CN205036145U - Single loop becomes exhales high shaft tower - Google Patents

Single loop becomes exhales high shaft tower Download PDF

Info

Publication number
CN205036145U
CN205036145U CN201520685689.6U CN201520685689U CN205036145U CN 205036145 U CN205036145 U CN 205036145U CN 201520685689 U CN201520685689 U CN 201520685689U CN 205036145 U CN205036145 U CN 205036145U
Authority
CN
China
Prior art keywords
arm
cross
cross arm
newly
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520685689.6U
Other languages
Chinese (zh)
Inventor
王力
赵晖
罗正帮
于永洋
葛娜
刘西民
陈曦鸣
罗义华
刘勇
计策
吴松
丁波
汪晓光
陈彦焰
夏威
郑少将
梁东跃
周转
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Anhui Electric Power Co Ltd, Anhui Huadian Engineering Consulting and Design Co Ltd, Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Anhui Electric Power Co Ltd
Priority to CN201520685689.6U priority Critical patent/CN205036145U/en
Application granted granted Critical
Publication of CN205036145U publication Critical patent/CN205036145U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model provides a single loop becomes exhales high shaft tower. It includes body of the tower, top layer ground wire cross arm, post insulators, top layer ground wire cross arm comprises the both sides cross arm of perpendicular to circuit direction, the upper strata is strideed across the cross arm and comprises the one deck both sides cross arm and the unilateral cross arm of one deck of the newly -built circuit direction of perpendicular to, the supplementary cross arm in middle level comprises the multilayer both sides cross arm of the newly -built circuit direction of perpendicular to, lower floor's brill cross arm more comprises the one deck both sides cross arm of the newly -built circuit direction of perpendicular to. The utility model discloses reduce the probability that the elder generation strode in the driller's journey of back the cross link transformation and put cable underground, avoided the power failure of cross link, increased the electric wire netting reliability, reduced the construction cost, further compressed wire pair ground distance with boring leading of shelves more.

Description

A kind of single loop becomes exhales high shaft tower
technical field:
The utility model relates to ultra-high-tension power transmission line technical field, particularly relates to the change of a kind of single loop and exhales high shaft tower.
background technology:
Work transmission line construction is the important component part in power grid construction, to take on the effect of transmission, distribution, pressure regulation in power system.In view of the principle of selecting the best qualified of transmission line of electricity to transmission corridor is identical, for the consideration reducing costs, reduce occupation of land, transmission line of electricity selects parallel cabling usually.By the impact of transformer station's drop point site, newly-built circuit often with built crossing elimination, according to regulatory requirements, the circuit that voltage is higher is generally erected at the top of the lower circuit of voltage, the electrical network common line of same voltage gradation should be erected at above industrial siding, therefore transmission line of electricity first occurs repeatedly across the situation of rear brill (or after subdrilling across).
In Practical Project, for transmission line of electricity first across the situation of rear brill (or after subdrilling across), affect by landform and site environment, only adopt a base shaft tower to be often difficult to direct realization, usually need to take following several means:
1) by boosted voltage grade higher line road or the lower circuit of reduction electric pressure, but cause line outage, increase line construction cost.
2) mode that employing overhead crossing, cable drill are got over, but cost of putting cable underground is higher, and circuit is not easy to patrol and examine after building up simultaneously.
In sum, such scheme constructional difficulties and comprehensive cost is higher, is unfavorable for engineering construction.
summary of the invention:
The purpose of this utility model is to provide the change of a kind of single loop and exhales high shaft tower, and the line crossing side wire of this shaft tower is presented font and arranged, identical with conventional line arrangement, avoids the impact on adjacent tower wire arrangements; The brill of this shaft tower is got over side and is adopted compact arrangement mode, have compressed lead, ground wire to ground level, optimize further and bore Vietnamese side's case, the possibility of reduce old track remodelling, putting cable underground.
In order to solve Problems existing in background technology, the utility model is by the following technical solutions: it comprises tower body, top layer ground wire cross-arm, support insulator, be provided with upper strata below top layer ground wire cross-arm and cross over wire cross-arm, be provided with middle level below upper strata leap wire cross-arm and assist cross-arm, middle level is assisted below cross-arm and is arranged lower floor's brill more wire cross-arm, described top layer ground wire cross-arm is made up of the both sides cross-arm perpendicular to line direction, described upper strata is crossed over cross-arm and is formed by perpendicular to one deck both sides cross-arm of newly-built line direction and the monolateral cross-arm of one deck, described middle level assists cross-arm to be made up of the multilayer both sides cross-arm perpendicular to newly-built line direction, described lower floor bores more cross-arm and is made up of one deck both sides cross-arm perpendicular to newly-built line direction, described support insulator is fixed on middle level and assists each cross-arm taper of cross-arm and tower body brill to get over above side line road, be fixed on the support insulator of cross-arm taper perpendicular to newly-built line direction, be fixed on the support insulator that tower body bores above more side line road and be parallel to newly-built line direction, the jumper string of described top layer ground wire cross-arm place suspension strap stay pipe.
The utility model achieves single loop change by a base shaft tower and exhales high boring to cross over, reduce first across cross link transformation in rear brill (or after subdrilling across) engineering and the probability of putting cable underground, avoid the power failure of cross link, add electric network reliability, reduce construction cost, have compressed the lead wire and earth wire distance to the ground boring more shelves further.
accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is wiring schematic diagram of the present utility model.
detailed description of the invention:
With reference to Fig. 1-2, it comprises tower body 1, top layer ground wire cross-arm 2, support insulator 6, be provided with upper strata below top layer ground wire cross-arm 2 and cross over wire cross-arm 3, be provided with middle level below upper strata leap wire cross-arm 3 and assist cross-arm 4, middle level is assisted below cross-arm 4 and is arranged lower floor's brill more wire cross-arm 5, described top layer ground wire cross-arm 2 is made up of the both sides cross-arm perpendicular to newly-built line direction, described upper strata is crossed over cross-arm 3 and is formed by perpendicular to one deck both sides cross-arm of newly-built line direction and the monolateral cross-arm of one deck, cross-arm length and cross-arm interlamellar spacing are determined by front and back line attachment wire arrangements form, described middle level assists cross-arm 4 to be made up of the multilayer both sides cross-arm perpendicular to newly-built line direction, described lower floor bores more cross-arm 5 and is made up of one deck both sides cross-arm perpendicular to newly-built line direction, cross-arm 3 is crossed on upper strata, cross-arm 4 is assisted in middle level, the length of more cross-arm 5 is bored by lower floor and spacing need meet electric requirement, upper strata leap cross-arm 3 length and spacing also need reference by leap side line line conductor arrangement form simultaneously, described middle level assists the number of plies of cross-arm 4 to be determined by the discrepancy in elevation of boring more between point and crossover point, the discrepancy in elevation more upper mesophere assists the number of plies of cross-arm more, described support insulator 6 is fixed on middle level and assists each cross-arm taper of cross-arm 4 and tower body 1 brill to get over above side line road, be fixed on the support insulator of cross-arm taper perpendicular to newly-built line direction, be fixed on the support insulator that tower body 1 bores above more side line road and be parallel to newly-built line direction, the charged dot spacing of described support insulator 6, charged point and wire, ground distance between centers of tracks, the spacing of charged point and tower body, electric requirement should be met, the jumper string 7 of described top layer ground wire cross-arm 2 place suspension strap stay pipe, crossing over side ground wire hangs on top layer ground wire cross-arm, bore more side ground wire can hang on middle level according to actual conditions and assist cross-arm, upper strata is crossed on cross-arm, ground wire can be cancelled time special, the radical crossing over side ground wire determines according to code requirement.
With reference to Fig. 2, when carrying out transmission line of electricity first across rear brill (or after subdrilling across) operation, newly-built one basic invention single loop becomes exhales high brill cross-over pole, leap side wire is suspended on topping wire cross-arm 3 place, leap side ground wire is suspended on top layer ground wire cross-arm 2 place, bore more side wire and be suspended on lower layer conductor cross-arm 5 place, bore more side ground wire to be suspended on middle level and to assist cross-arm 4 or topping wire cross-arm 3 place, cross over phase conductor on side to utilize the jumper string 7 of band stay pipe and be positioned at support insulator 6 that tower body 1 bores more side and be connected to and bore more phase conductor on side, the utilization of leap side phase conductor is positioned at middle level and assists the support insulator 6 of cross-arm 4 cross-arm taper to be connected to Zuan Yue side lower floor limit phase conductor.The utility model achieves single loop change by a base shaft tower and exhales high boring to cross over, reduce first across cross link transformation in rear brill (or after subdrilling across) engineering, the probability of putting cable underground, avoid the power failure of cross link, add electric network reliability, reduce construction cost, have compressed the lead wire and earth wire distance to the ground boring more shelves further.

Claims (1)

1. high shaft tower is exhaled in a single loop change, it is characterized in that, it comprises tower body, top layer ground wire cross-arm, support insulator, be provided with upper strata below top layer ground wire cross-arm and cross over wire cross-arm, be provided with middle level below upper strata leap wire cross-arm and assist cross-arm, middle level is assisted below cross-arm and is arranged lower floor's brill more wire cross-arm, described top layer ground wire cross-arm is made up of the both sides cross-arm perpendicular to line direction, described upper strata is crossed over cross-arm and is formed by perpendicular to one deck both sides cross-arm of newly-built line direction and the monolateral cross-arm of one deck, described middle level assists cross-arm to be made up of the multilayer both sides cross-arm perpendicular to newly-built line direction, described lower floor bores more cross-arm and is made up of one deck both sides cross-arm perpendicular to newly-built line direction, described support insulator is fixed on middle level and assists each cross-arm taper of cross-arm and tower body brill to get over above side line road, be fixed on the support insulator of cross-arm taper perpendicular to newly-built line direction, be fixed on the support insulator that tower body bores above more side line road and be parallel to newly-built line direction, the jumper string of described top layer ground wire cross-arm place suspension strap stay pipe.
CN201520685689.6U 2015-09-07 2015-09-07 Single loop becomes exhales high shaft tower Withdrawn - After Issue CN205036145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520685689.6U CN205036145U (en) 2015-09-07 2015-09-07 Single loop becomes exhales high shaft tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520685689.6U CN205036145U (en) 2015-09-07 2015-09-07 Single loop becomes exhales high shaft tower

Publications (1)

Publication Number Publication Date
CN205036145U true CN205036145U (en) 2016-02-17

Family

ID=55295054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520685689.6U Withdrawn - After Issue CN205036145U (en) 2015-09-07 2015-09-07 Single loop becomes exhales high shaft tower

Country Status (1)

Country Link
CN (1) CN205036145U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259247A (en) * 2019-07-05 2019-09-20 荆州市荆力工程设计咨询有限责任公司 A kind of single loop staggered floor electric power line pole tower
CN111173346A (en) * 2019-12-28 2020-05-19 国网安徽省电力有限公司经济技术研究院 Single-loop drill span steel pipe rod

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259247A (en) * 2019-07-05 2019-09-20 荆州市荆力工程设计咨询有限责任公司 A kind of single loop staggered floor electric power line pole tower
CN111173346A (en) * 2019-12-28 2020-05-19 国网安徽省电力有限公司经济技术研究院 Single-loop drill span steel pipe rod

Similar Documents

Publication Publication Date Title
CN205243135U (en) Two times overhead transmission line alternately bores tower more
CN105257061A (en) Single-circuit tower with variable nominal height
CN104901255A (en) High-voltage overhead line crossing method and safe distance separating device
CN103362343B (en) A kind of with tower six circuit pole tower
CN105298201A (en) Electric-transmission-line cable-terminal three-dimensional downwards-leading device
CN103603536B (en) Multiloop cross is handed over across steel pipe pole
CN202520040U (en) Bifurcated pole tower for realizing double-T connection of double circuit power transmission line
CN205116866U (en) Device is down drawn to transmission line cable termination solid
CN105155902B (en) A kind of compact double circuit, which becomes, exhales high shaft tower
CN101958519B (en) Method for transforming tangent tower of double-circuit double-bundle transmission lines by lifting in electrified mode in another place
CN205036145U (en) Single loop becomes exhales high shaft tower
CN202970091U (en) 220-kilovolt same-rod two-circuit tower head full composite material steel pipe rod
CN205046908U (en) Two return circuits of compact become exhales high shaft tower
CN106567597A (en) Novel double-loop variable-norminal-height tower
CN204927814U (en) 330kV distribution device's double -deck outlet structure
CN105155903B (en) A kind of double loop, which becomes, exhales high shaft tower
CN204983860U (en) Two return circuits become exhales high shaft tower
CN106639489A (en) 500 kV large-angle ladder type ground wire single circuit penetrating-crossing tower
CN201406865Y (en) 66KV overhead transmission line double-circuit horizontal crossing tower
CN206894191U (en) A kind of single loop drilling is across transmission line of electricity
CN203729648U (en) 66-kV four-loop and double-T-connection branch tower
CN206128797U (en) Novel two return circuits become exhales high tower
CN203452435U (en) Dual-loop spanning-and-ducking steel pipe rod
CN110453959A (en) A kind of double loop, which is bored, gets over steel pipe pole and transmission system
CN210622425U (en) Single-loop staggered-layer power transmission line tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160217

Effective date of abandoning: 20180123