CN205205885U - Steel stand verticality deviation processing unit - Google Patents

Steel stand verticality deviation processing unit Download PDF

Info

Publication number
CN205205885U
CN205205885U CN201520841880.5U CN201520841880U CN205205885U CN 205205885 U CN205205885 U CN 205205885U CN 201520841880 U CN201520841880 U CN 201520841880U CN 205205885 U CN205205885 U CN 205205885U
Authority
CN
China
Prior art keywords
steel post
steel stand
connector
bridging
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520841880.5U
Other languages
Chinese (zh)
Inventor
胡勇
阮梦姣
陈梦婷
王喻琦
魏威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Geosciences
Original Assignee
China University of Geosciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Geosciences filed Critical China University of Geosciences
Priority to CN201520841880.5U priority Critical patent/CN205205885U/en
Application granted granted Critical
Publication of CN205205885U publication Critical patent/CN205205885U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a steel stand verticality deviation processing unit, including the steel stand, set up connecting rod structure and/or bridging structure between the steel stand, the first connecting piece on steel stand outer lane is established including setting up at horizontal connecting rod between the steel stand and cover to the connecting rod structure, horizontal connecting rod is connected with the steel stand through first connecting piece, the bridging structure sets up including the slope and establishes the second connecting piece on steel stand outer lane with the cover at the bridging between the steel stand, and bridging passes through the second connecting piece and is connected with the steel stand. Application method as follows: steel stand verticality deviation is less than or equal to at 1300 o'clock, exclusive use connection structure, steel stand verticality deviation is greater than at 1300 o'clock, uses connecting rod structure and bridging structure simultaneously. The utility model discloses the simple structure, with low costs, the verticality deviation who produces the steel stand gives the high efficiency and remedies, the intelligent use, performance connecting rod structure and the respective advantage of bridging structure, the potential safety hazard that causes steel stand verticality deviation falls to minimumly.

Description

A kind of steel post perpendicularity deviation processing unit
Technical field
The utility model belongs to building field, relates to a kind of steel post perpendicularity deviation processing unit.
Background technology
Along with the great-leap-forward development of Urban Construction in China, in the construction of large-scale tall building foundation basis and basement, Large Underground Emporium, underground parking, underground station, underground transportation junction, underground substation etc., be all faced with the problem of deep-foundation pit engineering.Due to engineering geology with complicated hydrogeological conditions is changeable, environmental protection requirement is more and more higher, base pit engineering scale requires day by day complicated to exploit condition such as overlarge area and the development of large depth direction, duration progress and resources conservations.Compared with traditional construction method of deep foundation ditch; contrary sequence method has protection of the environment, saves social resources, shortens the plurality of advantages such as construction period; which overcoming many weak points that conventional temporary lining exists, is the Urban Underground Space Excavation carrying out sustainable development and effective economic means of building a conservation-minded society.Contrary sequence method is in construction process, from B1 namely inverse to do, such steel post top mark height buried depth is larger, be not easy during construction to control, meanwhile, during shoveling, digging machine deadweight and muck haulage car generation lateral pressure more easily cause steel post to tilt, and digging machine bucket easily collides steel post, cause its off normal to be broken to change, so contrary sequence method is the control of steel post verticality in the key of engineering construction.At present, adopted is preventive action more, utilizes preventing mean to prevent the generation of deviation in work progress.For the deviation cannot avoiding producing, there is no remedial measure.
Utility model content
One of the purpose of this utility model is to provide a kind of steel post perpendicularity deviation processing unit, simple structure, and cost is low, gives efficiently to remedy to the perpendicularity deviation that steel post produces, and removes steel post perpendicularity deviation and brings the potential safety hazard caused.
Two of the purpose of this utility model is to provide the using method of above-mentioned steel post perpendicularity deviation processing unit, according to extent of deviation reasonable employment, plays the advantage of each process structure, drops to minimum by the potential safety hazard that steel post perpendicularity deviation causes.
In order to reach above-mentioned first object, the utility model adopts following technical scheme: a kind of steel post perpendicularity deviation processing unit, comprise steel post, be arranged on the bar linkage structure between described steel post and/or be arranged on the bridging structure between described steel post, described bar linkage structure comprises the waling stripe be horizontally set between described steel post and the first connector be set on described steel post outer ring, and described waling stripe is connected with described steel post by described first connector; Described bridging structure comprises the bridging be inclined between described steel post and the second connector be set on described steel post outer ring, and the end of described bridging is connected with described steel post of stating by the second connector.
As preferably, described first connector is connected with first node plate, end and the described first node plate of described waling stripe are affixed.
As preferably, described second connector is connected with Section Point plate, described bridging is fixed in described Section Point plate.
As preferably, the peg of described first connector on described steel post is arranged, and prevents the first connector 22 from vertically sliding, in order to avoid affect its function.
As preferably, described first connector and described second connector include two connectors be connected by bolt, are convenient to install, easy to operate.
As preferably, described first connector and described second connector are anchor ear.
As preferably, described bridging comprises pole mutually arranged in a crossed manner, and described pole is connected by web in intersection.
In order to realize the second object of the present utility model, the utility model adopts following technical proposals: the using method of steel post perpendicularity deviation processing unit is as follows: when steel post perpendicularity deviation is less than or equal to 1/300, is used alone described syndeton; When steel post perpendicularity deviation is greater than 1/300, use described bar linkage structure and described bridging structure simultaneously.
As preferably, have use in multi-layer underground layer situation time, described bar linkage structure and described bridging structure are used alternatingly between each subterranean layer.
By implementing technique scheme, the utility model simple structure, cost is low, give efficiently to remedy to the perpendicularity deviation that steel post produces, according to extent of deviation reasonable employment, play bar linkage structure and bridging structure advantage separately, the potential safety hazard that steel post perpendicularity deviation causes is dropped to minimum.
Accompanying drawing explanation
Accompanying drawing 1 is bar linkage structure schematic diagram in the utility model one embodiment;
Accompanying drawing 2 is bridging structural representation in the utility model one embodiment;
Accompanying drawing 3 is the first connector schematic diagram in the utility model one embodiment.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Embodiment 1:
When steel post perpendicularity deviation is less than or equal to 1/300, uses processing unit as shown in Figure 1, comprise steel post 1, be arranged on bar linkage structure between steel post 1.Steel post 1 is provided with peg, bar linkage structure comprises the waling stripe 21 be horizontally set between steel post 1 and the first connector 22 be set on steel post 1 outer ring, the peg of the first connector 22 on steel post 1 is arranged, and peg of trying one's best, prevents the first connector 22 from vertically sliding; First connector 22 comprises two connectors 221 be connected by bolt 4, and as shown in Figure 3, what the present embodiment adopted is anchor ear.First connector 22 is connected with first node plate 23, and the end of waling stripe 21 is welded with first node plate 23, affixed by the first connector 22, first node plate 23 and steel post 1.
Embodiment 2:
When steel post perpendicularity deviation is greater than 1/300, the processing unit of use, comprises steel post 1, is arranged on bar linkage structure between steel post 1 and bridging structure.Steel post 1 is provided with peg, bar linkage structure comprises the waling stripe 21 be horizontally set between steel post 1 and the first connector 22 be set on steel post 1 outer ring as shown in Figure 1, the peg of the first connector 22 on steel post 1 is arranged, to try one's best peg, prevent the first connector 22 from vertically sliding; First connector 22 comprises two connectors 221 be connected by bolt 4, and what the present embodiment adopted is anchor ear.First connector 22 is connected with first node plate 23, and the end of waling stripe 21 is welded with first node plate 23, affixed by the first connector 22, first node plate 23 and steel post 1.
As shown in Figure 2, comprise the bridging 31 be inclined between steel post 1 and the second connector 32 be set on steel post 1 outer ring, wherein, bridging 31 comprises pole mutually arranged in a crossed manner to bridging structure, and pole is connected by web 34 in intersection; Second connector 32 also comprises two connectors 221 be connected by bolt 4, and the present embodiment adopts anchor ear.Second connector 32 is welded with Section Point plate 33, the end that bridging 31 is welded in Section Point plate 33 bridging 31 by the second connector 32 with state steel post 1 and be connected.
Above-mentioned processing unit is used in be had in the building of F3/B3, arranges bridging structure at B1 and F3/B3, and in underground, two layers arrange horizontal structure.

Claims (7)

1. a steel post perpendicularity deviation processing unit, it is characterized in that, the bridging structure comprising steel post (1), be arranged on the bar linkage structure between described steel post (1) and/or be arranged between described steel post (1), described bar linkage structure comprises the waling stripe (21) be horizontally set between described steel post (1) and the first connector (22) be set on described steel post (1) outer ring, and described waling stripe (21) is connected with described steel post (1) by described first connector (22); Described bridging structure comprises the bridging (31) be inclined between described steel post (1) and the second connector (32) be set on described steel post (1) outer ring, and the end of described bridging (31) is connected with described steel post (1) of stating by the second connector (32).
2. a kind of steel post perpendicularity deviation processing unit according to claim 1, it is characterized in that, described first connector (22) is connected with first node plate (23), end and the described first node plate (23) of described waling stripe (21) are affixed.
3. a kind of steel post perpendicularity deviation processing unit according to claim 1, it is characterized in that, described second connector (32) is connected with Section Point plate (33), and described bridging (31) is fixed in described Section Point plate (33).
4. a kind of steel post perpendicularity deviation processing unit according to claim 1, is characterized in that, the peg of described first connector (22) on described steel post (1) is arranged.
5. a kind of steel post perpendicularity deviation processing unit according to claim 1, it is characterized in that, described first connector (22) and described second connector (32) include two connectors (221) be connected by bolt (4).
6. a kind of steel post perpendicularity deviation processing unit according to claim 5, is characterized in that, described first connector (22) and described second connector (32) are anchor ear.
7. a kind of steel post perpendicularity deviation processing unit according to claim 1, it is characterized in that, described bridging (31) comprises pole mutually arranged in a crossed manner, and described pole is connected by web (34) in intersection.
CN201520841880.5U 2015-10-28 2015-10-28 Steel stand verticality deviation processing unit Expired - Fee Related CN205205885U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520841880.5U CN205205885U (en) 2015-10-28 2015-10-28 Steel stand verticality deviation processing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520841880.5U CN205205885U (en) 2015-10-28 2015-10-28 Steel stand verticality deviation processing unit

Publications (1)

Publication Number Publication Date
CN205205885U true CN205205885U (en) 2016-05-04

Family

ID=55843613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520841880.5U Expired - Fee Related CN205205885U (en) 2015-10-28 2015-10-28 Steel stand verticality deviation processing unit

Country Status (1)

Country Link
CN (1) CN205205885U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297795A (en) * 2015-10-28 2016-02-03 中国地质大学(武汉) Verticality deviation treatment component for steel stand columns and use method of verticality deviation treatment component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297795A (en) * 2015-10-28 2016-02-03 中国地质大学(武汉) Verticality deviation treatment component for steel stand columns and use method of verticality deviation treatment component

Similar Documents

Publication Publication Date Title
CN104652443B (en) Construction method of the interim horizontal support of deep basal pit as permanent structure beam
CN205134331U (en) Foundation ditch excavation bearing structure
CN202626972U (en) Novel section precast concrete fender post
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN103410152B (en) A kind of construction method for long and narrow deep foundation pit earthwork digging
CN103924602A (en) Deep soft soil foundation pit construction method
CN103742157A (en) Method of newly building underground space under ground by pipe jacking method
CN203594035U (en) Multilevel combined protection structure for shallow hole blasting excavation bridge foundation pit construction
CN201459756U (en) Hanging-type construction ceiling coil vertical shaft
CN203593968U (en) Steel tube bamboo row frame for shallow hole blasting excavation bridge foundation bit construction
CN101691760B (en) Composite foundation combining anchor rods with excavation and construction method thereof
CN204282399U (en) A kind of subway space enclosing structure
CN204780938U (en) Novel recoverable anchor formula double row pile supporting construction that draws
CN204662494U (en) Highway retaining wall reinforced structure
CN205205885U (en) Steel stand verticality deviation processing unit
CN202017214U (en) Power pole tower base for frozen soil foundation
CN204059401U (en) Novel combined traffic tunnel
CN105089058A (en) Method and device for quickly forming slag collecting platform on high and steep slope
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN102677671B (en) Construction method of precast pile in thick-slag-stone-layer field
CN205502070U (en) A dual -purpose underground gallery structure
CN104389609A (en) No-blasting mechanical digging method
CN201169781Y (en) Cap digging pit structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160504

Termination date: 20161028