CN205223840U - Bridge prefabrication pier stand and cushion cap socket joint formula connection structure - Google Patents

Bridge prefabrication pier stand and cushion cap socket joint formula connection structure Download PDF

Info

Publication number
CN205223840U
CN205223840U CN201521074139.7U CN201521074139U CN205223840U CN 205223840 U CN205223840 U CN 205223840U CN 201521074139 U CN201521074139 U CN 201521074139U CN 205223840 U CN205223840 U CN 205223840U
Authority
CN
China
Prior art keywords
column
cushion cap
built
hole groove
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201521074139.7U
Other languages
Chinese (zh)
Inventor
姜海西
周良
査义强
黄国斌
陆元春
沙丽新
吴刚
王志强
吴建兵
朱鹏志
张玉富
聂志宏
范雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Investment Construction Development Co Ltd Of Shanghai Highway
Shanghai Urban Construction Design Research Institute Co ltd
Original Assignee
Investment Construction Development Co Ltd Of Shanghai Highway
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Investment Construction Development Co Ltd Of Shanghai Highway, Shanghai Urban Construction Design Research Institute Co ltd filed Critical Investment Construction Development Co Ltd Of Shanghai Highway
Priority to CN201521074139.7U priority Critical patent/CN205223840U/en
Application granted granted Critical
Publication of CN205223840U publication Critical patent/CN205223840U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge prefabrication pier stand and cushion cap socket joint formula connection structure, the structure includes stand and cushion cap, and the stand sets up column mouting hole groove including exposing end and built -in end in the vertical direction of cushion cap, and cross sectional shape, size and the cross sectional shape of built -in end in column mouting hole groove, big or small phase -match are so that the stand built -in end can imbed column mouting hole inslot, and the clearance between the outer wall of stand built -in end and the inner wall in column mouting hole groove is more than or equal to 2cm, the top surface of cushion cap is equipped with the mud jacking hole, and the bottom surface in column mouting hole groove is equipped with an out grouting holes, is equipped with the mud jacking passageway between a mud jacking hole and the out grouting holes. The utility model discloses need not pre -buried a fairly large number of built -in fitting in prefabricated stand or cushion cap, site operation positioning accuracy requires redundancy low, the adjustment big to it is not high to requirements such as construction machinery, need not on -the -spot reinforcing bar and tying up, weld and concrete placement work on a large scale, swift facility is installed at the scene, work load is little.

Description

Bridge prefabrication pier column and cushion cap socket type connecting structure
Technical field
The utility model relates to bridge construction technical field, particularly a kind of bridge prefabrication pier column and cushion cap socket type connecting structure.
Background technology
In prior art, bridge construction precast pier column and the assembled of cushion cap are typically employed in embedded sleeve barrel in column or cushion cap, built-in metal bellows and adopt prestress wire, and the connecting reinforcement then in cushion cap or column accurately locates socket three kinds of built-in fitting Splicing models; In addition, prefabricated one section of column while of also having on cushion cap, arranges one section of cast in situs section and precast pier and cushion cap is linked to be overall joining method between this column and top column.
Due to above-mentioned three kinds of conventional built-in fitting Splicing models all need in column or cushion cap the built-in fitting such as pre-buried a fairly large number of sleeve, bellows or prestress pipe, and it is higher to the requirement of the construction such as connecting reinforcement and built-in fitting positioning precision in prefabricated units, the redundancy of site operation adjustment is less, all proposes very high requirement to construction machinery, equipment, manufacture processing etc.; And adopt the erection method that cast in situs section connects, need carry out reinforcement welding at the scene and concretely to build, site work amount is larger.
Utility model content
Because the above-mentioned defect of prior art, technical purpose of the present utility model is to provide a kind of bridge prefabrication pier column and cushion cap socket type connecting structure and assembling method thereof, improves in prior art the defects such as positioning accuracy request of constructing is high, job site adjustment redundancy is little, high to construction equipment requirement, site operation workload is large.
For achieving the above object, the utility model provides a kind of bridge prefabrication pier column and cushion cap socket type connecting structure, comprise column and cushion cap, described column comprises exposed junction and built-in end, the vertical direction of described cushion cap is arranged column and hole groove is installed, the cross sectional shape of the cross sectional shape of hole groove, size and described built-in end installed by described column, size matches to enable described column built-in end embed described column and installs in the groove of hole, and the gap between the inwall that hole groove installed by the outer wall of described column built-in end and described column is more than or equal to 2cm; The end face of described cushion cap is provided with mud jacking hole, and the bottom surface that hole groove installed by described column is provided with the first slurry outlet, is provided with mud jacking passage between described mud jacking hole and described first slurry outlet.
Further, the maximum outer profile size of described column built-in end equals the outer profile size of described column exposed junction.
Further, the maximum outer profile size of described column built-in end is less than the outer profile size of described column exposed junction, the end face of described cushion cap is also provided with the second slurry outlet, and the upper end that described second slurry outlet installs hole groove by pulp passage and described column is connected.
Further, the outer wall of described column built-in end arranges the column shear connector of some annular protrusions; The inwall of described column installation hole groove arranges the cushion cap shear connector of some annular protrusions.
The invention also discloses the assembling method of a kind of bridge prefabrication pier column and cushion cap, comprise the following steps:
A. prefabricated stand column, described column comprises column exposed junction and column built-in end;
B. prefabricated or cast-in-place cushion cap, the vertical direction of described cushion cap arranges column hole groove is installed, the cross sectional shape of the cross sectional shape of hole groove, size and described column built-in end installed by described column, size matches to enable described column built-in end embed described column and installs in the groove of hole, and the outer wall of described column built-in end and described column hole groove is installed inwall between gap be more than or equal to 2cm; The end face of described cushion cap is also provided with mud jacking hole, and the bottom surface that hole groove installed by described column is provided with the first slurry outlet, is provided with mud jacking passage between described mud jacking hole and described first slurry outlet;
C. at described column, hole groove bottom is installed and cushion block is set, the built-in end of described column is inserted described column and install in the groove of hole, between the bottom surface that described cushion block makes the bottom of described column built-in end and described column install hole groove, keep certain interval; Gap between the inwall that the position adjusting described column built-in end makes described column built-in end outer wall and described column install hole groove is more than or equal to 2cm;
D. by described mud jacking hole, described mud jacking passage and described first slurry outlet, high strength and no shrinting cementation material being fed into described column installs in the groove of hole, until described high strength and no shrinting cementation material is full of described column built-in end and described column install gap between the groove of hole, after described high strength and no shrinting cementation material solidifies, described column and described cushion cap are spliced into entirety.
Further, in described steps A, the sectional area of described column built-in end equals the sectional area of described column exposed junction, in described step D, described high strength and no shrinting cementation material to be injected in gap that described column built-in end and described column install between the groove of hole by described mud jacking hole, described mud jacking passage and described first slurry outlet until described high strength and no shrinting cementation material overflows the top that gap between the groove of hole installed by described column built-in end and described column.
Further, in described steps A, the sectional area of described column built-in end is less than the sectional area of described column exposed junction; In described step B, the end face of described cushion cap is also provided with the second slurry outlet, the upper end that described second slurry outlet installs hole groove by pulp passage and described column is connected; In described step D, described high strength and no shrinting cementation material is fed in gap that described column built-in end and described column install between the groove of hole until described high strength and no shrinting cementation material overflows described second slurry outlet by described mud jacking hole.
Further, in described steps A, the column shear connector of some annular protrusions is set at the outer wall of described column built-in end, in described step B, the cushion cap shear connector of some annular protrusions is set at the inwall of described column installation hole groove.
Further, toward each other, the gap between described column shear connector respect to one another and described cushion cap shear connector is more than or equal to 2cm for described column shear connector and described cushion cap shear connector.
The beneficial effects of the utility model:
The utility model is owing to have employed said structure and method, and without the need to a fairly large number of built-in fitting pre-buried in prefabricated stand column or cushion cap, site operation positioning accuracy request is low, the redundancy of adjustment is large, and not high to construction machinery, equipment, manufacture processing request; Without the need to on-the-spot binding reinforcing bars, welding and extensive concreting work, the quick facility of in-site installation, workload are little.
Be described further below with reference to the technique effect of accompanying drawing to design of the present utility model, concrete structure and generation, to understand the purpose of this utility model, characteristic sum effect fully.
Accompanying drawing explanation
Fig. 1 is the plan structure schematic diagram of the utility model embodiment 1.
Fig. 2 is A-A line sectional view in Fig. 1.
Fig. 3 is the volume rendering structural representation of cushion cap in the utility model embodiment 1.
Fig. 4 is the plan structure schematic diagram of the utility model embodiment 2.
Fig. 5 is A-A line sectional view in Fig. 4.
Fig. 6 is the volume rendering structural representation of cushion cap in the utility model embodiment 2.
In figure, 1 cushion cap; 11 cushion cap shear connectors; 12 mud jacking holes; 13 mud jacking passages; 14 first slurry outlets; Hole groove installed by 15 columns; 16 second slurry outlets; 17 pulp passages; 2 columns; 21 column shear connectors; 22 column exposed junctions; 23 column built-in ends; 3 high strength and no shrinting cementation material; 4 cushion blocks; 5 pile foundations; The top in groove gap, hole installed by 6 column built-in ends and column.
Detailed description of the invention
Embodiment 1
As shown in Fig. 1 Fig. 3, a specific embodiment of a kind of bridge prefabrication pier column of the utility model and cushion cap socket type connecting structure and assembling method thereof, comprises the following steps:
Prefabricated stand column 2, column 2 comprises exposed junction 22 and built-in end 23, built-in end 23 is for embedding in cushion cap 1, those skilled in the art should know, the cross-sectional sizes of column built-in end 23 and arrangement of reinforcement need meet bridge construction normally use with bridge geological process under keep firm every technical requirements, the maximum outer profile size of the present embodiment central post exposed junction 22 outer profile size and built-in end 23 is equal, and the outer wall of column built-in end 23 arranges the column shear connector 21 of some annular projections.
Prefabricated cushion cap 1, the vertical direction of cushion cap 1 arranges column hole groove 15 is installed, the cross sectional shape of hole groove 15 installed by column, the cross sectional shape of size and column built-in end 23, size match to make column built-in end 23 can embed column and install in hole groove 15, the inwall of column installation hole groove 15 arranged the cushion cap shear connector 11 of some annular projections; Meanwhile, those skilled in the art also should know, and the degree of depth that hole groove 15 installed by column need meet bridge construction and normally use build-in switching performance with prefabricated stand column under bridge geological process and cushion cap.Arrange mud jacking hole 12 at the end face of cushion cap 1, the bottom surface of installing hole groove 15 at column is provided with the first slurry outlet 14, between mud jacking hole 12 and the first slurry outlet 14, be provided with mud jacking passage 13; Mud jacking hole 12 can arrange one and also can arrange multiple, and correspondingly, mud jacking passage 13 also can arrange one or more, and mud jacking hole 12 and mud jacking passage 13 all arrange two in the present embodiment, mud jacking speed can be made to be in the milk sooner more even simultaneously; First slurry outlet 14 is arranged at the bottom surface that hole groove 15 installed by column, article one, mud jacking passage 13 is at least arranged first slurry outlet 14, also can arrange multiple, a mud jacking passage 13 is provided with 3 the first slurry outlets 14 in the present embodiment, similarly, multiple first slurry outlet 14 is set and can improves mud jacking speed, make grouting more even simultaneously.
It is worth mentioning that, cushion cap shear connector 11 and column shear connector 21 are set and can improve anchoring strength between column and cushion cap.Certainly, in some other embodiment, above-mentioned two kinds of shear connectors can all not arranged, and those skilled in the art should know, and the detail structures such as the anchorage depth now between column and cushion cap and cushion cap base plate thickness need corresponding increase to increase the anchoring strength between column and cushion cap.
Prefabricated cushion cap 1 is fixed on after on bridge pile foundation 5, the bottom surface of column installation hole groove 15 arranges cushion block 4, the built-in end 23 of column is inserted and is erected on cushion block 4 in column installation hole groove 15, the bottom surface that cushion block 4 makes the bottom of column built-in end 23 and column install hole groove 15 keeps certain interval, and the bottom surface avoiding column built-in end 23 directly to install hole groove 15 with column contacts thus the first slurry outlet 14 on hole groove 15 bottom surface installed by the closed column that is arranged at; The position of adjustment column built-in end makes column shear connector 21 and cushion cap shear connector 11 toward each other and gap between column shear connector 21 and cushion cap shear connector 11 is more than or equal to 2cm, the shear connector transmission force property be oppositely arranged is better than negative and positive mosaic, makes the anchoring strength between cushion cap and column higher.
Using grouting machine that high strength and no shrinting cementation material is fed into column by mud jacking hole 12, mud jacking passage 13 and the first slurry outlet 14 installs in hole groove 15, until the top 6 that high strength and no shrinting cementation material installs hole groove 15 gap from column built-in end 23 and column is overflowed, now, illustrate column built-in end 23 and column install gap between hole groove 15 completely be full of by high strength and no shrinting cementation material 3, be in the milk closely knit full.Treat that high strength and no shrinting cementation material 3 solidifies rear column 2 and is spliced into entirety with cushion cap 1.
Embodiment 2
As Figure 4-Figure 6, another specific embodiment of a kind of bridge prefabrication pier column of the utility model and cushion cap socket type connecting structure and assembling method thereof, comprises the following steps:
Prefabricated stand column 2, column 2 comprises exposed junction 22 and built-in end 23, built-in end 23 is for embedding in cushion cap 1, those skilled in the art should know, the cross-sectional sizes of column built-in end 23 and arrangement of reinforcement need meet structure and normally use and the every technical requirements under geological process, the outer profile size of the present embodiment central post exposed junction 22 is greater than the maximum outer profile size of built-in end 23, and the outer wall of column built-in end 23 arranges the column shear connector 21 of some annular projections.
Cast-in-place cushion cap 1, the vertical direction of cushion cap 1 arranges column hole groove 15 is installed, the cross sectional shape of hole groove 15 installed by column, the cross sectional shape of size and column built-in end 23, size match to make column built-in end 23 can embed column and install in hole groove 15, the inwall of column installation hole groove 15 arranged the cushion cap shear connector 11 of some annular projections; Meanwhile, those skilled in the art also should know, and the degree of depth that hole groove 15 installed by column need meet structure and normally use build-in switching performance with prefabricated stand column under geological process and cushion cap.Arrange mud jacking hole 12 at the end face of cushion cap 1, the bottom surface of installing hole groove 15 at column is provided with the first slurry outlet 14, between mud jacking hole 12 and the first slurry outlet 14, be provided with mud jacking passage 13; Mud jacking hole 12 can arrange one and also can arrange multiple, and correspondingly, mud jacking passage 13 also can arrange one or more, and mud jacking hole 12 and mud jacking passage 13 all arrange two in the present embodiment, mud jacking speed can be made to be in the milk sooner more even simultaneously; First slurry outlet 14 is arranged at the bottom surface that hole groove 15 installed by column, article one, mud jacking passage 13 is at least arranged first slurry outlet 14, also can arrange multiple, a mud jacking passage 13 is provided with 3 the first slurry outlets 14 in the present embodiment, similarly, multiple first slurry outlet 14 is set and can improves mud jacking speed, make grouting more even simultaneously.
Outer profile size due to the present embodiment central post exposed junction 22 is greater than the maximum outer profile size of built-in end 23, therefore column exposed junction 22 installs gap between hole groove 15 by covering column built-in end 22 and column completely, thus need on the end face of cushion cap 1, be provided with the second slurry outlet 16, the upper end that second slurry outlet 16 installs hole groove 15 by pulp passage 17 and column is connected, after column built-in end 22 and the column gap of installing between hole groove 15 is full of by grouting completely, cementation is overflowed from the second slurry outlet 16 by pulp passage 17; Second slurry outlet 16 can arrange one and also can arrange multiple, and correspondingly, pulp passage 17 also arranges one or more.The present embodiment is provided with two the second slurry outlets 16 and two pulp passages 17, can observe the grouting situation of different parts better, closely knit full to guarantee grouting.
Cushion cap 1 is built and is fixed on after on bridge pile foundation 5, the bottom surface of column installation hole groove 15 arranges cushion block 4, the built-in end 23 of column is inserted and is erected on cushion block 4 in column installation hole groove 15, the bottom surface that cushion block 4 makes the bottom of column built-in end 23 and column install hole groove 15 keeps certain interval, and the bottom surface avoiding column built-in end 23 directly to install hole groove 15 with column contacts thus the first slurry outlet 14 on hole groove 15 bottom surface installed by the closed column that is arranged at; The position of adjustment column built-in end makes column shear connector 21 and cushion cap shear connector 11 toward each other and gap between column shear connector 21 and cushion cap shear connector 11 is more than or equal to 2cm.
Using grouting machine that high strength and no shrinting cementation material is fed into column by mud jacking hole 12, mud jacking passage 13 and the first slurry outlet 14 installs in hole groove 15, until high strength and no shrinting cementation material overflows from the second slurry outlet 16, now, illustrate column built-in end 23 and column install gap between hole groove 15 completely be full of by high strength and no shrinting cementation material 3, be in the milk closely knit full.Treat that high strength and no shrinting cementation material solidifies rear column 2 and is spliced into entirety with cushion cap 1.
More than describe preferred embodiment of the present utility model in detail.Should be appreciated that those of ordinary skill in the art just can make many modifications and variations according to design of the present utility model without the need to creative work.Therefore, all technician in the art according to design of the present utility model on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment, all should by the determined protection domain of claims.

Claims (4)

1. a bridge prefabrication pier column and cushion cap socket type connecting structure, comprise column and cushion cap, it is characterized in that, described column comprises column exposed junction and column built-in end, the vertical direction of described cushion cap is arranged column and hole groove is installed, the cross sectional shape of the cross sectional shape of hole groove, size and described column built-in end installed by described column, size matches to enable described column built-in end embed described column and installs in the groove of hole, and the gap between the inwall that hole groove installed by the outer wall of described column built-in end and described column is more than or equal to 2cm; The end face of described cushion cap is provided with mud jacking hole, and the bottom surface that hole groove installed by described column is provided with the first slurry outlet, is provided with mud jacking passage between described mud jacking hole and described first slurry outlet.
2. want bridge prefabrication pier column described in 1 and cushion cap socket type connecting structure according to right, it is characterized in that, the maximum outer profile size of described column built-in end equals the outer profile size of described column exposed junction.
3. want bridge prefabrication pier column described in 1 and cushion cap socket type connecting structure according to right, it is characterized in that, the maximum outer profile size of described column built-in end is less than the outer profile size of described column exposed junction, the end face of described cushion cap is also provided with the second slurry outlet, and the upper end that described second slurry outlet installs hole groove by pulp passage and described column is connected.
4., according to the arbitrary described bridge prefabrication pier column of claim 1-3 and cushion cap socket type connecting structure, it is characterized in that, the outer wall of described column built-in end arranges the column shear connector of some annular protrusions; The inwall of described column installation hole groove arranges the cushion cap shear connector of some annular protrusions.
CN201521074139.7U 2015-12-21 2015-12-21 Bridge prefabrication pier stand and cushion cap socket joint formula connection structure Withdrawn - After Issue CN205223840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521074139.7U CN205223840U (en) 2015-12-21 2015-12-21 Bridge prefabrication pier stand and cushion cap socket joint formula connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521074139.7U CN205223840U (en) 2015-12-21 2015-12-21 Bridge prefabrication pier stand and cushion cap socket joint formula connection structure

Publications (1)

Publication Number Publication Date
CN205223840U true CN205223840U (en) 2016-05-11

Family

ID=55898915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521074139.7U Withdrawn - After Issue CN205223840U (en) 2015-12-21 2015-12-21 Bridge prefabrication pier stand and cushion cap socket joint formula connection structure

Country Status (1)

Country Link
CN (1) CN205223840U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421222A (en) * 2015-12-21 2016-03-23 上海市城市建设设计研究总院 Socket and spigot joint type connection structure for bridge prefabricated pier stand column and bearing platform and splicing method of socket and spigot joint type connection structure
CN107476432A (en) * 2017-08-23 2017-12-15 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated reinforced concrete column connecting structure
CN109518593A (en) * 2018-11-14 2019-03-26 安徽省交通规划设计研究总院股份有限公司 Assembly concrete-filled steel tube lattice pier
CN112030724A (en) * 2020-08-10 2020-12-04 山东高速建设管理集团有限公司 Bidirectional socket type prefabricated assembly type pier and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421222A (en) * 2015-12-21 2016-03-23 上海市城市建设设计研究总院 Socket and spigot joint type connection structure for bridge prefabricated pier stand column and bearing platform and splicing method of socket and spigot joint type connection structure
CN107476432A (en) * 2017-08-23 2017-12-15 上海市政工程设计研究总院(集团)有限公司 A kind of prefabricated reinforced concrete column connecting structure
CN107476432B (en) * 2017-08-23 2024-05-03 上海市政工程设计研究总院(集团)有限公司 Prefabricated reinforced concrete upright post connection structure
CN109518593A (en) * 2018-11-14 2019-03-26 安徽省交通规划设计研究总院股份有限公司 Assembly concrete-filled steel tube lattice pier
CN112030724A (en) * 2020-08-10 2020-12-04 山东高速建设管理集团有限公司 Bidirectional socket type prefabricated assembly type pier and construction method thereof

Similar Documents

Publication Publication Date Title
CN105421222A (en) Socket and spigot joint type connection structure for bridge prefabricated pier stand column and bearing platform and splicing method of socket and spigot joint type connection structure
CN105421223B (en) Precast pier column and cushion cap socket joint and slot combined connecting structure and assembling method
CN205223840U (en) Bridge prefabrication pier stand and cushion cap socket joint formula connection structure
CN101672007B (en) Constructing method of precast pier footing for bridge
KR101708760B1 (en) Construction method for precast concrete wall
CN103104053B (en) A kind of assembly concrete shear wall and construction method
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN103195087B (en) Mould support method of foundation pit basement haunch shearing wall
CN106013228A (en) Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof
CN108661223A (en) A kind of prefabricated superimposed sheet of assembled architecture reserves the construction technology of wire casing
CN102953394B (en) Precise foundation bolt positioning device
CN106968381A (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN205223838U (en) Prefabricating bridge pier stand and cushion cap socket joint and slot built -up connection structure
CN103259228A (en) Connecting method of wall electrical pipe line of prefabricated assembly type house
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN108582465A (en) After pour canopy, precast reinforced concrete frame beam and after pour canopy manufacturing method
KR20190022132A (en) Top-down method using precast-concrete colum
CN208792505U (en) A kind of precast wall body and assembling structure of assembled architecture
KR101299008B1 (en) Vertical shear connector for precast concrete bridge pier
CN113668775A (en) Sleeve group with positioning device and prefabrication construction method
KR102190480B1 (en) Implant pile pressing apparatus in architecture foundation system and a universal implant piling method
KR101169461B1 (en) Precast concrete bridge pier, and rapid constructing method for the same
CN107762053A (en) Prefabricated basement pipeline module and preparation method thereof
KR101658929B1 (en) Precast box structure and construction method thereof
CN113028139B (en) Combined type connector of rain and sewage pipe and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160511

Effective date of abandoning: 20170630

AV01 Patent right actively abandoned