CN205063382U - Building structure and passive room of equipment integration - Google Patents

Building structure and passive room of equipment integration Download PDF

Info

Publication number
CN205063382U
CN205063382U CN201520716771.0U CN201520716771U CN205063382U CN 205063382 U CN205063382 U CN 205063382U CN 201520716771 U CN201520716771 U CN 201520716771U CN 205063382 U CN205063382 U CN 205063382U
Authority
CN
China
Prior art keywords
air
equipment
pipeline
embedded
passive room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520716771.0U
Other languages
Chinese (zh)
Inventor
张小玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technology Development Promotion Center Ministry Of Housing And Urban-Rural Development Of People's Republic Of China
Original Assignee
Technology Development Promotion Center Ministry Of Housing And Urban-Rural Development Of People's Republic Of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Technology Development Promotion Center Ministry Of Housing And Urban-Rural Development Of People's Republic Of China filed Critical Technology Development Promotion Center Ministry Of Housing And Urban-Rural Development Of People's Republic Of China
Priority to CN201520716771.0U priority Critical patent/CN205063382U/en
Application granted granted Critical
Publication of CN205063382U publication Critical patent/CN205063382U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a building structure and passive room of equipment integration, belongs to the building energy conservation field, and it includes the exterior window, the exterior window adopt exterior window glass, the outer sunshade equipment of low -E coating film, still include bearing outer wall wallboard, floor, roof boarding, ventilation system pipeline, air intake, supply -air outlet, return air inlet, check valve, air outlet, unpowered hood, CO2 consistency transmitter, water storage tank and valve, bearing outer wall wallboard, floor and roof boarding adopt the board -like structure of CS, the ventilation system pipeline inlay the part of locating among the board -like structure of CS and be defined as embedded ventilation system pipeline, improve the indoor comfort level of building, reduce building heating, refrigeration energy consumption simultaneously by a wide margin, realize building supporting member and half prefabricationization of air pipe, standardize in the mill, the producing in serial form that building site prefabricated construction guarantees the reliability that passive room became more meticulous and be under construction to improve the efficiency of construction, outdoor no equipment, indoor no pipeline.

Description

A kind of building structure passive room integrated with equipment
Technical field
The invention belongs to building energy saving field, international IPC classification number is E04H14/00 or E04B5/16, particularly relates to a kind of building structure passive room integrated with equipment.
Background technology
Under global warming, energy starved background, the building energy conservation being core with high energy efficiency, low emission is just for the energy security and sustainable development that realize country play vital effect.Develop and popularize passive room, by natural ventilation, natural lighting, solar radiation obtains the hot and non-heating source in indoor and obtains the various passive type energy saving means such as hot and combine with architectural exterior-protecting construction high-efficiency energy-saving technology, under the prerequisite ensureing indoor environment comfortableness, by significantly reducing Building Heat/refrigeration duty, break away from the dependence to active mechanical heating and refrigeration system to greatest extent, and then reduce building and heating and energy consumption for cooling, make full use of regenerative resource simultaneously thus break away from the dependence to traditional fossil energy, become the important means of international building power-saving technology leading nation energy-saving and emission-reduction.
The Chief technology of passive room application comprises: 1. without the efficient outer heat preservation system of heat bridge: the Coefficient K≤0.15W/ (m of roofing, exterior wall, ground or not heating basement roof 2k); 2. pair Low-E high-performance thermal insulation exterior window: total solar energy transmittance g>=0.35 of glass, glass selectivity factor S>=1.25, overall window U factor K≤1.0W/ (m 2k); 3. efficient heat-recovering fresh air system: heat recovery rate R>=75%, ventilation power demand ev≤0.45Wh/m 3, air leak rate of air curtain≤1%; 4. the tightness measure that house is good: the technology that arranges of seal construction, the seal construction of all kinds of holes pipeline of the technology that arranges of the overall inner liner of house air leak rate of air curtain≤1%, window and body of wall arrange technology; 5. anti-bridge structure: the heat insulating material of thickness>=250mm is connected to the treatment technology that the anchoring of load bearing wall, balcony and agent structure construct without the connecting technology of heat bridge, key node; 6. high thickness external wall outer insulation fireproofing technique: fire proofing material coefficient of thermal conductivity λ≤0.045W/ (mK), meet fire do not spread, do not drip, do not discharge toxic gas, horizontal loops geometric pattern fire barrier or fire barrier, door and window hole three side technology is set; 7. moistureproof and waterproof technology; 8. noise protection measure.
The power-saving mechanism in passive room is: reduced the different transfer of heat outside architecture indoor by the peripheral structure that the thermal and insulating performance without heat bridge is superior, by the Low-E coating technique of outer window glass and the solar gain of effective external sunshade facility adjustment building, the VMC that the tightness measure good by house and High Efficiency Thermal reclaim reduces the ventilation infiltration heat transfer outside architecture indoor, effectively utilize indoor occupant simultaneously, illumination, the non-heating source heat radiation of equipment etc., enable building at extremely low auxiliary heating, just suitable indoor thermal comfort can be maintained under cooling load/energy consumption.
In above power-saving mechanism, the peripheral structure that thermal property is superior, effective external sunshade facility and good tightness measure belong to architectural exterior-protecting construction power-saving technology, and the VMC with efficient heat recovery function belongs to device energy conservation technology.As can be seen here, the high energy efficiency operation in passive room is the result of the common co-ordination of building external envelope structure and ventilation equipment.Under this operating mechanism, the year heating demand in passive room is no more than 15kWh/ (m 2a), be 1/10 to 1/4 of common energy saving building, year total primary energy demand (comprising heating, refrigeration, ventilation, domestic hot-water, illumination and household electrical appliance primary energy demand) is no more than 120kWh/ (m 2a).On the basis in passive room, more just likely building zero energy consumption builds even production capacity room to utilize regenerative resource further.
Researcher both domestic and external carries out numerous research to passive room, as Chinese invention patent CN104456699A discloses a kind of air type solar energy hot water VMC towards passive room, comprise solar energy collector, hot water cylinder, water tank blast pipe, water tank discharge pipe, the first heat exchange coil, the second heat exchange coil, the first indoor blast pipe, the second indoor blast pipe and total-heat exchanger; Wherein, the output of solar energy collector connects the gas input of hot water cylinder by water tank blast pipe; The gas output end of hot water cylinder connects the input of solar energy collector by water tank discharge pipe; The fluid output port of hot water cylinder connects the input of the first heat exchange coil and the input of the second heat exchange coil, and the output of the first heat exchange coil is connected the fluid input port of hot water cylinder with the output of the second heat exchange coil; First heat exchange coil is arranged in the first indoor blast pipe, and the second heat exchange coil is arranged in the second indoor blast pipe; First indoor blast pipe connects the second indoor blast pipe by total-heat exchanger; The present invention adopts heat exchange coil to carry out preheating to new wind, ensures that the cleaning entering room air is pollution-free to greatest extent.And for example Europatent EP2226445A2 with RO127967A1 individually discloses the pipe arrangement mode about passive room.
But foregoing invention is only to the Local Members in passive room, as VMC or pipe arrangement improve, fail to consider passive room entirety.
Summary of the invention
Technical problem to be solved by this invention overcomes the deficiencies in the prior art, provides a kind of China that is adapted to, be especially adapted to the building structure passive room integrated with equipment of the vast rural area of China.
A kind of building structure passive room integrated with equipment, comprise exterior window, described exterior window adopts outer window glass, the external sunshade equipment of Low-E plated film, also comprises load-bearing exterior wall wallboard, floor, roof panel, air system plumbing, air intake, air outlet, return air inlet, check (non-return) valve, air outlet, unpowered blast cap, CO 2concentration sensor, water tank and valve, described load-bearing exterior wall wallboard, floor and roof panel adopt CS plank frame, the described air system plumbing part be embedded among CS plank frame is defined as embedded air system plumbing, described air system plumbing comprises fresh air pipeline and return air duct, and described embedded air system plumbing comprises embedded fresh air pipeline and embedded return air duct.
Further, configuration reinforcement in described load-bearing exterior wall wallboard, described load-bearing exterior wall wallboard also comprises external wall insulating layer, outside concrete pavement, laminboard layer, inner side concrete pavement, the insulation layer of zinc-coated wire rack and coated embedded air system plumbing, described zinc-coated wire rack is that welding is made, described laminboard layer is the sandwiched plate of inner filling and flame-retardant graphite polyphenyl materials or rock wool, described outside concrete pavement and inner side concrete pavement are pea gravel concreten surface layer, described embedded fresh air pipeline and embedded return air duct are arranged in laminboard layer.
Further, described zinc-coated wire rack, described laminboard layer and described embedded air system plumbing are prefabricated integral member, and described pea gravel concreten surface layer adopts on-spot injection or cast in situs to make.
Further, described fresh air pipeline one end connects air intake, the other end extends downward underground in load-bearing exterior wall wallboard inside, described fresh air pipeline is arranged under ground portion and comprises vertical fresh air pipeline and curve fresh air pipeline, described curve fresh air pipeline is positioned at same plane, described curve fresh air pipeline is arranged in S shape in described plane, and described plane and horizontal plane angle angle are 5 ° ~ 10 °; Described return air duct one end connects return air inlet, and the other end extends upwardly to roof panel outer end in load-bearing exterior wall wallboard inside and is communicated with air outlet.
Further, described curve fresh air pipeline minimum point arranges water tank, described water tank arranges valve, the embedded air system plumbing heat insulating material penetrating outside concrete surface layer segment carries out coated, and described air system plumbing is connected with between described air intake, air outlet, return air inlet, check (non-return) valve, air outlet and all adopts tightness process.
Further, described passive room gross floor area is 186m 2f2/B2, floor height is 3m, described CS plank frame thickness is 180mm, wherein said laminboard layer thickness is 100mm, described outside concrete pavement and inner side concrete surface layer thickness are 40mm, and the thermal transmittance of described load-bearing exterior wall wallboard, floor and roof panel is 0.6W/ (m 2k), described external wall insulating layer all adopts the thick heat insulating material of 200mm to carry out full-enclosed and lays, and described heat insulating material coefficient of thermal conductivity is 0.032W/ (mK), described exterior window overall window U factor K=0.8W/ (m 2k), the total solar energy transmittance g=0.43 of described outer window glass, described air intake is the rectangle of 200mm × 200mm, be arranged at distance grade 5m At The Height, described air intake outside is provided with grid screen, described air outlet is the rectangle of 600mm × 150mm, and described air outlet number is 2, is placed in two layers of distance floor 2.6m At The Height respectively; Described return air inlet is the circle of diameter 100mm, described return air inlet number is 2, is placed in two layers of distance floor 0.2m At The Height respectively, and described air outlet and return air inlet are arranged on two relative face walls of room respectively, described air outlet is the circle of diameter 300mm, is placed on roof; The heat insulating material of described coated embedded air system plumbing is heat insulating material, and coefficient of thermal conductivity is 0.032W/ (mK), and coated thickness is 100mm.
Further, the described vertical fresh air pipeline length being arranged at underground is 6m.
Further, described fresh air pipeline and the caliber of return air duct are 100mm.
Further, the described curve fresh air pipeline length being arranged at underground is 150m.
Beneficial effect of the present invention is: CS plank frame and embedded ventilation system combine by present patent application, coordinate the strengthening measure of the outside outer heat preservation system of CS plank frame and the superior outer window and door system of thermal property etc., propose the construction program in the overall passive room of assembling space structures.The program takes full advantage of the feature that CS plank frame integrates the several functions such as load-bearing, airtight, thermal insulation, sound insulation, fire prevention, its sandwich structure is that the embedded configuration of ventilation system provides the foundation, and be easy to realize ventilation system pipeline cross-layer and lay continuously, and body of wall and roofing or laying continuously between body of wall and floor.
Utilize this construction program, attainable technique effect is:
(1) improve architecture indoor comfort level, significantly reduce building and heating, energy consumption for cooling simultaneously;
(2) realize building bearing component and ventilating duct half is prefabricated, in factory normalization, producing in serial form, assemble in siteization is constructed, and ensures that passive room becomes more meticulous the degree of reliability of construction, and improves efficiency of construction.
(3) outdoor without equipment, indoor without pipeline.
Accompanying drawing explanation
Fig. 1 is the building structure of present patent application passive room integrated with equipment construction program schematic diagram;
Fig. 2 is building structure passive room load-bearing exterior wall wallboard horizontal cross-sectional schematic diagram integrated with equipment;
Fig. 3 is building structure passive room load-bearing exterior wall wallboard facade cross-sectional schematic integrated with equipment;
Description of reference numerals:
1---air intake; 2---air outlet; 3---return air inlet; 4---check (non-return) valve; 5---air outlet; 6---unpowered blast cap; 7---fresh air pipeline; 8---return air duct; 9---CO 2concentration sensor; 10---water tank; 11---valve; 12---CS plank frame; 13---external wall insulating layer; 14---outside concrete pavement; 15---laminboard layer; 16---inner side concrete pavement; 17---zinc-coated wire rack; 18---embedded air system plumbing; 19---insulation layer.
Detailed description of the invention
Below by embodiment, and by reference to the accompanying drawings, technical scheme of the present invention is described in further detail.
Building structure passive room integrated with the equipment construction program that present patent application proposes, is made up of jointly CS plank frame system and VMC.
The requirement of structure based and using function, zinc-coated wire is adopted to make multi-form CS three dimensions rack with rational structural configuration and proprietary solder technology in factory, need to have configured air pipeline at space net rack laminboard layer according to design, and at the central layer that the inner filling and flame-retardant graphite polyphenyl materials of laminboard layer or rock wool are made, form a novel space structures sandwiched plate integrated with pipeline.Calculate according to structural mechanics, plain bars or prestressed reinforcement is configured in plate, spray (or building) pea gravel concreten surface layer on its surface after transporting in-site installation to and form load-bearing wall panel, floor and roof panel, complete the construction of building bearing structure and inner ventilation pipeline.
Beijing area residential building, building area amounts to 186m 2, F2/B2, floor height 3m, adopt 180mm thick CS plank frame system to build, wherein laminboard layer thickness 100mm, each 40mm of sprayed mortar surface layer is thick in both sides, and the thermal transmittance of load-bearing exterior wall wallboard, floor and roofing is 0.6W/ (m 2k).
According to the construction method in passive room, its load-bearing exterior wall wallboard, floor and roofing Surgery therapy all adopt the thick heat insulating material of 200mm to carry out full-enclosed and lay, heat insulating material coefficient of thermal conductivity is 0.032W/ (mK), and the thermal transmittance on exterior wall, roof, ground is 0.15W/ (m 2k).Exterior window overall window U factor K=0.8W/ (m 2k), the total solar energy transmittance g=0.43 of outer window glass.
Air intake size 200 × 200mm, be placed in apart from grade 5m At The Height, outside is provided with grid screen, can prevent foreign matter, rainwater enters indoor.Air outlet size 600 × 150mm, is placed in two-layer apart from floor 2.6m At The Height respectively.Return air inlet size φ 100mm, is placed in two-layer apart from floor 0.2m At The Height respectively.Air outlet and return air inlet are located on two relative face walls of room respectively, prevent air flow shortcircuit.Air outlet size φ 300mm, is placed on roof.
Fresh air pipeline caliber 100mm, inner to downward-extension at body of wall from air intake, be deep into underground.Fresh air pipeline is arranged under ground portion and comprises vertical fresh air pipeline and curve fresh air pipeline, described curve fresh air pipeline is positioned at same plane, described curve fresh air pipeline is arranged in S shape in described plane, it fully contacts with soil, underground fresh air pipeline buried depth calculates, PIPE DIAMETER CALCULATION and underground fresh air pipeline length computation in table 1 to table 6.Compare according to result of calculation and Parameter analysis, selectively descend pipe laying depth (i.e. vertical fresh air pipeline) to be 6m, caliber 100mm, curve fresh air pipeline length 150m.
Return air duct caliber 100mm, upwards extends in body of wall inside, reaches roofing, be communicated with air outlet from return air inlet.
For breaking off local heat bridge, the ventilating duct penetrating outside concrete surface layer segment must carry out coated process with heat insulating material.Adopt heat insulating material to wrap up, coefficient of thermal conductivity 0.032W/ (mK), coated thickness is 100mm.
The connection of the parts such as inner ventilation pipeline and outdoor pipeline, air port, valve, all adopt pipeline standardization connected mode, and take tightness process, the key node Construction treatment of building carries out according to the standard in passive room, forms structure, the equipment integration passive room of integrated.
Table 1 Beijing area climate parameter
Beijing annual mean surface temperature, DEG C 13.1
Beijing year surface temperature amplitude, DEG C 15.4
Soil thermal diffusivity, m 2/h 0.00318
Annual temperature wave moves the cycle, h 8760
Underground tunnel air adds temperature rise, DEG C 0
table 2 different depth stratum original temperature calculates
Buried depth, m Stratum original temperature, DEG C
1 2.71
2 6.94
3 10.10
4 12.19
5 13.41
6 13.98
Table 3 underground fresh air pipeline calculating parameter
Table 4 air exit temp calculates
Table 5 pipe diameter size Parameter analysis
Table 6 duct length Parameter analysis
This building is runed as follows:
Work as CO 2concentration sensor senses indoor CO 2when concentration is higher than setting value, interlock return air inlet check (non-return) valve is opened, because unpowered blast cap is in rotary state under natural wind action, foul indoor air is then extracted out indoor by return air inlet, air return pipeline and air outlet, micro-vacuum state in forming chamber, thus impel outdoor fresh air to enter into indoor by air intake, fresh air pipeline and air outlet, reduce indoor CO 2concentration, this process continues to indoor CO always 2concentration is lower than till setting value;
When CO2 concentration sensor senses indoor CO 2when concentration is lower than setting value, interlock return air inlet check (non-return) valve cuts out, even if so unpowered blast cap is in rotary state, and also can not air flowing in forming chamber;
The outdoor section of fresh air pipeline is embedded in 6m depths, underground, and its length is defined as 150m through calculating, caliber 0.1m.Outdoor fresh air, in the process through subterranean pipe line, utilizes soil source to realize the object of heating (winter) or cooling (summer), ensures that sending into indoor new wind meets indoor thermal comfort requirement;
The condensate water that outdoor air produces in the fresh air pipeline of underground is collected by underground water pot, and establishes inspection-pit to carry out Maintenance and Repair to underground water pot.Under extreme case, in water pot, condensate water collection is full, then unnecessary condensate water is overflowed by valve, and avoiding affects ventilating air quality.
The tight tightness that described building is possessed by superior peripheral structure and CS plank frame system itself reduces heat waste, the natural ventilation system such as ventilation and door and window hole infiltration ventilation of simultaneously windowing becomes organized scavenging way, and make full use of regenerative resource, while greatly reducing building and heating, energy consumption for cooling, ensure that the comfortableness of indoor occupants.
The sequence of construction of this building is:
Complete design drawing, determine that embedded air system plumbing goes out roofing and interface position → employings zinc-coated wire of going out base plate and makes multi-form CS three dimensions rack → need to have configured air pipeline → at laminboard layer inside filling and flame-retardant graphite polystyrene board or rock wool central layer → calculate according to structural mechanics at space net rack laminboard layer according to design with rational structural configuration and proprietary solder technology in factory, plain bars is configured or based process is carried out in prestressed reinforcement → job site in plate, lay underground ventilation pipeline, water tank and valve thereof are installed, and lay the space net rack that base plate waterproofing and insulation layer → in-site installation are embedded with fresh air pipeline, Special composition structure → within it, external surface sprays (or building) pea gravel concreten surface layer and forms load-bearing wall panel, floor and roof panel, the contact site completing the outer door and window → external door and window and body of wall that agent structure construction → laying roof waterproof layer → installation meets the requirement of passive room carries out waterproof sealing process → laying exterior wall, the outer heat preservation system on roof, and going out roofing and going out bottom parts of the embedded air system plumbing of encapsulation process → dock and ventilating duct is carried out to each key node, encapsulation process → be installed into air port is carried out to wall feed-through pipeline, air outlet, return air inlet, air outlet → at return air inlet place is installed check (non-return) valve → at air outlet place and is installed unpowered blast cap → install CO at indoor wall 2concentration sensor also carries out wireless connections braking.
Above detailed description of the invention is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to example to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.

Claims (9)

1. a building structure passive room integrated with equipment, comprise exterior window, described exterior window adopts outer window glass, the external sunshade equipment of Low-E plated film, it is characterized in that: also comprise load-bearing exterior wall wallboard, floor, roof panel, air system plumbing, air intake, air outlet, return air inlet, check (non-return) valve, air outlet, unpowered blast cap, CO 2concentration sensor, water tank and valve, described load-bearing exterior wall wallboard, floor and roof panel adopt CS plank frame, the described air system plumbing part be embedded among CS plank frame is defined as embedded air system plumbing, described air system plumbing comprises fresh air pipeline and return air duct, and described embedded air system plumbing comprises embedded fresh air pipeline and embedded return air duct.
2. a kind of building structure according to claim 1 passive room integrated with equipment, it is characterized in that: configuration reinforcement in described load-bearing exterior wall wallboard, described load-bearing exterior wall wallboard also comprises external wall insulating layer, outside concrete pavement, laminboard layer, inner side concrete pavement, the insulation layer of zinc-coated wire rack and coated embedded air system plumbing, described zinc-coated wire rack is that welding is made, described laminboard layer is the sandwiched plate of inner filling and flame-retardant graphite polyphenyl materials or rock wool, described outside concrete pavement and inner side concrete pavement are pea gravel concreten surface layer, described embedded fresh air pipeline and embedded return air duct are arranged in laminboard layer.
3. a kind of building structure according to claim 2 passive room integrated with equipment, it is characterized in that: described zinc-coated wire rack, described laminboard layer and described embedded air system plumbing are prefabricated integral member, described pea gravel concreten surface layer adopts on-spot injection or cast in situs to make.
4. a kind of building structure according to claim 3 passive room integrated with equipment, it is characterized in that: described fresh air pipeline one end connects air intake, the other end extends downward underground in load-bearing exterior wall wallboard inside, described fresh air pipeline is arranged under ground portion and comprises vertical fresh air pipeline and curve fresh air pipeline, described curve fresh air pipeline is positioned at same plane, described curve fresh air pipeline is arranged in S shape in described plane, and described plane and horizontal plane angle angle are 5 ° ~ 10 °; Described return air duct one end connects return air inlet, and the other end extends upwardly to roof panel outer end in load-bearing exterior wall wallboard inside and is communicated with air outlet.
5. a kind of building structure according to claim 4 passive room integrated with equipment, it is characterized in that: described curve fresh air pipeline minimum point arranges water tank, described water tank arranges valve, the embedded air system plumbing heat insulating material penetrating outside concrete surface layer segment carries out coated, and described air system plumbing is connected with between described air intake, air outlet, return air inlet, check (non-return) valve, air outlet and all adopts tightness process.
6. a kind of building structure according to claim 5 passive room integrated with equipment, is characterized in that: described passive room gross floor area is 186m 2f2/B2, floor height is 3m, described CS plank frame thickness is 180mm, wherein said laminboard layer thickness is 100mm, described outside concrete pavement and inner side concrete surface layer thickness are 40mm, and the thermal transmittance of described load-bearing exterior wall wallboard, floor and roof panel is 0.6W/ (m 2k), described external wall insulating layer all adopts the thick heat insulating material of 200mm to carry out full-enclosed and lays, and described heat insulating material coefficient of thermal conductivity is 0.032W/ (mK), described exterior window overall window U factor K=0.8W/ (m 2k), the total solar energy transmittance g=0.43 of described outer window glass, described air intake is the rectangle of 200mm × 200mm, be arranged at distance grade 5m At The Height, described air intake outside is provided with grid screen, described air outlet is the rectangle of 600mm × 150mm, and described air outlet number is 2, is placed in two layers of distance floor 2.6m At The Height respectively; Described return air inlet is the circle of diameter 100mm, described return air inlet number is 2, is placed in two layers of distance floor 0.2m At The Height respectively, and described air outlet and return air inlet are arranged on two relative face walls of room respectively, described air outlet is the circle of diameter 300mm, is placed on roof; The heat insulating material of described coated embedded air system plumbing is heat insulating material, and coefficient of thermal conductivity is 0.032W/ (mK), and coated thickness is 100mm.
7. a kind of building structure according to claim 6 passive room integrated with equipment, is characterized in that: the described vertical fresh air pipeline length being arranged at underground is 6m.
8. a kind of building structure according to claim 7 passive room integrated with equipment, is characterized in that: described fresh air pipeline and the caliber of return air duct are 100mm.
9. a kind of building structure according to claim 8 passive room integrated with equipment, is characterized in that: the described curve fresh air pipeline length being arranged at underground is 150m.
CN201520716771.0U 2015-09-16 2015-09-16 Building structure and passive room of equipment integration Withdrawn - After Issue CN205063382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520716771.0U CN205063382U (en) 2015-09-16 2015-09-16 Building structure and passive room of equipment integration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520716771.0U CN205063382U (en) 2015-09-16 2015-09-16 Building structure and passive room of equipment integration

Publications (1)

Publication Number Publication Date
CN205063382U true CN205063382U (en) 2016-03-02

Family

ID=55389957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520716771.0U Withdrawn - After Issue CN205063382U (en) 2015-09-16 2015-09-16 Building structure and passive room of equipment integration

Country Status (1)

Country Link
CN (1) CN205063382U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257021A (en) * 2015-09-16 2016-01-20 住房和城乡***科技发展促进中心 Building structure and equipment integrated passive house and building method thereof
CN109519008A (en) * 2018-12-20 2019-03-26 广东科达洁能股份有限公司 A kind of ceramic production device sound-insulation ventilation system and sound insulation method of ventilation
CN112503676A (en) * 2020-12-21 2021-03-16 五河县俊宝钢结构有限公司 Steel construction factory building ventilation unit

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257021A (en) * 2015-09-16 2016-01-20 住房和城乡***科技发展促进中心 Building structure and equipment integrated passive house and building method thereof
CN105257021B (en) * 2015-09-16 2018-01-12 住房和城乡***科技发展促进中心 A kind of building structure passive room integrated with equipment and its method of construction
CN109519008A (en) * 2018-12-20 2019-03-26 广东科达洁能股份有限公司 A kind of ceramic production device sound-insulation ventilation system and sound insulation method of ventilation
CN109519008B (en) * 2018-12-20 2024-05-28 广东科达洁能股份有限公司 Sound insulation ventilation system and sound insulation ventilation method for ceramic production equipment
CN112503676A (en) * 2020-12-21 2021-03-16 五河县俊宝钢结构有限公司 Steel construction factory building ventilation unit

Similar Documents

Publication Publication Date Title
CN105257021B (en) A kind of building structure passive room integrated with equipment and its method of construction
CN205063382U (en) Building structure and passive room of equipment integration
WO2013135108A1 (en) Assembled steel structure hollow building
CN2537782Y (en) Environment protection energy saving civil residential building
CN102493678B (en) Fabricated construction method of ecological-type house
Han et al. Exploring solutions to achieve carbon neutrality in China: A comparative study of a large-scale passive House district and a Green building district in Qingdao
CN206247662U (en) Solar energy heating warm keeping curtain wall and roofing and solar air-conditioner system
CN113374096A (en) Passive low-energy-consumption technically-improved building
CN102061778B (en) A kind of eco-house and construction method thereof
CN110821210A (en) House system of assembled positive energy room
CN202324250U (en) Novel thermal-insulation and energy-saving wall body
CN208312591U (en) Build heat circulating system
CN207405889U (en) Suitable for the deformation joint of roof structure of Passive low-energy building
CN207376987U (en) Go out roofing exhaust pipeline structure suitable for Passive low-energy building
CN207378299U (en) Suitable for the indoor drainage pipe structure of Passive low-energy building
WO2011116625A1 (en) Composite solar heat collecting plate of foam and black ceramic and its manufacturing method and applications
CN201424731Y (en) Insulating, temperature-adjusting and ventilating roof structure
CN206693696U (en) A kind of precast concrete assembled box computer room
CN112982697A (en) Passive room insulation board bracket mounting structure
CN205954828U (en) Super energy -conserving building system
Changfeng et al. Energy-saving design strategy of rural residential building in Tianjin area
CN207377046U (en) A kind of basement lighting roof construction suitable for Passive low-energy building
Lu Research on Key Technologies of Small House Type Ultra-Low Energy Consumption Residential Buildings
CN210086520U (en) Connection structure at plinth of energy-saving heat-preservation building
CN212613114U (en) Integrated energy-saving wall structure

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: Zhang Xiaoling

Document name: Notification of Acceptance of Patent Application

C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160302

Effective date of abandoning: 20180112

AV01 Patent right actively abandoned