CN204958138U - Hoist of handling modularization roof truss - Google Patents
Hoist of handling modularization roof truss Download PDFInfo
- Publication number
- CN204958138U CN204958138U CN201520693415.1U CN201520693415U CN204958138U CN 204958138 U CN204958138 U CN 204958138U CN 201520693415 U CN201520693415 U CN 201520693415U CN 204958138 U CN204958138 U CN 204958138U
- Authority
- CN
- China
- Prior art keywords
- hole
- roof truss
- hanging beam
- suspender
- shaped steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a hoist of handling modularization roof truss, it includes with the lifting hook, hangs ring, wire rope, rings, hanging beam, suspender, U shaped steel area, strengthen through -hole, connect the via hole and connecting bolt and nut, be provided with on modularization lightweight steel construction roof truss and strengthen the corresponding roof truss through -hole of through -hole, the enhancement through -hole passes through strengthening stud with the roof truss through -hole and the nut is connected, U shaped steel area surface is provided with the galvanizing coat, the suspender passes from the clearance between connecting bolt and the strengthening stud, install the spirit level on the hanging beam, be provided with the dead lever of perpendicular to hanging beam on the hanging beam bottom surface, it has the swinging arms to articulate on the dead lever, the utility model provides the intensity of high hoist prevents to warp safe and reliable, easy dismounting is swift, preventing the hoist corrosion, using safe and reliable, the position is adjustable, reasonable stress.
Description
Technical field
The utility model relates to a kind of suspender of handling modularization roof truss, is specifically related to the modularization lifting field, displaying room in a kind of housing construction more than 120 square meters.
Background technology
At present, the aim of displaying room designs more than 120 sq ms is to realize modularization integral disassembly, assembly, realizes the construction of efficient quick special quality.The suspender of current handling modularization roof truss needs specially according to the suspender of the wall surface design different size of different size size, and by thread tapping, suspender is connected with metope, dismounting is inconvenient, suspender needs in strict accordance with drawing simmering and bending, be not suitable for on-the-spot fast and efficient construction, have a strong impact on construction speed.
Utility model content
For the deficiencies in the prior art, technical problem to be solved in the utility model is to provide a kind of compact conformation, reasonable in design, with low cost, rapidly and efficiently and the suspender of safe and reliable handling modularization roof truss.
The technical solution of the utility model is as follows:
The utility model comprises the suspension hook be connected with hoisting crane, what be connected with suspension hook hangs circle, install the steel rope hung on circle, two suspension ring be connected with steel rope two ends respectively, the hanging beam that two ends are bolted with corresponding suspension ring lower end respectively, two suspender belts be connected with both sides, hanging beam lower end respectively, be separately positioned on the U-shaped steel band of two suspender belt lower ends, be arranged on the reinforcement through hole of U-shaped steel band two side elevation bottom, be arranged on the connecting through hole on U-shaped steel band two side elevation top and the tie bolt be installed on connecting through hole and nut, modularization lightweight steel construction roof truss is provided with the roof truss through hole corresponding with strengthening through hole, and described reinforcement through hole is connected by strengthening stud and nut with roof truss through hole, described U-shaped steel strip surface is provided with zinc coating, and described suspender belt passes from the gap between tie bolt and strengthening stud, described hanging beam is provided with level indicator, described hanging beam bottom surface is provided with the fixed link perpendicular to hanging beam, swing arm is had at fixed link upper end thereof.
The beneficial effects of the utility model are as follows:
The utility model is by being arranged on U-shaped steel band, strengthening stud, and the intensity improving suspender prevents distortion, safe and reliable; By arranging roof truss through hole, easy to process, tie bolt is convenient to disassembly; U-shaped steel strip surface is provided with zinc coating, prevents suspender corrosion, and suspender belt passes from the gap between tie bolt and strengthening stud, prevent the side sharp edge of U-shaped steel band and burr from damaging suspender belt, safe and reliable, during lifting, ensure the steady of handling and safety by level indicator; Further by the stationarity of fixed link and the handling of swing arm Real-Time Monitoring; U-shaped steel band pocket is adopted to hang roof truss, stressed more reasonable, avoid burr to scratch suspender belt, prevent suspender to be out of shape.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the U-shaped steel band of the utility model;
In accompanying drawing: 1, modularization lightweight steel construction roof truss; 2, U-shaped steel band; 3, suspender belt; 4, hanging beam; 5, circle is hung; 6, suspension hook; 7, suspension ring; 8, tie bolt; 9, strengthening stud; 10, roof truss through hole; 11, connecting through hole; 12, through hole is strengthened; 13, steel rope; 14, level indicator; 15, fixed link; 16, swing arm.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and beneficial effect clearly, be described in detail below in conjunction with the drawings and specific embodiments.
As Fig. 1, shown in 2: the utility model comprises the suspension hook 6 be connected with hoisting crane, what be connected with suspension hook 6 hangs circle 5, install the steel rope 13 hung on circle 5, two suspension ring 7 be connected with steel rope 13 two ends respectively, the hanging beam 4 that two ends are bolted with corresponding suspension ring 7 lower end respectively, two suspender belts 3 be connected with both sides, hanging beam 4 lower end respectively, be separately positioned on the U-shaped steel band 2 of two suspender belts 3, be arranged on the reinforcement through hole 12 of U-shaped steel band 2 liang of side elevation bottoms, be arranged on the connecting through hole 11 on U-shaped steel band 2 liang of side elevation tops and the tie bolt 8 be installed on connecting through hole 11 and nut, the intensity that can improve suspender prevents distortion, safe and reliable,
Modularization lightweight steel construction roof truss 1 is provided with the roof truss through hole 10 corresponding with strengthening through hole 12, strengthen through hole 12 to be connected by strengthening stud 9 and nut with roof truss through hole 10, easy to process, also strengthening stud 9 can directly be installed by the gap of roof truss, only need during dismounting nut to be loaded onto from bolt or pulls down, convenient and swift;
U-shaped steel band 2 surface is provided with zinc coating, and prevent suspender corrosion, suspender belt 3 passes from the gap between tie bolt 8 and strengthening stud 9, prevents the side sharp edge of U-shaped steel band 2 and burr from damaging suspender belt 3, safe and reliable.The intensity improving suspender by U-shaped steel band 2 prevents distortion, safe and reliable, and the intensity improving U-shaped steel band 2 further prevents distortion, safe and reliable; Hanging beam 4 is provided with level indicator 14; The steady of lifting and safety is ensured by level indicator 14.
Hanging beam 4 bottom surface is provided with the fixed link 15 perpendicular to hanging beam 4; Swing arm 16 is had at fixed link 15 upper end thereof.During handling, when hanging beam 4 not steadily time, swing arm 16 relies on deadweight vertically sagging and forms an angle with fixed link 15 shape, and Rigger only need observe this angle clearly can judge handling whether safety.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the utility model.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein when not departing from spirit or scope of the present utility model, can realize in other embodiments.Therefore, the utility model can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.
Claims (1)
1. the suspender of a handling modularization roof truss, it is characterized in that: comprise the suspension hook (6) be connected with hoisting crane, hanging of being connected with suspension hook (6) is enclosed (5), install the steel rope (13) hung on circle (5), two suspension ring (7) be connected with steel rope (13) two ends respectively, the hanging beam (4) that two ends are bolted with corresponding suspension ring (7) lower end respectively, two suspender belts (3) be connected with hanging beam (4) both sides, lower end respectively, be separately positioned on the U-shaped steel band (2) of two suspender belt (3) lower ends, be arranged on the reinforcement through hole (12) of U-shaped steel band (2) two side elevation bottom, be arranged on the connecting through hole (11) on U-shaped steel band (2) two side elevation top and the tie bolt (8) be installed on connecting through hole (11) and nut,
Modularization lightweight steel construction roof truss (1) is provided with the roof truss through hole (10) corresponding with strengthening through hole (12), and described reinforcement through hole (12) is connected by strengthening stud (9) and nut with roof truss through hole (10);
Described U-shaped steel band (2) surface is provided with zinc coating, and described suspender belt (3) passes from the gap between tie bolt (8) and strengthening stud (9);
Described hanging beam (4) is provided with level indicator (14);
Described hanging beam (4) bottom surface is provided with the fixed link (15) perpendicular to hanging beam (4); Swing arm (16) is had at fixed link (15) upper end thereof.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520693415.1U CN204958138U (en) | 2015-09-09 | 2015-09-09 | Hoist of handling modularization roof truss |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520693415.1U CN204958138U (en) | 2015-09-09 | 2015-09-09 | Hoist of handling modularization roof truss |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204958138U true CN204958138U (en) | 2016-01-13 |
Family
ID=55053218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520693415.1U Expired - Fee Related CN204958138U (en) | 2015-09-09 | 2015-09-09 | Hoist of handling modularization roof truss |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204958138U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106089329A (en) * | 2016-08-14 | 2016-11-09 | 哈尔滨热电有限责任公司 | A kind of device preventing feed pump turbine dummy piston inner gland body deformability |
-
2015
- 2015-09-09 CN CN201520693415.1U patent/CN204958138U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106089329A (en) * | 2016-08-14 | 2016-11-09 | 哈尔滨热电有限责任公司 | A kind of device preventing feed pump turbine dummy piston inner gland body deformability |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204847764U (en) | Prefabricated component production is with hoist and mount frame | |
CN203699647U (en) | Special lifting appliance for lifting large plates | |
CN204958138U (en) | Hoist of handling modularization roof truss | |
CN204958135U (en) | Hoist of handling modularization wall body | |
CN204958139U (en) | Stabilize handling floor beam's hoist | |
CN103395689A (en) | Horizontal hoisting clamp for wallboard | |
CN203382365U (en) | Lifting appliance system for lifting thin, long and thin-wall equipment integrally | |
CN202808173U (en) | Lifting device special for lateral columns | |
CN202417595U (en) | Sensor lifting device | |
CN202609768U (en) | Special lifting device for crane beam brake plate | |
CN204958144U (en) | Handling modularization floor beam's hoist | |
CN105129604B (en) | Paper roll suspender | |
CN201596610U (en) | Hanger on automatic aluminum hub spraying equipment | |
CN204038851U (en) | A kind of goods carrying vehicle container special hanger | |
CN201228196Y (en) | Special slings for rolling mill working roll | |
CN206569904U (en) | A kind of suspender for lifting steel plate | |
CN110642143A (en) | Gravity type self-discharging lifting hook and use method thereof | |
CN103470057B (en) | A kind of high-altitude component hoisting construction method | |
CN205973449U (en) | Jack -up handling rigging of buffering pulley | |
CN206142665U (en) | Detachable steel structural hoisting fixture | |
CN201907631U (en) | Rudder blade hoisting device | |
CN205045696U (en) | Iron tower lower margin cable suspension device for hot -galvanize | |
CN204689351U (en) | A kind of H profile steel structural elements suspender | |
CN204702399U (en) | A kind of Steel plate hoisting implement | |
CN204416919U (en) | A kind of lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160113 Termination date: 20180909 |