CN205012638U CN201520716082.XU CN201520716082U CN205012638U CN 205012638 U CN205012638 U CN 205012638U CN 201520716082 U CN201520716082 U CN 201520716082U CN 205012638 U CN205012638 U CN 205012638U
Authority
CN
China
Prior art keywords
chuck
chuck part
scaffold
chuck spare
spare
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520716082.XU
Other languages
Chinese (zh)
Inventor
梁浩愉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520716082.XU priority Critical patent/CN205012638U/en
Application granted granted Critical
Publication of CN205012638U publication Critical patent/CN205012638U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a scaffold chuck, including first chuck spare, second chuck spare, third chuck spare and fourth chuck spare, first chuck spare, second chuck spare, third chuck spare and fourth chuck spare order connection in proper order enclose into the cavity, and kneck each other is provided with the welding position and gives welded connection, the side of first chuck spare, second chuck spare, third chuck spare and fourth chuck spare all is provided with the fixed connection hole to wearing, first chuck spare, second chuck spare, third chuck spare and fourth chuck spare bottom all are provided with the U shaped frame body, and the U shaped frame body left and right sides all is connected with arc -shaped fixing plate. The utility model discloses a device can improve the scaffold chuck result of use effectively, and convenient adjustment as required selects different chucks to fix the scaffold, makes things convenient for the scaffold that fixed connection is different, and convenient to use has improved the result of use.

Description

A kind of scaffold chuck
Technical field
The utility model belongs to Construction Formwork & Scaffold Technology field, is specifically related to a kind of scaffold chuck.
Background technology
At present, in the use in building operations steel pipe support field, often need to use diversified scaffold, during these scaffolds use, need to realize between vertical rod with cross bar being connected, major part adopts the following two kinds structure, and 1) tube and couple scaffold: 2) splicing type dish button steel pipe support, these two kinds of structures, can arrange the upper uses such as grid are set up, shuttering supporting outside.Scaffold is the requisite operation facility of building trade, and along with the progress of science and technology, the development of society, in building trade, increasing people uses sheath buckle type scaffold to carry out operation, and sheath buckle type scaffold is mutually set up by cross bar and vertical rod and formed.General chuck in use, cannot meet instructions for use, to this, needs to adopt suitable mode to be improved.
Summary of the invention
The purpose of this utility model is to provide a kind of scaffold chuck, to improve chuck result of use better, convenient better for being connected and fixed between scaffold, easy to use, can be used as required.
To achieve these goals, the technical solution of the utility model is as follows.
A kind of scaffold chuck, comprise the first chuck part, the second chuck part, the 3rd chuck part and the 4th chuck part, first chuck part, the second chuck part, the 3rd chuck part and the 4th chuck part are linked in sequence successively and surround cavity, and interface is each other provided with welding position and is welded to connect; First chuck part, the second chuck part, the 3rd chuck part and the side of the 4th chuck part are provided with and are throughly fixedly connected with hole; Be provided with U-shaped framework bottom first chuck part, the second chuck part, the 3rd chuck part and the 4th chuck part, the U-shaped framework left and right sides is all connected with arc fixed plate.
Further, be provided with arc angling bottom U-shaped framework, inner framework size as required distance is 1 ~ 5 centimetre.
Further, arc fixed plate lateral surface is arranged to arcwall face, and its radian is 20 ~ 35 degree.
Further, arc fixed plate end face and U-shaped framework end face Nature Link are formed, and its junction forms 20 ~ 35 degree of radians.
Further, be fixedly connected with hole and be oppositely arranged in each chuck part, in the same size, be on sustained height face.
Further, the radian face on arc fixed plate and junction radian cooperatively interact nature transition.
In this device, utilize the first chuck part, the second chuck part, the 3rd chuck part and the 4th chuck part to be linked in sequence successively and surround cavity, scaffold upright rod or cross bar are put into cavity, the chuck part of suitable requirement is selected according to vertical rod or cross bar diameter, then welding manner is utilized to be welded and fixed at welding position place, thus the first chuck part, the second chuck part, the 3rd chuck part and the 4th chuck part are linked in sequence successively, form fastening cavity and give fixing feet hand cradle, conveniently use as required.The radian of the radian on the arc fixed plate in the first chuck part, the second chuck part, the 3rd chuck part and the 4th chuck part and junction is arranged has specific function, and these two gradients match and can increase holding capacity, improve scaffold result of use.
The beneficial effect of this utility model is: this utility model device can effectively improve scaffold chuck result of use, convenient adjustment as required selects different chucks to give fixing feet hand cradle, conveniently be fixedly connected with different scaffolds, easy to use, improve result of use.
Accompanying drawing explanation
Fig. 1 is institute's application apparatus perspective view in the utility model embodiment.
Fig. 2 is institute's application apparatus plan structure schematic diagram in the utility model embodiment.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described, better to understand the utility model.
Scaffold chuck as shown in Figure 1 and Figure 2, comprise the first chuck part 1, second chuck part 2, the 3rd chuck part 3 and the 4th chuck part 5, first chuck part 1, second chuck part 2, the 3rd chuck part 3 and the 4th chuck part 5 are linked in sequence successively and surround cavity, and interface is each other provided with welding position 6 and is welded to connect; First chuck part 1, second chuck part 2, the 3rd chuck part 3 and the side of the 4th chuck part 5 are provided with and are throughly fixedly connected with hole 4; Be provided with U-shaped framework bottom first chuck part 1, second chuck part 2, the 3rd chuck part 3 and the 4th chuck part 5, the U-shaped framework left and right sides is all connected with arc fixed plate.Be provided with arc angling bottom U-shaped framework, inner framework size as required distance is 1 ~ 5 centimetre.Arc fixed plate lateral surface is arranged to arcwall face, and its radian is 20 ~ 35 degree.Arc fixed plate end face and U-shaped framework end face Nature Link are formed, and its junction forms 20 ~ 35 degree of radians.Be fixedly connected with hole 4 to be oppositely arranged in each chuck part, in the same size, be on sustained height face.
When this device is specifically implemented, utilize the first chuck part 1, second chuck part 2, the 3rd chuck part 3 and the 4th chuck part 5 to be linked in sequence successively and surround cavity, scaffold upright rod or cross bar are put into cavity, the chuck part of suitable requirement is selected according to vertical rod or cross bar diameter, then welding manner is utilized to be welded and fixed at welding position 6 place, thus the first chuck part 1, second chuck part 2, the 3rd chuck part 3 and the 4th chuck part 5 are linked in sequence successively, form fastening cavity and give fixing feet hand cradle, conveniently use as required.The radian of the radian on the arc fixed plate in the first chuck part 1, second chuck part 2, the 3rd chuck part 3 and the 4th chuck part 5 and junction is arranged has specific function, and these two gradients match and can increase holding capacity, improve scaffold result of use.
The above is preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications are also considered as protection domain of the present utility model.

Claims (6)

1. a scaffold chuck, it is characterized in that: comprise the first chuck part, the second chuck part, the 3rd chuck part and the 4th chuck part, described first chuck part, the second chuck part, the 3rd chuck part and the 4th chuck part are linked in sequence successively and surround cavity, and interface is each other provided with welding position and is welded to connect; Described first chuck part, the second chuck part, the 3rd chuck part and the side of the 4th chuck part are provided with and are throughly fixedly connected with hole; Be provided with U-shaped framework bottom described first chuck part, the second chuck part, the 3rd chuck part and the 4th chuck part, the described U-shaped framework left and right sides is all connected with arc fixed plate.
2. scaffold chuck according to claim 1, is characterized in that: be provided with arc angling bottom described U-shaped framework, and inner framework size as required distance is 1 ~ 5 centimetre.
3. scaffold chuck according to claim 1, is characterized in that: described arc fixed plate lateral surface is arranged to arcwall face, and its radian is 20 ~ 35 degree.
4. scaffold chuck according to claim 1, is characterized in that: described arc fixed plate end face and U-shaped framework end face Nature Link are formed, and its junction forms 20 ~ 35 degree of radians.
5. scaffold chuck according to claim 1, is characterized in that: described in be fixedly connected with hole and be oppositely arranged in each chuck part, in the same size, be on sustained height face.
6. the scaffold chuck according to claim 3 or 4, is characterized in that: the radian face on described arc fixed plate and junction radian cooperatively interact nature transition.
CN201520716082.XU 2015-09-16 2015-09-16 Scaffold chuck Expired - Fee Related CN205012638U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520716082.XU CN205012638U (en) 2015-09-16 2015-09-16 Scaffold chuck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520716082.XU CN205012638U (en) 2015-09-16 2015-09-16 Scaffold chuck

Publications (1)

Publication Number Publication Date
CN205012638U true CN205012638U (en) 2016-02-03

Family

ID=55211249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520716082.XU Expired - Fee Related CN205012638U (en) 2015-09-16 2015-09-16 Scaffold chuck

Country Status (1)

Country Link
CN (1) CN205012638U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761550A (en) * 2019-10-31 2020-02-07 上海森大机械制造有限公司 Flat socket support, scaffold and flat socket support machining process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761550A (en) * 2019-10-31 2020-02-07 上海森大机械制造有限公司 Flat socket support, scaffold and flat socket support machining process

Similar Documents

Publication Publication Date Title
CN203701544U (en) Overturn-preventing scaffold
CN203702207U (en) Tunnel construction support device
CN205012638U (en) Scaffold chuck
CN208563944U (en) Double hose builder's jack structure
CN207469717U (en) A kind of architectural engineering scaffold bracing means
CN206299128U (en) A kind of casting system for avoiding concrete disintegration
CN202347829U (en) Mobile steel bar binding hanging bench
CN206385794U (en) Wall connecting piece and connecting system thereof
CN203062760U (en) Assembled steel bar processing platform
CN204895808U (en) L type hangs foot hand support
CN205089028U (en) Weight type four -column communication base station tower
CN203545458U (en) Concrete pipe piece lifting appliance
CN203034455U (en) Hoop component for preventing tubular pile from slipping
CN207419526U (en) A kind of underpass falsework
CN207259973U (en) A kind of wet seam construction Hanging Basket of bridge floor
CN207073320U (en) A kind of interim seat of flagpole
CN206144128U (en) Safe laborsaving pole setting of fixing a position
CN215978368U (en) Single-layer protection frame
CN210907862U (en) Steel bar cutting device for construction engineering construction
CN203626227U (en) Unloading structure of cantilever scaffold
CN209293802U (en) Tunnel construction formwork support
CN208294033U (en) A kind of reinforcing support construction for architectural engineering
CN210563361U (en) Pole setting connecting device based on lifting foot hand rack
CN209904796U (en) Steel construction handling device
CN211846886U (en) Safe firm building construction hoist and mount frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

Termination date: 20170916