CN205175865U - Concrete mix peaceability apparatus - Google Patents

Concrete mix peaceability apparatus Download PDF

Info

Publication number
CN205175865U
CN205175865U CN201520359575.2U CN201520359575U CN205175865U CN 205175865 U CN205175865 U CN 205175865U CN 201520359575 U CN201520359575 U CN 201520359575U CN 205175865 U CN205175865 U CN 205175865U
Authority
CN
China
Prior art keywords
concrete mix
slump cone
diameter
base
analyzer according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520359575.2U
Other languages
Chinese (zh)
Inventor
冯陆军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Institute of Technology
Original Assignee
Nantong Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Institute of Technology filed Critical Nantong Institute of Technology
Priority to CN201520359575.2U priority Critical patent/CN205175865U/en
Application granted granted Critical
Publication of CN205175865U publication Critical patent/CN205175865U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete mix peaceability apparatus, a simple structure, the simple operation, the higher concrete mix peaceability apparatus of precision, the main part comprises slump cone, the section of thick bamboo that catchments, scale stand, fixed feeding hopper supporting ring, tamper and base, its characterized in that: the slump cone is the round platform form, fixed feeding hopper supporting ring is installed outside the slump cone, the slump cone is placed at a middle position that catchments, the section of thick bamboo that catchments sets up on the base, still be equipped with the scale stand on the base, can surveyability see the yardstick, the operation of being convenient for improves the precision.

Description

A kind of concrete mix workability analyzer
Technical field
The utility model relates to a kind of concrete mix workability analyzer, the concrete mix workability analyzer that specifically a kind of degree of accuracy is higher.
Background technology
Workability refers to that concrete mix is easy to constructing operation and can obtains uniform quality, shaping closely knit performance.Workability is a comprehensive technological property, comprises the implication of three aspects such as mobility, cohesiveness and water-retaining property, interknits, but often there is contradiction between this three aspect.Mobility refers to that concrete mix is being easy to produce flowing, is being easy to carry and be easy to be full of the character of concrete blinding under gravity or mechanical vibration force effect.Cohesiveness is the ability that concrete mix keeps overall uniformity in work progress.Cohesiveness can ensure that well concrete mix is in conveying, pouring, the process such as shaping, and layering, segregation do not occur, and after namely ensureing sclerosis, concrete inner structure is even.Water-retaining property is the ability that concrete mix keeps moisture in work progress.Good water-retaining property can ensure that concrete mix is in conveying, shaping and condensation process, there is not large or serious bleeding, both a large amount of connection capillary-size pore because bleeding produces can have been avoided, can avoid due to bleeding again, make water build up at coarse aggregate and reinforcing bar bottom the interfacial adhesion defect caused.Water-retaining property has larger impact to concrete strength and permanance.
Utility model content
It is simple that the purpose of this utility model is to provide a kind of structure, the concrete mix workability analyzer that convenient operation, precision are high.
A kind of concrete mix workability analyzer, main body is made up of slump cone, Water collecting tube, scale column, fixing feeding hopper supporting ring, tamper and base, its innovative point is: described slump cone is round table-like, described fixing feeding hopper supporting ring is arranged on outside slump cone, described slump cone is placed on Water collecting tube middle position, described Water collecting tube is arranged on base, and described base is also provided with scale column.
Further, described slump cone is round table-like, and top is divided into inverted trapezoidal, and bottom is divided into trapezoid, its inwall should smooth, without convex-concave position; Bottom surface and end face should be parallel to each other and with the axes normal of cone.Install fixing feeding hopper supporting ring in the outside upper lower portion junction of slump cone, 2/3 At The Height pacifies two handles; The inside dimension of cylinder is: base diameter is 18.0 ~ 21.0cm; Top diameter is 8.5 ~ 11.0cm; Be highly 28.0 ~ 31.0cm; Wall thickness is even, and is 0.05cm ~ 0.20cm.
Further, described Water collecting tube is back taper barrel structure, and base diameter is 18.0 ~ 21.0cm, and top diameter is 33.0 ~ 42.0cm, and dark 8.0 ~ 12.0cm scribbles the annular section of different colours inside barrel.
Further, described scale column is right cylinder, and diameter is 1.5 ~ 2.0cm, high 35 ~ 40cm, and leg surface is carved with yardstick.
Further, described fixing feeding hopper supporting ring, main structure body is for being with staight shank circular, and annulus is arranged on the outside upper lower portion junction of slump cone, and staight shank is arranged on scale column by setscrew nut, turns on setscrew nut, and supporting ring can height up and down.
Further, described tamper is right cylinder, and diameter is 1.4 ~ 2.2cm, and length is 64 ~ 67cm, and one end is rounding, and in hemispherical, the other end is provided with shakes hands.
Further, described base is formed by being with Water collecting tube desktop, wall, column with holes and rectangular interspersed screw; Described desktop two ends are arranged on two walls, and the two ends of described desktop are respectively provided with two columns with holes, and described two rectangular interspersed screws, through the hole of two ends column with holes, are installed by wing nut.
Further, described desktop is rectangle, long 60 ~ 90cm, wide 50 ~ 60cm, thick 1.0 ~ 1.5cm.
Further, described wall is rectangle, wide 50 ~ 60cm, high 30 ~ 40cm, thick 1.0 ~ 1.5cm.
Further, described column with holes is rectangle, long 10 ~ 15cm, wide 3 ~ 5cm, thick 1.0 ~ 1.5cm; Hole is positioned at column upper end, and diameter is 1.5 ~ 2.5cm.
Further: described rectangular interspersed screw is right cylinder, and diameter is 1.0 ~ 1.5cm, and length is 110 ~ 120cm, and one end is provided with wing nut.
The beneficial effects of the utility model are:
1, concrete mix workability analyzer structure described in the utility model is simple, and easy to operate, precision is high, and error is little.
2, slump cone top and the bottom described in the utility model are connected by welding technology, and through quenching technical process, sturdy and durable, there is certain toughness, not fragile, and through glossing, meet the aesthetic standard of people.
3, Water collecting tube described in the utility model, Water collecting tube main portions barrel adopts the steel plate that 2mm is thick, scribbles the annular section of different colours inside barrel, can quantitatively judge the quality of water-retaining property according to the region of liquid level.
4, scale column described in the utility model, yardstick shown when can show mensuration accurately, very clear, convenient operation.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is described in further details.
Fig. 1 is the utility model general assembly structural representation.
Fig. 2 is the utility model general assembly structural profile schematic diagram.
Fig. 3 is the rectangular interspersed bolt structure schematic diagram of the utility model.
Fig. 4 is the utility model tamper structural representation.
Fig. 5 is the structural representation of the utility model base
Embodiment
General assembly structural representation as shown in Figure 1, is made up of base 1, slump cone 2, column with holes 3, scale column 4, setscrew nut 5, fixing feeding hopper supporting ring 6.
Rectangular interspersed bolt structure schematic diagram as shown in Figure 3, is made up of rectangular interspersed screw 7 and wing nut 8.
1) first soak slump cone, feeding hopper, Water collecting tube barrel and bottom surface and other apparatus with wet cloth, require wetting and without open fire.Base is placed on solid surface level, with long spiro nail, slump cone and base is fixed together, feeding hopper laid by slump cone.
2) divided by mixed concrete mixture sample scuppit 3 layers to load equably in cylinder on request, after making tamping every layer of specimen height be cylinder high about 1/3.Every layer plugs and pounds 25 times with tamper.Should be carried out to center by periphery along the hand of spiral when plugging and pounding, plug and pound at every turn and should be uniformly distributed on cross section.When plugging and pounding the concrete sample on a limit, tamper can tilt a little; When plugging and pounding bottom, tamper should run through entire depth; When plugging and pounding the second layer and top layer, tamper should insert the surface of this layer to lower one deck.During pouring top layer, concrete mix should be filled with to feeding hopper 2/3 place, after top layer plugs and pounds, scrape off unnecessary concrete mix and use spatula floating.
3), after removing the concrete on the base of cylinder limit, vertically slump cone is mentioned reposefully.The raising process of slump cone should complete in 5 ~ 10s.From be charged to the whole process mentioning slump cone and should complete in 150s.
4) after mentioning slump cone, slump scale immediately on mobile column, concrete mix examination body peak after making scale lower edge and collapsing is equal, from vertical rod, the lower limb of abutment ring reads scale (in units of mm), and this numerical value is the slump value of this concrete mix.
5) observe the height of liquid level in Water collecting tube, according to the color region at liquid level place, judge concrete water-retaining property.As the part concrete mix of liquid level in higher color region or cone is starched and aggregate exposure because flowing, then concrete water-retaining property is poor; If liquid level is in lower region, then show that water-retaining property is good.
6), after slump cone lift-off, as examination body collapses or cuts up phenomenon, then should resample measures.As second time still there is this phenomenon, then represent that this mixture workability is bad, should give record for future reference.
7) measure and after recording the slump, water-retaining property, impact gently with the mixture pyramid side that tamper is collapsing, if cone is sunk gradually, representing that the glutinous poly-property of mixture is good; If cone is decayed, part is burst apart or occur segregation, namely glutinous poly-property is poor.
8) when the slump recording mixture does not reach requirement, water cement ratio can be kept constant, increase by cement and the water of 5% or 10%; When the slump is excessive, sand coarse aggregate ratio can be kept constant, take the circumstances into consideration the consumption increasing sand and stone; As glutinous poly-property or poor water retention property, then need suitably to adjust sand coarse aggregate ratio.After each adjustment, mix is even as early as possible, re-starts the slump and measures.
The above is preferred implementation of the present utility model, can not limit the interest field of the utility model with this.It should be pointed out that for those skilled in the art, the technical solution of the utility model is modified or equivalent replacement, do not depart from protection domain of the present utility model.

Claims (11)

1. a concrete mix workability analyzer, main body is made up of slump cone, Water collecting tube, scale column, fixing feeding hopper supporting ring, tamper and base, it is characterized in that: described slump cone is round table-like, described fixing feeding hopper supporting ring is arranged on outside slump cone, described slump cone is placed on Water collecting tube middle position, described Water collecting tube is arranged on base, and described base is also provided with scale column.
2. a kind of concrete mix workability analyzer according to claim 1, is characterized in that: described slump cone is round table-like, and top is divided into inverted trapezoidal, and bottom is divided into trapezoid, its inwall should smooth, without convex-concave position; Bottom surface and end face should be parallel to each other and with the axes normal of cone; Install fixing feeding hopper supporting ring in the outside upper lower portion junction of slump cone, 2/3 At The Height pacifies two handles; The inside dimension of cylinder is: base diameter is 18.0cm ~ 21.0cm; Top diameter is 8.5cm ~ 11.0cm; Be highly 28.0cm ~ 31.0cm; Wall thickness is even, and is 0.05cm ~ 0.20cm.
3. a kind of concrete mix workability analyzer according to claim 2, it is characterized in that: described Water collecting tube is back taper barrel structure, base diameter is 18.0 ~ 21.0cm, and top diameter is 33.0 ~ 42.0cm, dark 8.0 ~ 12.0cm, scribbles the annular section of different colours inside barrel.
4. a kind of concrete mix workability analyzer according to claim 1, it is characterized in that: described scale column is right cylinder, diameter is 1.5cm ~ 2.0cm, high 30cm ~ 40cm, and leg surface is carved with yardstick.
5. a kind of concrete mix workability analyzer according to claim 1, it is characterized in that: described fixing feeding hopper supporting ring, main structure body is for being with staight shank circular, and annulus is arranged on the outside upper lower portion junction of slump cone, and staight shank is arranged on scale column by setscrew nut; After removing slump cone, by unclamping setscrew nut, supporting ring is Height Adjustable.
6. a kind of concrete mix workability analyzer according to claim 1, it is characterized in that: described tamper is right cylinder, diameter is 1.4 ~ 2.2cm, and length is 64 ~ 67cm, and one end is rounding, and in hemispherical, the other end is provided with shakes hands.
7. a kind of concrete mix workability analyzer according to claim 1, is characterized in that: described base is formed by being with Water collecting tube desktop, wall, column with holes and rectangular interspersed screw; Described desktop two ends are arranged on two walls, and the two ends of described desktop are respectively provided with two columns with holes, and described two rectangular interspersed screws, through the hole of two ends column with holes, are installed by wing nut.
8. a kind of concrete mix workability analyzer according to claim 7, is characterized in that: described band Water collecting tube desktop is the recessed rectangle of band, long 60 ~ 90cm, wide 50 ~ 60cm, thick 1.0 ~ 1.5cm; Described Water collecting tube is back taper barrel structure, and base diameter is 18.0 ~ 21.0cm, and top diameter is 33.0 ~ 42.0cm, and dark 8.0 ~ 12.0cm scribbles the annular section of different colours inside barrel.
9. a kind of concrete mix workability analyzer according to claim 7, is characterized in that: described wall is rectangle, wide 50 ~ 60cm, high 30 ~ 40cm, thick 1.0 ~ 1.5cm.
10. a kind of concrete mix workability analyzer according to claim 7, is characterized in that: described column with holes is rectangle, long 10 ~ 15cm, wide 3 ~ 5cm, thick 1.0 ~ 1.5cm; Hole is positioned at column upper end, and diameter is 1.5 ~ 2.5cm.
11. a kind of concrete mix workability analyzers according to claim 7, is characterized in that: described rectangular interspersed screw is right cylinder, and diameter is 1.0 ~ 1.5cm, and length is 110 ~ 120cm, and one end is provided with wing nut.
CN201520359575.2U 2015-05-29 2015-05-29 Concrete mix peaceability apparatus Expired - Fee Related CN205175865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520359575.2U CN205175865U (en) 2015-05-29 2015-05-29 Concrete mix peaceability apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520359575.2U CN205175865U (en) 2015-05-29 2015-05-29 Concrete mix peaceability apparatus

Publications (1)

Publication Number Publication Date
CN205175865U true CN205175865U (en) 2016-04-20

Family

ID=55739843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520359575.2U Expired - Fee Related CN205175865U (en) 2015-05-29 2015-05-29 Concrete mix peaceability apparatus

Country Status (1)

Country Link
CN (1) CN205175865U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107422106A (en) * 2017-08-03 2017-12-01 河海大学 A kind of method that in situ quantitation assesses the anti-isolation characteristic of fresh concrete material

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107422106A (en) * 2017-08-03 2017-12-01 河海大学 A kind of method that in situ quantitation assesses the anti-isolation characteristic of fresh concrete material
CN107422106B (en) * 2017-08-03 2019-08-06 河海大学 A kind of method of the anti-isolation characteristic of in situ quantitation assessment fresh concrete material

Similar Documents

Publication Publication Date Title
CN205049440U (en) Vibration frequency and vigorous consistometer of ballast quality adjustable dimension
CN104865158A (en) Concrete mixture peaceability tester
CN104634700A (en) Concrete fluidity testing device
CN104777078B (en) Filling bed self-dense concrete mixture stability testing device and its method of testing
CN211426501U (en) Concrete workability testing arrangement permeates water
CN205175865U (en) Concrete mix peaceability apparatus
CN117723441B (en) Concrete fluidity testing device
CN104833796B (en) A kind of electric concrete mixture workability analyzer
CN204495680U (en) Concrete flowability proving installation
CN205139143U (en) Electronic concrete mix peaceability apparatus
CN207020040U (en) A kind of cement consistency analyzer of energy leveling
CN209821200U (en) Novel slump appearance convenient to reading and promotion
CN209690309U (en) A kind of integral type concrete slump detection device
CN218382807U (en) Measuring device for architectural design
CN217717396U (en) Dry-mixed mortar detection equipment
CN211086015U (en) Detection apparatus for sound insulation mortar
CN213517146U (en) Concrete slump test fixing and leveling device
CN207501831U (en) A kind of concrete plate thickness of General portable takes a sample test control tool
CN204422526U (en) Folding slump cone
CN109612878B (en) Slump cone without treading and application thereof
CN209148693U (en) A kind of hydraulic engineering RC axial loading column device
CN212780809U (en) Detect device of cement concrete slump
CN208383877U (en) A kind of shield tunnel synchronous grouting concrete slump test device
CN206132766U (en) Slump chassis
CN213986482U (en) Test device for observing changes of bubbles on surface of clear water concrete

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420