CN205188976U - Drag -line double row pile supporting construction - Google Patents

Drag -line double row pile supporting construction Download PDF

Info

Publication number
CN205188976U
CN205188976U CN201520369819.5U CN201520369819U CN205188976U CN 205188976 U CN205188976 U CN 205188976U CN 201520369819 U CN201520369819 U CN 201520369819U CN 205188976 U CN205188976 U CN 205188976U
Authority
CN
China
Prior art keywords
seat
soldier pile
fender pile
pile
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520369819.5U
Other languages
Chinese (zh)
Inventor
谢纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520369819.5U priority Critical patent/CN205188976U/en
Application granted granted Critical
Publication of CN205188976U publication Critical patent/CN205188976U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a drag -line double row pile supporting construction, including a front -seat fender pile, a back row fender pile, a front -seat fender pile is connected by first guan liang, a back row fender pile is connected by second guan liang, first guan liang and second guanliang form its characterized in that of truss: a front -seat fender pile elevates above the soil, forms suo zhu (frame), a back row fender pile plane earth, reach between the fender pile of suo zhu (frame) and back row preceding campshed props up with the back row and is provided with prestressing force cable at least between the fender pile, the prestressing force cable with a truss and a fender pile form and are lighter than 90 degrees contained angles. The utility model discloses a front -seat fender pile and a back row fender pile are connected to cable and member, for front -seat suo zhu (frame) provides firm support, have increased supporting construction's flexural rigidity, and during the foundation ditch excavation, the soil pressure is shared to a front -seat fender pile, and the back row is strutted the stake and is played and keep off and draw anchor dual function. The utility model discloses no internal stay, the cable is recoverable, and economic benefits is good.

Description

A kind of drag-line Retaining Structure with Double-row Piles
Technical field
The utility model belongs to civil engineering foundation pit supporting construction technical field, is specifically related to a kind of drag-line Retaining Structure with Double-row Piles.
Background technology
Along with the novel urbanization planning of country advances, developing rapidly of civil engineering construction, deep foundation ditch is adapt to land resources science efficiency requirements to have become high-rise and super highrise building and infrastructure construction important component part, and its support engineering has also become the important subitem of Construction of Civil Engineering engineering.Common civil engineering Foundation Pit has undisturbed soil to put the combination of the supporting types such as slope, plate brad supporting, bolt-spary supports, pile-anchor retaining, joist anchor supporting, the supporting of campshed cantilever, steel sheet pile supporting, diaphragm wall and support supporting and wherein two kinds and two or more supporting type, and the pattern foundation pit supporting structure of current most object of construction production adopts above-mentioned supporting type.
Because city building density is more and more higher, congested in traffic, narrow field, geological conditions washability is poor.In order to make full use of soil, the contiguous new building Foundation Pit of existing building is restricted.
1, traditional slope of putting cannot be adopted to excavate, plate brad supporting and bolt-spary supports method can not be carried out again:
2, overhang mill pattern is not with inner support, anchor pole (rope), the soil pressure that the drag entirely provided by the part embedded in the soil body applies to balance foundation pit side-wall supporting and protection structure.Usually, when foundation depth is little, to can yet be regarded as a kind of supporting and protection structure type preferably from aspect analyses such as cost, construction period, construction technologies.But displacement is remarkable by the impact of geological conditions and insert depth, can not meet the requirement of complicated base pit engineering stability and controlling distortion aspect.
3, diaphragm wall adds the method supporting supporting, and as interim soil-baffling structure compared with other method costly, subsequently the lower duration of a project is long.
4, take traditional stake (wall) anchor supporting, owing to being close to the restriction of underground structure and pipeline, soil body limited width behind slope, so anchor cable angle is comparatively large, supporting effect is not good, the anchor cable and some side slopes cannot be constructed at all;
Utility model content
In order to solve the supporting of above-mentioned traditional stake (wall) anchor by soil body limited width behind slope, anchor cable angle is larger, supporting effect is not good, the anchor cable and some side slopes cannot be constructed at all, cause the excessive or performance difficulty of foundation pit deformation or anchorage etc. cannot be not suitable for the problem of foundation ditch, the utility model is in order to improve stress performance and the deformation characteristic of traditional stake (wall) anchor supporting and protection structure soldier pile, excavate the potential of supporting pile body, supporting and protection structure form is made more to be tending towards rationally reliable, meet the requirement that complicated foundation ditch props up the gear soil body, fully utilize the limited underground space, reduce environmental influence range, traditional stake (wall) anchor supporting and protection structure pattern is improved, propose a kind of drag-line double-row pile (wall) supporting and protection structure.
In order to solve the problem, the utility model is achieved by following technical scheme:
Drag-line Retaining Structure with Double-row Piles of the present utility model, comprise front-seat soldier pile, rear row's soldier pile, described front-seat soldier pile is connected by the first Guan Liang, described rear row's soldier pile is connected by the second Guan Liang, described first Guan Liang and the second Guan Liang forms truss by tie element, and wherein, described front-seat soldier pile elevates above the soil, form Suo Zhu, described rear row's soldier pile and ground maintain an equal level; First prestressed cable together with being provided with at least between described Suo Zhu with rear row's soldier pile, described first prestressed cable and described Suo Zhu are formed and are less than 90 degree of angles, and described first prestressed cable and described truss are formed and be less than 90 degree of angles; Second prestressed cable together with being provided with at least between described front-seat soldier pile with rear row's soldier pile, described second prestressed cable and described front-seat soldier pile are formed and are less than 90 degree of angles, and described second prestressed cable and described truss are formed and be less than 90 degree of angles.
Further, in order to provide support power for front-seat soldier pile better, the height of described Suo Zhu is greater than the trestle column of described front-seat soldier pile and rear row's soldier pile.
Further, in order to increase the stability of structure, the degree of depth that described rear row's soldier pile embeds soil is not less than the degree of depth that described front-seat soldier pile embeds soil.
Further, the two ends of described first prestressed cable are anchored respectively on described Suo Zhu and rear row's soldier pile, and the two ends of described second prestressed cable are anchored respectively arranges on soldier pile and front-seat soldier pile in the rear.
Further, the layout of described front-seat soldier pile and described rear row's soldier pile is that rectangular array is arranged, or T-shaped formula is arranged, or limit arch, steel frame type layout.
Compared with prior art, the beneficial effects of the utility model are:
The utility model increases the bending rigidity of supporting and protection structure, during excavation of foundation pit in early stage, front campshed plays a part to share soil pressure, and then campshed has been held concurrently and propped up gear and draw anchor double action, foundation ditch reaches certain depth, can effectively control foundation ditch deformation of bottom by drag-line Shi Hanzhang.
The utility model makes full use of drag-line intensity, controls guy cable length, and, easy construction low compared with anchor cable cost on rock, reliable in quality, the globality effectively improving Double-row-piles Structure and stability, increase its resistance to capsizing.
The utility model makes full use of pile soil common action, plays the self-bearing capacity of the soil body between two campsheds, changes soil body lateral pressure distribution, strengthens supporting effect.
The utility model make full use of play prestressed cable repeatedly can stretch-draw advantage, controlling distortion, strengthens supporting effect.
The utility model relies on little to geological conditions, applied widely, from weak soil to hard stratum, closely knit sandy gravel stratum, the multiple foundation conditions such as various soft or hard rocks can be applied, ground limited within can making full use of building line and space, play returns of investment.
The utility model is convenient without inner support, the cubic metre of earth and stone and underground engineering construction, effectively improve work efficiency, quality controllable, risks of foundation excavation significantly reduces, if remedial measure is effective and rapid when there is moderate finite deformation, there is good economic benefit, and drag-line can be recycled, cost-saving and meet sustainable development requirement.
The utility model drag-line influence basin is little is conducive to protection of the environment, and social benefit is high.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail, wherein:
Fig. 1 is the schematic diagram of drag-line Retaining Structure with Double-row Piles described in the utility model;
Fig. 2 is the top view of drag-line Retaining Structure with Double-row Piles described in the utility model.
In figure: the front-seat soldier pile of 1-Suo Zhu, 2-first Guan Liang, 3-, 4-second Guan Liang, arranges soldier pile after 5-, 6-truss, 7-first prestressed cable, 8-second prestressed cable.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the utility model, and be not used in restriction the utility model.
As shown in Fig. 1 ~ Fig. 2, drag-line Retaining Structure with Double-row Piles described in the utility model, comprise front-seat soldier pile 3, rear row's soldier pile 5, for connecting the first hat beam 2 of described front-seat soldier pile 3, for connecting the second hat beam 4 of described rear row's soldier pile 5, and the truss 6 of beam 2 and the second hat beam 4 is preced with for described first, described front-seat soldier pile 2 elevates above the soil, form Suo Zhu 1, described rear row's soldier pile 5 maintains an equal level with ground, first prestressed cable 7 together with being provided with at least between described Suo Zhu 1 with described rear row's soldier pile 5, second prestressed cable 8 together with being provided with at least between described front-seat soldier pile 3 with described rear row's soldier pile 5, prestressed cable 7 in the present embodiment, 8 are respectively three, but prestressed cable 7 of the present utility model, 8 are not limited to three, can according to the needs of the construction of reality, arrange one, article two, article four, the first prestressed cable 7 and the second prestressed cable 8 of grade.Described first prestressed cable 7 and described Suo Zhu 1 and described second prestressed cable 8 are all formed with described front-seat soldier pile 3 and are less than 90 degree of angles.Described first prestressed cable 7 and described truss 6 and described second prestressed cable 8 are all formed with described truss 6 and are less than 90 degree of angles.The two ends of described first prestressed cable 7 be anchored respectively arrange soldier pile 5 and Suo Zhu 1 in the rear reinforcing cage or annex on, the two ends of described second prestressed cable 8 be anchored respectively arrange soldier pile 5 and front-seat soldier pile 3 in the rear reinforcing cage or annex on.Certainly, the anchor position of described first prestressed cable 7 and the second prestressed cable 8 can be arranged on the surface of described front-seat soldier pile 3 and Suo Zhu 1.
The height of described Suo Zhu 1 is greater than the spacing of described front-seat soldier pile 3 and rear row's soldier pile 5.
In order to provide more reliable support force, the degree of depth that described rear row's soldier pile 5 embeds soil is not less than the degree of depth that described front-seat soldier pile embeds soil.
As shown in Figure 2, the described front-seat soldier pile 3 in the present embodiment is set to rectangular array with the plane of rear row's soldier pile 5 and arranges.But this arranges by novel front-seat soldier pile 3 and the plane of rear row's soldier pile 5 and is not limited to rectangular array and arranges, also can according to actual needs, and T-shaped formula is arranged, limit arch, steel frame type are arranged, quincunx layout or two trigonometric expression layout.
The utility model adopts drag-line and tie element to connect front-seat soldier pile and rear row's soldier pile, for front-seat Suo Zhu provides firm support, increase the bending rigidity of drag-line Retaining Structure with Double-row Piles, during excavation of foundation pit, front-seat soldier pile plays a part to share soil pressure, and then campshed has been held concurrently and propped up gear and draw anchor double action.The utility model is convenient without inner support, the cubic metre of earth and stone and underground engineering construction, effectively improve work efficiency, quality controllable, risks of foundation excavation significantly reduces; if remedial measure is effective and rapid when there is moderate finite deformation; and drag-line can be recycled; cost-saving; there is good economic benefit; drag-line influence basin is little is conducive to protection of the environment, and social benefit is high, meets sustainable development requirement.
Other structure of drag-line Retaining Structure with Double-row Piles described in the present embodiment is see prior art.
The above, it is only preferred embodiment of the present utility model, not any pro forma restriction is done to the utility model, therefore everyly do not depart from technical solutions of the utility model content, the any amendment done above embodiment according to technical spirit of the present utility model, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.

Claims (4)

1. a drag-line Retaining Structure with Double-row Piles, comprise front-seat soldier pile, rear row's soldier pile, described front-seat soldier pile is connected by the first Guan Liang, described rear row's soldier pile is connected by the second Guan Liang, described first Guan Liang and the second Guan Liang forms truss by tie element, it is characterized in that: described front-seat soldier pile elevates above the soil, form Suo Zhu, described rear row's soldier pile and ground maintain an equal level; First prestressed cable together with being provided with at least between described Suo Zhu with rear row's soldier pile, described first prestressed cable and described Suo Zhu are formed and are less than 90 degree of angles, and described first prestressed cable and described truss are formed and be less than 90 degree of angles; Second prestressed cable together with being provided with at least between described front-seat soldier pile with rear row's soldier pile, described second prestressed cable and described front-seat soldier pile are formed and are less than 90 degree of angles, and described second prestressed cable and described truss are formed and be less than 90 degree of angles.
2. drag-line Retaining Structure with Double-row Piles according to claim 1, is characterized in that: the degree of depth that described rear row's soldier pile embeds soil is not less than the degree of depth that described front-seat soldier pile embeds soil.
3. drag-line Retaining Structure with Double-row Piles according to claim 1, is characterized in that: the two ends of described first prestressed cable are anchored respectively on described Suo Zhu and rear row's soldier pile; The two ends of described second prestressed cable are anchored respectively arranges on soldier pile and front-seat soldier pile in the rear.
4. drag-line Retaining Structure with Double-row Piles according to any one of claims 1 to 3, is characterized in that: the layout of described front-seat soldier pile and described rear row's soldier pile is that rectangular array is arranged, or T-shaped formula is arranged, or limit arch, steel frame type layout.
CN201520369819.5U 2015-06-02 2015-06-02 Drag -line double row pile supporting construction Expired - Fee Related CN205188976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520369819.5U CN205188976U (en) 2015-06-02 2015-06-02 Drag -line double row pile supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520369819.5U CN205188976U (en) 2015-06-02 2015-06-02 Drag -line double row pile supporting construction

Publications (1)

Publication Number Publication Date
CN205188976U true CN205188976U (en) 2016-04-27

Family

ID=55781978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520369819.5U Expired - Fee Related CN205188976U (en) 2015-06-02 2015-06-02 Drag -line double row pile supporting construction

Country Status (1)

Country Link
CN (1) CN205188976U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155548A (en) * 2015-06-02 2015-12-16 谢纯 Cable double-row pile (wall) supporting structure
CN109056717A (en) * 2018-07-09 2018-12-21 广东工业大学 It is a kind of without support suspension device and its construction method
CN113605401A (en) * 2021-07-23 2021-11-05 江苏茂盛建设集团有限公司 Foundation pit steel structure supporting system and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155548A (en) * 2015-06-02 2015-12-16 谢纯 Cable double-row pile (wall) supporting structure
CN105155548B (en) * 2015-06-02 2018-05-22 谢纯 A kind of drag-line double-row pile (wall) supporting construction
CN109056717A (en) * 2018-07-09 2018-12-21 广东工业大学 It is a kind of without support suspension device and its construction method
CN109056717B (en) * 2018-07-09 2020-11-17 广东工业大学 Support-free supporting device and construction method thereof
CN113605401A (en) * 2021-07-23 2021-11-05 江苏茂盛建设集团有限公司 Foundation pit steel structure supporting system and construction method thereof

Similar Documents

Publication Publication Date Title
CN105155548A (en) Cable double-row pile (wall) supporting structure
CN103967031B (en) A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof
CN110629671A (en) Suspension bridge anchorage and construction method thereof
CN101565949A (en) Forming method of large shallow foundation pit with soft soil foundation
CN203594035U (en) Multilevel combined protection structure for shallow hole blasting excavation bridge foundation pit construction
CN205188976U (en) Drag -line double row pile supporting construction
CN207646746U (en) A kind of arch interlocking pile formula foundation pit supporting construction
CN205205833U (en) Soil nail and stock combined type double row pile underground structure
CN103243721B (en) Highrise Building With Raft Foundation and Core Walls Structure excavation construction method under Unfavorable geology condition
CN204780938U (en) Novel recoverable anchor formula double row pile supporting construction that draws
CN203593968U (en) Steel tube bamboo row frame for shallow hole blasting excavation bridge foundation bit construction
CN103939115A (en) Semi-subsurface excavation method construction shed tunnel method and structure
CN205776250U (en) A kind of Double-row-piles Structure system being provided with dilazep anchor pattern
CN101691760B (en) Composite foundation combining anchor rods with excavation and construction method thereof
CN204825923U (en) Relay formula underground structure
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN109881683A (en) A kind of more sublevel retaining structures and its construction method for combining artificial earth fill's grouting reinforcement technique
CN205399503U (en) Anti floating botton board anchor slab formula of basement machinery anchor stock that excels in
CN203498860U (en) Anchor rod foundation structure with concrete blocks for photovoltaic module brackets
CN204780939U (en) Masts type double row pile struts system
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN204715364U (en) A kind of foundation pit support device
CN201502065U (en) Anchor rod joint excavation compound basis
CN204849777U (en) Tilting board double row pile supporting construction that bears down on one
CN208815566U (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: Xie Chun

Document name: Notification to Go Through Formalities of Registration

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160427

Termination date: 20180602

CF01 Termination of patent right due to non-payment of annual fee