CN205036384U - 偏压溶腔环境下的隧道支护结构 - Google Patents

偏压溶腔环境下的隧道支护结构 Download PDF

Info

Publication number
CN205036384U
CN205036384U CN201520659348.1U CN201520659348U CN205036384U CN 205036384 U CN205036384 U CN 205036384U CN 201520659348 U CN201520659348 U CN 201520659348U CN 205036384 U CN205036384 U CN 205036384U
Authority
CN
China
Prior art keywords
tunnel
anchor cable
steel strand
anchor
bias voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520659348.1U
Other languages
English (en)
Inventor
韦庆武
武睿
李勇良
谭志乾
刘晓煜
李先健
韦露明
蔡文胜
符望春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN201520659348.1U priority Critical patent/CN205036384U/zh
Application granted granted Critical
Publication of CN205036384U publication Critical patent/CN205036384U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本实用新型公开了偏压溶腔环境下的隧道支护结构,其由门型框架,门型钢架通过支撑件支撑的隧道壁面的钢丝网,隧道***设置的与钢丝网连成一体的锚杆,以及隧道两侧、相邻门型框架间的多个由隧道壁面深入到稳定岩基内部的锚索,锚索两端张拉在稳定岩基和隧道壁面锚索入口处设置的锚具上。所述结构对施工中的隧道形成的多重支护,两侧张拉的预应力锚索可适应隧道两侧受压不同的情况,较好地适应此情况下对隧道的支护,避免隧道偏压导致的支护的变形及隧道的坍塌。

Description

偏压溶腔环境下的隧道支护结构
技术领域
本实用新型涉及一种隧道施工中使用的支护结构,以及隧道施工方法。
背景技术
公路、铁路穿越山体时需要建设隧道,在隧道施工过程受抵制环境的影响较大。当隧道施工遇岩溶及断裂构造发育地带时,施工难度非常大,施工时,隧道或隧道***会遇到多个大、中型溶腔,由于隧道位于溶腔的位置,以及溶腔内填充情况不同等原因,会导致隧道两侧受力不均,产生偏压,形成偏压溶腔。在偏压溶腔环境下施工时,因偏压的存在,隧道支护结构容易出现倾斜、变形,甚至坍塌的问题,带来安全风险。
实用新型内容
本实用新型旨在给出一种能够很好适应偏压溶腔环境的隧道支护结构。
本实用新型所述的偏压溶腔环境下的隧道支护结构,包括:隧道内纵向布置的一列门型框架和隧道壁面设置的钢丝网,门型框架通过支撑件与隧道壁面设置的钢丝网连接,对钢丝网进行支撑;在隧道的***设置径向打入***土体内的锚杆,钢丝网同样与这些锚杆固连为一体;在隧道的两侧,相邻门型框架之间位置,分别设置有多个由隧道壁面深入到稳定岩基内部的锚索,锚索水平或略微向上倾斜设置;锚索的两端则被拉紧产生预应力,锚索的一端锚固于稳定岩基内部,另一端则锚固在隧道壁面的锚索入口处设置的锚具上,所述锚具则安装在设置与锚索入口处的锚下承台上,而锚下承台则同时与前后两侧相邻的门型钢架相固连。
本实用新型所述的偏压溶腔环境下的隧道支护结构,其通过沿隧道方向(纵向)布置的门型钢架,由门型钢架通过支撑件支撑的位于隧道壁面的钢丝网,隧道周围径向设置的锚杆,以及隧道两侧相邻门型框架之间设置的、同时锚固于稳定岩基和与两相邻门型框架固连的锚下平台的锚具上的锚索,共同构成了对偏压溶腔环境下隧道的支护。其实现了对隧道施工过程的多重支护,可较为可靠的保证隧道的支护效果。两侧设置的预应力锚索,可适应隧道两侧受压不同的情况,当一侧压力较大时,可通过增加该侧的预应力锚索数量,或者通过增加该侧锚索预应力的大小,即可较好地适应及承受两侧的偏压,避免隧道支护的变形及隧道的坍塌。特别是,其可根据测量的隧道偏压情况,针对性的调整两侧锚索预应力,以适应具体偏压需要,其整个施工过程简单、操作方便;且可动态使用偏压的变化,如填充的变化及雨水汇流等情况发生变化时,可很好地动态适应其需求。
附图说明
图1为本发明所述偏压溶腔环境下的隧道支护结构的示意图。
图2为锚索结构示意图。
图3为锚索结构横断面示意图。
图4为锚索结构位于隧道壁面附近结构示意图。
具体实施方式
一种偏压溶腔环境下的隧道支护结构,如图1-4,在隧道1内,隧道开挖施工过程中,逐步纵向布置的一列门型框架2和隧道壁面设置的钢丝网3,门型框架通过支撑件4与隧道壁面设置的钢丝网连接,对钢丝网进行支撑;在隧道的***设置径向打入***土体内的锚杆5,钢丝网同样与这些锚杆固连为一体;在隧道的两侧,相邻门型框架2之间位置,分别设置有多个由隧道壁面深入到稳定岩基6内部的锚索7,锚索水平或略微向上倾斜设置;锚索的两端则被拉紧产生预应力,锚索7的一端锚固于稳定岩基6内部,另一端则锚固在隧道壁面的锚索入口处设置的锚具8上,所述锚具则安装在设置与锚索入口处的锚下承台9上,而锚下承台9则同时与前后两侧相邻的门型钢架2相固连。
锚下承台9与锚具之间可设置钢垫板10。
锚索伸入稳定岩基的深度宜不小于6m。
所述锚索7,如图2,图3,包括多根钢绞线71,使各钢绞线呈圆周方向均匀布置,注浆管72位于在各钢绞线的中部,牢靠捆扎在各钢绞线的中间;在锚索与注浆管之间安装多个隔离架73,隔离架在与钢绞线和注浆管对应的位置设置相应的通孔,可同时套在钢绞线和注浆管外,将注浆管与钢绞线相固定,相邻隔离架间的间距控制在1.0~1.5m;在锚索末端牢固安装导向帽74,钢绞线的中部还需设置排气管75。

Claims (2)

1.一种偏压溶腔环境下的隧道支护结构,其特征在于:包括:隧道内纵向布置的一列门型框架和隧道壁面设置的钢丝网,门型框架通过支撑件与隧道壁面设置的钢丝网连接,对钢丝网进行支撑;在隧道的***设置径向打入***土体内的锚杆,钢丝网同样与这些锚杆固连为一体;在隧道的两侧,相邻门型框架之间位置,分别设置有多个由隧道壁面深入到稳定岩基内部的锚索,锚索水平或略微向上倾斜设置;锚索的两端则被拉紧产生预应力,锚索的一端锚固于稳定岩基内部,另一端则锚固在隧道壁面的锚索入口处设置的锚具上,所述锚具则安装在设置与锚索入口处的锚下承台上,而锚下承台则同时与前后两侧相邻的门型钢架相固连。
2.根据权利要求1所述的偏压溶腔环境下的隧道支护结构,其特征在于:所述锚索包括多根钢绞线,各钢绞线呈圆周方向均匀布置,注浆管位于在各钢绞线的中部,牢靠捆扎在各钢绞线的中间;在锚索与注浆管之间安装多个隔离架,隔离架在与钢绞线和注浆管对应的位置设置相应的通孔,可同时套在钢绞线和注浆管外,将注浆管与钢绞线相固定,相邻隔离架间的间距控制在1.0~1.5m;在锚索末端牢固安装导向帽,钢绞线的中部还需设置排气管。
CN201520659348.1U 2015-08-28 2015-08-28 偏压溶腔环境下的隧道支护结构 Active CN205036384U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520659348.1U CN205036384U (zh) 2015-08-28 2015-08-28 偏压溶腔环境下的隧道支护结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520659348.1U CN205036384U (zh) 2015-08-28 2015-08-28 偏压溶腔环境下的隧道支护结构

Publications (1)

Publication Number Publication Date
CN205036384U true CN205036384U (zh) 2016-02-17

Family

ID=55295293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520659348.1U Active CN205036384U (zh) 2015-08-28 2015-08-28 偏压溶腔环境下的隧道支护结构

Country Status (1)

Country Link
CN (1) CN205036384U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178979A (zh) * 2015-08-28 2015-12-23 中铁二十五局集团第四工程有限公司 偏压溶腔环境下的隧道支护结构及施工方法
CN107034905A (zh) * 2017-05-25 2017-08-11 中铁局集团厦门建设工程有限公司 控制偏压变形的组合支挡结构及其施工方法
CN109578026A (zh) * 2018-11-02 2019-04-05 郑州工程技术学院 用于岩土锚杆支撑防护结构
CN110578330A (zh) * 2019-08-26 2019-12-17 天津大学 利用索锚和坑外地连墙控制隧道变形的装置及方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178979A (zh) * 2015-08-28 2015-12-23 中铁二十五局集团第四工程有限公司 偏压溶腔环境下的隧道支护结构及施工方法
CN107034905A (zh) * 2017-05-25 2017-08-11 中铁局集团厦门建设工程有限公司 控制偏压变形的组合支挡结构及其施工方法
CN109578026A (zh) * 2018-11-02 2019-04-05 郑州工程技术学院 用于岩土锚杆支撑防护结构
CN109578026B (zh) * 2018-11-02 2023-10-10 郑州工程技术学院 用于岩土锚杆支撑防护结构
CN110578330A (zh) * 2019-08-26 2019-12-17 天津大学 利用索锚和坑外地连墙控制隧道变形的装置及方法

Similar Documents

Publication Publication Date Title
CN205036384U (zh) 偏压溶腔环境下的隧道支护结构
CN203034464U (zh) 一种桁架式基坑支护结构
CN203923924U (zh) 0号段托架预压装置
CN105201524B (zh) 一种极软煤层巷道预空锚网直角可缩棚联合支护方法
CN102852552A (zh) 一种高水材料充填柱及其施工方法
CN105178979A (zh) 偏压溶腔环境下的隧道支护结构及施工方法
CN111022085A (zh) 一种预空软岩巷道支护结构及其施工方法
CN203821876U (zh) 混凝土柱的加固***
CN201991009U (zh) 深基坑灌注护坡桩加锚索支护体系
CN103306479A (zh) 超长悬挑桁架结构高空模板支撑***
CN205260049U (zh) 一种深部巷道支护用新型混凝土支架
CN204266133U (zh) 一种墩柱钢筋笼整体吊装结构
CN103806451A (zh) 一种锚碇型基坑加固结构及其施工方法
CN204919627U (zh) 一种框架式隔离保护体系
CN204825919U (zh) 支护基坑围檩抗剪结构
CN204041086U (zh) 一种可延伸钢绞线的锚杆
CN105201529A (zh) 一种沿空留巷横斜双拉纤维柔性模板及其充填方法
CN206635801U (zh) 一种深水水域桥梁施工塔吊基础结构
CN205530758U (zh) 一种建筑隔震结构
CN105133664B (zh) 一种组合框架式隔离保护体系及其施工方法
CN204282371U (zh) 一种用于基坑的预应力支撑
CN204532362U (zh) 一种大跨度地下结构
CN202755360U (zh) 一种锚固件前置的加劲桩
CN202658874U (zh) 一种柔性连墙件装置
CN203891014U (zh) 反向预应力锚索加固结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181024

Address after: 545007 No. 75, two district, Hongyan Road, Liuzhou, the Guangxi Zhuang Autonomous Region.

Co-patentee after: China Railway 25th Bureau Group Co., Ltd.

Patentee after: China Railway twenty-five Bureau Group Sixth Engineering Co., Ltd.

Address before: 545007 138 Heping Road, Liuzhou, the Guangxi Zhuang Autonomous Region

Co-patentee before: China Railway 25th Bureau Group Co., Ltd.

Patentee before: THE 4TH ENGINEERING CO., LTD.OF CHINA RAILWAY 25TH BUREAU GROUP

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190327

Address after: 545007 138 Heping Road, Liuzhou, the Guangxi Zhuang Autonomous Region

Co-patentee after: China Railway 25th Bureau Group Co., Ltd.

Patentee after: THE 4TH ENGINEERING CO., LTD.OF CHINA RAILWAY 25TH BUREAU GROUP

Address before: 545007 No. 75, two district, Hongyan Road, Liuzhou, the Guangxi Zhuang Autonomous Region.

Co-patentee before: China Railway 25th Bureau Group Co., Ltd.

Patentee before: China Railway twenty-five Bureau Group Sixth Engineering Co., Ltd.