CN205313967U - Connection construction between precast pier and bearing platform - Google Patents

Connection construction between precast pier and bearing platform Download PDF

Info

Publication number
CN205313967U
CN205313967U CN201520989007.0U CN201520989007U CN205313967U CN 205313967 U CN205313967 U CN 205313967U CN 201520989007 U CN201520989007 U CN 201520989007U CN 205313967 U CN205313967 U CN 205313967U
Authority
CN
China
Prior art keywords
pier
cushion cap
precast pier
island
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520989007.0U
Other languages
Chinese (zh)
Inventor
马会天
张金云
尹君
王伟
陈金彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201520989007.0U priority Critical patent/CN205313967U/en
Application granted granted Critical
Publication of CN205313967U publication Critical patent/CN205313967U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a connection construction between precast pier and bearing platform, its characterized in that the pier is connected with the cushion cap through installing the island by location mound location, combines together. Be equipped with interact's shear connector between pier shaft bottom linkage segment and the installation island. The utility model discloses a technical characterstic and effect: firstly, with annular cross -section prefabricating bridge pier lower part cover on the mound of location, the pier shaft location of being convenient for. Secondly, rim of a cup installation island within range prefabricating bridge pier except that at the bottom of the mound outside the steel plated scope, all does the chisel hair and handles, guarantees the connection quality, improves bridge pier column atress performance effectively. Thirdly, cushion cap and pier are connected through the looping -in island, and the junction is equipped with the shear connector, has strengthened the shear behavior of junction, construction convenience. Adopt the utility model discloses, pier and cushion cap are connected that the atress is reliable, construction convenience, easy operation, easily control, can effectively reduce field weld and concrete placement's work load for the construction progress.

Description

The connecting structure of a kind of precast pier and cushion cap
Technical field
The utility model relates to road and bridge construction technique field, particularly relates to the connecting structure of a kind of precast pier and cushion cap. Also relate to the installation positioning process of ring section precast pier and cushion cap.
Background technology
At present, the Bridge Pier Construction of Bridges in Our Country substructure adopts cast-in-situ construction method mostly, this kind of constructional method needs road pavement to carry out shutoff when constructing, add that the cast-in-place construction duration is long, construction quality is wayward, and support, template consumption in construction is big, executive cost height, and directly affect the road ability of construction point, incompatible with the requirement of urban construction and development.
The length of bridge is generally more than several kilometers, and even tens kilometers, this just determines bridge and must become across array by a large amount of. For shortening construction period as far as possible, it is ensured that construction quality, reducing the impact on surrounding environment, reduce the impact on traffic, Bridge Pier Construction should adopt in factory for prefabrication prefabricated, the form of construction work that on-the-spot location and installation is connected with cushion cap. Wherein, the connection of precast pier and cushion cap is the key technical problem in design.
The connection of the prefabricated pier body of tradition and cushion cap generally adopts reserved connection reinforcing bar bottom cushion cap top, prefabricated pier body respectively, completes the site welding of reinforcing bar after pier body hoisted in position, and cast connects the method for section concrete. Such mode of connection is too simple to the process of structure, the shearing resistance of junction, antidetonation ability, and steel quantity consumption is relatively big, also seriously affects the durable of agent structure and stress performance, there is potential safety hazard.
For solving above-mentioned deficiency, also there is the trial that some are useful at present, as Chinese patent CN85202839 discloses one " assembled prefabricated components made of reinforced concrete ", add bridge pier bending strength, reduce site operation amount to greatest extent, accelerating construction progress, but the document only discloses the structure of prefabricated component, but do not express the connection relation between prefabricated component and cushion cap.
Chinese patent CN101413250 discloses one " the tenon head type method of attachment of bridge spanning the sea precast pier and cushion cap ", improve the strained condition of connecting portion, solve tradition connect in shearing slip problem, it is to increase the endurance quality of joint. Although but the document disclose between bridge pier with cushion cap a kind of special be connected relation, be also referred between pier body and cushion cap, all need first to locate between each prefabricated pier body and install afterwards, the not location technology in detail assembling construction.
As Chinese patent CN102363946A discloses one " precast assembling upright post supporting platform structure and assembled positioning process thereof ", owing to needing to arrange prestress wire in the through hole of column prefabricated subsection, relative to tradition onsite concrete bridge pier, the cost of the pier column of this method of attachment wants high a lot. In addition, preload tension wire need to carrying out during site operation the operation such as stretch-draw, grouting, construction technology is complicated, and the engineering time is longer.
As Chinese patent CN202543789U discloses one " connecting structure of precast pier and cushion cap ", connecting at the bottom of pier between section end face and pier body bottom surface adopts concavo-convex shearing key to connect, on-the-spot employing dry seam (glueing joint seam) form connects, maximum degree decreases site welding and cast-in-place concrete workload, it is of value to quality control, accelerate construction speed, but the seam between joint section being coincide, it is higher to require, and between joint section, adopting deformed bar or regular reinforcement to connect the bigger construction space of needs, construction technology is complicated. In addition, adopting the dry seam section assembling bridge pier that normal concrete is built, as joint only adopts concavo-convex shearing key, under seismic force effects, bridge pier joint section joint area easily occurs clashing into damage, and the concrete scaling of joint location is serious, and weather resistance has much room for improvement.
Tradition bridge pier generally adopts solid cross section, concrete material large usage quantity, and field cast-in-place construction period is long, Framework Of Steel Reinforcement integral drift easily occurs in construction process, causes concrete cover excessively thin, the problems such as pier stud reinforcing steel bars exposed, corrosion.
Given this, also need at present a kind of can meet the precast pier of multiple object and the connection structures of cushion cap such as supporting capacity is strong, strength of joint height, easy construction are effective, good in economic efficiency simultaneously.
Practical novel content
For solving the problems of the technologies described above, the utility model provides a kind of safe and reliable, and the connecting structure of the precast pier of easy construction and cushion cap, applicable is particularly suitable for ring section in various bridge pier form of fracture, and strength of joint requires high bridge pier.
In order to realize above-mentioned technical purpose, the utility model takes following technical scheme: the connecting structure of a kind of precast pier and cushion cap, include cushion cap, cup mouth installation island and precast pier, location bridge pier is buried at described cushion cap top in advance, described precast pier is by locating pier location, and described precast pier is connected with cushion cap by cup mouth installation island, bottom described precast pier pier body, the section of connection is provided with encased steel plate, WELDING STUDS is welded, and encased steel plate is connected by onsite concrete between island with installing with cup mouth outside described encased steel plate.
Further, described precast pier is annular hollow cross section.
Further, locate by location pier bottom the pier body of described precast pier, and described cushion cap end face locates onsite concrete between precast pier and cup mouth installation island; Described precast pier and cup mouth are installed and are arranged shearing key between island.
Further, described shearing key is arranged on the encased steel plate of the section of connection bottom pier body, is that the WELDING STUDS by welding three layers of staggered arrangement is formed.
Further, described precast pier is arranged in cup mouth installation island.
Further, described cushion cap top is positioned at location Dun Chu and arranges reserved steel bar, is provided with the thick mortar leveling layer of 2cm between described cushion cap and described location pier, and is connected to reserved steel bar by erecting between described cushion cap with location pier.
Further, described cushion cap top be positioned at cup mouth install island place reserved steel bar is set, bottom described installation island, slope angle is set, described cup mouth install island with before described cushion cap by erect to reserved steel bar be connected.
Further, described cup mouth installs the slope angle number of degrees on island is 45 °.
A dock constructional method for ring section precast pier and cushion cap, the method comprises the following steps:
1) prefabricated place carries out ring section bridge pier pier body structure manufacture, cast in situs cushion cap concrete, and be positioned at cushion cap top location pier and cup mouth install island place reserved steel bar is set, after bearing platform construction, end face absolute altitude is checked, build the thick mortar leveling layer of 2cm, then build location pier concrete;
2) hang fortune after reaching concrete load age and precast pier is installed;
3), after precast pier installs location check adjustment, encased steel plate welds the WELDING STUDS of three layers of staggered arrangement along surrounding;
4) set up cup mouth and island template is installed, build cup mouth and island concrete is installed, complete the connection of precast pier and cushion cap.
Technology feature of the present utility model and effect be: one is be enclosed within precast pier bottom, ring section on the pier of location, is convenient to pier body location. Two is that cup mouth installs precast pier within the scope of island, except encased steel plate scope at the bottom of pier, all does dabbing process, ensures to connect quality, effectively improve bridge pier column stress performance. Three is that bridge pier and cushion cap install island connection by annular, and junction is provided with shearing key, enhances the shear behavior of junction, easy construction. Adopt the utility model, bridge pier is connected with cushion cap, bridge pier location reliable by power simply, easy construction, simple to operate, be easy to control, the workload of site welding and concrete placement can be effectively reduced, accelerating construction progress.
Accompanying drawing explanation
Fig. 1 is the structure iron of the utility model embodiment 1.
Fig. 2 is the vertical view of the utility model embodiment 1.
Fig. 3 is that precast pier pier body of the present utility model connects the big master drawing in section dabbing surface.
Fig. 4 is construction flow chart of the present utility model.
In figure: 1 is precast pier; 2 is cushion cap; 3 is location pier; 4 is cup mouth installation island; 5 is shearing key; 6 is encased steel plate; 7 is ridge design section; 8 is the thick mortar leveling layer of 2cm; 9 is reserved steel bar.
Embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated. It is to be understood that specific embodiment described herein is only in order to explain the utility model, and it is not used in restriction the utility model
Embodiment 1
A connecting structure for precast pier and cushion cap, described ring section precast pier 1 is enclosed within the pier 3 of location and completes to install location, then is connected by onsite concrete and cushion cap 2 by cup mouth installation island 4, combines together. Encased steel plate 6 and ridge design dabbing section 7 it is provided with bottom the precast pier 1 pier body of described ring section, encased steel plate 6 and ridge design dabbing section 7 all complete with prefabricated together with precast pier in the pre-formed process of prefabricated pier, after precast pier installs location, the WELDING STUDS welding 3 layers of staggered arrangement on encased steel plate 6 is used as shearing key 5, finally builds cup mouth and installs island 4 concrete connection cushion cap 2.Being provided with the thick mortar leveling layer 8 of 2cm between described location pier 3 and cushion cap 2, location pier 3 and cushion cap 2 are connected by reserved steel bar 9.
For single-column pier, structure of the present utility model forms as shown in Figure 2 (wherein Fig. 1 is the connecting structure vertical planning drawing of precast pier and cushion cap, and Fig. 2 is the A-A sectional view of Fig. 1), is made up of following 9 parts: precast pier 1; Cushion cap 2; Location pier 3; Cup mouth installs island 4; Shearing key 5; Encased steel plate 6; Ridge design section 7; The thick mortar leveling layer 8 of 2cm; Reserved steel bar 9. Wherein, precast pier 1 is installed in the scope of island 4 at cup mouth, except encased steel plate at the bottom of pier 6 scope, all does dabbing process, ensures to connect quality; Dabbing section is in precast pier prefabrication process, and the outer pipe die interior welds Checkered Steel Plate connecting section at the bottom of pier is to generate ridge design dabbing section.
Ring section precast pier 1 is in prefabrication process, and the outer pipe die interior welds Checkered Steel Plate connecting section at the bottom of pier is to generate ridge design dabbing section 7; It is provided with steel plate in the outer pipe die of welding section at the bottom of pier and it is used as later stage welding encased steel plate 6.
Below in conjunction with Fig. 4, construction procedure of the present utility model is described further.
The first step, prefabricated place carries out ring section bridge pier pier body structure manufacture, cast in situs cushion cap concrete, and reserved location pier and cup mouth install island reinforcing bar, after bearing platform construction, are checked by end face absolute altitude, build the thick mortar leveling layer of 2cm, then build location pier concrete; 2nd step, hangs fortune and installs precast pier after reaching concrete load age; 3rd step, after precast pier installs location check adjustment, encased steel plate welds the WELDING STUDS of three layers of staggered arrangement along surrounding; 4th step, erection cup mouth installs island template, builds cup mouth and installs island concrete, completes the connection of precast pier and cushion cap.
The foregoing is only better embodiment of the present utility model; not in order to limit the utility model; all any amendment, equivalent replacement and improvement etc. done within spirit of the present utility model and principle, all should be included within protection domain of the present utility model.

Claims (8)

1. the connecting structure of a precast pier and cushion cap, it is characterized in that: include cushion cap, cup mouth installation island and precast pier, location bridge pier is buried at described cushion cap top in advance, described precast pier is by locating pier location, and described precast pier is connected with cushion cap by cup mouth installation island, bottom described precast pier pier body, the section of connection is provided with encased steel plate, welds WELDING STUDS outside described encased steel plate, and encased steel plate is connected by onsite concrete between island with installing with cup mouth.
2. by the connecting structure of a kind of precast pier according to claim 1 and cushion cap, it is characterised in that: described precast pier is annular hollow cross section.
3. by the connecting structure of a kind of precast pier according to claim 1 and cushion cap, it is characterised in that: locate by location pier bottom the pier body of described precast pier, and described cushion cap end face locates onsite concrete between precast pier and cup mouth installation island; Described precast pier and cup mouth are installed and are arranged shearing key between island.
4. by the connecting structure of a kind of precast pier according to claim 3 and cushion cap, it is characterised in that: described shearing key is arranged on the encased steel plate of the section of connection bottom pier body, is that the WELDING STUDS by welding three layers of staggered arrangement is formed.
5. by the connecting structure of a kind of precast pier described in claim 1 or 2 and cushion cap, it is characterised in that: described precast pier is arranged on cup mouth and installs in island.
6. by the connecting structure of a kind of precast pier described in claim 1 or 2 and cushion cap, it is characterized in that: described cushion cap top is positioned at location Dun Chu and arranges reserved steel bar, it is provided with the thick mortar leveling layer of 2cm between described cushion cap and described location pier, and it is connected to reserved steel bar by erecting between described cushion cap with location pier.
7. by the connecting structure of a kind of precast pier described in claim 1 or 2 and cushion cap, it is characterized in that: described cushion cap top is positioned at cup mouth installation island place and arranges reserved steel bar, bottom described installation island, slope angle is set, described cup mouth install island with before described cushion cap by erect to reserved steel bar be connected.
8. by the connecting structure of a kind of precast pier according to claim 7 and cushion cap, it is characterised in that: it is 45 ° that described cup mouth installs the slope angle number of degrees on island.
CN201520989007.0U 2015-11-30 2015-11-30 Connection construction between precast pier and bearing platform Expired - Fee Related CN205313967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520989007.0U CN205313967U (en) 2015-11-30 2015-11-30 Connection construction between precast pier and bearing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520989007.0U CN205313967U (en) 2015-11-30 2015-11-30 Connection construction between precast pier and bearing platform

Publications (1)

Publication Number Publication Date
CN205313967U true CN205313967U (en) 2016-06-15

Family

ID=56315686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520989007.0U Expired - Fee Related CN205313967U (en) 2015-11-30 2015-11-30 Connection construction between precast pier and bearing platform

Country Status (1)

Country Link
CN (1) CN205313967U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442433A (en) * 2015-11-30 2016-03-30 中铁二十四局集团安徽工程有限公司 Connection structure of prefabricated bridge pier and bearing platform and construction method thereof
CN106626048A (en) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 Grouting mold and method for wind driven generator tower drum and foundation
CN108442237A (en) * 2018-04-27 2018-08-24 福建工程学院 The construction and its construction method that a kind of precast pier and prefabricated cushion cap quickly splice
CN108505433A (en) * 2018-04-27 2018-09-07 福建工程学院 A kind of bridge pier structure and its construction method
CN109594467A (en) * 2017-09-30 2019-04-09 郑州市交通规划勘察设计研究院 Precast pier and cushion cap connection structure, construction method, precast pier, cushion cap
CN109914224A (en) * 2019-04-18 2019-06-21 重庆锦森腾建筑工程咨询有限公司 Packaged type bridges substructure
CN110205919A (en) * 2019-06-12 2019-09-06 建华建材(中国)有限公司 Prefabricated high-strength concrete modular bridge pier structure and its construction method
CN110453607A (en) * 2019-08-22 2019-11-15 苏交科集团股份有限公司 Prefabricated pier steel bar connection mode and construction method thereof
CN110468723A (en) * 2019-08-30 2019-11-19 中铁六局集团太原铁路建设有限公司 The main pier encased steel plate installation engineering method of swivel bridges
CN113737777A (en) * 2021-09-22 2021-12-03 安徽省公路桥梁工程有限公司 Construction method for connecting precast pile and precast column with bearing platform

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442433A (en) * 2015-11-30 2016-03-30 中铁二十四局集团安徽工程有限公司 Connection structure of prefabricated bridge pier and bearing platform and construction method thereof
CN106626048A (en) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 Grouting mold and method for wind driven generator tower drum and foundation
CN109594467A (en) * 2017-09-30 2019-04-09 郑州市交通规划勘察设计研究院 Precast pier and cushion cap connection structure, construction method, precast pier, cushion cap
CN108505433B (en) * 2018-04-27 2023-11-21 福建工程学院 Pier structure and construction method thereof
CN108442237A (en) * 2018-04-27 2018-08-24 福建工程学院 The construction and its construction method that a kind of precast pier and prefabricated cushion cap quickly splice
CN108505433A (en) * 2018-04-27 2018-09-07 福建工程学院 A kind of bridge pier structure and its construction method
CN109914224A (en) * 2019-04-18 2019-06-21 重庆锦森腾建筑工程咨询有限公司 Packaged type bridges substructure
CN110205919A (en) * 2019-06-12 2019-09-06 建华建材(中国)有限公司 Prefabricated high-strength concrete modular bridge pier structure and its construction method
CN110205919B (en) * 2019-06-12 2024-06-07 建华建材(中国)有限公司 Prefabricated high-strength concrete combined pier structure and construction method thereof
CN110453607A (en) * 2019-08-22 2019-11-15 苏交科集团股份有限公司 Prefabricated pier steel bar connection mode and construction method thereof
CN110468723A (en) * 2019-08-30 2019-11-19 中铁六局集团太原铁路建设有限公司 The main pier encased steel plate installation engineering method of swivel bridges
CN110468723B (en) * 2019-08-30 2020-11-06 中铁六局集团太原铁路建设有限公司 Installation and construction method for wrapping steel plate outside main pier of swivel bridge
CN113737777A (en) * 2021-09-22 2021-12-03 安徽省公路桥梁工程有限公司 Construction method for connecting precast pile and precast column with bearing platform

Similar Documents

Publication Publication Date Title
CN205313967U (en) Connection construction between precast pier and bearing platform
CN105442433A (en) Connection structure of prefabricated bridge pier and bearing platform and construction method thereof
CN109457625B (en) Steel-concrete combined assembled bridge row frame pier system and construction method
CN105386405B (en) Based on bolted Precast Concrete Segmental Bridges concrete pier of steel tube
CN105735112B (en) Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN104120647B (en) It is suitable for section assembling concrete frame bridge pier system and the construction method of rapid construction
CN110512647B (en) Partial assembly type subway station structure design and construction method
CN105544381A (en) Connection structure of precast pier with annular section and bearing platform and construction method of connection structure
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN105908621A (en) Damage-controllable self-resetting section prefabricated assembled steel pipe concrete bridge pier and manufacturing method thereof
CN110952440B (en) Prefabricated section steel concrete and reinforced concrete spliced pier and construction process
CN108049305A (en) The splicing construction and joining method of a kind of precast pier and prefabricated cushion cap
CN104153287A (en) Segmental assembled concrete frame pier system with self-reset function and method
CN212128825U (en) Assembled integrated pier column and bent cap combined structure
CN105970803A (en) Shear-resistant energy dissipation device of assembled pier and construction method
CN110924291A (en) Prefabricated stiffened concrete-filled steel tube and reinforced concrete assembled pier and construction process
CN205188954U (en) Novel reinforced concrete prefabrication side stake pile extension structure
CN203855904U (en) Windproof net upright column structure
CN205369005U (en) Joint construction of annular cross -section prefabricating bridge pier and cushion cap
CN103510458B (en) Pile type continuous rigid frame bridge and construction method thereof
CN211006741U (en) Reinforced structure of P & H type rock stock fan foundation
CN110130485B (en) Prefabricated assembly type beam column node with toothed plates and assembly method thereof
CN203475289U (en) Pile type continuous rigid frame bridge
CN110644353A (en) Energy-consuming and shock-absorbing corrugated steel pipe-rubber concrete assembled pier and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

CF01 Termination of patent right due to non-payment of annual fee