Split type iron tower base Download PDFInfo
- Publication number
- CN205077974U CN205077974U CN201520698158.0U CN201520698158U CN205077974U CN 205077974 U CN205077974 U CN 205077974U CN 201520698158 U CN201520698158 U CN 201520698158U CN 205077974 U CN205077974 U CN 205077974U
- Authority
- CN
- China
- Prior art keywords
- steel tower
- sinker
- iron tower
- fixing base
- holder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a split type iron tower base, including an iron tower fixing base and a plurality of counter weight seat, wherein, the middle part of iron tower fixing base is provided with the control tower, the iron tower fixing base, the both ends of the upper surface of counter weight seat are provided with the lug, the iron tower fixing base, it has a plurality of connecting pipes to run through on the counter weight seat, the outer wall of connecting pipe is provided with a plurality of strengthening ribs, counter weight seat upper portion is provided with the collar tie beam, the counter weight seat, it is fixed as an organic whole through the matching of connecting pipe and connecting rod between the iron tower fixing base, collar tie beam on a plurality of counter weight seats encloses into the rectangle form, the control tower, the shaping is pour to iron tower fixing base an organic whole during fabrication, the middle part of strengthening rib is provided with the sleeve pipe, the sleeve pipe cup joints on the connecting pipe, iron tower fixing base and a plurality of counter weight seat are arranged on same horizontal plane. Be fixed with the flange on the control tower, the flange is used for assembling the iron tower, lug, connecting pipe are pour through cement and are fixed on iron tower fixing base or counter weight seat. The utility model discloses simple structure, it is convenient to connect, and the construction is quick, does not disturb residents, fixes firmly and does benefit to and assemble other annexes above that.
Description
Technical field:
The utility model relates to steel tower and attachment technique field thereof, is specifically related to a kind of split type steel tower pedestal.
Background technology:
The iron tower foundation of electric power or communication, need to carry out field fabrication at the construction field (site): base of first digging pit, then cement is built, and needs at least to park could form iron tower foundation in more than 28 days after building, on iron tower foundation, finally set up the steel tower of electric power or communication again.The making of this iron tower foundation, excavation area is large, and the engineering time is long, if when downtown area or kerbside arrange steel tower, noise is large, disturbs residents and has a strong impact on traffic, have impact on the life of the regional people that construct.In view of this technical problem, occur that some carry out the mode of split production to iron tower foundation, such as, China Patent Publication No. CN203668965U discloses a kind of split type steel tower prefabricated foundation, wherein every layer of weight coating forms by two pieces of precast concrete balancing weights are placed side by side, and the precast concrete balancing weight in adjacent weight coating is that right-angled intersection is placed; The precast concrete balancing weight being positioned at the bottom is prefabricated with immobilizing foundation leading screw, fixes by nut after the upper end of described immobilizing foundation leading screw extends up through weight coating; Above every layer of weight coating, medium position is provided with flange, described flange is equipped with the set bolt for reinforcement by connection weight coating.The utility model is made up of two-layer or multilayer weight coating, and every layer of weight coating is provided with two pieces of precast concrete balancing weights, and upper and lower adjacent precast concrete balancing weight is that right-angled intersection connects.The balancing weight of this up-down structure connects not easily, and, be unfavorable for when link damages changing, namely there is the problem of steadiness deficiency, in addition, iron tower foundation sets up other annexes as machine room etc., need additionally to set up, be unfavorable for operation.In view of this technical problem, need to occur that a kind of structure is simple, easy to connect, construction fast, does not disturb residents, fixation and be beneficial to the split type steel tower pedestal of the one of assembling other annexes thereon.
Summary of the invention:
The purpose of this utility model is to overcome the shortcoming existed in prior art, provides a kind of structure simple, easy to connect, and construction fast, does not disturb residents, fixation and be beneficial to the split type steel tower pedestal of the one of assembling other annexes thereon.
To achieve these goals, the utility model provides a kind of split type steel tower pedestal, comprise a steel tower holder and multiple sinker, wherein, the middle part of steel tower holder is provided with control tower, steel tower holder, the two ends of the upper surface of sinker are provided with hanger, steel tower holder, sinker runs through and has multiple tube connector, the outer wall of tube connector is provided with multiple reinforcing rib, reinforcing rib is in ' rice ' shape or ' ten ' shape, sinker top is provided with collar tie beam, sinker, be fixed as one by the coupling of tube connector and connecting rod between steel tower holder, collar tie beam on multiple sinker surrounds rectangular-shaped, control tower, steel tower holder during fabrication formed by integrally casting is shaping, the middle part of reinforcing rib is provided with sleeve pipe, casing pipe sleeve is connected on tube connector, steel tower holder and multiple sinker are arranged in same level.
Control tower is fixed with flange, and flange is for assembling steel tower; Hanger, tube connector are built by cement and are fixed on steel tower holder or sinker.
Collar tie beam is fixed with machine room, and the two ends of connecting rod have been threaded nut.
Further, sinker is preferably 3-6,
Further, the arrangement mode of sinker and steel tower holder is: steel tower fixed seating is in the middle part of multiple sinker.Or steel tower fixed seating is in the side of multiple sinker.
Further, the connected mode of reinforcing rib and tube connector is: the middle part of reinforcing rib arranges sleeve pipe, casing pipe sleeve not existing together at tube connector, and then joints cement defines steel tower holder or sinker, meanwhile, arranges hanger at upper surface.
Further, collar tie beam is i beam, and collar tie beam fixes machine room by locked with bolts, and machine room is board-like room, and bottom is anchored on collar tie beam by Baltimore groove and then locking is fixed.
Advantage of the present utility model is, structure is simple, easy to connect, and construction fast, does not disturb residents, fixation and be beneficial to and assemble other annexes thereon, is specially:
Sinker of the present utility model and steel tower holder are arranged in same level, and the arrangement mode of sinker and steel tower holder is: steel tower fixed seating is in the middle part of multiple sinker.Or steel tower fixed seating is in the side of multiple sinker.Sinker arranges collar tie beam, and the collar tie beam on multiple sinker forms rectangular-shaped, and collar tie beam is for locking fixing machine room.Critical piece sinker of the present utility model and steel tower holder can carry out through engineering approaches processing, when assembling, by connecting rod through after tube connector, then being tightened by bolts connecting rod, being locked as one by sinker and steel tower holder.Sinker and steel tower holder are arranged in same level, are beneficial to and use connecting rod to connect as one, and be beneficial to replacing connecting rod, make it more easily be fastenedly connected and be integrated.
Accompanying drawing illustrates:
Fig. 1 is the structural representation of the main apparent direction of steel tower holder of the present utility model.
Fig. 2 is the structural representation in the side-looking direction of steel tower holder of the present utility model.
Fig. 3 is the structural representation of the main apparent direction of sinker of the present utility model.
Fig. 4 is the structural representation in the side-looking direction of sinker of the present utility model.
Fig. 5 is the cross-sectional schematic of the tube connector part of sinker of the present utility model.
Fig. 6 be steel tower holder of the present utility model and sinker combinationally use overlook direction schematic diagram.
Accompanying drawing identifies:
1, hanger 2, steel tower holder 3, control tower
4, tube connector 5, sinker 6, collar tie beam
7, connecting rod 8, reinforcing rib
Detailed description of the invention:
Below in conjunction with accompanying drawing, the utility model is described.As shown in figs 1 to 6, Fig. 1 is the structural representation of the main apparent direction of steel tower holder of the present utility model.Fig. 2 is the structural representation in the side-looking direction of steel tower holder of the present utility model.Fig. 3 is the structural representation of the main apparent direction of sinker of the present utility model.Fig. 4 is the structural representation in the side-looking direction of sinker of the present utility model.Fig. 5 is the cross-sectional schematic of the tube connector part of sinker of the present utility model.Fig. 6 be steel tower holder of the present utility model and sinker combinationally use overlook direction schematic diagram.
The split type steel tower pedestal of the utility model, comprise a steel tower holder 2 and multiple sinker 5, wherein, the middle part of steel tower holder 2 is provided with control tower 3, steel tower holder 2, the two ends of the upper surface of sinker 5 are provided with hanger 1, steel tower holder 2, sinker 5 runs through and has multiple tube connector 4, the outer wall of tube connector 4 is provided with multiple reinforcing rib 8, reinforcing rib 8 is in ' rice ' shape or ' ten ' shape, sinker 5 top is provided with collar tie beam 6, sinker 5, be fixed as one by the coupling of tube connector 4 and connecting rod 7 between steel tower holder 2, collar tie beam on multiple sinker 5 surrounds rectangular-shaped, control tower 3, steel tower holder 2 during fabrication formed by integrally casting is shaping, the middle part of reinforcing rib 8 is provided with sleeve pipe, casing pipe sleeve is connected on tube connector 4, steel tower holder 2 and multiple sinker 5 are arranged in same level.Control tower 3 is fixed with flange, and flange is for assembling steel tower; Hanger 1, tube connector 4 are built by cement and are fixed on steel tower holder 2 or sinker 5.Collar tie beam 6 is fixed with machine room, and the two ends of connecting rod 7 have been threaded nut.
Further, sinker 5 is preferably 3-6, and further, sinker 5 with the arrangement mode of steel tower holder 2 is: steel tower holder 2 is positioned at the middle part of multiple sinker 5.Or steel tower holder 2 is positioned at the side of multiple sinker 5.Further, reinforcing rib 8 with the connected mode of tube connector 4 is: the middle part of reinforcing rib 8 arranges sleeve pipe, and casing pipe sleeve does not exist together tube connector 4, and then joints cement defines steel tower holder 2 or sinker 5, meanwhile, arranges hanger 1 at upper surface.Further, collar tie beam 6 is i beam, and collar tie beam 6 fixes machine room by locked with bolts, and machine room is board-like room, and bottom is anchored on collar tie beam by Baltimore groove and then locking is fixed.
The utility model structure is simple, easy to connect, construction fast, do not disturb residents, fixation and be beneficial to and assemble other annexes thereon, sinker of the present utility model and steel tower holder are arranged in same level, and the arrangement mode of sinker and steel tower holder is: steel tower fixed seating is in the middle part of multiple sinker.Or steel tower fixed seating is in the side of multiple sinker.Sinker arranges collar tie beam, and the collar tie beam on multiple sinker forms rectangular-shaped, and collar tie beam is for locking fixing machine room.Critical piece sinker of the present utility model and steel tower holder can carry out through engineering approaches processing, when assembling, by connecting rod through after tube connector, then being tightened by bolts connecting rod, being locked as one by sinker and steel tower holder.Sinker and steel tower holder are arranged in same level, are beneficial to and use connecting rod to connect as one, and be beneficial to replacing connecting rod, make it more easily be fastenedly connected and be integrated.
Claims (3)
1. a split type steel tower pedestal, comprise a steel tower holder (2) and multiple sinker (5), it is characterized in that, the middle part of described steel tower holder (2) is provided with control tower (3), steel tower holder (2), the two ends of the upper surface of sinker (5) are provided with hanger (1), steel tower holder (2), sinker (5) runs through and has multiple tube connector (4), the outer wall of tube connector (4) is provided with multiple reinforcing rib (8), reinforcing rib (8) is in ' rice ' shape or ' ten ' shape, sinker (5) top is provided with collar tie beam (6), sinker (5), be fixed as one by the coupling of tube connector (4) and connecting rod (7) between steel tower holder (2), collar tie beam on multiple sinker (5) surrounds rectangular-shaped, control tower (3), formed by integrally casting is shaping during fabrication for steel tower holder (2), the middle part of reinforcing rib (8) is provided with sleeve pipe, casing pipe sleeve is connected on tube connector (4), steel tower holder (2) and multiple sinker (5) are arranged in same level.
2. split type steel tower pedestal according to claim 1, it is characterized in that, (3) are fixed with flange to described control tower, and flange is for assembling steel tower; Hanger (1), tube connector (4) are built by cement and are fixed on steel tower holder (2) or sinker (5).
3. split type steel tower pedestal according to claim 1, it is characterized in that, (6) are fixed with machine room to collar tie beam, and the two ends of connecting rod (7) have been threaded nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520698158.0U CN205077974U (en) | 2015-09-10 | 2015-09-10 | Split type iron tower base |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520698158.0U CN205077974U (en) | 2015-09-10 | 2015-09-10 | Split type iron tower base |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205077974U true CN205077974U (en) | 2016-03-09 |
Family
ID=55430388
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520698158.0U Expired - Fee Related CN205077974U (en) | 2015-09-10 | 2015-09-10 | Split type iron tower base |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205077974U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108060821A (en) * | 2016-11-06 | 2018-05-22 | 河北富亿达通信设备有限公司 | A kind of split type steel tower pedestal |
-
2015
- 2015-09-10 CN CN201520698158.0U patent/CN205077974U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108060821A (en) * | 2016-11-06 | 2018-05-22 | 河北富亿达通信设备有限公司 | A kind of split type steel tower pedestal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510640B (en) | A kind of fabricated shear wall and assembly method thereof | |
CN106759430B (en) | A kind of wind-powered electricity generation complete machine construction method of three bucket foundations and concrete support structure | |
CN105715068A (en) | Underpinning and reinforcing structure for seismic isolation bearing of existing brick-concrete structure and construction method for underpinning and reinforcing structure | |
CN106592777B (en) | Assembled steel-is mixed to combine beam-column node structure and its implementation method | |
CN106320537A (en) | Prefabricated concrete-filled square steel tube column and steel girder connecting joint | |
CN201288328Y (en) | Beam-plate integrated prefabricated split mounting type tower crane fixed foundation | |
CN104410030A (en) | Light concrete laminated slab assembly type cable trench and forming method thereof | |
CN103243638B (en) | Bridge space radioactive concrete-filled steel tube bridge pier and construction method thereof | |
CN105064759B (en) | A kind of GFRP pipes reinforced concrete combined structure member multiloop power transmission rod | |
CN205604719U (en) | Superelevation, jumbo size board structural template braced system that encorbelments | |
CN106522263B (en) | A kind of wind-powered electricity generation complete machine construction method of four bucket foundations and concrete support structure | |
CN206157913U (en) | Assembled square steel tube concrete post and girder steel connected node | |
CN205077974U (en) | Split type iron tower base | |
CN206428805U (en) | A kind of concrete prefabricated balcony of assembled steel | |
CN103741961B (en) | To boost sales after the prefabricated circular hole slab of existing building the dark seismic strengthening of beams method of key | |
CN203546944U (en) | Assembly type shear wall | |
CN204850639U (en) | GFRP pipe reinforced concrete combined member multiloop transmission of electricity pole | |
CN104563281B (en) | A kind of prefabricated balcony structure and its construction method | |
CN209053126U (en) | A kind of inspection shaft | |
CN210685110U (en) | Assembled novel bidirectional ribbed profiled steel sheet composite floor | |
CN212025899U (en) | Concrete pipe and pier structure | |
CN204418728U (en) | A kind of precast monolithic washroom | |
CN207714515U (en) | A kind of prefabrication wall and girder steel additional reinforcement part | |
CN204370831U (en) | The additional Fabricated balcony structure in old community | |
CN204418559U (en) | A kind of bolt-type syndeton for connecting stair upper end |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160309 Termination date: 20160910 |