CN205280328U - Tired pulse testing platform control system of forcecirculation - Google Patents

Tired pulse testing platform control system of forcecirculation Download PDF

Info

Publication number
CN205280328U
CN205280328U CN201520514280.8U CN201520514280U CN205280328U CN 205280328 U CN205280328 U CN 205280328U CN 201520514280 U CN201520514280 U CN 201520514280U CN 205280328 U CN205280328 U CN 205280328U
Authority
CN
China
Prior art keywords
hydraulic
embedded controller
valve
control system
check valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520514280.8U
Other languages
Chinese (zh)
Inventor
姚月进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Ouluhuamei Automation Equipment Co Ltd
Original Assignee
Tianjin Ouluhuamei Automation Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Ouluhuamei Automation Equipment Co Ltd filed Critical Tianjin Ouluhuamei Automation Equipment Co Ltd
Priority to CN201520514280.8U priority Critical patent/CN205280328U/en
Application granted granted Critical
Publication of CN205280328U publication Critical patent/CN205280328U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a tired pulse testing platform control system of forcecirculation. It includes that computer, embedded controller, proportion enlarge board, hydrovalve, pressure sensor, check valve, hydraulic pump, hydraulic motor, hydraulic tank and oil sump tank, and the computer links to each other with embedded controller, and embedded controller enlargies the board with the proportion respectively and links to each other with pressure sensor, and pressure sensor links to each other with hydrovalve and test respectively, and the hydrovalve links to each other with the check valve with the oil sump tank respectively, and it is continuous with hydraulic tank that the check valve passes through the hydraulic pump, and the hydraulic pump is continuous with hydraulic motor. The utility model discloses the tracking to periodic signal can be realized well, control accuracy is improved.

Description

Pressures cycle fatigue pulse testing bench control system
Technical field
This utility model relates to pulse test bench technical field, is specifically related to pressures cycle fatigue pulse testing bench control system.
Background technology
Pressures cycle fatigue pulse test bench is for automobile brake pipe, inlet manifold, steering tube, fuel pipe, air-conditioner pipe, cooling water pipe, radiator tube, hot air hose, cleaner and filtering organ pipe, the vapour vehicle component such as turbocharging organ pipe carry out pressure fatigue test, now widely used a kind of test method is by adopting electrohydraulic proportion technology to carry out tired pulse test, the method is mainly adjusted by the valve port opening of proportional pressure control valve and holds the pressure of intracavity liquid to simulate various cycle pressure signal (such as sine wave to control test specimen, triangular wave etc.), thus test specimen being carried out repeatedly compression shock to check its fatigue behaviour. in electro-hydraulic proportional control system, control strategy widely used at present is PID control, and it has simple in construction, good stability, reliable operation, the advantage such as easy to adjust. but being as the growing of science and technology, the requirement controlling system control accuracy is more and more higher, and traditional PID controls to meet so high required precision.
Utility model content
For solving the problems referred to above, this utility model provides pressures cycle fatigue pulse testing bench control system, it is possible to realize the tracking to periodic signal well, improves control accuracy.
For achieving the above object, the technical scheme that this utility model is taked is: pressures cycle fatigue pulse testing bench control system, including computer, embedded controller, proportional amplifier plate, hydraulic valve, pressure transducer, check valve, hydraulic pump, hydraulic electric motor, hydraulic oil container and oil sump tank, computer is connected with embedded controller, embedded controller is connected with proportional amplifier plate and pressure transducer respectively, pressure transducer is connected with hydraulic valve and test block respectively, hydraulic valve is connected with oil sump tank and check valve respectively, check valve is connected with hydraulic oil container by hydraulic pump, hydraulic pump is connected with hydraulic electric motor.
As preferably, described hydraulic valve is proportional pressure control valve.
As preferably, described embedded controller includes main control unit, AD conversion module and D/A conversion module, and main control unit is connected with AD conversion module and D/A conversion module respectively.
This utility model has the advantages that and can realize the tracking to periodic signal well, improves control accuracy.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
In order to make the purpose of this utility model and advantage clearly understand, below in conjunction with embodiment, this utility model is further elaborated. Should be appreciated that specific embodiment described herein is only in order to explain this utility model, be not used to limit this utility model.
As shown in Figure 1, this utility model embodiment provides pressures cycle fatigue pulse testing bench control system, including computer 1, embedded controller 2, proportional amplifier plate 3, hydraulic valve 4, pressure transducer 5, check valve 6, hydraulic pump 7, hydraulic electric motor 8, hydraulic oil container 9 and oil sump tank 10, computer 1 is connected with embedded controller 2, embedded controller 2 is connected with proportional amplifier plate 3 and pressure transducer 5 respectively, pressure transducer 5 is connected with hydraulic valve 4 and test block 11 respectively, hydraulic valve 4 is connected with oil sump tank 10 and check valve 6 respectively, check valve 6 is connected with hydraulic oil container 9 by hydraulic pump 7, hydraulic pump 7 is connected with hydraulic electric motor 8.
It should be noted that described hydraulic valve 4 is proportional pressure control valve.
Additionally, described embedded controller 2 includes main control unit, AD conversion module and D/A conversion module, main control unit is connected with AD conversion module and D/A conversion module respectively.
This detailed description of the invention computer acts primarily as supervisory function bit, realizes the control to embedded controller by human-computer interaction interface, and then controls the execution of whole hardware system. Embedded controller is made up of main control unit, A/D modular converter and D/A modular converter, and its effect is the operation that hydraulic system has been controlled being correlated with by the instruction accepting computer. Proportional amplifier plate selects the direct current amplification board supporting with proportional pressure control valve, can be considered scaling link. The inlet pressure of overflow valve is the test pressure of testpieces, and adopts this pressure signal of sensor acquisition. Hydraulic pressure executive item part is mainly used in performing the order that embedded controller is passed on, and operates accordingly.
The above is only preferred implementation of the present utility model; it should be pointed out that, for those skilled in the art, under the premise without departing from this utility model principle; can also making some improvements and modifications, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (3)

1. pressures cycle fatigue pulse testing bench control system, it is characterized in that, including computer (1), embedded controller (2), proportional amplifier plate (3), hydraulic valve (4), pressure transducer (5), check valve (6), hydraulic pump (7), hydraulic electric motor (8), hydraulic oil container (9) and oil sump tank (10), computer (1) is connected with embedded controller (2), embedded controller (2) is connected with proportional amplifier plate (3) and pressure transducer (5) respectively, pressure transducer (5) is connected with hydraulic valve (4) and test block (11) respectively, hydraulic valve (4) is connected with oil sump tank (10) and check valve (6) respectively, check valve (6) is connected with hydraulic oil container (9) by hydraulic pump (7), hydraulic pump (7) is connected with hydraulic electric motor (8).
2. pressures cycle fatigue pulse testing bench control system according to claim 1, it is characterised in that described hydraulic valve (4) is proportional pressure control valve.
3. pressures cycle fatigue pulse testing bench control system according to claim 1, it is characterized in that, described embedded controller (2) includes main control unit, AD conversion module and D/A conversion module, and main control unit is connected with AD conversion module and D/A conversion module respectively.
CN201520514280.8U 2015-07-15 2015-07-15 Tired pulse testing platform control system of forcecirculation Expired - Fee Related CN205280328U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520514280.8U CN205280328U (en) 2015-07-15 2015-07-15 Tired pulse testing platform control system of forcecirculation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520514280.8U CN205280328U (en) 2015-07-15 2015-07-15 Tired pulse testing platform control system of forcecirculation

Publications (1)

Publication Number Publication Date
CN205280328U true CN205280328U (en) 2016-06-01

Family

ID=56064894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520514280.8U Expired - Fee Related CN205280328U (en) 2015-07-15 2015-07-15 Tired pulse testing platform control system of forcecirculation

Country Status (1)

Country Link
CN (1) CN205280328U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108120601A (en) * 2017-12-20 2018-06-05 华中科技大学 A kind of alcohol consumes instrument fuel-flow control system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108120601A (en) * 2017-12-20 2018-06-05 华中科技大学 A kind of alcohol consumes instrument fuel-flow control system

Similar Documents

Publication Publication Date Title
CN103644151B (en) The test bed hydraulic control system of energy-conservation low impact hydraulic cylinder
CN104006034B (en) Hydraulic servo variable-load loading test bench
CN109058234B (en) Performance test system and detection method for hydraulic system of electric proportional control valve compensation excavator
CN104502116A (en) Hydraulic simulation test apparatus and system, and test method
CN201858218U (en) Oil return device for engineering machinery
CN101762426B (en) Hydraulic hard tube experimental table and experimental method
CN205280328U (en) Tired pulse testing platform control system of forcecirculation
CN109030251A (en) Hydraulic hose high temperature pulse test system
CN203572646U (en) Hydraulic valve performance test rig
CN103423217B (en) A kind of hydraulic load analog of low noise
EP2098644A3 (en) Apparatus for fixing hydraulic pipes for construction equipment
CN207894596U (en) A kind of Reservoir Charge-Up valve reliability test system
CN204128811U (en) A kind of hydraulic means air film hole being carried out to analogue flow rate detection
CN207278600U (en) A kind of supercharging device suitable for underwater Burning rate testing system
CN203587454U (en) Vertical multi-cylinder loading testing machine
ATE554979T1 (en) METHOD FOR MEASUREMENT OF THE PRESSURE ON AN ANALOGIZED, ELECTROMAGNETICALLY CONTROLLED HYDRAULIC VALVE
CN202330426U (en) Numerical-control constant-pressure perfusion experiment device
CN112082794A (en) Double-power-source gas cylinder fatigue experiment device
CN204286733U (en) Normal temperature water attack pilot system
CN205280391U (en) Auto -lock swing hydraulic press performance testing platform
CN204646621U (en) A kind of simulated solution press pump carries out the device of hydraulic loaded
CN212379047U (en) Double-power-source gas cylinder fatigue experiment device
CN206972628U (en) A kind of analogue means of ultra-deep sea pressure environment
CN201555771U (en) Test stand for hydraulic hard tube
CN202789853U (en) Part debugging device for heading machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601

Termination date: 20170715

CF01 Termination of patent right due to non-payment of annual fee