has double dynamical operation platform.Existing single-power operation platform is subject to the restriction of single-power, in actual use, is almost chronically at the fully loaded state even overloaded, brings very big potential safety hazard to workmen.Restriction due to power, it is impossible to the elevator hoistways for super large ultra-wide carries out non-standard de-sign, makes the extensibility of subsequent product be greatly affected by restriction.Existing double dynamical operation platform main rope installation site is unreasonable, less convenient during construction, can only for the guide rail specified from being designed, the versatility of elevator hoistways is not strong, it is easy to abrasion.
Utility model content
Based on above deficiency, the technical problems to be solved in the utility model is to provide a kind of double dynamical operation platform, and it installs rationally, easy construction, and highly versatile and not easily wear-out life are high.
In order to solve above technical problem, this utility model have employed techniques below scheme:
A kind of double dynamical operation platform, including: support mechanism;Hoisting mechanism, including the first main rope, the second main rope, the first elevator and the second elevator, described first main rope one end is fixed on support mechanism, the other end is arranged in described first elevator, described second main rope one end is fixed on described support mechanism, and the other end is arranged in described second elevator;Release mechanism, described release mechanism includes safety steel cable and safety lock, described safety steel cable is arranged between described first main rope and the second main rope, described safety steel cable one end is fixed on described support mechanism, the other end is through described safety lock, and described safety lock is fixing with described operating platform to be connected;Operating platform, is fixedly connected with described first elevator and the second elevator.
Described first main rope is to the distance 0.266m at operation platform center, and described second main rope is to the distance 0.266m at operation platform center.
Described operating platform includes pedal and guard rail connected vertically with described pedal.
Guard rail top is further fixed on some telescopic tubes, and telescopic tube top is provided with protection canopy, and described protection canopy includes the first ceiling and the second ceiling, and described first ceiling is all hinged with the top of described guard rail with described second ceiling.
The bottom of described pedal is vertically installed with installing rack, and described first elevator, the second elevator and safety locking fix on described installing rack, and the bottom of the bottom of described installing rack and described pedal is also tiltedly installed with at least one diagonal brace.
Described installing rack and/or guard rail are respectively arranged with can slide along hoistway inwall lead boots, described guide rail is the projection being arranged on described hoistway inwall, described in lead boots be provided with the groove matched with described projection.
Adopting above technical scheme, this utility model achieves techniques below effect:
(1) the double dynamical operation platform of this utility model, its main rope is suitable for operation platform centre distance, installs rationally, and easy construction, highly versatile and steel wire rope not easily wear-out life is high.
(2) double; two elevators drive, lifting force is big, elevator construction suitable in high-storey building, and use two main ropes and a safety steel cable, wherein elevator provides power along the operation up and down that main rope up and down motion is operation platform, safety steel cable and safety lock combination for pinning steel wire rope when operation platform drops, it is prevented that operation platform continues tenesmus;
(3) run with cage guide guiding, do not rock, good stability;
(4) protection canopy is arranged to lifting type, and protection canopy can be opened, and can prevent weight from falling, moreover it is possible to for construction worker's escape.
Accompanying drawing explanation
Fig. 1 is the front view of the double dynamical operation platform of this utility model;
Fig. 2 is the side view of the double dynamical operation platform of this utility model.
Detailed description of the invention
As depicted in figs. 1 and 2, this utility model provides a kind of double dynamical operation platform, including: support mechanism 1;Hoisting mechanism 2, including the first main rope the 21, second main rope the 22, first elevator 23 and the second elevator 24, first main rope 21 one end is fixed on support mechanism 1, the other end described first elevator 23 of traverse, second main rope 22 one end is fixed on described support mechanism 1, the other end described second elevator 24 of traverse;Release mechanism 3, release mechanism 3 includes safety steel cable 31 and safety lock 32, safety steel cable 31 is arranged between the first main rope 21 and the second main rope 22, safety steel cable 31 one end is fixed on described support mechanism 1, the other end is through safety lock 32, and safety lock 32 is fixing with operating platform 4 to be connected;Operating platform 4, is fixedly connected with the first elevator 23 and the second elevator 24.
Support mechanism is machine room load bearing cross beam, machine room load bearing cross beam is positioned on machine room floor, main rope and safety steel cable are fixed on machine room load bearing cross beam each through wedge-type cable wire end tapered sleeve, wedge-type cable wire end tapered sleeve has lineoutofservice signal pull more big, the fixing more firmly characteristic of steel wire rope, it is ensured that the fixation of steel wire rope is reliable.In order to further main rope and safety steel cable be fixed, it is also possible to be respectively provided with rope cramp on main rope with safety steel cable.Main rope is additionally provided with weight-limiting apparatus, sensor that weight-limiting apparatus includes measuring main rope live load and the controller that the load-carrying Data Control elevator according to sensor feedback rotates, according to steel wire rope, the active force of sensor can be drawn current load-carrying, when double dynamical operation platform is overweight, weight-limiting apparatus will cut off the power supply of double dynamical operation platform, until restoring electricity when double dynamical operation platform load-carrying is in volume carries, use double dynamical operation platform to avoid workmen to overload, ensure the safety of workmen.
Wherein, elevator is the driving power of the lifting operation of double dynamical operation platform, the LTD type elevator that the mechanism of twisting rope by electromagnetic braking motor, centrifugal speed-limiting device, double reduction system and " α " form that elevator adopts forms, and for the elevator of different model, different size, have employed adjustable movable mechanism, flexible is led boots and is positioned, to adapt to the gauge of different in width needed for different elevator, different depth and different guide rail size, and start steady prompt, operate steadily, speed uniform.Safety lock 32 is the safety guard of elevator installation platform; for guaranteeing the person and the equipment safety of unit in charge of construction; research and development are mounted with the centrifugal triggered safety lock 32 that model is LSL30 on elevator installation platform further; this safety lock 32 is by steel wire rope connection construction platform by rope sheave; when operation platform decrease speed exceedes limit value; safety lock 32 energy automatic locking steel wire rope, limits double dynamical operation platform and declines, protect workmen's safety.Its key problem in technology is characterized as being elevator installation platform lapse rate when exceeding limit value, and rope sheave quick rotation makes the block that gets rid of of centrifugal speed limiting mechanism trigger lock rope device, so that safety steel cable locked rapidly by rope clamp.
Operating platform 4 includes pedal 41 and guard rail 42 connected vertically with pedal 41, guard rail 42 top is further fixed on some telescopic tubes 43, telescopic tube 43 top is provided with protection canopy 44, it is all hinged with the top of guard rail 42 that protection canopy 44 includes the first ceiling and the second ceiling, the first ceiling and the second ceiling.Protection canopy 44 is arranged to lifting type, and protection canopy can be opened, and can prevent weight from falling, moreover it is possible to for construction worker's escape.Being vertically installed with installing rack 5 bottom pedal 41, first elevator the 23, second elevator 24 and safety lock 32 are fixed on installing rack 5, are also tiltedly installed with at least one diagonal brace 6 with bottom pedal 41 bottom installing rack 5.
Wherein, installing rack 5 and/or guard rail 42 is respectively arranged with can slide along hoistway inwall lead boots, guide rail is the projection being arranged on hoistway inwall, lead and boots are provided with the groove matched with projection, run with cage guide guiding, do not rock, good stability;First main rope 21 is to the distance 0.266m at operation platform center, and the second main rope 22 arrives the distance 0.266m at operation platform center.Main rope is suitable for the distance at operation platform center, installs rationally, and easy construction, highly versatile and steel wire rope not easily wear-out life is high.
Last it is noted that these are only preferred embodiment of the present utility model; it is not limited to this utility model; although this utility model being described in detail with reference to embodiment; for a person skilled in the art; technical scheme described in foregoing embodiments still can be modified by it; or wherein portion of techniques feature is carried out equivalent replacement; but it is all within spirit of the present utility model and principle; any amendment of being made, equivalent replacement, improvement etc., should be included within protection domain of the present utility model.
Claims (3)
1. a double dynamical operation platform, including support mechanism, hoisting mechanism, release mechanism and operating platform;Described hoisting mechanism includes the first main rope, the second main rope, the first elevator and the second elevator, described first main rope one end is fixed on support mechanism, the other end is arranged in described first elevator, described second main rope one end is fixed on described support mechanism, and the other end is arranged in described second elevator;Described operating platform is fixedly connected with described first elevator and the second elevator, it is characterised in that:
Described release mechanism only includes a safety steel cable and a safety lock, and described safety steel cable is arranged between described first main rope and the second main rope, described safety steel cable one end is fixed on described support mechanism, the other end is through described safety lock, and described safety lock is fixing with described operating platform to be connected;
Described first main rope is to the distance 0.266m at operating platform center, and described second main rope is to the distance 0.266m at operating platform center;
Described operating platform includes pedal and guard rail connected vertically with described pedal;
The bottom of described pedal is vertically installed with installing rack, and described first elevator, the second elevator and safety locking fix on described installing rack, and the bottom of the bottom of described installing rack and described pedal is also tiltedly installed with at least one diagonal brace.
2. double dynamical operation platform according to claim 1, it is characterized in that: guard rail top is further fixed on some telescopic tubes, telescopic tube top is provided with protection canopy, described protection canopy includes the first ceiling and the second ceiling, and described first ceiling is all hinged with the top of described guard rail with described second ceiling.
3. double dynamical operation platform according to claim 2, it is characterized in that: described installing rack and/or guard rail are respectively arranged with can slide along hoistway inwall lead boots, described guide rail is the projection being arranged on described hoistway inwall, described in lead boots be provided with the groove matched with described projection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521043431.2U CN205346757U (en) | 2015-12-15 | 2015-12-15 | Double dynamical construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521043431.2U CN205346757U (en) | 2015-12-15 | 2015-12-15 | Double dynamical construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205346757U true CN205346757U (en) | 2016-06-29 |
Family
ID=56168789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521043431.2U Active CN205346757U (en) | 2015-12-15 | 2015-12-15 | Double dynamical construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205346757U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113213389A (en) * | 2021-04-23 | 2021-08-06 | 无锡瑞吉德机械有限公司 | Compact elevator mounting platform |
-
2015
- 2015-12-15 CN CN201521043431.2U patent/CN205346757U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113213389A (en) * | 2021-04-23 | 2021-08-06 | 无锡瑞吉德机械有限公司 | Compact elevator mounting platform |
CN113213389B (en) * | 2021-04-23 | 2022-04-15 | 无锡瑞吉德机械有限公司 | Compact elevator mounting platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3909897A1 (en) | Elevator car, elevator and method | |
CN203699606U (en) | Lifter and iron tower | |
US20080308362A1 (en) | Cable management assembly and method for construction elevator systems | |
CN101830388B (en) | Installation method of counter-weight frame of elevator | |
CN104453201B (en) | Automatic ascending and descending type material platform | |
CN102359263B (en) | Automatic falling preventing device for integral lifting scaffold | |
CN204802823U (en) | Construction platform | |
EP3569550B1 (en) | Lift | |
CN205346757U (en) | Double dynamical construction platform | |
CN211974271U (en) | Hanging basket applied to curved surface | |
CN106744182B (en) | The multi-functional mounting platform of elevator shaft component | |
US12012305B2 (en) | Method for building an elevator system, and elevator system suitable for carrying out the method | |
CN204173715U (en) | Iron tower of power transmission line jacking system | |
CN204727380U (en) | A kind of double dynamical operation platform | |
CN213923658U (en) | Conveying device for lifting materials in super high-rise building floor | |
CN102455254A (en) | Safety lock test stand | |
CN104276485A (en) | Power transmission line iron tower lifting device | |
CN103738809A (en) | Elevator car buffer braking method and device not meeting retention working condition | |
CN116249668A (en) | Elevator apparatus | |
CN204434023U (en) | The anti-displacement lock of gear type elevator cab | |
CN203545378U (en) | Buffering and braking device of elevator cab not meeting retention working condition | |
JP5841929B2 (en) | How to change the main rope of the elevator | |
CN213771100U (en) | High-safety tower crane convenient to use | |
CN204434035U (en) | A kind of elevator wire rope puts rope device | |
CN215402484U (en) | Underlying traction type construction elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |