CN205330027U - Remove roof structure's convulsions workplace - Google Patents

Remove roof structure's convulsions workplace Download PDF

Info

Publication number
CN205330027U
CN205330027U CN201620060102.7U CN201620060102U CN205330027U CN 205330027 U CN205330027 U CN 205330027U CN 201620060102 U CN201620060102 U CN 201620060102U CN 205330027 U CN205330027 U CN 205330027U
Authority
CN
China
Prior art keywords
side wall
door
air
chute
moves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620060102.7U
Other languages
Chinese (zh)
Inventor
沈德旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Yuankai Science And Technology Co Ltd
Original Assignee
Ningbo Yuankai Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Yuankai Science And Technology Co Ltd filed Critical Ningbo Yuankai Science And Technology Co Ltd
Priority to CN201620060102.7U priority Critical patent/CN205330027U/en
Application granted granted Critical
Publication of CN205330027U publication Critical patent/CN205330027U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The utility model relates to a remove roof structure's convulsions workplace, including left side wall, right side wall, roof face and suction compartment, the both sides at the roof face are connected respectively to left side wall, right side wall, the suction compartment links to each other respectively with left side wall, right side wall and stationary roof, be equipped with convulsions strip seam on the inner wall of suction compartment, be equipped with the suction opening on the suction compartment, floating gate and stationary roof are drawn together to roof bread, the floating gate is connected with stationary roof, all be equipped with movable sliding chute on left side wall and the right side wall inner wall, establish in movable sliding chute at the both ends of floating gate, stationary roof and left side wall and right side wall fixed connection, all be equipped with a plurality of inlet scoop on left side wall and the right side wall, the floating gate is other to be equipped with air supply arrangement, and this air supply arrangement includes forced draught blower, pipe -line system, support and shutter supply -air outlet.

Description

A kind of air extraction workshop of movable roof structure
Technical field
This utility model relates to a kind of dust arrester, particularly relates to the air extraction workshop of a kind of movable roof structure。
Background technology
In the post processing of large-scale workpiece, producing substantial amounts of dust, these dust need through processing。In existing process equipment, exhaust equipment adopts grid or network structure mostly, the exhaust equipment of this structure is uneven in convulsion process, and due to workpiece volume excessive when putting the workpiece in convulsion station fairly cumbersome, particularly the hoisting transportation of some workpiece needs to adopt little driving or small crane, and therefore exhaust equipment causes the impact on capturing technology。
Utility model content
Present situation to above-mentioned prior art, technical problem to be solved in the utility model is in that the air extraction workshop providing a kind of good dedusting effect and movable roof structure reasonable in design。
The technical scheme that the above-mentioned technical problem of this utility model solution adopts is: the air extraction workshop of a kind of movable roof structure, including left side wall, right side wall, deck and suction compartment, described left side wall, right side wall is connected to the both sides of deck, described suction compartment and left side wall, right side wall and fixing top board are respectively connected with, the inwall of described suction compartment is provided with convulsion bar seam, described suction compartment is provided with suction opeing, described deck includes mobile door and fixing top board, described mobile door is connected with fixing top board, described left side wall and right side wall inwall are equipped with mobile chute, the two ends of described mobile door are located in mobile chute, described fixing top board is fixing with left side wall and right side wall to be connected, described left side wall and right side wall are equipped with several inlet scoops, it is provided with air-supply arrangement by described mobile door, this air-supply arrangement includes pressure fan, tubing, support and shutter air outlet。
Further, also including extrinsic articulation air suction arm, this extrinsic articulation air suction arm is placed in below mobile door。
Further, described mobile door includes first and moves door and second and move door, described mobile chute includes first and moves chute and second and move chute, described first two ends moving door are located at first and move in chute, described second two ends moving door are located at second and move in chute, described first moves door and second moves a connection, and described second moves door is connected with fixing top board。
Further, mobile door transmission system it is provided with in described right side wall, described mobile door transmission system includes worm gear speed-reducing motor, drivewheel, driven pulley, Timing Belt, travel switch and suspension bracket, Timing Belt connects into loop configuration with drivewheel and driven pulley, drivewheel is connected on worm gear speed-reducing motor, suspension bracket is connected on Timing Belt, and suspension bracket and first moves a connection。
Further, described right side wall inwall is provided with plastic tube, and plastic tube is connected with electric button box。
Compared with prior art, the utility model has the advantage of: this utility model is at the left side wall of air extraction workshop and right side wall, newly-increased bar shaped inlet scoop, optimizes convulsion air-flow further and moves towards reasonability in workplace, make the escape dust at workplace dead angle place easily facilitate seizure absorption;Air-supply arrangement is set by mobile door, it is further provided power source, adopts the economic benefits and social benefits pattern of the monolateral air draught of monolateral air-supply, it is simple to dust gathers precipitation in air extraction workshop, do not diffuse into workshop and go。Ensureing on the basis of same nominal convulsion amount, enhancing the capturing efficiency in each seizure air port in air extraction workshop。
Accompanying drawing explanation
Fig. 1 is the air extraction workshop structural representation one of a kind of movable roof structure of this utility model;
Fig. 2 is the air extraction workshop structural representation two of a kind of movable roof structure of this utility model;
Fig. 3 is the air extraction workshop structural representation three of a kind of movable roof structure of this utility model
Fig. 4 is air extraction workshop Fig. 2 partial enlarged drawing of a kind of movable roof structure of this utility model。
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with accompanying drawing, this utility model is further elaborated。
As Figure 1-4, a kind of air extraction workshop of movable roof structure, including left side wall 1, right side wall 2, deck 3 and suction compartment 4, described left side wall 1, right side wall 2 are connected to the both sides of deck 3, and suction compartment 4 is respectively connected with left side wall 1, right side wall 2 and fixing top board 3;The inwall of suction compartment 4 is provided with six convulsion bar seams 5, six convulsion bar seams 5 are divided into two row and are evenly distributed on the inwall of suction compartment 4, more or less of convulsion bar seam 5 can also be set according to the inwall size of suction compartment 4, when adopting convulsion bar seam 5 to make convulsion, air-flow can be evenly, suction compartment 4 is provided with suction opeing 6, and suction opeing 6 is connected with blower fan;Deck 3 includes mobile door 7 and fixing top board 8, and mobile door 7 is connected with fixing top board 8;Left side wall 1 and right side wall 2 inwall are equipped with mobile chute 9, the two ends of mobile door 7 are located in mobile chute 9, mobile door 7 can slide in mobile chute 9, realize the switch of mobile door 7, fixing top board 8 is fixed be connected with left side wall 1 and right side wall 2, being equipped with several inlet scoops 15 on described left side wall 1 and right side wall 2, described mobile door 7 is other is provided with air-supply arrangement 13, and this air-supply arrangement 13 includes pressure fan, tubing, support and shutter air outlet。Described mobile door 7 includes first and moves door 71 and second and move door 72, and mobile chute 9 includes first and moves chute 91 and second and move chute 92;First two ends moving door 71 are located at first and move in chute 91, and the second two ends moving door 72 are located at second and move in chute 92;First moves door 71 moves door 72 with second and is connected, second moves door 72 is connected with fixing top board 8, when closing mobile door 7, first is pulled to move door 71, moving door 71 by first drives second to move door 72, until mobile door 7 completely closes, when opening mobile door 7, first move door 71 by first to close, then first move door 71 and drive second to move door 72 to close, until second moves door 72 and be completely disposed on fixing top board 8, first moves door 71 is completely disposed at second and moves on door 72, now moves door 7 and fully opens。Mobile door transmission system 10 it is provided with in described right side wall 2, described mobile door transmission system 10 includes worm gear speed-reducing motor 101, drivewheel 102, driven pulley 103, Timing Belt 104, travel switch 105 and suspension bracket 106, Timing Belt 104 connects into loop configuration with drivewheel 102 and driven pulley 103, drivewheel 102 is connected on worm gear speed-reducing motor 101, travel switch 105 is located on right side wall 2, suspension bracket 106 is connected on Timing Belt 104, suspension bracket 106 moves door 71 with first and is connected, the first switch moving door 71 is controlled by mobile door transmission system 10, realize the switch of mobile door 7。Described right side wall 2 inwall is provided with plastic tube 11, plastic tube 11 is connected with electric button box 12, cloth live wire in plastic tube 11, electric wire is connected with electric button box 12 and mobile door transmission system 10, mobile door transmission system 10 is controlled, it is achieved the switch of mobile door 7 by electric button box 12。
Operation principle brief description:
During operation, mobile door 7 is opened by electric button box 12, mobile door 7 is closed again through electric button box 12 after big-and-middle-sized work piece hoisting is put into workplace, if the air extraction workshop of this movable roof structure accesses dust separation system, operator opens cleaning system, dedusting fan runs after starting, and workman just can be operated in the air extraction workshop of this movable roof structure。
Compared with prior art, the utility model has the advantage of: this utility model is at the left side wall of air extraction workshop and right side wall, newly-increased bar shaped inlet scoop, optimizes convulsion air-flow further and moves towards reasonability in workplace, make the escape dust at workplace dead angle place easily facilitate seizure absorption;Air-supply arrangement is set by mobile door, it is further provided power source, adopts the economic benefits and social benefits pattern of the monolateral air draught of monolateral air-supply, it is simple to dust gathers precipitation in air extraction workshop, do not diffuse into workshop and go。Ensureing on the basis of same nominal convulsion amount, enhancing the capturing efficiency in each seizure air port in air extraction workshop。

Claims (5)

1. the air extraction workshop of a movable roof structure, including left side wall, right side wall, deck and suction compartment, described left side wall, right side wall is connected to the both sides of deck, described suction compartment and left side wall, right side wall and fixing top board are respectively connected with, the inwall of described suction compartment is provided with convulsion bar seam, described suction compartment is provided with suction opeing, described deck includes mobile door and fixing top board, described mobile door is connected with fixing top board, described left side wall and right side wall inwall are equipped with mobile chute, the two ends of described mobile door are located in mobile chute, described fixing top board is fixing with left side wall and right side wall to be connected, it is characterized in that, described left side wall and right side wall are equipped with several inlet scoops, it is provided with air-supply arrangement by described mobile door, this air-supply arrangement includes pressure fan, tubing, support and shutter air outlet。
2. the air extraction workshop of a kind of movable roof structure according to claim 1, it is characterised in that also include extrinsic articulation air suction arm, this extrinsic articulation air suction arm is placed in below mobile door。
3. the air extraction workshop of a kind of movable roof structure according to claim 1, it is characterized in that, described mobile door includes first and moves door and second and move door, described mobile chute includes first and moves chute and second and move chute, described first two ends moving door are located at first and move in chute, described second two ends moving door are located at second and move in chute, and described first moves door and second moves a connection, and described second moves door is connected with fixing top board。
4. the air extraction workshop of a kind of movable roof structure according to claim 1 or 3, it is characterized in that, mobile door transmission system it is provided with in described right side wall, described mobile door transmission system includes worm gear speed-reducing motor, drivewheel, driven pulley, Timing Belt, travel switch and suspension bracket, Timing Belt connects into loop configuration with drivewheel and driven pulley, drivewheel is connected on worm gear speed-reducing motor, and suspension bracket is connected on Timing Belt, and suspension bracket and first moves a connection。
5. the air extraction workshop of a kind of movable roof structure according to claim 1, it is characterised in that described right side wall inwall is provided with plastic tube, and plastic tube is connected with electric button box。
CN201620060102.7U 2016-01-15 2016-01-15 Remove roof structure's convulsions workplace Expired - Fee Related CN205330027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620060102.7U CN205330027U (en) 2016-01-15 2016-01-15 Remove roof structure's convulsions workplace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620060102.7U CN205330027U (en) 2016-01-15 2016-01-15 Remove roof structure's convulsions workplace

Publications (1)

Publication Number Publication Date
CN205330027U true CN205330027U (en) 2016-06-22

Family

ID=56318322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620060102.7U Expired - Fee Related CN205330027U (en) 2016-01-15 2016-01-15 Remove roof structure's convulsions workplace

Country Status (1)

Country Link
CN (1) CN205330027U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109571245A (en) * 2018-12-28 2019-04-05 太仓联洲机械设备有限公司 Polishing dust remover is welded in multi-functional noise elimination

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109571245A (en) * 2018-12-28 2019-04-05 太仓联洲机械设备有限公司 Polishing dust remover is welded in multi-functional noise elimination

Similar Documents

Publication Publication Date Title
CN105194938B (en) A kind of BAIYE wind-guiding type air purifier
CN103583160B (en) Motor driven negative pressure straw fruit thing picks up separator
CN203006610U (en) Single-station cloth distribution conveying device
CN2916458Y (en) Dust-collecting device for filter screen of air conditioner
CN205330027U (en) Remove roof structure's convulsions workplace
CN213317663U (en) Movable dust collecting device of cast tube stripper
CN107570516A (en) A kind of movable energy-saving dedusting noise reduction workpiece repairs room
CN206291680U (en) A kind of ginger splices drying and dewatering system
CN109228259B (en) Blow molding device for producing case shell of draw-bar box
CN209835117U (en) Movable dust collecting equipment for bagged cement loading room
CN108642839B (en) Ironing device
CN202028285U (en) Dusting machine for filter core of air cleaner
CN104309105A (en) Blister device and blister method
CN203964630U (en) A kind of deduster dust shield
CN207451259U (en) A kind of touch paper folding apparatus
CN206849987U (en) A kind of air-cooled battery cooling furnace
CN206337340U (en) Pre-oxidation furnace hot air circulating system
CN206111619U (en) Ultra -thin multi -functional air supply exhaust electrical apparatus
CN206066570U (en) A kind of extruded sheet active dust-collecting type trimmer
CN204923917U (en) Portable dust collector in line frequency furnace stokehold
CN110605805B (en) Be used for integrative automatic processing system of cystosepiment raw materials foaming cooling
CN210231505U (en) Smoke collecting device for gravity casting machine
CN210306195U (en) Plasma cutting waste gas collecting system
CN210566974U (en) Dust adsorption type power ventilating duct
CN211233726U (en) Efficient material drying equipment for luggage production process

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160622

Termination date: 20170115

CF01 Termination of patent right due to non-payment of annual fee