CN205242981U - Concrete construction operation platform - Google Patents
Concrete construction operation platform Download PDFInfo
- Publication number
- CN205242981U CN205242981U CN201521104836.2U CN201521104836U CN205242981U CN 205242981 U CN205242981 U CN 205242981U CN 201521104836 U CN201521104836 U CN 201521104836U CN 205242981 U CN205242981 U CN 205242981U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- vertical connecting
- steel pipe
- concrete construction
- bearing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a concrete construction operation platform, including the footboard, still include two at least support angle framves, the support angle frame is including vertical connecting rod, horizontal bearing bar, oblique pull rod and template steel pipe, vertical connecting rod and template steel pipe fixed connection, horizontal bearing bar with the lower extreme fixed connection of vertical connecting rod, to one side the pull rod set firmly in between horizontal bearing bar and the vertical connecting rod, the footboard set up in on the horizontal bearing bar. The utility model discloses a concrete construction operation platform has advantages such as simple structure, safe and reliable, range of application guangZhou.
Description
Technical field
The utility model relates to construction implement, relates in particular to a kind of concrete construction operating platform.
Background technology
In recent years, along with the increase of depth of building, reinforced concrete structure is because of its good mechanical property and economy,Being applied to gradually high building structure especially has in the high building structure of special external form, concrete construction formwork erection,Comparative maturity of frame aspect. In the time adopting reinforced concrete structure to build skyscraper, supporting work high above the ground working measureThere is potential safety hazard. The simple and crude bamboo wood pedal that more commonly concrete construction personnel set up voluntarily or there is no crosshead and straightConnect walking and construct between template, security incident frequency occurs higher, unified feasible executing while needing a kind of concrete construction badlyWork operating platform.
Utility model content
The technical problems to be solved in the utility model is to overcome the deficiencies in the prior art, and a kind of simple in structure, safety is providedReliably, the concrete construction operating platform of applied range.
For solving the problems of the technologies described above, the utility model by the following technical solutions:
A kind of concrete construction operating platform, comprises pedal, also comprises that at least two are supported corner bracket, described support corner bracket bagDraw together vertical connecting rod, Horizontal load-bearing bar, brace and template steel pipe, described vertical connecting rod is fixedly connected with template steel pipe, instituteState Horizontal load-bearing bar and be fixedly connected with the lower end of described vertical connecting rod, described brace is fixedly arranged on described Horizontal load-bearing bar and perpendicularBetween direct-connected extension bar, described pedal is erected on described Horizontal load-bearing bar.
Further improvement as technique scheme:
The upper end of described vertical connecting rod is provided with crook, and described crook hang on described template steel pipe.
Described template steel pipe is provided with screwed hole, and described vertical connecting rod is fixed by the bolt of being located in described screwed holeOn template steel pipe.
On described pedal, be installed with guardrail, described guardrail arranges along tread length direction, guardrail top and describedly vertically connectBetween extension bar, be installed with guardrail pull bar.
Compared with prior art, the utility model has the advantage of: concrete construction operating platform profit of the present utility model, vertical connecting rod is set and is fixedly connected with template steel pipe as support with existing template steel pipe in building template system, perpendicularDirect-connected extension bar lower end arranges Horizontal load-bearing bar in order to pedal to be installed, and between Horizontal load-bearing bar and vertical connecting rod, brace is set,Overall structure is simple, reliable, the security while effectively having improved concrete construction.
Further, vertically connecting rod upper end arranges crook, utilizes crook to hang on template steel pipe, structure letterSingle, be convenient to dismounting, and there is higher reliability after installing, be applicable to the more random plank sheathing system of traditional processing.
Further, screwed hole is set on template steel pipe, utilizes bolt that vertical connecting rod is fixed on template steel pipe,Simple and reliable for structure, vertically connecting rod can lift use after connecting with template steel pipe together with steel form system, and synchronous realization builtBuild the assembled, very convenient of thing template system and concrete construction operating platform, be applicable to steel form system.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model concrete construction operating platform embodiment 1;
Fig. 2 is the side view of the utility model concrete construction operating platform embodiment 1;
Fig. 3 is the structural representation of the utility model concrete construction operating platform embodiment 2;
Fig. 4 is the side view of the utility model concrete construction operating platform embodiment 2.
In figure, each label represents: 1, template steel pipe; 2, vertical connecting rod; 3, Horizontal load-bearing bar; 4, brace; 5, pedal;6, crook; 7, bolt; 8, guardrail; 9, guardrail pull bar.
Detailed description of the invention
Below in conjunction with Figure of description and specific embodiment, the utility model is further described.
Embodiment 1
As shown in Figure 1, the concrete construction operating platform of the present embodiment, comprises pedal 5, also comprises at least two strut anglesFrame, supports corner bracket and comprises vertical connecting rod 2, Horizontal load-bearing bar 3, brace 4 and template steel pipe 1, vertically connecting rod 2 and formwork steelPipe 1 is fixedly connected with, and Horizontal load-bearing bar 3 is fixedly connected with the lower end of vertical connecting rod 2, and brace 4 is fixedly arranged on Horizontal load-bearing bar 3 HesVertically, between connecting rod 2, pedal 5 is erected on Horizontal load-bearing bar 3, wherein between Horizontal load-bearing bar 3 and vertical connecting rod 2, tiltedlyBetween pull bar 4 and Horizontal load-bearing bar 3, vertical connecting rod 2, all adopt threaded fastener to achieve a fixed connection, at other embodiment alsoCan adopt welding, riveted joint etc. This concrete construction operating platform utilizes existing template steel pipe 1 conduct in building template systemSupport, vertical connecting rod 2 is set and is fixedly connected with template steel pipe 1, vertically connecting rod 2 lower ends arrange Horizontal load-bearing bar 3 in order to peaceDress pedal 5, arranges brace 4 between Horizontal load-bearing bar 3 and vertical connecting rod 2, and overall structure is simple, reliable, has effectively improvedSecurity when concrete construction.
As shown in Figure 2, in the present embodiment, vertically the upper end of connecting rod 2 is provided with crook 6, and crook 6 hang on templateOn steel pipe 1, simple in structure, be convenient to dismounting, and there is higher reliability after installing, be applicable to traditional processing more randomPlank sheathing system.
Embodiment 2
As shown in Figure 3 and Figure 4, structure and the embodiment 1 of the concrete construction operating platform of the present embodiment are roughly the same, noBe with part, template steel pipe 1 is provided with screwed hole, and vertically connecting rod 2 is fixed on template by the bolt 7 of being located in screwed holeOn steel pipe 1, this concrete construction operating platform is simple and reliable for structure, vertically connecting rod 2 be connected with template steel pipe 1 after can with punching blockPlate system lifts use together, synchronously realizes the assembled, very convenient of building template system and concrete construction operating platform,Be applicable to steel form system.
In the present embodiment, be installed with guardrail 8 on pedal 5, guardrail 8, along pedal 5 length direction settings, can further improve behaviourDo the security of platform, between guardrail 8 tops and vertical connecting rod 2, be installed with guardrail pull bar 9, the installation that has improved guardrail 8 is strongDegree, reliability.
Although the utility model discloses as above with preferred embodiment, but not in order to limit the utility model. AnyThose of ordinary skill in the art, in the situation that not departing from technical solutions of the utility model scope, can utilize above-mentioned announcementTechnology contents technical solutions of the utility model are made to many possible variations and modification, or be revised as the equivalence of equivalent variationsEmbodiment. Therefore, every content that does not depart from technical solutions of the utility model, according to the utility model technical spirit to above realityExecute any simple modification, equivalent variations and modification that example is done, all should drop in the scope of technical solutions of the utility model protection.
Claims (4)
1. a concrete construction operating platform, comprises pedal (5), it is characterized in that: also comprise that at least two are supported corner bracket, instituteState support corner bracket and comprise vertical connecting rod (2), Horizontal load-bearing bar (3), brace (4) and template steel pipe (1), described vertical connectionBar (2) is fixedly connected with template steel pipe (1), and described Horizontal load-bearing bar (3) is even fixing with the lower end of described vertical connecting rod (2)Connect, described brace (4) is fixedly arranged between described Horizontal load-bearing bar (3) and vertical connecting rod (2), and described pedal (5) is erected onOn described Horizontal load-bearing bar (3).
2. concrete construction operating platform according to claim 1, is characterized in that, described vertical connecting rod (2) upperEnd is provided with crook (6), and described crook (6) hang on described template steel pipe (1).
3. concrete construction operating platform according to claim 1, is characterized in that, described template steel pipe (1) is provided withScrewed hole, described vertical connecting rod (2) is fixed on template steel pipe (1) by the bolt (7) of being located in described screwed hole.
4. concrete construction operating platform according to claim 3, is characterized in that, on described pedal (5), is installed with and protectsHurdle (8), described guardrail (8), along pedal (5) length direction setting, sets firmly between guardrail (8) top and described vertical connecting rod (2)There is guardrail pull bar (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521104836.2U CN205242981U (en) | 2015-12-28 | 2015-12-28 | Concrete construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521104836.2U CN205242981U (en) | 2015-12-28 | 2015-12-28 | Concrete construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205242981U true CN205242981U (en) | 2016-05-18 |
Family
ID=55942061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521104836.2U Active CN205242981U (en) | 2015-12-28 | 2015-12-28 | Concrete construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205242981U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610510A (en) * | 2018-12-12 | 2019-04-12 | 中铁局集团厦门建设工程有限公司 | Subway station and half cap excavation method section main structure mid-board spell formula traveling shuttering certainly |
-
2015
- 2015-12-28 CN CN201521104836.2U patent/CN205242981U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610510A (en) * | 2018-12-12 | 2019-04-12 | 中铁局集团厦门建设工程有限公司 | Subway station and half cap excavation method section main structure mid-board spell formula traveling shuttering certainly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206174504U (en) | Steel structure support | |
CN204001650U (en) | Overhanging scaffold for building | |
CN205531399U (en) | Interim support frame is installed in high -order steel truss segmentation | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
CN204385883U (en) | A kind of Fabricated balcony | |
CN205242981U (en) | Concrete construction operation platform | |
CN204343642U (en) | Builder's jack corner support frame | |
CN204059901U (en) | A kind of high-altitude construction operation platform | |
CN202000268U (en) | Foldable front outrigger for bridge girder erection machine | |
CN205276843U (en) | Instrument formula protection frame suitable for assemble protruding type component of integral concrete | |
CN202467170U (en) | Aluminum alloy rising template system | |
CN202055509U (en) | Upright rod installation structure of directly-inserted scaffold | |
CN205590111U (en) | Construction elevator attaches wall structure | |
CN201377167Y (en) | High-altitude assembly platform for segmented factory-building pillars | |
CN205840289U (en) | A kind of suspension type vertical operating platform | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN204980945U (en) | Supplementary tower crane dismounting device | |
CN204343647U (en) | A kind of the shaped steel suspension scaffolding bracing frame | |
CN203201164U (en) | Tool type guard bar for construction site | |
CN204038917U (en) | Detachable external hanging type operating platform | |
CN203361596U (en) | Auxiliary support of integrated lifting operation platform | |
CN206051211U (en) | A kind of special extended type wall-attached frame | |
CN200999454Y (en) | Integral cross brace connected building construction gate type scaffold | |
CN206360079U (en) | A kind of frame structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |