CN205276921U - Building site is with climbing device - Google Patents

Building site is with climbing device Download PDF

Info

Publication number
CN205276921U
CN205276921U CN201620016032.5U CN201620016032U CN205276921U CN 205276921 U CN205276921 U CN 205276921U CN 201620016032 U CN201620016032 U CN 201620016032U CN 205276921 U CN205276921 U CN 205276921U
Authority
CN
China
Prior art keywords
hydro
support frame
base
junctor
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620016032.5U
Other languages
Chinese (zh)
Inventor
陈志渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suining Xinyi Construction Service Co.,Ltd.
Xu Huiying
Yi Jia
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620016032.5U priority Critical patent/CN205276921U/en
Application granted granted Critical
Publication of CN205276921U publication Critical patent/CN205276921U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a building site is with climbing device, the on -line screen storage device comprises a base, fixed surface installation bottom suspension fagging on the base, bottom suspension fagging top is provided with top support frame, connect by the footboard between top support frame and the bottom suspension fagging, through the round pin hub connection between the adjacent footboard, lie in and connect through the connector between the adjacent round pin axle of footboard homonymy, the connector both ends all are provided with the pinhole, the box is connected to connector one end pinhole, connector other end pinhole connection dog, box and dog cooperation installation, just top support frame upper end fixed mounting connecting plate, top support frame pass through two relative sides bolt and crane fixed connection, crane bottom surface and hydraulic telescoping rod top fixed connection, whole device easy operation, and need not avoid the damage to the building with the help of the effect of building, and still reduced constructor's the climbing degree of difficulty, improved security and the travelling comfort climbed.

Description

A kind of construction site climbing device
Technical field
The utility model relates to building apparatus technical field, is specially a kind of construction site climbing device.
Background technology
In construction site, workman often needs to climb and constructs above the cylinder of buildings or body of wall to buildings, in the prior art, the ladder in existing construction site is usually beaten hole on cylinder or body of wall or is fixed by welding on buildings, and buildings is caused damage, and dismounting inconvenience, and ladder often gradient is excessive, climb difficulty and intensity big, add workmen and climb danger and physical demands, for this reason, we propose a kind of construction site climbing device.
Practical novel content
The purpose of this utility model is to provide a kind of construction site climbing device, to solve in above-mentioned background technology the problem proposed.
For achieving the above object, the utility model provides following technical scheme: a kind of construction site climbing device, comprise base, described base upper surface fixed installation lower supporting plate, it is provided with upper support frame above described lower supporting plate, connect by pedal between described upper support frame and lower supporting plate, pinned connection is passed through between adjacent pedal, connected by junctor between the bearing pin that pedal is adjacent with side, described junctor two ends are provided with pin-and-hole, described junctor one end pin-and-hole connect box, junctor the other end pin-and-hole connects block, described casing and block coordinate to be installed, described junctor outside is provided with scalable dw, and described upper support frame upper end fixed installation web plate, upper support frame two relative sides are fixedly connected with lifting support by bolt, described lifting support bottom surface is fixedly connected with hydraulic pressure expansion link top, described hydraulic pressure expansion link coordinates installation with hydro-cylinder, described hydro-cylinder is fixedly mounted on base upper surface, and described hydraulic pressure expansion link is set with permanent sleeve, described permanent sleeve is between hydro-cylinder and hydraulic pressure expansion link top, permanent sleeve is fixedly connected with support leg one end, the described support leg the other end is fixedly mounted on ground, and described base upper surface is provided with hydro-pump and motor, described hydro-pump and hydro-cylinder connect, hydro-pump rotating shaft and motor output shaft connect.
Preferably, the quantity of described hydro-cylinder has four, and four hydro-cylinders are evenly distributed on base upper surface.
Preferably, described web plate is obliquely installed, and web plate is positioned at the top of lifting support.
Preferably, the quantity of described support leg has six, has and is separately installed with two support legs on two adjacent permanent sleeves, and on two other permanent sleeve, each installation one supports leg.
Preferably, the quantity of described pedal is at least four, and four pedals press broken line shape distribution on the direction of vertical lower supporting plate upper surface.
Compared with prior art, the beneficial effects of the utility model are: climbing mechanism is placed in integrally by base by this construction site climbing device, it is convenient to mobile, operationally hydraulic pressure expansion link is made to drive lifting support to rise by the effect of hydro-cylinder, upper support frame up moves under the drive of rising frame, pedal is opened by folded state, climbing upstairs is formed by pedal, avoid vertical climbing, alleviate the physical demands of climbing, reduce workmen's operation intensity, whole device is simple to operate, climb position can change flexibly, and do not need the effect by buildings, avoid the damage to buildings, also reduce the climbing difficulty of workmen, improve the security of climbing and comfortable property.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model connector construction schematic diagram.
In figure: 1 base, 2 hydro-pumps, 3 support leg, 4 bearing pins, 5 bolts, 6 lifting supports, 7 web plates, 8 upper support frames, 9 junctors, 10 pedals, 11 lower supporting plates, 12 permanent sleeves, 13 hydraulic pressure expansion links, 14 hydro-cylinders, 15 motors, 16 pin-and-holes, 17 casings, 18 blocks, 19 scalable dw.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that described embodiment is only the utility model part embodiment, instead of whole embodiments. Based on the embodiment in the utility model, those of ordinary skill in the art are not making other embodiments all obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1-2, the utility model provides a kind of technical scheme: a kind of construction site climbing device, comprise base 1, base 1 upper surface fixed installation lower supporting plate 11, upper support frame 8 it is provided with above lower supporting plate 11, connect by pedal 10 between upper support frame 8 and lower supporting plate 11, the quantity of pedal 10 is at least four, and four pedals 10 press broken line shape distribution on the direction of vertical lower supporting plate 10 upper surface, connected by bearing pin 4 between adjacent pedal 10, connected by junctor 9 between the bearing pin 4 that pedal 10 is adjacent with side, junctor 9 two ends are provided with pin-and-hole 16, junctor 9 one end pin-and-hole 16 connect box 17, junctor 9 the other end pin-and-hole 16 connects block 18, casing 17 and block 18 coordinate to be installed, block 18 can move in casing 17 inside, junctor 9 outside is provided with scalable dw 19, under the effect of junctor 9, pedal 10 can realize launching and folding along with the rising of upper support frame 8 and decline, and upper support frame 8 upper end fixed installation web plate 7, web plate 7 is obliquely installed, and web plate 7 is positioned at the top of lifting support 6, web plate 7 is away from one end connecting building thing of upper support frame 8, can move to above buildings from pedal 10 by web plate 7 operation personnel, upper support frame 8 two relative sides are fixedly connected with lifting support 6 by bolt 5, lifting support 6 bottom surface is fixedly connected with hydraulic pressure expansion link 13 top, hydraulic pressure expansion link 13 coordinates installation with hydro-cylinder 14, hydro-cylinder 14 is fixedly mounted on base 1 upper surface, the quantity of hydro-cylinder 14 has four, and four hydro-cylinders 14 are evenly distributed on base 1 upper surface, hydraulic pressure power is adopted to realize rising and the decline of lifting support 6, save manpower, and hydraulic pressure expansion link 13 is set with permanent sleeve 12, permanent sleeve 12 is between hydro-cylinder 14 and hydraulic pressure expansion link 13 top, permanent sleeve 12 is fixedly connected with support leg 3 one end, supporting leg 3 the other end is fixedly mounted on ground, do not need the support of buildings, prevent the damage to buildings, the quantity supporting leg 3 has six, have and two adjacent permanent sleeves 12 are separately installed with two support legs 3, on two other permanent sleeve 12, each installation one supports leg 3, permanent sleeve 12 and support leg 3 improve the stability of climbing device, be conducive to increasing climbing height, and base 1 upper surface is provided with hydro-pump 2 and motor 15, hydro-pump 2 and hydro-cylinder 14 connect, hydro-pump 2 rotating shaft and motor 15 output shaft connect, whole device is simple to operate, climb position can change flexibly, and do not need the effect by buildings, avoid the damage to buildings, also reduce the climbing difficulty of workmen, improve the security of climbing and comfortable property.
Although it has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, be appreciated that and these embodiments can be carried out multiple change, amendment, replacement and modification when not departing from principle of the present utility model and spirit, scope of the present utility model by claims and etc. jljl limit.

Claims (5)

1. a construction site climbing device, comprise base (1), it is characterized in that: described base (1) upper surface fixed installation lower supporting plate (11), described lower supporting plate (11) top is provided with upper support frame (8), connect by pedal (10) between described upper support frame (8) and lower supporting plate (11), connected by bearing pin (4) between adjacent pedal (10), it is positioned at pedal (10) to be connected by junctor (9) with between the adjacent bearing pin (4) in side, described junctor (9) two ends are provided with pin-and-hole (16), described junctor (9) one end pin-and-hole (16) connect box (17), junctor (9) the other end pin-and-hole (16) connects block (18), described casing (17) and block (18) coordinate to be installed, described junctor (9) outside is provided with scalable dw (19), and described upper support frame (8) upper end fixed installation web plate (7), upper support frame (8) two relative sides are fixedly connected with lifting support (6) by bolt (5), described lifting support (6) bottom surface is fixedly connected with hydraulic pressure expansion link (13) top, described hydraulic pressure expansion link (13) coordinates installation with hydro-cylinder (14), described hydro-cylinder (14) is fixedly mounted on base (1) upper surface, and described hydraulic pressure expansion link (13) is set with permanent sleeve (12), described permanent sleeve (12) is positioned between hydro-cylinder (14) and hydraulic pressure expansion link (13) top, permanent sleeve (12) is fixedly connected with support leg (3) one end, described support leg (3) the other end is fixedly mounted on ground, and described base (1) upper surface is provided with hydro-pump (2) and motor (15), described hydro-pump (2) and hydro-cylinder (14) connect, hydro-pump (2) rotating shaft and motor (15) output shaft connect.
2. a kind of construction site according to claim 1 climbing device, it is characterised in that: the quantity of described hydro-cylinder (14) has four, and four hydro-cylinders (14) are evenly distributed on base (1) upper surface.
3. a kind of construction site according to claim 1 climbing device, it is characterised in that: described web plate (7) is obliquely installed, and web plate (7) is positioned at the top of lifting support (6).
4. a kind of construction site according to claim 1 climbing device, it is characterized in that: the quantity of described support leg (3) has six, having and be separately installed with two supports leg (3) on two adjacent permanent sleeves (12), the upper each installation one of two other permanent sleeve (12) supports leg (3).
5. a kind of construction site according to claim 1 climbing device, it is characterized in that: the quantity of described pedal (10) is at least four, and four pedals (10) press broken line shape distribution on the direction of vertical lower supporting plate (10) upper surface.
CN201620016032.5U 2016-01-07 2016-01-07 Building site is with climbing device Expired - Fee Related CN205276921U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620016032.5U CN205276921U (en) 2016-01-07 2016-01-07 Building site is with climbing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620016032.5U CN205276921U (en) 2016-01-07 2016-01-07 Building site is with climbing device

Publications (1)

Publication Number Publication Date
CN205276921U true CN205276921U (en) 2016-06-01

Family

ID=56061505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620016032.5U Expired - Fee Related CN205276921U (en) 2016-01-07 2016-01-07 Building site is with climbing device

Country Status (1)

Country Link
CN (1) CN205276921U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057402A (en) * 2018-10-21 2018-12-21 济宁市昊通工程机械有限公司 A kind of height tunable arrangement of the safe ladder cage of engineering
CN109403564A (en) * 2018-11-20 2019-03-01 毕欣 A kind of stair activity height adjusting method based on level identification
CN109958135A (en) * 2018-11-20 2019-07-02 成都中技智慧企业管理咨询有限公司 A kind of height adjusting method of the deep basal pit stair activity based on safety

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057402A (en) * 2018-10-21 2018-12-21 济宁市昊通工程机械有限公司 A kind of height tunable arrangement of the safe ladder cage of engineering
CN109403564A (en) * 2018-11-20 2019-03-01 毕欣 A kind of stair activity height adjusting method based on level identification
CN109958135A (en) * 2018-11-20 2019-07-02 成都中技智慧企业管理咨询有限公司 A kind of height adjusting method of the deep basal pit stair activity based on safety
CN109958135B (en) * 2018-11-20 2021-06-29 玛斯特信息科技南通有限公司 Deep foundation pit up and down stair height adjusting method based on safety

Similar Documents

Publication Publication Date Title
CN201040692Y (en) Double horizontal arm grounding hold-pole
CN210457248U (en) Self-jacking device for jacking and adding standard joint
CN201785758U (en) Foundation pit supporting system
CN205276921U (en) Building site is with climbing device
CN204940312U (en) A kind of integral lifting lowering system of steel cofferdam
CN201942481U (en) Scissors type lifting platform arm support mechanism
CN203255914U (en) Unit-typed curtain wall lifting device
CN209052305U (en) Portal frame is used in a kind of transport of highway engineering construction
CN204152426U (en) A kind of quick removal of home rig of hydraulic cylinder raising
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN201793330U (en) Gantry hanger frame device
CN102359109A (en) Static pile press for narrow site and ultra-short side pile distance construction
CN206888658U (en) A kind of power construction is stood up device with shaft tower
CN207166021U (en) Supply line's inspection platform
CN203334282U (en) Whole loading and transporting type hydraulic static pile driver
CN213679698U (en) Auxiliary insulating platform of overhead vehicle
CN205530308U (en) Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers
CN213738414U (en) Multi-upright-column synchronous jacking joint adding system
CN212392581U (en) Bypass operation crossing structure
CN210369852U (en) Compact folding hanging flower basket device
CN210457249U (en) Electric pole holding structure with self-jacking machine body
CN208023970U (en) Construction discharging platform
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN206839545U (en) A kind of dedicated hydraulic device for demolition, installation large size bearing
CN205820706U (en) A kind of gantry crane's supporting legs

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160808

Address after: 629000, Sichuan province Suining city boat mountain bright moon road Wantong company dormitory No. 2-4-7-11

Patentee after: Suining Xinyi Construction Service Co.,Ltd.

Address before: 629000, No. 5, building 2, 397 Middle Road, Binjiang Middle Road, Suining, Sichuan,

Patentee before: Yi Jia

Patentee before: Xu Huiying

Effective date of registration: 20160808

Address after: 629000, No. 5, building 2, 397 Middle Road, Binjiang Middle Road, Suining, Sichuan,

Patentee after: Yi Jia

Patentee after: Xu Huiying

Address before: 362000 Shigu, Fujian, Yongchun County town of Phoenix Village, No.

Patentee before: Chen Zhiyuan

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601

Termination date: 20170107

CF01 Termination of patent right due to non-payment of annual fee