CN205063097U - Civil engineering is with preventing hot wall - Google Patents

Civil engineering is with preventing hot wall Download PDF

Info

Publication number
CN205063097U
CN205063097U CN201520797462.0U CN201520797462U CN205063097U CN 205063097 U CN205063097 U CN 205063097U CN 201520797462 U CN201520797462 U CN 201520797462U CN 205063097 U CN205063097 U CN 205063097U
Authority
CN
China
Prior art keywords
erection column
fire
fire blocks
civil engineering
special
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520797462.0U
Other languages
Chinese (zh)
Inventor
陆志成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing University Yuanpei College
Original Assignee
Shaoxing University Yuanpei College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing University Yuanpei College filed Critical Shaoxing University Yuanpei College
Priority to CN201520797462.0U priority Critical patent/CN205063097U/en
Application granted granted Critical
Publication of CN205063097U publication Critical patent/CN205063097U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a civil engineering is with preventing hot wall relates to civil engineering technical field, including polylith parallel distribution's reinforced concrete structure's erection column, all seted up a plurality of mounting groove on the every erection column, install the fire blocks of making by fire -proof material between two adjacent erection columns, all be provided with a plurality of and mounting groove assorted installation lug on the every fire blocks, a plurality of erection columns with the bottom of a plurality of fire blocks be connected with jointly with the erection column on the reinforced concrete structure's that each other matches of mounting groove and the installation lug homogeneous phase on the fire blocks special -shaped base, it has the tie coat all to fill in the fit clearance that erection column, fire blocks and special -shaped base formed each other. This civil engineering is with preventing hot wall, it is energy -concerving and environment -protective, need not on -the -spot concreting construction, can realize on -site Assembly.

Description

A kind of civil engineering fire wall
technical field:
The utility model relates to the technical field of civil engineering, especially a kind of civil engineering fire wall.
background technology:
Civil engineering is the general designation of the science and technology of building all kinds of engineering services.It had both referred to the technical activities such as applied material, equipment and the exploration carried out, design, construction, maintenance, also the object of engineering construction is referred to, namely be built on the ground or underground, in land or water, be directly or indirectly the various engineering services of human lives, production, military affairs, Scientific Research Service, such as house, road, railway, transport pipeline, tunnel, bridge, canal, dykes and dams, harbour, power station, aerodrome, ocean platform, feedwater and draining and preventive works etc.
The conventional structure of existing fire wall is that steel concrete solid wall structure or reinforced concrete frame add infilled wall structure, its way be all sporadicly construct on the spot, on-the-spot assembling reinforcement, formwork erection, concreting, masonry infill wall the operational method of whitewashing, its shortcoming is the dispersion of building troop, workmanship is uneven, the engineering time is long, and construction has dust, noise, sewage etc.
utility model content:
The technical problems to be solved in the utility model is: in order to solve the prior art Problems existing in above-mentioned background technology, provide a kind of civil engineering fire wall, energy-conserving and environment-protective, without the need to cast in situs construction, can Assembling be realized.
The utility model solves the technical scheme that its technical problem adopts:
A kind of civil engineering fire wall, it is characterized in that: the erection column comprising the parallel distribution of polylith, every block erection column all offers multiple installation groove, between adjacent two pieces of erection columns, fire blocks are installed, every block fire blocks are provided with multiple installation projection with installing groove match, the bottom of multiple erection column and multiple fire blocks is connected with special-shaped base jointly, and special-shaped base mates mutually with the installation groove on erection column and the installation projection on fire blocks; All tack coat is filled with in the fit clearance that erection column, fire blocks and special-shaped base are formed each other.
Further restriction is as follows:
Described erection column is square, the front end face of erection column, rear end face and soffit all offers the installation groove of rectangle; Fire blocks are square, and the front end face of fire blocks, rear end face and soffit are provided with the installation projection with the rectangle installing groove match; Abnormity base is cuboid, the upper surface of special-shaped base be arranged at intervals with successively with the installation projection of the rectangle installing groove match and with the installation groove installing the rectangle that projection matches.
All at grade, the soffit of special-shaped base parallels with the upper surface of erection column for the upper surface of described erection column and the upper surface of fire blocks.
The beneficial effects of the utility model are: civil engineering fire wall of the present utility model, erection column, fire blocks and special-shaped base can all machine in factory in advance, assembling splicing is carried out at the scene that is transported to again, and energy-conserving and environment-protective, also effectively shorten the construction period, saved manpower.
Below in conjunction with drawings and Examples, the utility model is further illustrated.
accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model.
Number in the figure: 1, erection column, 2, groove is installed, 3, fire blocks, 4, projection is installed, 5, special-shaped base, 6, tack coat, rectangle installs projection 7, and rectangle installs groove 8.
detailed description of the invention:
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model are described in a schematic way, and therefore it only shows the formation relevant with the utility model.
A kind of civil engineering fire wall as shown in Figure 1, comprise the erection column 1 of the reinforced concrete structure of the parallel distribution of polylith, every block erection column 1 all offers multiple installation groove 2, between adjacent two pieces of erection columns 1, the fire blocks 3 be made up of fire proofing material are installed, every block fire blocks 3 are provided with multiple installation projection 4 matched with installation groove 2, the bottom of multiple erection column 1 and described multiple fire blocks 3 is connected with special-shaped base 5 jointly, abnormity base 5 is reinforced concrete structure, abnormity base 5 mates mutually with the installation groove 2 on erection column 1 and the installation projection 4 on fire blocks 3, tack coat 6 is all filled with in the fit clearance that erection column 1, fire blocks 3 and special-shaped base 5 are formed each other.
In the embodiment of Fig. 1: erection column 1 is square, the front end face of erection column 1, rear end face and soffit all offer the installation groove 2 of rectangle; Fire blocks 3 are square, and the front end face of fire blocks 3, rear end face and soffit are provided with and the installation projection 4 installing the rectangle that groove 2 matches; Abnormity base 5 be cuboid, and the upper surface of special-shaped base 5 is arranged at intervals with successively and installs the rectangle that groove 2 matches and install projection 7, and and installs groove 8 with the rectangle that installation projection 4 matches.All at grade, the soffit of special-shaped base 5 parallels with the upper surface of erection column 1 for the upper surface of erection column 1 and the upper surface of fire blocks 3.
This civil engineering fire wall, erection column 1, fire blocks 3 and special-shaped base 5 can all machine in factory in advance, then assembling splicing is carried out at the scene that is transported to, and energy-conserving and environment-protective, also effectively shorten the construction period, saved manpower.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this utility model technological thought, can carry out various change and amendment completely.The technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to right.

Claims (3)

1. a civil engineering fire wall, it is characterized in that: the erection column (1) comprising the parallel distribution of polylith, every block erection column (1) all offers multiple installation groove (2), between adjacent two pieces of erection columns (1), fire blocks (3) are installed, every block fire blocks (3) are provided with multiple installation projection (4) matched with installation groove (2), the bottom of multiple erection column (1) and multiple fire blocks (3) is connected with special-shaped base (5) jointly, abnormity base (5) mates mutually with the installation groove (2) on erection column (1) and the installation projection (4) on fire blocks (3), tack coat (6) is all filled with in the fit clearance that erection column (1), fire blocks (3) and special-shaped base (5) are formed each other.
2. a kind of civil engineering fire wall according to claim 1, is characterized in that: described erection column (1) is square, the front end face of erection column (1), rear end face and soffit all offers the installation groove (2) of rectangle; Fire blocks (3) are square, and the front end face of fire blocks (3), rear end face and soffit are provided with and the installation projection (4) installing the rectangle that groove (2) matches; Described special-shaped base (5) is cuboid, the upper surface of special-shaped base (5) be arranged at intervals with successively with install rectangle that groove (2) matches install projection (7), with the rectangle that projection (4) matches is installed groove (8) is installed.
3. a kind of civil engineering fire wall according to claim 1 and 2, it is characterized in that: all at grade, the soffit of special-shaped base (5) parallels with the upper surface of erection column (1) for the upper surface of described erection column (1) and the upper surface of fire blocks (3).
CN201520797462.0U 2015-10-16 2015-10-16 Civil engineering is with preventing hot wall Expired - Fee Related CN205063097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520797462.0U CN205063097U (en) 2015-10-16 2015-10-16 Civil engineering is with preventing hot wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520797462.0U CN205063097U (en) 2015-10-16 2015-10-16 Civil engineering is with preventing hot wall

Publications (1)

Publication Number Publication Date
CN205063097U true CN205063097U (en) 2016-03-02

Family

ID=55389672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520797462.0U Expired - Fee Related CN205063097U (en) 2015-10-16 2015-10-16 Civil engineering is with preventing hot wall

Country Status (1)

Country Link
CN (1) CN205063097U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109958462A (en) * 2019-04-03 2019-07-02 江苏金阳交通工程有限公司 A kind of tunnel sound-proof wall
CN110748033A (en) * 2019-12-02 2020-02-04 沈阳众磊道桥有限公司 Aluminum mesh fireproof flame-retardant concrete load-bearing wall surface system and construction method thereof
CN112523381A (en) * 2020-11-02 2021-03-19 国网江苏省电力工程咨询有限公司 Ultrahigh-performance concrete rapid-assembly explosion-proof wall structure and preparation and use method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109958462A (en) * 2019-04-03 2019-07-02 江苏金阳交通工程有限公司 A kind of tunnel sound-proof wall
CN110748033A (en) * 2019-12-02 2020-02-04 沈阳众磊道桥有限公司 Aluminum mesh fireproof flame-retardant concrete load-bearing wall surface system and construction method thereof
CN112523381A (en) * 2020-11-02 2021-03-19 国网江苏省电力工程咨询有限公司 Ultrahigh-performance concrete rapid-assembly explosion-proof wall structure and preparation and use method thereof

Similar Documents

Publication Publication Date Title
CN106759420B (en) A kind of prefabricated assembled transformer substation foundation structure
RU2510444C2 (en) Three-arched underground station of column type and its erection methods (yurkevich device and methods)
CN106801436B (en) A kind of construction method overlapping assembled underground pipe gallery
CN111705795B (en) Prefabricated anchor pier for slope reinforcement and post-cast lattice beam assembly integral construction method
CN205063097U (en) Civil engineering is with preventing hot wall
CN112502186A (en) Building space structure integrated assembly type subway station structure
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN105401593A (en) Assembly type square underground pipe gallery
CN207499427U (en) Assembly integrated precast superimposed sheet support system
CN110295624B (en) Construction method for co-building structure of crossroad underground sidewalk and comprehensive pipe rack
CN105256836A (en) Construction method for fast restoring road traffic in construction of underground project
CN105952459A (en) Splicing-type primary support method for tunnel
CN204551532U (en) Assembling cable shaft
CN209854577U (en) Assembled thin-wall box-shaped channel
CN108978709B (en) Urban comprehensive pipe gallery branch construction method in space-limited environment
CN113202106B (en) Deep foundation pit excavation method
CN207646753U (en) Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN205445125U (en) Execute i -shaped assembled enclosure fast
KR20150059640A (en) Perpendicular hall module and construction method for perpendicular hall using the same
CN108571010A (en) A kind of cut and cover method engineering prefabricated bodies structure and the integrated method of supporting construction
CN210134453U (en) Integral utility tunnel of environment-friendly prefabricated assembly
CN106988326A (en) Full precast splice type armored concrete side slope protection modular assembly and its construction method
Oleinik et al. Optimization of parameters for the construction of prefabricated residential buildings
CN102677660B (en) Quick pile-forming method and method for quickly building urban flyover by quick pile-forming method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

Termination date: 20171016