CN205134327U - Concrete diclinic props row -pile support system - Google Patents

Concrete diclinic props row -pile support system Download PDF

Info

Publication number
CN205134327U
CN205134327U CN201520887182.9U CN201520887182U CN205134327U CN 205134327 U CN205134327 U CN 205134327U CN 201520887182 U CN201520887182 U CN 201520887182U CN 205134327 U CN205134327 U CN 205134327U
Authority
CN
China
Prior art keywords
diagonal brace
anchor pier
campshed
bracing
support system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520887182.9U
Other languages
Chinese (zh)
Inventor
黄金桥
徐双全
傅婧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201520887182.9U priority Critical patent/CN205134327U/en
Application granted granted Critical
Publication of CN205134327U publication Critical patent/CN205134327U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a concrete diclinic props row -pile support system, the bracing I and the bracing II that prop including the diclinic, anchor pier I, anchor pier II, guan liang, waist rail, stand stake and linking beam. The both ends of bracing I are provided with guan liang and anchor pier I respectively, and the both ends of bracing II are provided with waist rail and anchor pier II respectively. The beneficial effects of the utility model are that: through the setting of double bracing, can improve the whole bending resistance of campshed, reduce the foundation ditch displacement, the lateral stiffness who has increased the campshed that sets up of guan liang and waist rail and anchor pier, the linking beam who sets up between two bracings has strengthened the wholeness of strutting the system, has improved stability, and the form of strutting of bracing has overcome the not enough shortcoming of the scope of operation in the hole, has guaranteed the security of construction, has enlarged the application of bracing in excavation supporting.

Description

A kind of Concrete Double diagonal brace campshed support system
Technical field
The utility model relates to Base hole supporting technology field, particularly relates to a kind of Concrete Double diagonal brace campshed support system.
Background technology
In recent years, along with a large amount of constructions of highrise building and all kinds of underground engineering, deep foundation pit support more and more causes engineers and technicians and builds the attention of authorities.At present, in deep-foundation pit engineering, conventional internal support of foundation pit has horizontal support and bearing diagonal two kinds, compared to horizontal support, piles in deep pits diclinic supporting system is while guarantee base pit stability, there is the advantages such as engineering quantity is little, cost is low, shoveling is convenient, the duration is short, receive the favor of a lot of large span foundation ditch.
Utility model content
In order to overcome many deficiencies that prior art exists, the utility model provides a kind of Concrete Double diagonal brace campshed support system, for the support system in deep-foundation pit engineering, not only structural safety is reliable for support system, good integrity, and easy construction, engineering quantity are little, cost is low, the duration is short, can effectively solve Problems existing in conventional construction method.
The technical solution adopted in the utility model is: a kind of Concrete Double diagonal brace campshed support system, comprises diagonal brace I and the diagonal brace II of diclinic support, anchor pier I, anchor pier II, Guan Liang, waist rail, stand column pile and linking beam.The two ends of diagonal brace I are respectively arranged with Guan Liang and anchor pier I, and the two ends of diagonal brace II are respectively arranged with waist rail and anchor pier II.
Preferably, described anchor pier I, anchor pier II are arranged on basement bottom board.
Preferably, described Guan Liang is arranged on campshed top, and waist rail is close to side in the middle part of campshed.
Preferably, described stand column pile runs through diagonal brace II, and stake top is crossing with diagonal brace I.
Preferably, described linking beam is arranged between two groups of diagonal braces, is all provided with linking beam between two diagonal braces I of two adjacent groups and between two diagonal braces II.
Preferably, described linking beam two ends are positioned at stand column pile and diclinic supports intersection.
The beneficial effects of the utility model are: a kind of Concrete Double diagonal brace campshed support system that the utility model provides, by the setting of double diagonal brace, the overall bending resistance of campshed can be improved, reduce foundation ditch displacement, the setting of Guan Liang and waist rail and anchor pier adds the anti-side rigidity of campshed, the linking beam arranged between two diagonal braces enhances the globality of support system, improve stability, and the support form of diagonal brace overcomes the shortcoming of scope of operation deficiency in hole, ensure that the safety of construction, expand the application of diagonal brace in pattern foundation pit supporting structure.
Accompanying drawing explanation
Fig. 1 is a kind of Concrete Double diagonal brace campshed support system structural representation.
Fig. 2 is a kind of Concrete Double diagonal brace campshed support system sectional drawing.
In accompanying drawing, 1, campshed, 2, Guan Liang, 3, waist rail, 4, linking beam, 51, anchor pier I, 52, anchor pier II, 6, diclinic support, 61, diagonal brace I, 62, diagonal brace II, 7, stand column pile, 8, basement bottom board.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
As shown in Figure 1, 2, a kind of Concrete Double diagonal brace campshed support system of the present embodiment, comprises diagonal brace I 61 and the diagonal brace II 62 of diclinic support 6, anchor pier I 51, anchor pier II 52, hat beam 2, waist rail 3, stand column pile 7 and linking beam 4.The two ends of diagonal brace I 61 are respectively arranged with hat beam 2 and anchor pier I 51, the two ends of diagonal brace II 62 are respectively arranged with waist rail 3 and anchor pier II 52, anchor pier I 51, anchor pier II 52 are arranged on basement bottom board 8, and hat beam 2 is arranged on campshed 1 top, and waist rail 3 is close to side in the middle part of campshed 1.Stand column pile 7 runs through diagonal brace II 62, and stake top is crossing with diagonal brace I 61, and linking beam 4 is arranged between two groups of diagonal braces, is all provided with linking beam between two diagonal braces I 61 and between two diagonal braces II 62, and linking beam 4 two ends are positioned at stand column pile 7 and support 6 intersections with diclinic.
Above-described embodiment is to specific descriptions of the present utility model; only for being further described the utility model; can not be interpreted as the restriction to the utility model protection domain, the technician of this area makes some nonessential improvement according to the content of above-mentioned utility model to the utility model and adjustment all falls within protection domain of the present utility model.

Claims (6)

1. a Concrete Double diagonal brace campshed support system, it is characterized in that: the diagonal brace I (61) and the diagonal brace II (62) that comprise diclinic support (6), anchor pier I (51), anchor pier II (52), Guan Liang (2), waist rail (3), stand column pile (7) and linking beam (4), the two ends of diagonal brace I (61) are respectively arranged with Guan Liang (2) and anchor pier I (51), and the two ends of diagonal brace II (62) are respectively arranged with waist rail (3) and anchor pier II (52).
2. a kind of Concrete Double diagonal brace campshed support system according to claim 1, is characterized in that: anchor pier I (51), anchor pier II (52) are arranged on basement bottom board (8).
3. a kind of Concrete Double diagonal brace campshed support system according to claim 1, is characterized in that: Guan Liang (2) is arranged on campshed (1) top, and waist rail (3) is close to side, campshed (1) middle part.
4. a kind of Concrete Double diagonal brace campshed support system according to claim 1, it is characterized in that: stand column pile (7) runs through diagonal brace II (62), stake top is crossing with diagonal brace I (61).
5. a kind of Concrete Double diagonal brace campshed support system according to claim 1, is characterized in that: linking beam (4) is arranged between two groups of diagonal braces, is all provided with linking beam between two diagonal braces I (61) and between two diagonal braces II (62).
6. a kind of Concrete Double diagonal brace campshed support system according to claim 1, is characterized in that: linking beam (4) two ends are positioned at stand column pile (7) and support (6) intersection with diclinic.
CN201520887182.9U 2015-11-10 2015-11-10 Concrete diclinic props row -pile support system Expired - Fee Related CN205134327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520887182.9U CN205134327U (en) 2015-11-10 2015-11-10 Concrete diclinic props row -pile support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520887182.9U CN205134327U (en) 2015-11-10 2015-11-10 Concrete diclinic props row -pile support system

Publications (1)

Publication Number Publication Date
CN205134327U true CN205134327U (en) 2016-04-06

Family

ID=55620134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520887182.9U Expired - Fee Related CN205134327U (en) 2015-11-10 2015-11-10 Concrete diclinic props row -pile support system

Country Status (1)

Country Link
CN (1) CN205134327U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107677498A (en) * 2017-11-02 2018-02-09 中国建筑第八工程局有限公司 The simulation test device and method of the stake soil support combination supporting system mechanism of action
CN108166506A (en) * 2018-01-24 2018-06-15 浙江立鹏建设有限公司 A kind of foundation pit supporting construction
CN109183809A (en) * 2018-10-16 2019-01-11 北京建工国际投资有限责任公司 A kind of construction method of Muddy Bottoms clay deep-foundation pit engineering composite support support replacement
CN109356169A (en) * 2018-12-03 2019-02-19 中国建筑局(集团)有限公司 Foundation pit row pile supporting system and construction method thereof
CN109577346A (en) * 2019-01-02 2019-04-05 深圳市前海世茂投资管理有限公司 A kind of foundation pit supporting system and its method of construction
CN109930610A (en) * 2019-04-12 2019-06-25 广东电白二建集团有限公司 Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN110761297A (en) * 2019-11-04 2020-02-07 石家庄铁道大学 Supporting device for construction of civil bridge
CN111648371A (en) * 2020-06-17 2020-09-11 王冰璇 Pier-row type enclosure wall with deformation control frame
CN115506419A (en) * 2022-09-06 2022-12-23 深圳市基础工程有限公司 Seamless leakage-proof construction method for basement exterior wall

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107677498A (en) * 2017-11-02 2018-02-09 中国建筑第八工程局有限公司 The simulation test device and method of the stake soil support combination supporting system mechanism of action
CN107677498B (en) * 2017-11-02 2023-10-03 中国建筑第八工程局有限公司 Simulation test device and method for action mechanism of pile-soil-support combined support system
CN108166506B (en) * 2018-01-24 2020-07-07 浙江立鹏建设有限公司 Foundation pit supporting structure
CN108166506A (en) * 2018-01-24 2018-06-15 浙江立鹏建设有限公司 A kind of foundation pit supporting construction
CN109183809A (en) * 2018-10-16 2019-01-11 北京建工国际投资有限责任公司 A kind of construction method of Muddy Bottoms clay deep-foundation pit engineering composite support support replacement
CN109183809B (en) * 2018-10-16 2021-03-23 北京建工国际投资有限责任公司 Construction method for replacing support of composite support of muddy clay deep foundation pit engineering
CN109356169A (en) * 2018-12-03 2019-02-19 中国建筑局(集团)有限公司 Foundation pit row pile supporting system and construction method thereof
CN109356169B (en) * 2018-12-03 2024-04-19 中国建筑一局(集团)有限公司 Foundation pit row pile supporting system and construction method thereof
CN109577346A (en) * 2019-01-02 2019-04-05 深圳市前海世茂投资管理有限公司 A kind of foundation pit supporting system and its method of construction
CN109930610A (en) * 2019-04-12 2019-06-25 广东电白二建集团有限公司 Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN110761297A (en) * 2019-11-04 2020-02-07 石家庄铁道大学 Supporting device for construction of civil bridge
CN110761297B (en) * 2019-11-04 2021-05-04 石家庄铁道大学 Supporting device for construction of civil bridge
CN111648371A (en) * 2020-06-17 2020-09-11 王冰璇 Pier-row type enclosure wall with deformation control frame
CN115506419A (en) * 2022-09-06 2022-12-23 深圳市基础工程有限公司 Seamless leakage-proof construction method for basement exterior wall

Similar Documents

Publication Publication Date Title
CN205134327U (en) Concrete diclinic props row -pile support system
CN203145038U (en) lattice column type tower crane foundation
CN204510467U (en) A kind of cap node for basement flat slab structure
CN203256761U (en) Tower crane foundation arranged on top plate of basement
CN203654294U (en) Foundation pit supporting structure used in reverse building method
CN201679147U (en) Underpinning structure for superstructure shear wall during underground top-down construction of high-rise building
CN103938634A (en) Deep foundation pit supporting structure and construction method
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN104195956A (en) Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof
CN203200745U (en) Underground continuous wall's reinforcement support in reverse construction method construction
CN202416252U (en) L-shaped flood prevention retaining wall with high piles
CN202416324U (en) Beam and slab structure superposed through top-down beam and down-top slab construction of foundation pit project
CN202273242U (en) Base of union type mini type pile rod tower
CN203821399U (en) Deep foundation pit supporting structure
CN215630021U (en) Highway bridge construction foundation ditch protector
CN104153374A (en) Combined foundation pit supporting structure with inclined strut and pull anchor
CN201169781Y (en) Cap digging pit structure
CN201722700U (en) Infrastructure of tower crane
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN206015511U (en) One implant post steel pipe column
CN202440824U (en) Three-line-pile super-deep foundation-pit support structure
CN207794098U (en) Supporting construction is supportted in a kind of oblique throwing convenient for construction of bottom plates
CN202644590U (en) Foundation trench anti-floating structure for underground construction
CN203429557U (en) Anchor pole back beam applied to underpass bridge jacking construction
CN206053345U (en) A kind of pump line support meanss

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406

Termination date: 20161110

CF01 Termination of patent right due to non-payment of annual fee