CN205329696U - Mud jacking crossover sub for bored concrete pile - Google Patents

Mud jacking crossover sub for bored concrete pile Download PDF

Info

Publication number
CN205329696U
CN205329696U CN201521042431.0U CN201521042431U CN205329696U CN 205329696 U CN205329696 U CN 205329696U CN 201521042431 U CN201521042431 U CN 201521042431U CN 205329696 U CN205329696 U CN 205329696U
Authority
CN
China
Prior art keywords
sound detecting
slip casting
detecting pipe
pipe
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521042431.0U
Other languages
Chinese (zh)
Inventor
王朋林
章子乔
周庆磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201521042431.0U priority Critical patent/CN205329696U/en
Application granted granted Critical
Publication of CN205329696U publication Critical patent/CN205329696U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a mud jacking crossover sub for bored concrete pile, including sounding pipe and slip casting crossover sub, the sounding pipe upper end is equipped with the slip casting crossover sub, and the slip casting crossover sub passes through screw thread and slip casting union coupling, and the sounding pipe lower extreme sets up in the bored concrete pile. Utilize sounding pipe to carry out a construction process of base pressure thick liquid as the mud jacking pipe, fluid pressure type sounding pipe and slip casting crossover sub combine the transitional coupling, make sounding pipe reach one tub of dual -purpose, and change convenient purpose.

Description

A kind of bored concrete pile mud jacking adapter
Technical field
This utility model relates to construction engineering technical field, is specifically related to a kind of bored concrete pile mud jacking adapter。
Background technology
At present, fast development along with architectural engineering, the requirement of foundation bearing capacity is also more and more higher, cast-in-situ bored pile is a kind of common base form, grouting behind shaft or drift lining method reinforcing pile end can not only strengthen the bearing capacity of ground, can also greatly shorten stake long, so pile foundation grouting behind shaft or drift lining construction technology is widely used in pile foundation construction;So-called grouting behind shaft or drift lining, it is exactly after cast-in-situ bored pile pile, adopt high-pressure injection pump by the bottom of pre-pile anchoring or the grouting pipe of stake side (many blank pipes valve is set bottom conduit, conduit extends up to stake top or ground, downside connects the Grouting Pipe of check valve form) at the bottom of stake or stake side high-pressure injected water slurry liquid, acted on by the filling of serosity, densification, consolidation etc., the real soft basis at the bottom of stake of plug, reach consolidation bottom sediment and the purpose of extruding soil layer;Serosity returns slurry diffusion on the side along stake simultaneously, strengthens the side friction of soil layer and pile body, under Soft Soil, can improve the quality of cast-in-situ bored pile pile, improves bearing capacity of single pile, reduces engineering settling amount。
At present for needing the pile foundation of ultrasound examination to widely use sound detecting pipe as grouting pipe, sound detecting pipe is made to reach collection ultrasound examination and the effect that is integrated of two kinds of purposes of mud jacking passage, but utilize sound detecting pipe to carry out the construction technology of pile base grouting as mud jacking passage, also having problems with: 1) fluid pressure type sound detecting pipe tube wall is very thin, only 1.2 millimeters, it is difficult with traditional welding at the construction field (site) and sound detecting pipe is effectively connected with casting head;2) traditional welding construction technology not only difficulty is big, and take time and effort, having a strong impact on pile foundation mud jacking speed, pile foundation has irrigated, after treating concrete initial set, weld filling adaptor and open plug to carrying out setting-out at the bottom of stake, after treating on concrete strength, remove the filling adaptor welded and pile foundation is carried out ultrasound examination, finally must weld filling adaptor and carry out pile base grouting, so hydraulic pressure sound detecting pipe must be performed twice at welding, strengthen difficulty of construction and lose time;3) owing to mud jacking pressure is big, reach 3Mpa, add that welding procedure difficulty is big, very easily cause that in mud jacking process, serosity sprays from junction。
Summary of the invention
The technical problems to be solved in the utility model is, exist in construction hydraulic pressure sound detecting pipe must be performed twice at welding for prior art, strengthen difficulty of construction, lose time and owing to mud jacking pressure causes greatly the problem that welding procedure difficulty is big, provide a kind of bored concrete pile mud jacking adapter, sound detecting pipe is utilized to carry out the construction technology of pile base grouting as madjack pipe, reach a pipe dual-purpose, and change convenient purpose, efficient, safe, economic feature simple to operate, easy to use, is particularly well-suited to have the pile bottom grouting of the cast-in-situ bored pile of ultrasound examination to construct。
This utility model be the technical scheme is that by the above-mentioned technical problem of solution
A kind of bored concrete pile mud jacking adapter, including sound detecting pipe and slip casting adapter, sound detecting pipe upper end is provided with slip casting adapter, and slip casting adapter is connected with Grouting Pipe by screw thread, and sound detecting pipe lower end is arranged in bored concrete pile。
Connecing technique scheme, described slip casting adapter is connected with sound detecting pipe by screw thread。
Connect technique scheme, in described slip casting adapter, be provided with sealing ring。
Connecing technique scheme, described sealing ring is rubber ring。
Described sound detecting pipe includes hydraulic pressure sound detecting pipe, sound detecting pipe joint and thin-walled sound detecting pipe, and hydraulic pressure sound detecting pipe lower end is connected with thin-walled sound detecting pipe upper end by sound detecting pipe joint, and thin-walled sound detecting pipe is arranged in bored concrete pile。
Described Grouting Pipe is provided with ball valve。
This utility model has the advantages that
Sound detecting pipe is utilized to carry out the construction technology of pile base grouting as madjack pipe, fluid pressure type sound detecting pipe and slip casting adapter connect in conjunction with transition, sound detecting pipe is made to have reached a pipe dual-purpose, and change convenient purpose, efficient, safe, economic feature simple to operate, easy to use, is particularly well-suited to have the pile bottom grouting of the cast-in-situ bored pile of ultrasound examination to construct。
Accompanying drawing explanation
Fig. 1 is the structural representation of bored concrete pile mud jacking adapter in this utility model embodiment;
Fig. 2 is the A partial schematic diagram of Fig. 1;
In figure, 1-bored concrete pile, 2-thin-walled sound detecting pipe, 3-sound detecting pipe joint, 4-hydraulic pressure sound detecting pipe, 5-Grouting Pipe, 6-high-pressure injection pump, 7-slip casting adapter, 8-screw thread, 9-rubber ring, 10-ball valve。
Detailed description of the invention
Below in conjunction with drawings and Examples, this utility model is described in detail。
With reference to shown in Fig. 1~Fig. 2, bored concrete pile mud jacking adapter in a kind of embodiment that this utility model provides, including sound detecting pipe and slip casting adapter 7, sound detecting pipe upper end is provided with slip casting adapter 7, slip casting adapter 7 is connected with Grouting Pipe by screw thread 8, and sound detecting pipe lower end is arranged in bored concrete pile 1;Utilize sound detecting pipe to carry out the construction technology of pile base grouting, fluid pressure type sound detecting pipe and slip casting adapter 7 as madjack pipe to connect in conjunction with transition, make sound detecting pipe reach a pipe dual-purpose, and change convenient purpose。
The slip casting adapter 7 upper end mouth of pipe and the lower end mouth of pipe are equipped with screw thread 8, and slip casting adapter 7 upper end is connected with Grouting Pipe 5 by screw thread 8, and slip casting adapter 7 lower end is connected with sound detecting pipe 4 by screw thread 8;Screw thread 8 dismounting and change can be passed through, simple and convenient。
Further, Grouting Pipe 5 other end is connected with high-pressure injection pump 6
It is provided with sealing ring (namely slip casting adapter 7 hickey place is provided with sealing ring) in described slip casting adapter 7, it is ensured that the air-tightness of slip casting adapter 7 seam, makes cement grout in mud jacking process be unlikely to overflow from seam。
Described sealing ring is rubber ring 9。
Described sound detecting pipe includes hydraulic pressure sound detecting pipe 4, sound detecting pipe joint 3 and thin-walled sound detecting pipe 2, and hydraulic pressure sound detecting pipe 4 lower end is connected with thin-walled sound detecting pipe 2 upper end by sound detecting pipe joint 3, and thin-walled sound detecting pipe 2 is arranged in bored concrete pile 1。
Described Grouting Pipe 5 is provided with ball valve 10 with slip casting adapter 7 link, it is ensured that after slip casting completes, cement grout will not reflux。
Further, the screw thread place of slip casting adapter 7 thickeies, and uses rubber ring;Namely the intensity adding junction also ensure that the sealing of junction。
In an embodiment of the present utility model, work process of the present utility model:
Pile foundation has irrigated, and after concrete initial set, on fluid pressure type sound detecting pipe top, screw thread 8 interface is connected with slip casting adapter 7, and screw thread 8 seam places rubber ring 9, to guarantee the sealing of seam;Grouting Pipe 5 and high-pressure injection pump 6 is connected again through slip casting adapter 7, suitable for reading and Grouting Pipe 5 interface of slip casting adapter 7 is threaded connection, hickey is tightened during connection, high-pressure injection pump 6 and Grouting Pipe 5 are directly connected to, pressurizeed toward pile foundation bottom water injection by Grouting Pipe 5 and sound detecting pipe, a base concrete is made to open plug, form slip casting passage, open after plug completes, take off slip casting adapter 7, after pile body ultrasound examination completes, can according to opening plug job step equally, cement grout is entered toward a rising pouring by high-pressure injection pump 6, reach the purpose of pile grouting。
This utility model avoids Site Welding operation, as long as adopting conventional tool docking slip casting adapter 7 and Grouting Pipe 5 screwed tight and can be easily accomplished, saves time, laborsaving, province's expense, and once mounting is successfully, accelerates pile foundation slip casting progress;Avoiding changing in a large number the cost of casting head because of weld job, casting head can be reused, and slip casting adapter 7 simple in construction, and namely general producer can complete to make, and cost is low。
Above is only preferred embodiment of the present utility model, certainly with this interest field limiting this utility model, therefore can not change according to the equivalence that this utility model claim is made, still belong to protection domain of the present utility model。

Claims (6)

1. a bored concrete pile mud jacking adapter, it is characterised in that include sound detecting pipe and slip casting adapter, sound detecting pipe upper end is provided with slip casting adapter, and slip casting adapter is connected with Grouting Pipe by screw thread, and sound detecting pipe lower end is arranged in bored concrete pile。
2. bored concrete pile mud jacking adapter according to claim 1, it is characterised in that described slip casting adapter is connected with sound detecting pipe by screw thread。
3. bored concrete pile mud jacking adapter according to claim 1, it is characterised in that be provided with sealing ring in described slip casting adapter。
4. bored concrete pile mud jacking adapter according to claim 3, it is characterised in that described sealing ring is rubber ring。
5. bored concrete pile mud jacking adapter according to claim 1, it is characterized in that, described sound detecting pipe includes hydraulic pressure sound detecting pipe, sound detecting pipe joint and thin-walled sound detecting pipe, and hydraulic pressure sound detecting pipe lower end is connected with thin-walled sound detecting pipe upper end by sound detecting pipe joint, and thin-walled sound detecting pipe is arranged in bored concrete pile。
6. bored concrete pile mud jacking adapter according to claim 1, it is characterised in that described Grouting Pipe is provided with ball valve。
CN201521042431.0U 2015-12-15 2015-12-15 Mud jacking crossover sub for bored concrete pile Active CN205329696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521042431.0U CN205329696U (en) 2015-12-15 2015-12-15 Mud jacking crossover sub for bored concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521042431.0U CN205329696U (en) 2015-12-15 2015-12-15 Mud jacking crossover sub for bored concrete pile

Publications (1)

Publication Number Publication Date
CN205329696U true CN205329696U (en) 2016-06-22

Family

ID=56207045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521042431.0U Active CN205329696U (en) 2015-12-15 2015-12-15 Mud jacking crossover sub for bored concrete pile

Country Status (1)

Country Link
CN (1) CN205329696U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978737A (en) * 2018-07-04 2018-12-11 中国二十冶集团有限公司 A kind of construction method for bored concrete pile sound detecting pipe slip casting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108978737A (en) * 2018-07-04 2018-12-11 中国二十冶集团有限公司 A kind of construction method for bored concrete pile sound detecting pipe slip casting

Similar Documents

Publication Publication Date Title
CN102828509B (en) Joint grouting method from bottom and side of prestressed pipe pile
CN104846810A (en) Self-circulating posterior grouting bored pile construction method
CN206768813U (en) Grouting behind shaft or drift lining pile for prestressed pipe
CN201865113U (en) Automatic check valve type pressure grouting device
CN101761345A (en) Reinforcement device for tunnel top soil and construction method thereof
CN106836213A (en) Grouting behind shaft or drift lining pre-stress hollow square pile and its construction technology
CN110439286A (en) A kind of liner is put more energy into joint steel pipe concrete column drag reduction jack-up construction method of weakening
CN205918368U (en) Bore notes an organic whole and retreat formula slip casting drilling rod
CN103031847B (en) Reducing overlap joint combined type orifice pipe grouting method
CN106988308A (en) Grouting behind shaft or drift lining pile for prestressed pipe and its construction technology
CN107387035A (en) Gas injection High Pressure Drain system in a kind of well
CN107542093A (en) A kind of Punching Borehole Cast-in-place Concrete Pile bottom cleaning method
CN205329696U (en) Mud jacking crossover sub for bored concrete pile
CN105114698A (en) River opposite jacking butt joint construction process and specially-produced head
CN208563315U (en) A kind of pile foundation grouting behind shaft or drift lining constructing device
CN112917660B (en) Efficient anti-blocking backflow grouting pipe and method
CN206204974U (en) A kind of device for plugging for concrete pipe base core-drawing hole water burst
CN205875188U (en) Pressure -bearing precipitation well plugging device
CN107975127A (en) The outer antipriming of vertical jacking
CN204492746U (en) A kind of multifunctional information grouting device
CN201801805U (en) Combined double-liquid mixing and grouting device
CN103437345A (en) Method for construction of diameter-expanding pile on pile top
CN203878590U (en) Post-reinforcement structure for cast-in-place piles
CN207392205U (en) Pile foundation post-grouting device
CN109914390A (en) It is a kind of to construct the slip casting structure and construction method of cold seam for biting connecions campshed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant