CN204965161U - Concrete placement control system - Google Patents

Concrete placement control system Download PDF

Info

Publication number
CN204965161U
CN204965161U CN201520736349.1U CN201520736349U CN204965161U CN 204965161 U CN204965161 U CN 204965161U CN 201520736349 U CN201520736349 U CN 201520736349U CN 204965161 U CN204965161 U CN 204965161U
Authority
CN
China
Prior art keywords
central controller
storer
operation valve
control valve
input end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520736349.1U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU LENGBEIGUAN TECHNOLOGY Co Ltd
Original Assignee
HANGZHOU LENGBEIGUAN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU LENGBEIGUAN TECHNOLOGY Co Ltd filed Critical HANGZHOU LENGBEIGUAN TECHNOLOGY Co Ltd
Priority to CN201520736349.1U priority Critical patent/CN204965161U/en
Application granted granted Critical
Publication of CN204965161U publication Critical patent/CN204965161U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

The utility model discloses a concrete placement control system, including data acquisition monitoring unit, data preprocessing and memory, central controller, watering device, the speed control valve of unloading, admixture control valve, alarm, high in the clouds server. This system can be to the temperature of concrete construction within range, humidity, the wind speed, the stress and strain isoparametric detects, through the various equipment of central controller control, the system can be according to environmental change and atress condition automatically regulated watering device, speed control valve and the admixture control valve of unloading makes concrete placement reach the good result, when the defect takes place for concrete placement, the system can automatic alarm, thereby improve managerial efficiency, remote control function still has, high detecting precision and stable and reliable system, the maintenance management is convenient.

Description

A kind of concreting control system
Technical field
The utility model relates to a kind of control system, particularly a kind of concreting control system.
Background technology
Current concreting adopts manually operated method mostly, and does not note the impact of environmental change, concrete curing weak effect, and construction quality is often difficult to control, and causes engineering safety hidden danger, too increases artificial and handling cost.Therefore a kind of concreting control system is reliably needed badly.
Summary of the invention
The purpose of this utility model is just to provide a kind of reasonable in design, intelligentized control method, a kind of concreting control system of use safety.
To achieve these goals, the technical solution adopted in the utility model is: a kind of concreting control system of the present utility model, comprises data acquisition and monitoring unit, data pre-processing and storer, central controller, watering device, discharge rate operation valve, additive operation valve, alarm, cloud server; Data acquisition and monitoring unit comprises temperature sensor, humidity sensor, air velocity transducer, environmental monitor, strain gauge, strain transducer, load-bearing monitor device, high-definition camera, defect inspection device; Data acquisition and monitoring unit is connected with data pre-processing and storer, data pre-processing and storer are connected with central controller input end, and central controller output terminal is connected with watering device, discharge rate operation valve, additive operation valve, alarm, cloud server respectively; Temperature sensor, humidity sensor, air velocity transducer are connected with environmental monitor input end; Strain gauge, strain transducer are connected with load-bearing monitor device input end, and high-definition camera is connected with defect inspection device input end.
As preferably, described data pre-processing and storer and central controller all have 10 input ports, 10 output ports, easily extensible to 50 input port, 50 output ports, can carry out centralized control to multiple concrete construction place.
Compared with prior art, the utility model has the advantage of: this system can detect parameters such as the temperature within the scope of concrete construction, humidity, wind speed, ess-strains, by the various equipment of central controller controls, system environmentally can change and automatically regulates watering device, discharge rate operation valve and additive operation valve to make concreting reach good result with stressing conditions, when concreting generation defect, system meeting automatic alarm, thus the raising efficiency of management, also there is remote control function, system stability is reliable, and maintenance management is convenient.
Accompanying drawing explanation
Fig. 1 is structured flowchart of the present utility model.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
See Fig. 1, a kind of concreting control system of the present utility model, comprises data acquisition and monitoring unit, data pre-processing and storer, central controller, watering device, discharge rate operation valve, additive operation valve, alarm, cloud server; Data acquisition and monitoring unit comprises temperature sensor, humidity sensor, air velocity transducer, environmental monitor, strain gauge, strain transducer, load-bearing monitor device, high-definition camera, defect inspection device; Data acquisition and monitoring unit is connected with data pre-processing and storer, data pre-processing and storer are connected with central controller input end, and central controller output terminal is connected with watering device, discharge rate operation valve, additive operation valve, alarm, cloud server respectively; Temperature sensor, humidity sensor, air velocity transducer are connected with environmental monitor input end; Strain gauge, strain transducer are connected with load-bearing monitor device input end, and high-definition camera is connected with defect inspection device input end.Described data pre-processing and storer and central controller all have 10 input ports, 10 output ports, easily extensible to 50 input port, 50 output ports, can carry out centralized control to multiple concrete construction place.
In the present embodiment, environmental monitor can temperature, humidity, the wind speed parameter in Real-time Collection concrete construction place, and when parameter exceeds setting range, central controller can drive watering device to sprinkle water maintenance; The ess-strain parameter of load-bearing monitor device Real-time Collection key position, when parameter exceeds setting range, central controller can drive discharge rate operation valve to regulate concreting speed, and drives additive operation valve to add water reducer, retardant and pumping admixture, improves concrete pouring quality; Defect inspection device monitors concrete defect by high-definition camera, when recognizing defect (as honeycomb, dew muscle, pitted skin, hole), there are quality problems in concrete, central controller can drive alarm equipment alarm, and defect picture is preserved automatically, upload to cloud server.System manager can also by the distance control mode adjustment optimum configurations of cloud server, and optimization system controls, efficiently more convenient.

Claims (2)

1. a concreting control system, is characterized in that: comprise data acquisition and monitoring unit, data pre-processing and storer, central controller, watering device, discharge rate operation valve, additive operation valve, alarm, cloud server; Data acquisition and monitoring unit comprises temperature sensor, humidity sensor, air velocity transducer, environmental monitor, strain gauge, strain transducer, load-bearing monitor device, high-definition camera, defect inspection device; Data acquisition and monitoring unit is connected with data pre-processing and storer, data pre-processing and storer are connected with central controller input end, and central controller output terminal is connected with watering device, discharge rate operation valve, additive operation valve, alarm, cloud server respectively; Temperature sensor, humidity sensor, air velocity transducer are connected with environmental monitor input end; Strain gauge, strain transducer are connected with load-bearing monitor device input end, and high-definition camera is connected with defect inspection device input end.
2. a kind of concreting control system according to claim 1, it is characterized in that: described data pre-processing and storer and central controller all have 10 input ports, 10 output ports, easily extensible to 50 input port, 50 output ports, can carry out centralized control to multiple concrete construction place.
CN201520736349.1U 2015-09-22 2015-09-22 Concrete placement control system Expired - Fee Related CN204965161U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520736349.1U CN204965161U (en) 2015-09-22 2015-09-22 Concrete placement control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520736349.1U CN204965161U (en) 2015-09-22 2015-09-22 Concrete placement control system

Publications (1)

Publication Number Publication Date
CN204965161U true CN204965161U (en) 2016-01-13

Family

ID=55060215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520736349.1U Expired - Fee Related CN204965161U (en) 2015-09-22 2015-09-22 Concrete placement control system

Country Status (1)

Country Link
CN (1) CN204965161U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108121225A (en) * 2017-11-27 2018-06-05 中铁十二局集团有限公司 Concrete continuous beam cantilever casting control system and control method
CN108277724A (en) * 2018-04-27 2018-07-13 中铁隧道局集团有限公司 A kind of pavement concrete automatic pouring control system
CN108818882A (en) * 2018-03-06 2018-11-16 华侨大学 A kind of concrete intelligent aggregate and preparation method thereof
CN109557288A (en) * 2018-11-27 2019-04-02 山西大学 The concrete test block carbonization case remotely controlled
CN109594781A (en) * 2018-12-12 2019-04-09 湖南易兴建筑有限公司 Running gate system
CN109610324A (en) * 2018-12-07 2019-04-12 江西集银科技有限公司 A kind of bridge hanging basket Deck curing facility and control method
CN109949289A (en) * 2019-03-18 2019-06-28 四川轻化工大学 A kind of concrete surface defect image identifying system and method based on artificial intelligence
CN111119314A (en) * 2020-02-28 2020-05-08 北京鼎吉建筑工程有限公司 Full-automatic centrifugal mortar rotary spraying pouring equipment

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108121225A (en) * 2017-11-27 2018-06-05 中铁十二局集团有限公司 Concrete continuous beam cantilever casting control system and control method
CN108121225B (en) * 2017-11-27 2019-09-06 中铁十二局集团有限公司 Concrete continuous beam cantilever casting control system and control method
CN108818882A (en) * 2018-03-06 2018-11-16 华侨大学 A kind of concrete intelligent aggregate and preparation method thereof
CN108277724A (en) * 2018-04-27 2018-07-13 中铁隧道局集团有限公司 A kind of pavement concrete automatic pouring control system
CN109557288A (en) * 2018-11-27 2019-04-02 山西大学 The concrete test block carbonization case remotely controlled
CN109610324A (en) * 2018-12-07 2019-04-12 江西集银科技有限公司 A kind of bridge hanging basket Deck curing facility and control method
CN109594781A (en) * 2018-12-12 2019-04-09 湖南易兴建筑有限公司 Running gate system
CN109594781B (en) * 2018-12-12 2021-10-29 湖南易兴建筑有限公司 Pouring system
CN109949289A (en) * 2019-03-18 2019-06-28 四川轻化工大学 A kind of concrete surface defect image identifying system and method based on artificial intelligence
CN111119314A (en) * 2020-02-28 2020-05-08 北京鼎吉建筑工程有限公司 Full-automatic centrifugal mortar rotary spraying pouring equipment

Similar Documents

Publication Publication Date Title
CN204965161U (en) Concrete placement control system
CN205158117U (en) Electric power patrols line unmanned aerial vehicle control system
CN205158178U (en) Electric welding control system
CN102866659B (en) Automatic control system for circulating cooling water
CN103660021B (en) Precast beam automatic spray curing system
CN205139618U (en) Shower room control system
CN103984300A (en) Efficient method for frequency conversion and energy saving of oil pumping unit
CN204883291U (en) Dam control system
CN109377079B (en) Safety monitoring system for electric pole holding construction
CN205148330U (en) Manipulator control system
CN204189003U (en) A kind of wisdom infield management system
CN205062628U (en) Bituminous paving maintenance control system
CN203712846U (en) Automatic prefabricated beam spraying maintenance system
CN103558816A (en) Icing monitoring system of high-voltage transmission lines
CN204115762U (en) Non-negative pressure water-supply installation switch board comprehensive detection device
CN204925823U (en) Wheat dampening control system
CN204945813U (en) Stablize the automatic flow rate adjusting device of negative-pressure pneumatic transmission system air flow rate
CN205068133U (en) Hydrometric cableway control system
CN204492773U (en) Oil pumper wireless control system
CN209197083U (en) A kind of idle call intelligent and energy saving system
CN203405747U (en) Intelligent temperature and humidity controller
CN204956482U (en) Train moisturizing blowdown control system
CN205158087U (en) Eat material sculpture control system
CN203149822U (en) Hotel management monitoring system
CN204965166U (en) Control system is pour to dam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113