CN205035772U - Balanced type hydraulic pressure dam - Google Patents

Balanced type hydraulic pressure dam Download PDF

Info

Publication number
CN205035772U
CN205035772U CN201520638514.XU CN201520638514U CN205035772U CN 205035772 U CN205035772 U CN 205035772U CN 201520638514 U CN201520638514 U CN 201520638514U CN 205035772 U CN205035772 U CN 205035772U
Authority
CN
China
Prior art keywords
men
unit
barrage
pedestal
hydraulic pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520638514.XU
Other languages
Chinese (zh)
Inventor
肖培建
周骞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Liwei Hydraulic Equipment Co.,Ltd.
Original Assignee
HUNAN LIWEI HYDRAULIC EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN LIWEI HYDRAULIC EQUIPMENT CO Ltd filed Critical HUNAN LIWEI HYDRAULIC EQUIPMENT CO Ltd
Priority to CN201520638514.XU priority Critical patent/CN205035772U/en
Application granted granted Critical
Publication of CN205035772U publication Critical patent/CN205035772U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Abstract

The utility model provides a balanced type hydraulic pressure dam, it solves current energy consumption height, and it needs powerful drive power to open and close, and hydraulic system's work will be maintain always to the retaining state, has serious safety and environmental pollution hidden danger, the construction investment is high, and the construction degree of difficulty is big, has step and numerous deep hole groove on the dam foundation and uses unsatisfactoryly, does not have technical problem such as sand washing when draining. Its technical scheme main points are: balanced type hydraulic pressure dam adopts the pivot biasing, and the off -center position of pivot is rationally confirmed to the structure of ba men slope, can realize the balance of each operating torque, reaches bamen in that to open and close the in -process driving moment minimum, or one of them kind of selected retaining and the two types that turns on the water need not the purpose of power work. It mainly is that the retaining that is arranged in hydraulic still can regard as the view dam in the scenic spot to use.

Description

Balanced type hydraulic pressure barrage
Technical field
The utility model relates to a kind of barrage, particularly a kind of can be used on hydraulic engineering as catchwork irrigation, open in flood discharge and scenic spot as the balanced type hydraulic pressure barrage viewing and admiring dam use.
Background technology
At present, in domestic hydraulic engineering, generally adopt the shutter dam of steel and concrete structure, steel-slag sand, rubber dam, bottom-shaft type hydraulic pressure dam.But all there is certain defect, one is that security reliability is low, Ba Men needs very large driving force to open and close, and the operating pressure of design of Hydraulic System is generally all greater than 16MPa, when hydraulic system may wear to a certain degree or metal hose explosion all by cause can not the major accident of flood discharge and water oil stain dye.Two is that this several Ba Men installation has particular/special requirement to barrage pedestal (1), as the hole slot needed for hydraulic cylinder action, after Ba Men puts upside down, footing step is generally greater than 400 millimeters, the various supporting piers in dam foundation surface etc. affect the factor of underlying strength, add the expense of civil works, three be barrages all at present all can not solve discharge water or flood discharge time the floater sandstone requirement of simultaneously discharging under water.
Summary of the invention
For solving above-mentioned three difficult problems, the purpose of this utility model be to provide a kind of environmental protection and energy saving, safe and reliable, invest little, adopt the balanced type hydraulic pressure barrage of metal construction.
The utility model solves the technical scheme that its technical problem adopts: it comprises antipriming (6) at the bottom of barrage pedestal (1), unit Ba Men (2), side antipriming (3), integral type bearing (4), hydraulic jack (5), dam, barrage pedestal (1) adopts " " shape structure, unit Ba Men (2) is arranged in barrage pedestal (1) in oblique angle, described integral type bearing (4) is provided with front-end bearing pedestal (8) and rear bearing block (9), integral type bearing (4) secure fit is arranged on the bottom in barrage pedestal (1), the back of unit Ba Men (2) is provided with hinged-support (21), hinged-support (21) is arranged at stringcourse bottom in the level being in unit Ba Men (2), be arranged on rotating shaft (7) on front-end bearing pedestal (8) also in being horizontally disposed with and being in stringcourse position on the lower side in the level of unit Ba Men (2), when making retaining be in the water level B line of normal retaining, the rotating torque that hydraulic pressure produces that the axis horizontal face of rotating shaft (7) is upper and lower balances, shaft axis vertical plane both sides by unit dam door 2 conduct oneself with dignity produce rotating torque keep balance, make to open and close required moment by hydraulic jack to unit Ba Men (2) be greater than zero and be close to zero, time below the water level B line position that retaining is in normal retaining, the rotating torque that hydraulic pressure produces that the axis horizontal face of rotating shaft (7) is upper and lower is comparatively large, and unit Ba Men (2) is in closed condition all the time under non-power state, so that normal retaining, each rotating shaft (7) is each passed through corresponding hinged-support (21) engagement sleeves and is contained on corresponding front-end bearing pedestal (8), and unit Ba Men (2) can be rotated around front-end bearing pedestal (8), be in discharge water flood discharge state time, after unit Ba Men (2) opens, form flood discharge passage up and down, thus realize bottom sand washing, top excretion floating thing function, the bottom one-tenth activity cooperation of hydraulic jack (5) is arranged on rear bearing block (9), and expansion link outer end and unit Ba Men (2) back of hydraulic jack (5) are hinged.
The side antipriming (3) coordinated with it is respectively arranged with in the both sides of barrage pedestal (1).
Barrage pedestal (1) bottom is provided with antipriming at the bottom of dam (6) with unit Ba Men (2) junction, bottom, bottom unit Ba Men (2), when retaining state and at the bottom of the dam of foundation bottom, antipriming (6) closely cooperates, and improves stability and the sealing of balanced type barrage further.
Described front-end bearing pedestal (8) and rear bearing block (9) adopt Split bearing pedestal, so that installation and repairing.
Described unit Ba Men (2) adopts airfoil unit Ba Men, and namely bottom thickness is thicker, weight is relatively heavier, and top is wing tip shape, and thinner thickness, lighter in weight.
Described integral type bearing (4) and oil cylinder triangularity shape are arranged, to strengthen its intensity.
More than 2 identical unit Ba Men (2) are set according to barrage width and are assembled into overall barrage.
The beneficial effects of the utility model are: it passes through barrage unit dam door pivot Horizontal offset in appropriate location, the back side, unit Ba Men inclination certain angle is arranged on two integral type bearings, each integral type bearing there are two groups of Split bearing pedestals being convenient to installation and repairing, front-end bearing pedestal dress unit Ba Men, rear bearing block fills hydraulic jack, and at the bottom of lower dam, antipriming is arranged on the structure on barrage pedestal.When maximum retaining state, rotating torque that water pressure the produces balance that shaft axis horizontal plane is upper and lower, the rotating torque that shaft axis vertical plane both sides are produced by unit Ba Men deadweight also balances, and now opening and closing required moment by hydraulic jack to unit Ba Men is zero substantially.Maximum keying moment is opened when retaining highly equals axis height, and unlatching moment is now only about 5% of other form unit of same specification Ba Men.In order to allow barrage in normal retaining state without the need to hydraulic work system, get anticlockwise rotating torque during design slightly larger than clockwise rotating torque, namely actual axis is offset to the appropriate location above of equilbrium position.Because required driving is minimum, can adopt flexibly various driving force even manpower Ba Men is opened and closed, the design uses the low power hydraulic system of low pressure.
It has following features:
One is obvious energy conservation.When designing axis height a little more than the equilibrium valve calculated, balanced type hydraulic pressure barrage can unpowered reliable retaining.When designing axis height and being assorted lower than the balance calculated, balanced type hydraulic pressure barrage can when retaining highly exceedes certain water level unpowered automatic draining.Only need supporting small-sized low-pressure hydraulic system.
Two is that retaining is safe and reliable with the flood discharge duty that discharges water.Airfoil unit Ba Men and integral type bearing and oil cylinder triangularity arrange that intensity is good, combine closely again, further increase stability and the sealing of balanced type barrage bottom unit dam door when retaining state with antipriming at the bottom of foundation bottom dam.During the flood discharge state that discharges water, unit Ba Men forms flood discharge passage simultaneously up and down, serves sand washing top, bottom excretion floating thing effect.
Three is that long service life and installation and maintenance are simple.Due to unit Ba Men only change retaining with discharge water duty time need driving force in short-term, and hydraulic system pressure is lower than 1.6MPa, weares and teares extremely low.
Four is that construction investment is low.Because the surface of base installed does not need the step required by bottom-shaft type barrage and the deep-hole slot needed for hydraulic jack work, civilwork engineering quantity can reduce by more than 20%.
The view dam that its retaining be applicable in hydraulic engineering also can be used as in scenic spot uses.
Accompanying drawing explanation
Fig. 1 is block construction schematic diagram of the present utility model.
Fig. 2 be Fig. 1 face structural representation.
Fig. 3 is the A-A sectional structure schematic diagram of Fig. 2.
Fig. 4 is the plan structure schematic diagram of Fig. 1.
In figure: antipriming (6), rotating shaft (7), front-end bearing pedestal (8), rear bearing block (9), hinged-support (21) at the bottom of barrage pedestal (1), unit Ba Men (2), side antipriming (3), integral type bearing (4), hydraulic jack (5), dam, axis horizontal line A, normal water bit line B, axes normal line C.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further details.
Embodiment 1, the utility model comprises antipriming (6) at the bottom of barrage pedestal (1), unit Ba Men (2), side antipriming (3), integral type bearing (4), hydraulic jack (5), dam; Barrage pedestal (1) adopts " " shape structure, unit Ba Men (2) is arranged in barrage pedestal (1) in oblique angle; Described integral type bearing (4) is provided with front-end bearing pedestal (8) and rear bearing block (9), integral type bearing (4) secure fit is arranged on the bottom in barrage pedestal (1).
The back of unit Ba Men (2) is provided with hinged-support (21), hinged-support (21) is arranged at stringcourse bottom in the level being in unit Ba Men (2), be arranged on rotating shaft (7) on front-end bearing pedestal (8) also in being horizontally disposed with and being in stringcourse position on the lower side in the level of unit Ba Men (2), when making retaining be in the water level B line of normal retaining, the rotating torque that hydraulic pressure produces that the axis horizontal face of rotating shaft (7) is upper and lower balances, shaft axis vertical plane both sides by unit dam door 2 conduct oneself with dignity produce rotating torque keep balance, make to open and close required moment by hydraulic jack to unit Ba Men (2) be greater than zero and be close to zero, time below the water level B line position that retaining is in normal retaining, the rotating torque that hydraulic pressure produces that the axis horizontal face of rotating shaft (7) is upper and lower is comparatively large, and unit Ba Men (2) is in closed condition all the time under non-power state, so that normal retaining.
Each rotating shaft (7) is each passed through corresponding hinged-support (21) engagement sleeves and is contained on corresponding front-end bearing pedestal (8), and unit Ba Men (2) can be rotated around front-end bearing pedestal (8); Be in discharge water flood discharge state time, after unit Ba Men (2) opens, form flood discharge passage up and down, thus realize bottom sand washing, top excretion floating thing function.
The bottom one-tenth activity cooperation of hydraulic jack (5) is arranged on rear bearing block (9), and expansion link outer end and unit Ba Men (2) back of hydraulic jack (5) are hinged.
It passes through barrage unit dam door 2 rotating shaft Horizontal offset in appropriate location, the back side, unit dam door 2 certain angle that tilts is arranged on two integral type bearings 4, each integral type bearing 4 there are two groups of Split bearing pedestals being convenient to installation and repairing, front-end bearing pedestal dress (8) unit dam door 2, (9) fill hydraulic jack to rear bearing block, and at the bottom of lower dam, antipriming (6) is arranged on the structure on barrage pedestal (1).Operating principle: during maximum retaining state, rotating torque that water pressure the produces balance that shaft axis horizontal plane is upper and lower, shaft axis vertical plane both sides by unit dam door 2 conduct oneself with dignity produce rotating torque also balance, now opening and closing required moment by hydraulic jack to unit dam door 2 is zero substantially.Maximum keying moment is opened when retaining highly equals axis height, and unlatching moment is now only about 5% of other form unit dam door 2 of same specification.In order to allow barrage in normal retaining state without the need to hydraulic work system, get anticlockwise rotating torque during design slightly larger than clockwise rotating torque, namely actual axis is offset to the appropriate location above of equilbrium position.Because required driving is minimum, can adopt flexibly various driving force even manpower Ba Men is opened and closed, the design uses the low power hydraulic system of low pressure.
Its energy-saving effect is remarkable.When designing axis height a little more than the equilibrium valve calculated, balanced type hydraulic pressure barrage can unpowered reliable retaining.When designing axis height and being assorted lower than the balance calculated, balanced type hydraulic pressure barrage can when retaining highly exceedes certain water level unpowered automatic draining.Only need supporting small-sized low-pressure hydraulic system.
Its retaining is safe and reliable with the flood discharge duty that discharges water.With integral type bearing (4) and oil cylinder triangularity, airfoil unit Ba Men (2) arranges that intensity is good, unit Ba Men (2) combines closely with antipriming (6) at the bottom of foundation bottom dam again when retaining state bottom, further increases stability and the sealing of balanced type barrage.During the flood discharge state that discharges water.Unit dam door 2 forms flood discharge passage simultaneously up and down, serves sand washing top, bottom excretion floating thing effect.
Its long service life and installation and maintenance simple.Due to unit dam door 2 only change retaining with discharge water duty time need driving force in short-term, and hydraulic system pressure is lower than 1.6MPa, weares and teares extremely low.4, construction investment is low.Because the surface of base installed does not need the step required by bottom-shaft type barrage and the deep-hole slot needed for hydraulic jack work, civilwork engineering quantity can reduce by more than 20%.
Width due to a movable barrage is generally tens meters of supreme kms, in order to manufacture the convenience of transporting and installing, by multiple identical cell gate body composition in design, therefore only providing it and filling a unit dam door barrage view.
The view dam that its retaining be applicable in hydraulic engineering also can be used as in scenic spot uses.
The three large problems round current bottom-shaft type hydraulic pressure barrage exists: one is that energy consumption is high, open and close and need powerful driving force, retaining state wants the work of maintenance medium pressing system always, there is serious safety and environment pollution hidden trouble.Two is that construction investment is high, and difficulty of construction is large, the dam foundation has step and numerous deep-hole slots.Three is of non-ideal use, does not have the effect of sand washing when discharging water.
Balanced type hydraulic pressure barrage adopts rotating shaft to be biased, the structure that Ba Men tilts, rationally determines can realize the balance of each opplied moment in the position that rotating shaft is biased, reach Ba Men driving moment in opening-closing process minimum, or wherein a kind of object without the need to dynamically working of selected retaining and the two states that discharges water.Consult Fig. 1 to Fig. 4.
Embodiment 2, the utility model also can be respectively arranged with the side antipriming (3) coordinated with it in the both sides of barrage pedestal (1).Or on barrage pedestal (1) bottom, unit Ba Men (2) junction, bottom is provided with antipriming at the bottom of dam (6), bottom unit Ba Men (2), when retaining state and at the bottom of the dam of foundation bottom, antipriming (6) closely cooperates, and improves stability and the sealing of balanced type barrage further.Consult Fig. 1 to Fig. 4, all the other are with embodiment 1.
Embodiment 3, front-end bearing pedestal described in the utility model (8) and rear bearing block (9) adopt Split bearing pedestal, so that installation and repairing.Consult Fig. 1 to Fig. 4, all the other same above-described embodiments.
Embodiment 4, unit Ba Men (2) described in the utility model adopts airfoil unit Ba Men, and namely bottom thickness is thicker, weight is relatively heavier, and top is wing tip shape, and thinner thickness, lighter in weight.Consult Fig. 1 to Fig. 4, all the other same above-described embodiments.
Embodiment 5, integral type bearing (4) described in the utility model and oil cylinder triangularity shape are arranged, to strengthen its intensity.Consult Fig. 1 to Fig. 4, all the other same above-described embodiments.
Embodiment 6, the utility model can arrange more than 2 identical unit Ba Men (2) according to barrage width and be assembled into overall barrage.Consult Fig. 1 to Fig. 4, all the other same above-described embodiments.

Claims (7)

1. a balanced type hydraulic pressure barrage, is characterized in that: it comprises antipriming (6) at the bottom of barrage pedestal (1), unit Ba Men (2), side antipriming (3), integral type bearing (4), hydraulic jack (5), dam, barrage pedestal (1) adopts " " shape structure, unit Ba Men (2) is arranged in barrage pedestal (1) in oblique angle, described integral type bearing (4) is provided with front-end bearing pedestal (8) and rear bearing block (9), integral type bearing (4) secure fit is arranged on the bottom in barrage pedestal (1), the back of unit Ba Men (2) is provided with hinged-support (21), hinged-support (21) is arranged at stringcourse bottom in the level being in unit Ba Men (2), be arranged on rotating shaft (7) on front-end bearing pedestal (8) also in being horizontally disposed with and being in stringcourse position on the lower side in the level of unit Ba Men (2), when making retaining be in the water level B line of normal retaining, the rotating torque that hydraulic pressure produces that the axis horizontal face of rotating shaft (7) is upper and lower balances, shaft axis vertical plane both sides by unit dam door 2 conduct oneself with dignity produce rotating torque keep balance, make to open and close required moment by hydraulic jack to unit Ba Men (2) be greater than zero and be close to zero, time below the water level B line position that retaining is in normal retaining, the rotating torque that hydraulic pressure produces that the axis horizontal face of rotating shaft (7) is upper and lower is comparatively large, and unit Ba Men (2) is in closed condition all the time under non-power state, so that normal retaining, each rotating shaft (7) is each passed through corresponding hinged-support (21) engagement sleeves and is contained on corresponding front-end bearing pedestal (8), and unit Ba Men (2) can be rotated around front-end bearing pedestal (8), be in discharge water flood discharge state time, after unit Ba Men (2) opens, form flood discharge passage up and down, thus realize bottom sand washing, top excretion floating thing function, the bottom one-tenth activity cooperation of hydraulic jack (5) is arranged on rear bearing block (9), and expansion link outer end and unit Ba Men (2) back of hydraulic jack (5) are hinged.
2. balanced type hydraulic pressure barrage according to claim 1, is characterized in that: be respectively arranged with the side antipriming (3) coordinated with it in the both sides of barrage pedestal (1).
3. balanced type hydraulic pressure barrage according to claim 1, it is characterized in that: on barrage pedestal (1) bottom, unit Ba Men (2) junction, bottom is provided with antipriming at the bottom of dam (6), bottom unit Ba Men (2), when retaining state and at the bottom of the dam of foundation bottom, antipriming (6) closely cooperates, and improves stability and the sealing of balanced type barrage further.
4. balanced type hydraulic pressure barrage according to claim 1, is characterized in that: described front-end bearing pedestal (8) and rear bearing block (9) adopt Split bearing pedestal, so that installation and repairing.
5. balanced type hydraulic pressure barrage according to claim 1, is characterized in that: described unit Ba Men (2) adopts airfoil unit Ba Men, and namely bottom thickness is thicker, weight is relatively heavier, and top is wing tip shape, and thinner thickness, lighter in weight.
6. balanced type hydraulic pressure barrage according to claim 1, is characterized in that: described integral type bearing (4) and oil cylinder triangularity shape are arranged, to strengthen its intensity.
7. balanced type hydraulic pressure barrage according to claim 1, is characterized in that: arrange more than 2 identical unit Ba Men (2) according to barrage width and be assembled into overall barrage.
CN201520638514.XU 2015-08-24 2015-08-24 Balanced type hydraulic pressure dam Active CN205035772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520638514.XU CN205035772U (en) 2015-08-24 2015-08-24 Balanced type hydraulic pressure dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520638514.XU CN205035772U (en) 2015-08-24 2015-08-24 Balanced type hydraulic pressure dam

Publications (1)

Publication Number Publication Date
CN205035772U true CN205035772U (en) 2016-02-17

Family

ID=55294684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520638514.XU Active CN205035772U (en) 2015-08-24 2015-08-24 Balanced type hydraulic pressure dam

Country Status (1)

Country Link
CN (1) CN205035772U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133552A (en) * 2015-08-24 2015-12-09 湖南力威液压设备有限公司 Balance type hydraulic barrage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133552A (en) * 2015-08-24 2015-12-09 湖南力威液压设备有限公司 Balance type hydraulic barrage

Similar Documents

Publication Publication Date Title
CN105133552A (en) Balance type hydraulic barrage
CN102095004B (en) Large-sized hydraulic speed change floating box flap valve
CN108442338A (en) The arrangement of Hydropower Station Underground formula workshop machine set outlet gate
CN103031824A (en) Hydraulic horizontal dam
CN205035772U (en) Balanced type hydraulic pressure dam
CN204940217U (en) A kind of ultra-large type plane splits arc triangle gate
CN203755254U (en) Horizontal sliding flood gate
CN203498804U (en) Low-weir high-gate pneumatic landscape gate structure
CN202347502U (en) Trunnion lodging type gate
CN201459687U (en) Water lock of underwater falling gate
CN201459686U (en) Hydraulic up-turning type gate
CN201245832Y (en) Side self-operated sluice
CN202298571U (en) Hydraulic horizontal dam
CN110258465B (en) Planar gate system
CN202989895U (en) Mountain ship lock
CN213571809U (en) Diversion tunnel inlet tower frame bypass structure for ecological drainage
CN2751071Y (en) Multi-support-hinge type arc gate with deep hole
CN204676691U (en) C type Hydro-automatic gate
CN203514271U (en) Middle-hinged upturning steel gate
CN104775403B (en) A kind of pilot-operated type Hydro-automatic gate structure
CN208056018U (en) The arrangement of Hydropower Station Underground formula workshop machine set outlet gate
CN206971183U (en) More than 200 meters superelevation dam reservoir emptying tunnel structures
CN207405584U (en) A kind of checkdam for hydraulic and hydroelectric engineering
CN208201804U (en) A kind of hydraulic engineering gate
CN206143736U (en) Novel rise horizontal sluice

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Balance type hydraulic barrage

Effective date of registration: 20180719

Granted publication date: 20160217

Pledgee: Xiangtan enterprise financing Company limited by guarantee

Pledgor: HUNAN LIWEI HYDRAULIC EQUIPMENT Co.,Ltd.

Registration number: 2018430000045

PE01 Entry into force of the registration of the contract for pledge of patent right
CP03 Change of name, title or address

Address after: 411228 south of parrot Road, east of Hehua Road, Yisuhe Town, Xiangtan County, Xiangtan City, Hunan Province (68 parrot Road, tianyijingkai District)

Patentee after: Hunan Liwei Hydraulic Equipment Co.,Ltd.

Address before: 411228, Hunan County, Hunan Province, Xiangtan County, 428 Xiangtan Begonia Road, hydraulic equipment Co., Ltd.

Patentee before: HUNAN LIWEI HYDRAULIC EQUIPMENT Co.,Ltd.

CP03 Change of name, title or address
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200813

Granted publication date: 20160217

Pledgee: Xiangtan enterprise financing Company limited by guarantee

Pledgor: HUNAN LIWEI HYDRAULIC EQUIPMENT Co.,Ltd.

Registration number: 2018430000045

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Balanced hydraulic barrage

Effective date of registration: 20200904

Granted publication date: 20160217

Pledgee: Xiangtan small and medium sized micro Financing Guarantee Co.,Ltd.

Pledgor: Hunan Liwei Hydraulic Equipment Co.,Ltd.

Registration number: Y2020980005700

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230720

Granted publication date: 20160217

Pledgee: Xiangtan small and medium sized micro Financing Guarantee Co.,Ltd.

Pledgor: Hunan Liwei Hydraulic Equipment Co.,Ltd.

Registration number: Y2020980005700

PC01 Cancellation of the registration of the contract for pledge of patent right