CN205342405U - Installation device is rectified to portable flange - Google Patents

Installation device is rectified to portable flange Download PDF

Info

Publication number
CN205342405U
CN205342405U CN201620033955.1U CN201620033955U CN205342405U CN 205342405 U CN205342405 U CN 205342405U CN 201620033955 U CN201620033955 U CN 201620033955U CN 205342405 U CN205342405 U CN 205342405U
Authority
CN
China
Prior art keywords
bolt
special
flange
base
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620033955.1U
Other languages
Chinese (zh)
Inventor
徐军杰
沈元第
李占全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Extraordinary Hoisting Engineering Of Blue Nest Co Ltd
Original Assignee
Tianjin Extraordinary Hoisting Engineering Of Blue Nest Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Extraordinary Hoisting Engineering Of Blue Nest Co Ltd filed Critical Tianjin Extraordinary Hoisting Engineering Of Blue Nest Co Ltd
Priority to CN201620033955.1U priority Critical patent/CN205342405U/en
Application granted granted Critical
Publication of CN205342405U publication Critical patent/CN205342405U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses an installation device is rectified to portable flange, including a pair of special bolt, a pair of special (gate)wedge and a pair of base, special bolt constitute by orbed bolt head, the rectangle middle part and the cylindrical body of bolt, the base for round platform shape, it can anastomotic semicircular depressed with the bolt head of special bolt the higher authority to be equipped with one, special (gate)wedge above be equipped with a bolt hole that can hold special bolt, special bolt inserts in the bolt hole, the base arrange in and play fixed effect between bolt head and the barrel flange interface lower flange of special bolt. Special bolt for the bolt through the thermal treatment after. Special (gate)wedge and the material of base be the Q345 steel. Installation device is rectified to portable flange, can shorten tower section of thick bamboo installation time greatly, installation time is steerable about 1 hour.

Description

Portable flange correction erecting device
Technical field
This utility model relates to flange correction installing area, particularly relates to portable flange correction erecting device.
Background technology
Build in the process that blower fan tower barrel is installed at wind-power electricity generation at present, between tower, a kind of novel reverse flange connection is because of its stability height, registration is just progressively expanded, but this connected mode brings certain difficulty to installment work, current installation method is, inside flange face, strengthen gusset place install jack by slow for flange para-position, this installation method makes every section of tower set-up time at least two hour, this patent be intended to design one lightly, structural formula alignment tool easily, to simplify mounting process, accelerate installation effectiveness.
Summary of the invention
This utility model is for achieving the above object, it is provided that portable flange correction erecting device, including a pair special bolt, a pair special wedge and a pair base;Described special bolt is made up of spherical bolt head, rectangular central portion and cylindrical bolt body;Described base is truncated cone-shaped, is arranged above with the semi-cylindrical canyon that the bolt head of and special bolt can coincide;Described special wedge is arranged above with a bolt hole that can hold special bolt, and special bolt inserts in bolt hole;Described base is placed between the bolt head of special bolt and shell flange interface lower flange and plays fixing effect.
Described special bolt is the bolt after Overheating Treatment.
Described special wedge and the material of base are Q345 steel.
The beneficial effects of the utility model are: portable flange described in the utility model correction erecting device, it is possible to being greatly shortened the tower set-up time, the set-up time can be controlled in 1 hours.
Accompanying drawing explanation
Fig. 1 is the structural representation during installation of portable flange described in the utility model correction erecting device;
Fig. 2 is the top view of the special wedge of portable flange described in the utility model correction erecting device;
Fig. 3 is that the BB of the special wedge of portable flange described in the utility model correction erecting device is to sectional view;
Fig. 4 is the Special bolt structure schematic diagram of portable flange described in the utility model correction erecting device;
Fig. 5 is the special bolt AA case sectional view of portable flange described in the utility model correction erecting device;
Fig. 6 is the left view of the base of portable flange described in the utility model correction erecting device;
Fig. 7 is the front view of the base of portable flange described in the utility model correction erecting device;
1-shell flange interface lower flange reinforcement;2-special bolt;The special wedge of 3-;4-base;5-shell flange interface upper flange reinforcement.
Detailed description of the invention
Detailed narration is will make reference to below with reference to embodiment of the present utility model.
Portable flange correction erecting device, including a pair special bolt 2, a pair special wedge 3 and a pair base 4;Described special bolt 2 is made up of spherical bolt head, rectangular central portion and cylindrical bolt body;Described base 4 is truncated cone-shaped, is arranged above with the semi-cylindrical canyon that the bolt head of and special bolt 2 can coincide;Described special wedge 3 is arranged above with a bolt hole that can hold special bolt 2, and special bolt 2 inserts in bolt hole;Described base 4 is placed between the bolt head of special bolt 2 and shell flange interface lower flange reinforcement 1 and plays fixing effect.
Described special bolt 2 is the bolt after Overheating Treatment.
Described special wedge 3 and the material of base 4 are Q345 steel.
When correction is installed, a pair special wedge 3 is placed in the both sides of shell flange interface lower flange reinforcement, a pair special bolt 2 is utilized to fix, special bolt 2 and shell flange interface lower flange reinforcement is blocked with base 4, and after this portable flange correction erecting device is fixed, then in shell flange interface upper flange reinforcement 5 process in place, it is not necessary to manpower or jack centering, available flange self gravitation, slowly falls centering after rise in place.Can pass through to change different length high intensity special bolt 2, so that portable flange correction erecting device is adapted to the reinforcement of the different interval of different flange.
The above is only preferred implementation of the present utility model; it should be pointed out that, for those skilled in the art, under the premise without departing from this utility model principle; can also making some improvements and modifications, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (3)

1. portable flange correction erecting device, it is characterised in that include a pair special bolt (2), a pair special wedge (3) and a pair base (4);Described special bolt (2) is made up of spherical bolt head, rectangular central portion and cylindrical bolt body;Described base (4) is truncated cone-shaped, is arranged above with the semi-cylindrical canyon that the bolt head of and special bolt (2) can coincide;Described special wedge (3) is arranged above with a bolt hole that can hold special bolt (2), and special bolt (2) inserts in bolt hole;Described base (4) is placed between the bolt head of special bolt (2) and shell flange interface lower flange (1) and plays fixing effect.
2. portable flange according to claim 1 correction erecting device, it is characterised in that described special bolt (2) is the bolt after Overheating Treatment.
3. portable flange according to claim 1 and 2 correction erecting device, it is characterised in that described special wedge (3) and the material of base (4) are Q345 steel.
CN201620033955.1U 2016-01-14 2016-01-14 Installation device is rectified to portable flange Withdrawn - After Issue CN205342405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620033955.1U CN205342405U (en) 2016-01-14 2016-01-14 Installation device is rectified to portable flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620033955.1U CN205342405U (en) 2016-01-14 2016-01-14 Installation device is rectified to portable flange

Publications (1)

Publication Number Publication Date
CN205342405U true CN205342405U (en) 2016-06-29

Family

ID=56175231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620033955.1U Withdrawn - After Issue CN205342405U (en) 2016-01-14 2016-01-14 Installation device is rectified to portable flange

Country Status (1)

Country Link
CN (1) CN205342405U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105522377A (en) * 2016-01-14 2016-04-27 天津蓝巢特种吊装工程有限公司 Portable flange correction installation device
CN111730539A (en) * 2020-07-06 2020-10-02 黄增文 Alignment installation device for automobile axle shaft sleeve

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105522377A (en) * 2016-01-14 2016-04-27 天津蓝巢特种吊装工程有限公司 Portable flange correction installation device
CN105522377B (en) * 2016-01-14 2018-11-06 天津蓝巢特种吊装工程有限公司 Portable flange corrects mounting device
CN111730539A (en) * 2020-07-06 2020-10-02 黄增文 Alignment installation device for automobile axle shaft sleeve

Similar Documents

Publication Publication Date Title
CN205342405U (en) Installation device is rectified to portable flange
CN206128597U (en) Assembly type structure work platform
CN203946088U (en) Equipment hanger under a kind of car
CN205742554U (en) A kind of steel column and the Mixed Architecture of beams of concrete
CN204376279U (en) Hydroelectric station GIS bus auxiliary repair adjustable supporting device
CN103661453A (en) Compartment and roof structure thereof
CN207344455U (en) A kind of rectifier press-fit diode fixture
CN105080976A (en) Installation method and device for backing plates of vertical rolling mill
CN105522377A (en) Portable flange correction installation device
CN202925983U (en) Bracket supporting frame
CN204781345U (en) Two substructure drawknot muscle built -in fitting construction structures
CN204891081U (en) Oval machine shakes fixing device of pipe
CN205776325U (en) Dismountable electrical equipment steel bracket embedded part device
CN206554526U (en) A kind of built-in fitting fixing device
CN206226377U (en) A kind of solar energy irradiation instrument support
CN103203584B (en) A kind of marine wind electric field major diameter tower drum flange bolt hole dislocation processing method
CN207003245U (en) A kind of bridge fence-slab fixing device
CN203880641U (en) Lawn lamp installation frame
CN206436765U (en) A kind of stabilizer bushing mounting structure and automobile
CN102794725B (en) A kind of back beam positioning jig device
CN206385822U (en) A kind of civil engineering guard rail
CN104358355A (en) Detachable column base fixing device and construction method thereof
CN203045969U (en) Back-loaded embedded anchor fixing device
CN203638062U (en) Spring type rail upright post device for erection of guardrail
CN221167933U (en) Support foundation support pad device suitable for slope

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160629

Effective date of abandoning: 20181106

AV01 Patent right actively abandoned